1.035
ABUTMENT INPUT DATA
SD/117
Skew angle = 0o
Span 6V X 10 m effective span without footpaths
wc 75 + 107.925
0.9
VRCC VRCC M25
M25 0 + 107.025
0
VC = 4.575 m 875 VRCC M25 300 + 106.725
Abut ht = 9.310 m 800
St. length of abutment
= 12 m
in normal HFL + 102.450
eL = 0.210
eT = 2.85 VCC M20 9.310 m
2.85
1700 (SILL LEVEL)
m
4000 1700 2750 97.415
8450 1.6
95.815
100 CC(1:3:6)
-6.610
6.610
ABUTMENT SECTION -A1 & A2
Approach Slab
300 RCL + 108.000
wc 75 + 107.925
0.9
VRCC VRCC M25
M25 0 + 107.025
0
875 VRCC M25 300 + 106.725
800
HFL + 102.450
100mm CC(1:3:6)
PIER INPUT DATA
PIER SECTION-P1
Skew angle = 0o
Span 6V X 10 m effective span with footpaths
SD Drg. No.SD/109
Sl.No ITEM
1 Effective Span 10
2 Deck Total Length 10.4
3 Road Crest Level 108
4 Sill Level 95.815
5 Highest Flood Level 102.45
6 Vertical Clearance 4.575
7 Height of Pier 10.910 VC
8 Maximun Scour Depth 11.472 Pier ht
9 Velocity of water throug Vents 2.864
RCL + 108.000
wc 0.075 + 107.925
0.9
VRCC M30
+ 107.025
1150
VRCC M20 300 + 106.725
1000
HFL + 102.450
= 4.575 m
= 10.910 m
VCC M20 10.910
7.5 m
+ 0 m
7.5 m
RCL + 108.000
wc 75 + 107.925
0.9
VRCC M25
+ 107.025
920
VRCC M20 300 + 106.725
820
HFL + 102.450
0.550
107.900
1.600
98.375 (Sill level )
0.50 m
0.5 2.100 0.5 97.850
100 CC(1:3:6)
VRCC RAFT Design:
Main Steel:
Ast= M/σstxjxd = 6.46 cm2
8.42 M
RA RB
Span moment:
Max.Span moment (@ Centre)= 40.92 T-M
Net span moment= 36.42 T-M 4.1 T-M 40.9 T-M 4.86 T-M
Ast= M/σstxjxd = 48.42 cm2 36.4 T-M
Min. % ge of stee0.15% bD = 7.50 cm2
B.M.D
Spacing of 16mm Ŧ bars @ 4.15 cm C/C
Distribution Steel:
Min. % ge of Distribution steel= 0.12% bD= 6 cm2
Ast on each side = 3.00 cm2
Spacing of mm Ŧ bars @ 37.716 cm C/C
Provide 12mm Ŧ bars @ 300 mm C/C in transverse direction at both Top & Bottom
Distribution Steel of
Abutment
RAFT
16mmŦ @ 16mmŦ @
250 mm C/C 110 mm C/C
Reinforcement Detailing
DESIGN OF BACKING WALL & BED BLOCK:
0.3
CONCRETE MIX = M25 0.075
VRCC M25 RCL 108.000
R.C.L = 108.000
= 30 deg.
0.9
Deck thickness = 0.900 m
Ka = 0.297
0
= 1.8 t/cum
0.3
Width of backing wall = 0.3 m
Intensity of Live load surcharge at RCL = 0.297 1.8 1.2 = 0.642 t/sqm
2
Moment = 0.642 X 0.975 2 = 0.305 t-m
Intensity of first Wheel load for overlapping portion = 2 3.51 = 0.57 t/m
Distribution steel:
Provide 8 nos of 12 mm dia tor bars @ top & at bottom equally spaced in a
width of 0.88 m (Steel provided = 8X 1.131 = 9.046 Cm2)
Using 10 mm dia bars volume of each stirrup = 215 0.786 = 168.99 Cm3
0.3m
8 nos of
12 mm dia each at top & at bottom
equally spaced
0.3 m 10 mm dia stirrups @
120 mm c/c
0.875 m
Provide 8 nos of 12 mm dia tor bars @ top & at bottom equally spaced in a
width of 0.92 m (Steel provided 8X 1.13076 9.04608 Cm2)
Using 10 mm dia bars volume of each stirrup = 270 0.786 212.22 Cm3
920mm
⃝ ⃝ ⃝ ⃝ ⃝ ⃝ ⃝ ⃝
300
mm
⃝ ⃝ ⃝ ⃝ ⃝ ⃝ ⃝ ⃝
1) Load as per drawing SD/114including Hand Rails @ 3KN/m = 284.3 T ---- (a)
Load of RCC Hand Railings = 0. 3 *10.4= 3.12 T -----(b)
= 140.59 + 8.892
149.482 T
150.000
#NAME?
= 278.06 + 17.784
= 295.844 T