I Canal Details:

No. Particulars U/S D/S


1 Ground Level (m) 603.900 603.900
2 Canal Bed Level (m) 600.760 524.345
3 Full Supply Level (m) 602.280 525.865
4 Side slope 1.0:1 1.0:1
5 Bed Width (m) 6.100 6.100
6 Full Supply Depth (m) 1.520 1.520
7 Free Board (m) 0.450 0.450
8 Design discharge 9.230 cumecs 9.230 cumecs
9 Velocity 0.820 m/s 0.820 m/s
10 Bed Gradient 1: 1760 1: 1760
11 Free Board Level (m) 602.730 526.315

II Road Details:
Type of Road = CART TRACK CROSSING
Width of Carriage way = 5.500 m
Number of Lanes = single
Angle of Crossing = 0°

EIT-QMS01-WRE-QSF-A021-R0
DESIGN OF DECK SLAB:
Top width of canal at FSL = 10.200 m Carriage way width = 5.500 m
No of Spans = 1 Deck slab overall width = 6.400 m
Support width at end (Abutment) = 0.400 m Deck slab thickness = 0.950 m
Support width at end (Abutment) = 0.400 m Wearing coat thickness = 0.075 m
Width of Expansion joint = 20 mm Clear span = 10.200 m
Kerb Width = 0.450 m Overall span = 11.000 m
Kerb Depth = 0.300 m Clear cover = 40 mm
Side wall thickness = 0.200 m Main steel = 25 mm
Side wall height = 0.860 m Distribution steel = 12 mm
Grade of concrete = M25 Effective Deck slab thickness = 0.898 m
Grade of steel = Fe 500 Unit weight of concrete = 2500 kg/m³
Unit weight of wearing coat = 2400 kg/m³

Design Constants for Slab Bridge :


Using M25 grade Concrete and Fe 500 grade steel (Ref. IRC:21-2000,Cl.303.1, Table 9 & 10)
scbc = 8.333 N/mm² sst = 240.000 N/mm²
m = 10
1
n = = 0.258
1 + ( 240 ) / (10 x 8.33 )
j = 1 - 0.258/3 = 0.914
Q = ( 1/2 ) x 8.33 x 0.258 x 0.914 = 0.981
Convert to M K S system Q = 10.01

Effective Span : (Ref. IRC:21-2000,Cl.305.4.2)


i) Clear Span + Effective Depth = 11.100 m
ii) Clear Span + c/c Support = 10.600 m
Whichever is less
Effective Span (Leff) = 10.600 m

Dead Load Calculation:


Weight of deck slab = 0.950 x 2500 = 2375.00 Kg/m
Weight of wearing coat = 0.075 x 2400 = 180.00 Kg/m
Weight of kerb 0.450 x 0.300 x 2500 x 2
= = 105.47 Kg/m
6.400
Weight of Side wall 0.200 x 0.86 x 2500 x 2
= = 134.38 Kg/m
6.400
Total = 2794.85 Kg/m
Say 2795.00 Kg/m
Bending moment due to Dead Load:
Bending Moment due to dead load = w l2 = 2795.00 x 10.60 ²
8 8
= 39256.00 kgm
Live Load Calculation:
For class 'A' loading
Effective width of dispersion
L' 6.4
= = 0.604
L 10.6
k = 1.966

0.881
5.181
2.7t 2.7t 11.4t 11.4 t 6.8 t
1.10 3.20 1.20 5.10 0.80
6.30 4.30
A 5.3 B

10.6 R

Resultant acts at a distance of x from 2.7 t


x= 2.7 x 1.1 + 11.4 x 4.3 + 11.4 x 5.5 + 6.8 x 9.8
(2.7 + 2.7 + 11.4 + 11.4 + 6.8)
181.33
x = = 5.181 m
35
The placement of load should be such that the centre of span is midway between the wheel load and CG of the load
system.
11.4 11.4
2.7 2.7 0.3191 6.8
3.2 0.440 0.440
1.1 1.2 4.3 0.240
0.560 5.3 5.3
Ra Rb
10.6
R

4.5 4.5 (Ref. IRC:6-2014,Cl.208.2)


Impact factor = =
6 + Leff (6.0 + 10.60)
= 0.27 If impact factor is greater than 0.5, restrict to 0.5
Axle -1:
bw = 0.650 m
x = 5.300 - 0.440 = 4.860
Effective width of slab be = k x ( 1 - x / L)+bw
be = 1.966 x 4.860(1-4.860/10.60)+0.65 = 5.825 m
0.475 0.15 0.5 1.3 0.5

