GIVEN DATA :

Length upto RTL = 15 m


Height of RTL from deck top = 0.572 m
Height of Super structure = 2 m
Depth of filling = 0.5 m
LL acting from RTL = 1.525 m
Thickness of bearing + pedestal = 0.3 m
Thickness of pilecap = 1.8 m
Thickness of pier cap = 1.5 m
C/c distance b/n bearings = 1.7 m ( in Longitudinal direction )
C/c distance b/n bearings = 2.6 m ( in Transverse direction )
Unit weight of concrete = 2.5 T/mᵌ
Pier cap top level = 12.128 m
Pile cap top level = -0.5 m
Right span length , L1(span 1) = 31 m ( c/c of exp. Joint )
Left span length , L2(span 2) = 28 m ( c/c of exp. Joint )
Right span length = 26.3 m ( c/c of bearings )
Left span length = 26.3 m ( c/c of bearings )
Radius of Horizontal curve = 0 m
Factor for Effective length = 1.3 ( in Longitudinal direction )
Factor for Effective length = 2.3 ( in Transverse direction )
Clear height of pier = 12.428 m
Equi Dim of pier in longitudnal direction ,hy = 2.426 m
Equi Dim of pier in transverse direction ,hx = 1.488 m
Lex = 16.1564 m
Ley = 28.5844 m
Lex/hy = 6.659687
Ley/hx = 19.20995 > 12 Slender column
Additional minimum eccentricity = 0.02 m
Slenderness factor in Transverse direction = 0.292678
Slenderness factor in Longitudnal direction = 0.060051

DEAD LOAD CALCULATION FOR DIFFERENT SPANS

SEGMENT S1:
Area of Segment = 6.454 m²
Length of Segment = 1.95 m
Volume of Segment = 12.5853 mᵌ
Weight of Sgment = 31.46325 T
CG of Soffit = 1.17 m
Moment of Inertia X 3.316 m⁴
Y 23.201 m⁴
SEGMENT SS2:
Area of Segment = 6.082 m²
Length of Segment = 3 m
Volume of Segment = 18.246 mᵌ
Weight of Sgment = 45.615 T
CG of Soffit = 1.191 m
Moment of Inertia X 3.208 m⁴
Y 22.721 m⁴
SEGMENT SS3:
Area of Segment = 5.304 m²
Length of Segment = 3 m
Volume of Segment = 15.912 mᵌ
Weight of Sgment = 39.78 T
CG of Soffit = 1.248 m
Moment of Inertia X 2.91 m⁴
Y 21.56 m⁴
SEGMENT SS4 AND S5:
Area of Segment = 4.895 m²
Length of Segment = 3 m
Volume of Segment = 14.685 mᵌ
Weight of Sgment = 36.7125 T
CG of Soffit = 1.285 m
Moment of Inertia X 2.72 m⁴
Y 20.88 m⁴

WEIGHT OF 31m SPAN : WEIGHT OF 28m SPAN :


No. of Segments S1 = 2 No. of Segments S1
No. of Segments S2 = 2 No. of Segments S2
No. of Segments S3 = 2 No. of Segments S3
No. of Segments S4 = 5 No. of Segments S4
Total Segment weight = 208.6395 T Total Segment weight

FUTURE PRESTRESSING BLOCK :


BLISTER BLOCK -
Total area = 0.61 m²
Length of Block = 0.756 m
Total weight of 4 Blocks = 4.6116 T

DEVIATER BLOCK -
C/s area = 0.279 m²
Length of Deviator Block = 0.3 m
Total weight of 4 Blocks = 0.837 T

TOTAL WEIGHT OF PRESTRESSING BLOCK = 5.4486 T

END DIAPHRAGM -
Area of Diaphragm = 2.81 m²
Weight of Diaphragm = 8 T

TOTAL DEAD LOAD OF SUPER STRUCTURE


Total Dead Load = Wt. of Super Structure + Future Prestressing Block + Diaphragm
= 398.9228 + 5.4486 + 8
= 412.3714 T
Self wt of superstructure span-1 = 208.6395 T
Self wt of superstructure span-2 = 190.2833 T
CG of Dead load from Soffit = 1.236 m
Longitudinal Moment = 15.60281 T-m

SUPER IMPOSED DEAD LOAD 1 :


Intensity of Superimposed load = 5 T/mᵌ
SIDL 1 from Span 1 = 77.5 m
SIDL 1 from Span 2 = 70 T
Total SIDL 1 = 147.5 T
Vertical CG of SIDL 1 from deck = 0.803 m
CG of SIDL 1 from soffit = 2.803 m
Longitudinal moment = 6.375 T-m

SUPER IMPOSED DEAD LOAD 2 :


Intensity of superimposed load = 1.96 T/m
SIDL 2 from Span 1 = 30.38 m
SIDL 2 from Span 2 = 27.44 T
Total SIDL 2 = 57.82 T
Vertical CG of SIDL 2 from deck = 0 m
CG of SIDL 2 from soffit = 2 m
Longitudinal moment = 2.499 T-m

DEAD LOAD CALCULATIONS OF PIER CAP

CALCULATIONS FOR PEDESTAL :


Size of Pedestal : Length = 0.85 m
Breadth = 1 m
Height = 0.3 m
No. of Pedestal = 4
Unit weight Pedestal = 2.5 T/mᵌ
Total weight of Pedestal = 2.55 T
CG of the pedstal = 0.15 m

CALCULATIONS FOR PIER CAP :


Unit weight Pier cap = 2.5 T/mᵌ
Area of Bottom part ( A1 ) = 4.16 m²
Area of Top part ( A2 ) = 11.16 m²
Height of Pier cap = 1.5 m
Weight of Pier cap = 27.66704 T
CG of the pier = 0.64 m
Total dead load of pier cap + pedstal = 30.21704 T
CG of the pier+pedstal = 0.901351 m

DEAD LOAD CALCULATIONS OF PIER

Total Area = 3.61 m²


Length of Pier = 11.128 m
Volume of Pier = 40.17208 mᵌ
Unit weight of Concrete = 2.5 T/mᵌ
Total weight of Pier = 100.4302 T/mᵌ

Total load of pier + cap = 130.6472 T

CALCULATION OF LOADS OF PILE CAP


Dim. Along traffic direction = 5.2
Dim. Along perpendicular to traffic direction = 5.2
Thickness of pile cap = 1.8
Selfweight of pilecap + Crash barrier = 134.83
Ground level = -2.3
Dist. b/n G.L and pilecap top level = 0.5
Unit weight of soil = 2
Self weight of earth on pilecap projection = 23.43
Selfweight of crash barrier = 13.15
Total weight of pilecap and earth fill = 158.26 T
No. of piles = 4
LIVE LOAD CALCULATIONS

MAXIMUM REACTION CASE (Both track loaded )

Height of RTL from deck top = 0.572 m


Eccentricity from rail top = 1.525 m
Height of segment = 2 m

16 16 16 16

0.85 3.45 2.3 4.4 2.3 12.4


26.3

Total load on one span


CG of total load from c/l of pier
Reaction on pier ( Excluding CDA)
CDA
Reaction on pier due to CDA
Braking force / Tractive force
Eccentricity of braking force from bearing top
Change in Vertical reaction
Net reaction on pier
Vertical load 186.763 (Excluding CDA)
Vertical load 257.5905 (Including CDA)
Longitudinal force 38.4
Longitudinal moment 72.12478

MAXIMUM LONGITUDINAL MOMENT CASE ( Both tracks loaded )

Total load on one span


CG of total load from c/l of pier
Reaction on pier ( Excluding CDA)
CDA
Reaction on pier due to CDA
Braking force / Tractive force
Eccentricity of braking force from bearing top
Change in Vertical reaction
Net reaction on pier
Vertical load = 60.95989 T (Excluding CDA)
Vertical load = 81.89686 T (Including CDA)
Longitudinal force = 19.2 T (Including CDA)
Longitudinal moment = 69.61233 T-m (Including CDA)

MAXIMUM TRASVERSE MOMENT CASE : (One track loaded )


Trasverse eccentricity w.r.t centre of deck = 2.1 m
Vertical load = 93.381516 T (Excluding CDA)
Vertical load = 128.79526 T (Including CDA)
Longitudinal moment = 36.062388 T-m (Including CDA)
Trasverse moment = 270.47005 T-m (Including CDA)
Longitudinal force = 19.2 T

Live load Reactions :(Excluding CDA)


Load Case V.load (T)
Case 1: Max Reaction 186.7630311
Case 2: Max Longitudnal moment 60.95989078
Case 3: Max Transverse moment 93.38151557
Live load Reactions :(Including CDA)
Load Case V.load Long. Mom Trans. Mom
(T)
Case 1: Max Reaction 257.590527 72.12478 0
Case 2: Max Longitudnal moment 81.89685817 69.61233 0
Case 3: Max Transverse moment 128.7952635 36.06239 270.4701

Braking force in Longitudnal direction


Load Case Hor.load Bearing level
(T)
Case 1: Max Reaction 38.4 12.428
Case 2: Max Longitudnal moment 19.2 12.428
Case 3: Max Transverse moment 19.2 12.428

FORCES DUE TO BEARING MOMENT


Bearing sizes are considered same for both spans.
Length of Right span = 31 m
Length of Left span = 28 m
Length of bearing = 450 mm
Width of Bearing = 600 mm
Thickness of bearing = 80 mm
Thickness of steel laminate = 4 mm
No. of Internal elastomers = 4
Thickness of Internal elastomers = 12 mm
Side cover = 6 mm
Temperature variation = 25 deg
Temperature coefficient = 1.17E-05 per ᵒ C
Creep in concrete = 4.30E-05
Creep strain per 10Mpa = 4.30E-04
Shrinkage strain = 2.50E-04 m
Movement of Right span = 1.51E-02 m
Movement of Left span = 1.36E-02 N/mm²
Shear modulus = 1 N/mm²
Effective height of bearing = 60 mm
Effective area of bearing = 257544 mm²
Shear rating of bearing = 4292.4 N/mm
No. of bearings on piers = 2 (from 1 span)
Force on pier due to right span = 1.32E+01 T
Force on pier due to left span = 11.914582 T
Net force acting on pier = 1.2765624 T

SEISMIC FORCES
Area = 3610619.3 m²
Perimeter = 7026.5482 m
Principal moments and X-Y directions about Centroid :
I: 1.64E+12 along[1.0000 0.0000]
J: 6.63E+11 along[0.0000 1.0000]

Zone factor (Z) = 0.1 (From table 1a, IRS , Zone - 2 )


Importance factor (I) = 1.5 (From table 2, IRS , Railway Bridge)
Response reduction factor ® = 2.5/2 (From table 3 , IRS , RC pier without Ducti
= 1.25
Deflection(Δ) = 1 mm
Youngs modulus (E) = 34000 N/mm² (From IRS CBC , M50 concrete
Height upto bearing top = 12.428 m
Force in Longitudinal direction = 6.6640532 T
Force in transverse direction = 2.6935303 T

Total dead load = 617.69135 T


Live load (excluding CDA) = 60.959891 T

Force in longitudnal direction(Fʟ) = 6.6640532 T


Force in transverse direction(Tт) = 2.6935303 T

Natural time period in longitudnal direction(Tʟ) = 0.3044504 sec


Natural time period in transverse direction(Tт) = 0.4905508 sec

Sа/g Transverse Direction = 2.038525


Sа/g Longitudnal Direction = 2.5

Ah Horizontal Transverse Direction = 0.1223115


Ah Horizontal Longitudnal Direction = 0.15

Av Vertical Transverse Direction = 0.081541


Av Vertical Longitudnal Direction = 0.1

SEISMIC - LONGITUDINAL DIRECTION


Component L.F for Ver.Sei. L.F for Hor.Sei. Acting @
Ver.Load force lat.load force RL
DL of super str. 1 41.23714 1 61.8557 12.428
SIDL 1 1 14.75 1 22.125 12.428
SIDL 2 1 5.782 1 8.673 12.428
Wt. of piercap+pedestal 1 3.021704 1 4.532556 11.526649
Wt. of pier 1 10.04302 1 15.06453 5.314
Total 74.83386 112.2508 11.436876
Live load , LL1 0.5 9.338152 0 0 0
LL2 0.5 3.047995 0 0 0
LL3 0.5 4.669076 0 0 0
DL + LL 1 84.17201 112.2508 11.436876
DL + LL 2 77.88185 112.2508 11.436876
DL + LL 3 79.50293 112.2508 11.436876