5700kg 5700kg

0.85 1.800 5.825 /2


5.562
6.400

Effective width of Dispersion = 0.450 + 0.150 + 0.500/ 2 + 1.800 + 5.825/2 = 5.562 m


11400 x 1.270
Average intensity of load for Axle 1 = = 2602.792 kg
5.562
Axle -2:
bw = 0.500 + 0.075 x 2 = 0.650 m
x = 6.060m
Effective width of slab be = k x ( 1 - x / L)+bw
be = 1.966 x 6.060(1-6.060/10.60)+0.65 = 5.754m

0.475 0.15 0.5 1.3 0.5

5700kg 5700kg

0.85 1.8 5.754 /2


5.53
6.40
Effective width of Dispersion = 0.450 + 0.150 + 0.500/ 2 + 1.800 + 5.754/2 = 5.527 m
11400 x 1.270
Average intensity of load for Axle 2 = = 2619.52 kg
5.527
2602.79 kg 2619.52 kg

4.860 1.20 4.540

10.6
Support Reactions:
Rb = (2602.79 x 4.860) + (2619.52 x 6.060)
10.60
Rb = 2690.720 kg
Ra+Rb = 5222.313 kg
Ra = 2531.59 kg
Maximum Bending moment occurs under load 2
BM = (2690.72 x 4.540) = 12217 kgm

As per IRC 6- 2014, Table 2, for single lane traffic, the load combination to be considered is one lane of Class A to
occupy 2.3 m . The remaining width of carriageway shall be loaded with 500Kg/m2
Carriage way width = 5.500 m
Remaining width = 5.50 - 2.30 = 3.20 m
Additional load = 3.20 x 500 = 1600 Kg/m

Bending moment due to additional load = 1600 x 10.60²/8 = 22472 kgm


Total Live Load Bending Moment = 12217.00 + 22472.00 = 34689.00 kgm
Total BM = 34689.00 + 39256 = 73945.00 kgm
Calculation of Effective Depth:
M 73945.00
Effective depth required, dreq = = = 86 cm
Qxb 10.010
Total depth provided,D = 95.000 cm
Effective depth provided, dpro = 89.750 cm
Effective Depth Provided > Effective Depth required : SAFE
Area of Main steel required:
M 73945.000 x 100
Ast required = =
sst . j. d 2400 x 0.914 x 89.750
2
= 37.560 cm² = 3756 mm
Required Spacing = 491 x 1000
= 130 mm
3756
25 dia. bar at 130 mm c/c
491 x 1000
Ast provided = = 3776 mm2
130
Area of Distribution steel required:
Bending moment = 0.3ML+0.2MD (Ref. IRC:21-2000,Cl.305.18.1)
= 0.3 x 34689.00 + 0.2 x 39256.00 = 18258kgm
M 18257.90 x 100
Ast required = =
sst . j. d 2400 x 0.914 x 89.750
2
= 9.274 cm² = 927 mm
Required Spacing = 113 x 1000
= 120 mm
927
12 dia. bar at 120 mm c/c
113 x 1000
Ast provided = = 942 mm2
120

Check for Shear:


Dead Load Shear
Maximum shear at the support = 2795.00 x 10.60
= 14814 kg
2
For class 'A' loading
Axle -1:
x = Distance of 1st axle load from support
x = Depth of Slab + Thickness of wearing coat + Wheel breadth / 2 + Support width / 2
x = 0.95 + 0.075 + 0.25 / 2 + 0.40 / 2
x = 1.350 m
beff = k x (1 - x/L) + bw
beff = 1.966 x 1.350 x (1- 1.350 / 10.60 ) + 0.650 = 2.967 m
Effective width of Dispersion = 0.450 + 0.15 + 0.50/ 2 + 1.80 + 2.967/2 = 4.134 m

0.475 0.15 0.5 1.3 0.5

5700kg 5700kg

0.85 1.8 2.967 /2


4.13
6.40
11400 x 1.270
Average intensity of load for Axle 1 = = 3502.60 kg
4.134
Axle -2:
x = Distance of 2nd axle load from support
x = Depth of Slab + Thickness of wearing coat + Wheel breadth / 2 + Support width / 2
x = 2.550 m
beff = k x (1 - x/L) + bw
beff = 1.966 x 2.550 x (1- 2.550 / 10.60 ) + 0.65 = 4.458 m
Effective width of Dispersion = 0.450 + 0.15 + 0.50/ 2 + 1.80 + 4.458/2 = 4.879 m