SEISMIC - TRANSVERSE DIRECTION


Component L.F for Ver.Sei. L.F for Hor.Sei. Acting @
Ver.Load force lat.load force RL
DL of super str. 1 33.62517 1 50.43776 13.664
SIDL 1 1 12.0273 1 18.04095 15.231
SIDL 2 1 4.714701 1 7.072051 14.428
Wt. of piercap+pedestal 1 2.463928 1 3.695892 11.526649
Wt. of pier 1 8.189179 1 12.28377 5.314
Total 61.02028 91.53042 12.824982
Live load , LL1 0.5 7.614422 0.5 11.42163 16.525
LL2 0.5 2.485365 0.5 3.728048 16.525
LL3 0.5 3.807211 0.5 5.710817 16.525
DL + LL 1 68.6347 102.952 13.235467
DL + LL 2 63.50564 95.25846 12.969786
DL + LL 3 64.82749 97.24123 13.042278
tudinal direction )
verse direction )

tudinal direction )
verse direction )
OF 28m SPAN :
= 2
= 2
= 2
= 4
ment weight = 190.2833 T
16 16 16 16 16

2.3 4.4 2.3 12.4 2.3


0.85 0.85 29.3

80 112
15.82 15.07143
34.46388 57.63823
0.397678 0.376629
13.70553 21.70822
16 22.4
4.097 4.097
-4.98494 6.264355
43.18446 85.6108
(Excluding CDA)
(Including CDA)

16 16 16 16

2.3 12.4 2.3 4.4


0.85 0.85 29.3

0 96
0 13.18333
0 55.59044
0 0.376629
0 20.93697
0 19.2
4.097 4.097
0 5.369447
0 81.89686

(Excluding CDA)
(Including CDA)
(Including CDA)
(Including CDA)
along[1.0000 0.0000]
along[0.0000 1.0000]

ble 1a, IRS , Zone - 2 )


ble 2, IRS , Railway Bridge)
ble 3 , IRS , RC pier without Ductile detailing )

(From IRS CBC , M50 concrete )


16 16 16

4.4 2.3 2.05 0.85


16 16

2.3 6.45 0.85


1A : DL + SIDL + LL 1 + FPLL 1 + BR 1 + CF 1
1B: DL + SIDL + LL 2 + FPLL 2 + BR 2 + CF 2
1C: DL + SIDL + LL 3 + FPLL 3 + BR 3 + CF 3
2A: DL + SIDL + 50% LL 1 + 50% FPLL 1 + 50% BR 1 + 50% CF 1 + ( SEISMIC-L ) ( SEISMIC-VERT.DOWN )
2B: DL + SIDL + 50% LL 1 + 50% FPLL 1 + 50% BR 1 + 50% CF 1 + ( SEISMIC-L ) ( SEISMIC-VERT.UP )
2C: DL + SIDL + ( SEISMIC-L ) ( SEISMIC-VERT.DOWN )
2D: DL + SIDL + ( SEISMIC-L ) ( SEISMIC-VERT.UP )
2E: DL + SIDL + 50% LL 3 + 50% FPLL 3 + 50% BR 3 + 50% CF 3 + ( SEISMIC-T ) ( SEISMIC-VERT.DOWN )
2F: DL + SIDL + 50% LL 3 + 50% FPLL 3 + 50% BR 3 + 50% CF 3 + ( SEISMIC-T ) ( SEISMIC-VERT.UP )
2G: DL + SIDL + ( SEISMIC-T ) ( SEISMIC-VERT.DOWN )
2H: DL + SIDL + ( SEISMIC-T ) ( SEISMIC-VERT.UP )
3A: DL + SIDL + ( ONE SPAN DISLODDGED )
3B: DL + SIDL + ( ONE SPAN DISLODDGED ) ( SEISMIC-L )

LOAD FACTORS - ULS CONDITION

LOAD COMBINATION NORMAL CASE SEISMIC-L SEISMIC-T OSD


1A 1B 1C 2A/2B 2C/2D 2E/2F 2G/2H 3A
1 DL 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25
2 SIDL 1 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25
3 SIDL 2 2 2 2 1.5 1.5 1.5 1.5 2
4 PIER + CAP 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25
5 PILECAP 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25
6 LL 1 1.75 0.5
7 LL 2 1.75
8 LL 3 1.75 0.5
9 BR 1 1.75 0.5
10 BR 2 1.75
11 BR 3 1.75 0.5
12 CF 1 1.75 0.5
13 CF 2 1.75
14 CF 3 1.75 0.5
15 FPLL 1 1.5 0.5
16 FPLL 2 1.5
17 FPLL 3 1.5 0.5
18 SR/FR 1 1 1 1 1 1 1 1
19 SEISMIC-L 1.2 1.5
20 SEISMIC-T 1.2 1.5

LOAD COMBINATION NORMAL CASE SEISMIC-L SEISMIC-T OSD


1A 1B 1C 2A/2B 2C/2D 2E/2F 2G/2H 3A
1 DL 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25
2 SIDL 1 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25
3 SIDL 2 2 2 2 1.5 1.5 1.5 1.5 2
4 PIER + CAP 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25
5 PILECAP 1.25 1.25 1.25 1.25 1.25 1.25 1.25 1.25
6 LL 1 1.75 0.5
7 LL 2 1.75
8 LL 3 1.75 0.5
9 BR 1 1.75 0.5
10 BR 2 1.75
11 BR 3 1.75 0.5
12 CF 1 1.75 0.5
13 CF 2 1.75
14 CF 3 1.75 0.5
15 FPLL 1 1.5 0.5
16 FPLL 2 1.5
17 FPLL 3 1.5 0.5
18 SR/FR 1 1 1 1 1 1 1 1
19 SEISMIC-L 1.2 1.5
20 SEISMIC-T 1.2 1.5
OSD
3B
1.25
1.25
1.5
1.25
1.25

1
1.5

OSD
3B
1.25
1.25
1.5
1.25
1.25

1
1.5
CALCULATION OF LOADS AT BASE OF PIER - ULTIMATE LIMIT STATE CONDITION

Level at base of Pier = -0.5 m

LOAD COMBINATION 1A: DL + SIDL + LL 1 + FPLL 1 + BR 1 + CF 1

SL. NO. LOAD LOAD VERTICAL LOAD TRASVERSE HORIZONTAL FORCE


FACTOR VL(t) ML (t-m) MT (t-m) HT (t) L.Arm (m) MT (t-m)
1 DL 1.25 515.5 19.5 0.0 0.0 0.0 0.0
2 SIDL 1 1.25 184.4 8.0 0.0 0.0 0.0 0.0
3 SIDL 2 2 115.6 5.0 0.0 0.0 0.0 0.0
4 PIER+CAP 1.25 163.3 85.8 418.4 0.0 0.0 0.0
5 LL 1 1.75 450.8 72.1 0.0 0.0 0.0 0.0
6 BR 1 1.75 0.0 0.0 0.0 0.0 0.0 0.0
7 CF 1 1.75 0.0 0.0 0.0 0.0 0.0 0.0
8 FPLL 1 1.5 0.0 0.0 0.0 0.0 0.0 0.0
9 SR/FR 1 0.0 0.0 0.0 0.0 0.0 0.0
TOTAL 1429.6 0.0

ML 85.8466808
MT 418.403628
LOAD COMBINATION 1B: DL + SIDL + LL 2+ FPLL 2 + BR 2 + CF 2
SL. NO. LOAD LOAD VERTICAL LOAD TRASVERSE HORIZONTAL FORCE
FACTOR VL(t) ML (t-m) MT (t-m) HT (t) L.Arm (m) MT (t-m)
1 DL 1.25 515.5 19.5 0.0 0.0 0.0 0.0
2 SIDL 1 1.25 184.4 8.0 0.0 0.0 0.0 0.0
3 SIDL 2 2 115.6 5.0 0.0 0.0 0.0 0.0
4 PIER+CAP 1.25 163.3 67.4 328.4 0.0 0.0 0.0
5 LL 2 1.75 143.3 69.6 0.0 0.0 0.0 0.0
6 BR 2 1.75 0.0 0.0 0.0 0.0 0.0 0.0
7 CF 2 1.75 0.0 0.0 0.0 0.0 0.0 0.0
8 FPLL 2 1.5 0.0 0.0 0.0 0.0 0.0 0.0
9 SR/FR 1 0.0 0.0 0.0 0.0 0.0 0.0
TOTAL 1122.1 0.0

ML 67.3832782
MT 328.41582
LOAD COMBINATION 1C: DL + SIDL + LL 3 + FPLL 3 + BR 3 + CF 3
SL. NO. LOAD LOAD VERTICAL LOAD TRASVERSE HORIZONTAL FORCE
FACTOR VL(t) ML (t-m) MT (t-m) HT (t) L.Arm (m) MT (t-m)
1 DL 1.25 515.5 19.5 0.0 0.0 0.0 0.0
2 SIDL 1 1.25 184.4 8.0 0.0 0.0 0.0 0.0
3 SIDL 2 2 115.6 5.0 0.0 0.0 0.0 0.0
4 PIER+CAP 1.25 163.3 72.3 352.4 0.0 0.0 0.0
5 LL 3 1.75 225.4 63.1 473.3 0.0 0.0 0.0
6 BR 3 1.75 0.0 0.0 0.0 0.0 0.0 0.0
7 CF 3 1.75 0.0 0.0 0.0 0.0 0.0 0.0
8 FPLL 3 1.5 0.0 0.0 0.0 0.0 0.0 0.0
9 SR/FR 1 0.0 0.0 0.0 0.0 0.0 0.0
TOTAL 1204.2 0.0

ML 72.3117662
MT 352.436519
LOAD COMBINATION 2A: DL + SIDL + 50%LL 1 + 50%FPLL 1 + 50%BR 1 + CF 1+(SEISMIC -L)(SEISMIC-VERT DOWN)
SL. NO. LOAD LOAD VERTICAL LOAD TRASVERSE HORIZONTAL FORCE
FACTOR VL(t) ML (t-m) MT (t-m) HT (t) L.Arm (m) MT (t-m)
1 DL 1.25 515.5 19.5 0.0 0.0 0.0 0.0
2 SIDL 1 1.25 184.4 8.0 0.0 0.0 0.0 0.0
3 SIDL 2 2 115.6 5.0 0.0 0.0 0.0 0.0
4 PIER+CAP 1.25 163.3 72.6 353.7 0.0 0.0 0.0
5 LL 1 0.5 128.8 36.1 0.0 0.0 0.0 0.0
6 BR 1 0.5 0.0 0.0 0.0 0.0 0.0 0.0
7 CF 1 0.5 0.0 0.0 0.0 0.0 0.0 0.0
8 FPLL 1 0.5 0.0 0.0 0.0 0.0 0.0 0.0
9 SR/FR 1 0.0 0.0 0.0 0.0 0.0 0.0
10 SEISMIC L(V 1.2 101.0 0.0 0.0 0.0 0.0 0.0
TOTAL 1208.6 0.0
ML 72.5765874
MT 353.727217

LOAD COMBINATION 2B: DL + SIDL + 50%LL 1 + 50%FPLL 1 + 50%BR 1 + CF 1+(SEISMIC -L)(SEISMIC-VERT UP)
SL. NO. LOAD LOAD VERTICAL LOAD TRASVERSE HORIZONTAL FORCE
FACTOR VL(t) ML (t-m) MT (t-m) HT (t) L.Arm (m) MT (t-m)
1 DL 1.25 515.5 19.5 0.0 0.0 0.0 0.0
2 SIDL 1 1.25 184.4 8.0 0.0 0.0 0.0 0.0
3 SIDL 2 2 115.6 5.0 0.0 0.0 0.0 0.0
4 PIER+CAP 1.25 163.3 60.4 294.6 0.0 0.0 0.0
5 LL 1 0.5 128.8 36.1 0.0 0.0 0.0 0.0
6 BR 1 0.5 0.0 0.0 0.0 0.0 0.0 0.0
7 CF 1 0.5 0.0 0.0 0.0 0.0 0.0 0.0
8 FPLL 1 0.5 0.0 0.0 0.0 0.0 0.0 0.0
9 SR/FR 1 0.0 0.0 0.0 0.0 0.0 0.0
10 SEISMIC L(VER 1.2 -101.0 0.0 0.0 0.0 0.0 0.0
TOTAL 1006.6 0.0
ML 60.4455897
MT 294.602584

2C: DL + SIDL + ( SEISMIC-L ) ( SEISMIC-VERT.DOWN )


SL. NO. LOAD LOAD VERTICAL LOAD TRASVERSE HORIZONTAL FORCE
FACTOR VL(t) ML (t-m) MT (t-m) HT (t) L.Arm (m) MT (t-m)
1 DL 1.25 515.5 19.5 0.0 0.0 0.0 0.0
2 SIDL 1 1.25 184.4 8.0 0.0 0.0 0.0 0.0
3 SIDL 2 2 115.6 5.0 0.0 0.0 0.0 0.0
4 PIER+CAP 1.25 163.3 65.5 319.3 0.0 0.0 0.0
5 LL 1 0 0.0 0.0 0.0 0.0 0.0 0.0
6 BR 1 0 0.0 0.0 0.0 0.0 0.0 0.0
7 CF 1 0 0.0 0.0 0.0 0.0 0.0 0.0
8 FPLL 1 0 0.0 0.0 0.0 0.0 0.0 0.0
9 SR/FR 1 0.0 0.0 0.0 0.0 0.0 0.0
10 SEISMIC L(VE 1.5 112.3 0.0 0.0 0.0 0.0 0.0
TOTAL 1091.0 0.0
ML 65.5175824
MT 319.322703

2D: DL + SIDL + ( SEISMIC-L ) ( SEISMIC-VERT.UP )


SL. NO. LOAD LOAD VERTICAL LOAD TRASVERSE HORIZONTAL FORCE
FACTOR VL(t) ML (t-m) MT (t-m) HT (t) L.Arm (m) MT (t-m)
1 DL 1.25 515.5 19.5 0.0 0.0 0.0 0.0
2 SIDL 1 1.25 184.4 8.0 0.0 0.0 0.0 0.0
3 SIDL 2 2 115.6 5.0 0.0 0.0 0.0 0.0
4 PIER+CAP 1.25 163.3 52.0 253.6 0.0 0.0 0.0
5 LL 1 0 0.0 0.0 0.0 0.0 0.0 0.0
6 BR 1 0 0.0 0.0 0.0 0.0 0.0 0.0
7 CF 1 0 0.0 0.0 0.0 0.0 0.0 0.0
8 FPLL 1 0 0.0 0.0 0.0 0.0 0.0 0.0
9 SR/FR 1 0.0 0.0 0.0 0.0 0.0 0.0
10 SEISMIC L(VER 1.5 -112.3 0.0 0.0 0.0 0.0 0.0
TOTAL 866.5 0.0
ML 52.036121
MT 253.616116

LOAD COMBINATION 2E: DL + SIDL + 50%LL 3 + 50%FPLL 3 + 50%BR 3 + CF 3+(SEISMIC -T)(SEISMIC-VERT DOWN)
SL. NO. LOAD LOAD VERTICAL LOAD TRASVERSE HORIZONTAL FORCE
FACTOR VL(t) ML (t-m) MT (t-m) HT (t) L.Arm (m) MT (t-m)
1 DL 1.25 515.5 19.5 0.0 0.0 0.0 0.0
2 SIDL 1 1.25 184.4 8.0 0.0 0.0 0.0 0.0
3 SIDL 2 2 115.6 5.0 0.0 0.0 0.0 0.0
4 PIER+CAP 1.25 163.3 67.3 328.1 0.0 0.0 0.0
5 LL 3 0.5 64.4 18.0 135.2 0.0 0.0 0.0
6 BR 3 0.5 0.0 0.0 0.0 0.0 0.0 0.0
7 CF 3 0.5 0.0 0.0 0.0 0.0 0.0 0.0
8 FPLL 3 0.5 0.0 0.0 0.0 0.0 0.0 0.0
9 SR/FR 1 0.0 0.0 0.0 0.0 0.0 0.0
10 SEISMIC L(V 1.2 77.8 0.0 0.0 116.7 13.5 1580.2
TOTAL 1121.0 116.7
ML 67.315488
MT 328.085421

2F: DL + SIDL + 50% LL 3 + 50% FPLL 3 + 50% BR 3 + 50% CF 3 + ( SEISMIC-T ) ( SEISMIC-VERT.UP )


SL. NO. LOAD LOAD VERTICAL LOAD TRASVERSE HORIZONTAL FORCE
FACTOR VL(t) ML (t-m) MT (t-m) HT (t) L.Arm (m) MT (t-m)
1 DL 1.25 515.5 19.5 0.0 0.0 0.0 0.0
2 SIDL 1 1.25 184.4 8.0 0.0 0.0 0.0 0.0
3 SIDL 2 2 115.6 5.0 0.0 0.0 0.0 0.0
4 PIER+CAP 1.25 163.3 58.0 282.5 0.0 0.0 0.0
5 LL 3 0.5 64.4 18.0 135.2 0.0 0.0 0.0
6 BR 3 0.5 0.0 0.0 0.0 0.0 0.0 0.0
7 CF 3 0.5 0.0 0.0 0.0 0.0 0.0 0.0
8 FPLL 3 0.5 0.0 0.0 0.0 0.0 0.0 0.0
9 SR/FR 1 0.0 0.0 0.0 0.0 0.0 0.0
10 SEISMIC L(VE 1.2 -77.8 0.0 0.0 116.7 13.5 1580.2
TOTAL 965.4 116.7
ML 57.9724522
MT 282.54889

2G: DL + SIDL + ( SEISMIC-T ) ( SEISMIC-VERT.DOWN )


SL. NO. LOAD LOAD VERTICAL LOAD TRASVERSE HORIZONTAL FORCE
FACTOR VL(t) ML (t-m) MT (t-m) HT (t) L.Arm (m) MT (t-m)
1 DL 1.25 515.5 19.5 0.0 0.0 0.0 0.0
2 SIDL 1 1.25 184.4 8.0 0.0 0.0 0.0 0.0
3 SIDL 2 2 115.6 5.0 0.0 0.0 0.0 0.0
4 PIER+CAP 1.25 163.3 64.3 313.3 0.0 0.0 0.0
5 LL 1 0 0.0 0.0 0.0 0.0 0.0 0.0
6 BR 1 0 0.0 0.0 0.0 0.0 0.0 0.0
7 CF 1 0 0.0 0.0 0.0 0.0 0.0 0.0
8 FPLL 1 0 0.0 0.0 0.0 0.0 0.0 0.0
9 SR/FR 1 0.0 0.0 0.0 0.0 0.0 0.0
10 SEISMIC L(VE 1.5 91.5 0.0 0.0 137.3 13.3 1829.5
TOTAL 1070.3 137.3
ML 64.2733109
MT 313.258314

2H: DL + SIDL + ( SEISMIC-T ) ( SEISMIC-VERT.UP )


SL. NO. LOAD LOAD VERTICAL LOAD TRASVERSE HORIZONTAL FORCE
FACTOR VL(t) ML (t-m) MT (t-m) HT (t) L.Arm (m) MT (t-m)
1 DL 1.25 515.5 19.5 0.0 0.0 0.0 0.0
2 SIDL 1 1.25 184.4 8.0 0.0 0.0 0.0 0.0
3 SIDL 2 2 115.6 5.0 0.0 0.0 0.0 0.0
4 PIER+CAP 1.25 163.3 53.3 259.7 0.0 0.0 0.0
5 LL 1 0 0.0 0.0 0.0 0.0 0.0 0.0
6 BR 1 0 0.0 0.0 0.0 0.0 0.0 0.0
7 CF 1 0 0.0 0.0 0.0 0.0 0.0 0.0
8 FPLL 1 0 0.0 0.0 0.0 0.0 0.0 0.0
9 SR/FR 1 0.0 0.0 0.0 0.0 0.0 0.0
10 SEISMIC L(VE 1.5 -91.5 0.0 0.0 137.3 13.3 1829.5
TOTAL 887.3 137.3
ML 53.2803925
MT 259.680506

3A: DL + SIDL + ( ONE SPAN DISLODDGED )


SL. NO. LOAD LOAD VERTICAL LOAD TRASVERSE HORIZONTAL FORCE
FACTOR VL(t) ML (t-m) MT (t-m) HT (t) L.Arm (m) MT (t-m)
1 DL 1.25 260.8 19.5 0.0 0.0 0.0 0.0
2 SIDL 1 1.25 96.9 8.0 0.0 0.0 0.0 0.0
3 SIDL 2 2 60.8 5.0 0.0 0.0 0.0 0.0
4 PIER+CAP 1.25 163.3 34.9 169.9 0.0 0.0 0.0
5 SR/FR 1 0.0 0.0 0.0 0.0 0.0 0.0
TOTAL 581.7 0.0

ML 34.93406
MT 170.26328

3B: DL + SIDL + ( ONE SPAN DISLODDGED ) ( SEISMIC-L )


SL. NO. LOAD LOAD VERTICAL LOAD TRASVERSE HORIZONTAL FORCE
FACTOR VL(t) ML (t-m) MT (t-m) HT (t) L.Arm (m) MT (t-m)
1 DL 1.25 260.8 19.5 0.0 0.0 0.0 0.0
2 SIDL 1 1.25 96.9 8.0 0.0 0.0 0.0 0.0
3 SIDL 2 2 60.8 5.0 0.0 0.0 0.0 0.0
4 PIER+CAP 1.25 163.3 38.4 186.9 0.0 0.0 0.0
9 SR/FR 1 0.0 0.0 0.0 0.0 0.0 0.0
10 SEISMIC L 1.5 58.2 0.0 0.0 0.0 0.0 0.0
TOTAL 639.9 0.0
ML 38.427466
MT 187.289608
LONGITUDINAL HORIZONTAL FORCE DESIGN VALUE
HL (t) L.Arm (m) ML (t-m) ML(t-m) MT(t-m)
0.0 0.0 0.0 19.5 0.0
0.0 0.0 0.0 8.0 0.0
0.0 0.0 0.0 5.0 0.0
0.0 0.0 0.0 85.8 418.4
0.0 0.0 0.0 72.1 0.0
67.2 12.9 868.8 868.8 0.0
0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0
1.3 12.9 16.5 16.5 0.0
68.5 1075.7 418.4

LONGITUDINAL HORIZONTAL FORCE DESIGN VALUE


HL (t) L.Arm (m) ML (t-m) ML(t-m) MT(t-m)
0.0 0.0 0.0 19.5 0.0
0.0 0.0 0.0 8.0 0.0
0.0 0.0 0.0 5.0 0.0
0.0 0.0 0.0 67.4 328.4
0.0 0.0 0.0 69.6 0.0
33.6 12.9 434.4 434.4 0.0
0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0
1.3 12.9 16.5 16.5 0.0
34.9 620.4 328.4

LONGITUDINAL HORIZONTAL FORCE DESIGN VALUE


HL (t) L.Arm (m) ML (t-m) ML(t-m) MT(t-m)
0.0 0.0 0.0 19.5 0.0
0.0 0.0 0.0 8.0 0.0
0.0 0.0 0.0 5.0 0.0
0.0 0.0 0.0 72.3 352.4
0.0 0.0 0.0 63.1 473.3
33.6 12.9 434.4 434.4 0.0
0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0
1.3 12.9 16.5 16.5 0.0
34.9 618.8 825.8

EISMIC-VERT DOWN)
LONGITUDINAL HORIZONTAL FORCE DESIGN VALUE
HL (t) L.Arm (m) ML (t-m) ML(t-m) MT(t-m)
0.0 0.0 0.0 19.5 0.0
0.0 0.0 0.0 8.0 0.0
0.0 0.0 0.0 5.0 0.0
0.0 0.0 0.0 72.6 353.7
0.0 0.0 0.0 36.1 0.0
19.2 12.9 248.2 248.2 0.0
0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0
1.3 12.9 16.5 16.5 0.0
134.7 11.9 1607.9 1607.9 0.0
155.2 2013.7 353.7

EISMIC-VERT UP)
LONGITUDINAL HORIZONTAL FORCE DESIGN VALUE
HL (t) L.Arm (m) ML (t-m) ML(t-m) MT(t-m)
0.0 0.0 0.0 19.5 0.0
0.0 0.0 0.0 8.0 0.0
0.0 0.0 0.0 5.0 0.0
0.0 0.0 0.0 60.4 294.6
0.0 0.0 0.0 36.1 0.0
19.2 12.9 248.2 248.2 0.0
0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0
1.3 12.9 16.5 16.5 0.0
134.7 11.9 1607.9 1607.9 0.0
155.2 2001.6 294.6

LONGITUDINAL HORIZONTAL FORCE DESIGN VALUE


HL (t) L.Arm (m) ML (t-m) ML(t-m) MT(t-m)
0.0 0.0 0.0 19.5 0.0
0.0 0.0 0.0 8.0 0.0
0.0 0.0 0.0 5.0 0.0
0.0 0.0 0.0 65.5 319.3
0.0 0.0 0.0 0.0 0.0
0.0 12.9 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0
1.3 12.9 16.5 16.5 0.0
168.4 11.9 2009.9 2009.9 0.0
169.7 2124.4 319.3

LONGITUDINAL HORIZONTAL FORCE DESIGN VALUE


HL (t) L.Arm (m) ML (t-m) ML(t-m) MT(t-m)
0.0 0.0 0.0 19.5 0.0
0.0 0.0 0.0 8.0 0.0
0.0 0.0 0.0 5.0 0.0
0.0 0.0 0.0 52.0 253.6
0.0 0.0 0.0 0.0 0.0
0.0 12.9 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0
1.3 12.9 16.5 16.5 0.0
168.4 11.9 2009.9 2009.9 0.0
169.7 2110.9 253.6

EISMIC-VERT DOWN)
LONGITUDINAL HORIZONTAL FORCE DESIGN VALUE
HL (t) L.Arm (m) ML (t-m) ML(t-m) MT(t-m)
0.0 0.0 0.0 19.5 0.0
0.0 0.0 0.0 8.0 0.0
0.0 0.0 0.0 5.0 0.0
0.0 0.0 0.0 67.3 328.1
0.0 0.0 0.0 18.0 135.2
9.6 12.9 124.1 124.1 0.0
0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0
1.3 12.9 16.5 16.5 0.0
0.0 0.0 0.0 0.0 1580.2
10.9 258.4 2043.6
LONGITUDINAL HORIZONTAL FORCE DESIGN VALUE
HL (t) L.Arm (m) ML (t-m) ML(t-m) MT(t-m)
0.0 0.0 0.0 19.5 0.0
0.0 0.0 0.0 8.0 0.0
0.0 0.0 0.0 5.0 0.0
0.0 0.0 0.0 58.0 282.5
0.0 0.0 0.0 18.0 135.2
9.6 12.9 124.1 124.1 0.0
0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0
1.3 12.9 16.5 16.5 0.0
0.0 0.0 0.0 0.0 1580.2
10.9 249.1 1998.0

LONGITUDINAL HORIZONTAL FORCE DESIGN VALUE


HL (t) L.Arm (m) ML (t-m) ML(t-m) MT(t-m)
0.0 0.0 0.0 19.5 0.0
0.0 0.0 0.0 8.0 0.0
0.0 0.0 0.0 5.0 0.0
0.0 0.0 0.0 64.3 313.3
0.0 0.0 0.0 0.0 0.0
0.0 12.9 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0
1.3 12.9 16.5 16.5 0.0
0.0 0.0 0.0 0.0 1829.5
1.3 113.2 2142.7

LONGITUDINAL HORIZONTAL FORCE DESIGN VALUE


HL (t) L.Arm (m) ML (t-m) ML(t-m) MT(t-m)
0.0 0.0 0.0 19.5 0.0
0.0 0.0 0.0 8.0 0.0
0.0 0.0 0.0 5.0 0.0
0.0 0.0 0.0 53.3 259.7
0.0 0.0 0.0 0.0 0.0
0.0 12.9 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0
1.3 12.9 16.5 16.5 0.0
0.0 0.0 0.0 0.0 1829.5
1.3 102.3 2089.1

LONGITUDINAL HORIZONTAL FORCE DESIGN VALUE


HL (t) L.Arm (m) ML (t-m) ML(t-m) MT(t-m)
0.0 0.0 0.0 19.5 0.0
0.0 0.0 0.0 8.0 0.0
0.0 0.0 0.0 5.0 0.0
0.0 0.0 0.0 34.9 169.9
1.3 12.9 16.5 16.5 0.0
1.3 83.9 169.9

LONGITUDINAL HORIZONTAL FORCE DESIGN VALUE


HL (t) L.Arm (m) ML (t-m) ML(t-m) MT(t-m)
0.0 0.0 0.0 19.5 0.0
0.0 0.0 0.0 8.0 0.0
0.0 0.0 0.0 5.0 0.0
0.0 0.0 0.0 38.4 186.9
1.3 12.9 16.5 16.5 0.0
87.3 11.9 1041.6 1041.6 0.0
88.5 1129.0 186.9
Load Combination 1A 1B 1C 2A 2B 2C
Vertical Load (T) 1429.6 1122.1 1204.2 1208.6 1006.6 1091.0
Longitudinal Horizontal Force (T) 68.5 34.9 34.9 155.2 155.2 169.7
Transverse Horizontal Force (T) 0.0 0.0 0.0 0.0 0.0 0.0
ML (T-m) 1075.7 620.4 618.8 2013.7 2001.6 2124.4
MT (T-m) 418.4 328.4 825.8 353.7 294.6 319.3
2D 2E 2F 2G 2H 3A 3B
866.5 1121.0 965.4 1070.3 887.3 581.7 639.9
169.7 10.9 10.9 1.3 1.3 1.3 88.5
0.0 116.7 116.7 137.3 137.3 0.0 0.0
2110.9 258.4 249.1 113.2 102.3 83.9 1129.0
253.6 2043.6 1998.0 2142.7 2089.1 169.9 186.9
DESIGN OF PIER

CHECK FOR ULS CONDITION


area of steel provided at base =

Actual size of pier =


Size of Equilvalent rectangle =
Aspect ratio of elliptical pier =
Aspect ratio of rectangle =
Iᵪᵪ of the actual pier =
Iᵧᵧ of the actual pier =
ᵪᵪ Equivalent Pier =
ᵧᵧ Equivalent Pier =

C/s area of Elliptical pier =


C/s area of Rectangle pier =
Percentage of Steel =
Grade of Concrete =
Grade of Steel =
p/fck =

i) Load case 1A
Vertical Load , P =
Longitudinal Moment , Mᵪ =
Transverse Moment , Mᵧ =
P/fck*b*D =
Puz =
=
P/Puz =
Then , αn =

From Chart 47 of SP:16


About X-axis,
b =
D =
d'/D =
=
Mu/fck*b*D² =
Ultimate moment capacity,
Mux =

About Y-axis,
d'/b =

Mu/fck*b*D² =
Ultimate moment capacity,
Muy =

〖 "{" ��/��� "}" 〗 ^𝛼𝑛+ =


〖 "{" ��/��� "}" 〗 ^��

Check for Shear:


HL = 68.4765623853
HT = 0

Area of Steel provided at top = 60


= 48230.4
Percentage of Steel = 1.3360636119

As per Cl. 15.6.6 of IRS Concrete bridge code,


Multiplication factor = 1+(0.05
∗𝑃)/𝐴�
where, P = Ultimate axial load
= 1266.26260979
Multiplication factor = 1.1720557009
Permissible Shear stress , Vc = 0.27/𝑌�*{(100∗𝐴𝑠)/
(𝑏𝑤∗𝑑)}⅓{fck}⅓
Clause 15.4.3.2 of IRS Concrete bridge c
where Ym is taken as 1.25 and fck shall not exceed 40.

Hence Vc = 0.8136097173
Vux = Vuy = shear capacity of concrete+reinforcement
= 245.633241225
𝑉�/𝑉𝑢�+ = 0.2787756333
��/���

Check for lateral ties


as per Cl. 15.9.4.3 of IRS,
As main reinforcement is provided with Bundled Bars,
Equivalent area = 1607.68
Equivalent dia. Of bars = 45.2548339959
Min dia. Of lateral bar = 11.313708499
Dia provided = 12

Max. Spacing = 384


Provided spacing at base = 300

CHECK FOR ULS CONDITION FOR ALL LOAD CASES :

Depth of pier (D) 2.426


Width (b) 1.488
Area of cross section (m²) 3.61
Area of steel (Ast) (m²) 0.064
Percentage of steel (p) 1.78
Grade of Concrete 50
Grade of Steel 500
p/fck 0.036

CHECK FOR SHEAR


Area of Steel (Ast) (m²) 0.0482304
Percentage of steel (p) 1.3360636119
fck 40

Load Combination 1A 1B 1C
Vertical Load P (T) 1429.6 1122.1 1204.2
Longitudinal moment,Mx(T-m) 1075.7 620.4 618.8
Transverse moment,My(T-m) 418.4 328.4 825.8
P/(fckbD) 0.1 0.1 0.1
Axial loading capacity Puz(T) 10473.2 10473.2 10473.2
P/Puz 0.1 0.1 0.1
αn 1 1 1
Effective Cover d'(m) 0.11 0.11 0.11
d'/D 0.05 0.05 0.05
About X axis Mu/(fck*b*D²) 0.095 0.09 0.092
Mux(T-m) 4240.4 4017.2 4106.5
d'/D 0.1 0.1 0.1
About Y axis Mu/(fck*b*D²) 0.09 0.085 0.086
Muy(T-m) 2464.0 2327.1 2354.5
〖 "{" ��/��� "}" 〗 ^𝛼𝑛+ 0.4 0.3 0.5
〖 "{" ��/��� "}" 〗 ^��
Longitudinal Horizontal Force HL (T) 68.5 34.9 34.9
Transverse Horizontal Force HT (T) 0 0 0
Ultimate Axial load P (T) 1266.3 958.8 1040.9
Multiplication factor 1.172 1.130 1.141
Permissible Shear stress Vc 0.814 0.814 0.814
Vux=Vuy 245.6 236.9 239.2
𝑉�/𝑉𝑢�+ 0.3 0.1 0.1
��/���
48 No's of 32 mm dia.
32 No's of 32 mm dia.
64307.2 mm²

2.6 x 1.6 m
2.426 x 1.488 m
1.63
1.63
6.60E-01 m⁴
1.64E+00 m⁴
0.67 m⁴
1.77 m⁴

3.611 m²
3.61 m²
1.7814181493 %
M 50
Fe 500
0.036

1429.57 T
1075.71 T-m
418.40 T-m
0.08
102742425.14 N
10473.23 T
0.1364976346
1 ( Table 19 , IRS CBC - 1997 )

1488 m
2426 m

0.045342127
0.09

4017.2423339 T-m

0.045342127

0.08
2190.2195083 T-m

0.267772425 + 0.191032737

= 0.458805162 <=1 Hence OK

No's of 32 mm dia. Bars

1+(0.05
∗𝑃)/𝐴�
mate axial load

27/𝑌�*{(100∗𝐴𝑠)/
𝑏𝑤∗𝑑)}⅓{fck}⅓
ause 15.4.3.2 of IRS Concrete bridge code

r capacity of concrete+reinforcement
T
<=1 Hence OK

ok
2A 2B 2C 2D 2E 2F 2G
1208.6 1006.6 1091.0 866.5 1121.0 965.4 1070.3
2013.7 2001.6 2124.4 2110.9 258.4 249.1 113.2
353.7 294.6 319.3 253.6 2043.6 1998.0 2142.7
0.1 0.1 0.1 0.0 0.1 0.1 0.1
10473.2 10473.2 10473.2 10473.2 10473.2 10473.2 10473.2
0.1 0.1 0.1 0.1 0.1 0.1 0.1
1 1 1 1 1 1 1
0.11 0.11 0.11 0.11 0.11 0.11 0.11
0.05 0.05 0.05 0.05 0.05 0.05 0.05
0.092 0.089 0.09 0.088 0.09 0.089 0.09
4106.5 3972.6 4017.2 3928.0 4017.2 3972.6 4017.2
0.1 0.1 0.1 0.1 0.1 0.1 0.1
0.086 0.083 0.084 0.08 0.085 0.083 0.084
2354.5 2272.4 2299.7 2190.2 2327.1 2272.4 2299.7
0.6 0.6 0.7 0.7 0.9 0.9 1.0

155.2 155.2 169.7 169.7 10.9 10.9 1.3


0 0 0 0 116.7 116.7 137.3
1045.3 843.3 927.7 703.2 957.7 802.1 907.0
1.142 1.115 1.126 1.096 1.130 1.109 1.123
0.814 0.814 0.814 0.814 0.814 0.814 0.814
239.3 233.6 236.0 229.6 236.8 232.4 235.4

0.6 0.7 0.7 0.7 0.5 0.5 0.6


2H 3A 3B
887.3 581.7 639.9
102.3 83.9 1129.0
2089.1 169.9 186.9
0.0 0.0 0.0
10473.2 10473.2 10473.2
0.1 0.1 0.1
1 1 1
0.11 0.11 0.11
0.05 0.05 0.05
0.088 0.086 0.087
3928.0 3838.7 3883.3
0.1 0.1 0.1
0.081 0.076 0.078
2217.6 2080.7 2135.5
1.0 0.1 0.4

1.3 1.3 88.5


137.3 0 0
723.9 418.4 476.6
1.098 1.057 1.065
0.814 0.814 0.814
230.2 221.5 223.1

0.6 0.0 0.4