0.475 0.15 0.5 1.3 0.5

5700kg 5700kg

0.85 1.8 4.458 /2


4.88
6.40
11400 x 1.270
Average intensity of load for Axle 2 = = 2967.41 kg
4.879
3502.60 x 9.250 + 2967.41 x 8.050
Live Load Shear Force = = 5310.1 kg
10.6
Total shear force = 5310.07 + 14814.00 = 20124.00 kg
Shear force = 20124.00 kg
20124.00
Nominal shear stress (tv) = = 2.242 kg/cm²
100 x 90

100 x Ast 100 x 37.760 = 0.421 %


Percentage of Ast = =
Bxd 100 x 90
Permissible shear stress( tc ) = 2.915 kg/cm² (Ref. IRC:21-2000,Cl.304.7.1.3)
tc > tv
Permissible shear stress > Nominal shear stress: SAFE
Dirt Wall Design
Dirt wall designed for = CTC
Number of lane = Single Lane
Carriage way width = 5.50 m
Thickness of Approach slab = 0.30 m

Dirt wall details (Concrete) (Steel)


Dirt wall material = M25 Fe415 HYSD
Height of dirt wall (above abutment cap) = 0.650 m
Top width of dirt wall = 0.30 m
Width of abutment cap = 0.70 m
Thickness of abutment cap = 0.30 m
Clear cover provided = 50 mm
Dia. of main reinforcement = 10 mm
Dia. of distribution reinforcement = 10 mm
300
10mm dia longitudinal bars 4 at inner & 4 at outer surface

10mm dia 2 legged stirrups at 200mm c/c


650

300

700 All dimensions are in meters

Longitudinal Steel
Area of Steel required in Longitudinal direction
Providing 0.30% of steel per meter run both at Top and Bottom
= ( 0.30 x 300 x 950 )
= 585.00 sq. mm
100
Providing 10 mm dia. reinforcement
585.00sq mm
No. of bars = = 7.45 ~ 8nos.
78.50sq mm
Hence, provide 10 mm dia. long. bars; 4 nos. on each face excluding abutment cap reinforcement

EIT-QMS01-WRE-QSF-A030-R0
Transverse Steel
Area of Steel required in Longitudinal direction
Providing 0.30% of steel per meter run both at Top and Bottom
= ( 0.30 x 650 x 300 )
= 585.00 sq. mm
100

Providing 10 mm dia. 2 legged stirrups

2 x 78.50 x 1000
Spacing of stirrups = = 268 mm c/c
585.00
Hence, provide 10 mm dia. 2 legged stirrups at 200 mm c/c

EIT-QMS01-WRE-QSF-A030-R0
Abutment Cap Design
Abutment cap designed for = CTC
Number of lane = Single Lane
Carriage way width = 5.50 m
Top width of abutment = 0.70 m

Abutment cap details (Concrete) (Steel)


Abutment cap material = M25 Fe415 HYSD
Thickness of Abutment cap = 0.30 m
Width of Abutment cap = 0.70 m
Clear cover provided = 50 mm
Dia. of main reinforcement = 10 mm
Dia. of distribution reinforcement = 10 mm

10mm dia 2 legged stirrups at 200mm c/c


700 10mm dia longitudinal bars 5 at top & 5 at bottom

300

All dimensions are in meters

(( Ref. IRC:78-2000; Cl. 710.8.2.) The thickness of cap over the hollow pier or column type of
abutment should not be less than 250 mm but in case of solid plain or reinforced concrete pier
and abutment, the thickness can be reduced to 200 mm.)

Longitudinal Steel
Area of Steel required in Longitudinal direction
Providing 0.30% of steel per meter run both at Top and Bottom
= ( 0.30 x 700 x 300 )
= 630.00 sq. mm
100
Providing 10 mm dia. reinforcement
630.00sq mm
No. of bars = = 8.03 = 10 no.
78.50sq mm
Hence, provide 10 mm dia. longitudinal bars; 5 nos. at top and 5 nos. at bottom

EIT-QMS01-WRE-QSF-A030-R0
Transverse Steel
Area of Steel required in Longitudinal direction
Providing 0.30% of steel per meter run both at Top and Bottom
= ( 0.30 x 700 x 300 )
= 630.00 sq. mm
100
Providing 10 mm dia. 2 legged stirrups

2 x 78.50 x 1000
Spacing of stirrups = = 249 mm c/c
630.00
Hence, provide 10 mm dia. 2 legged stirrups at 200 mm c/c

EIT-QMS01-WRE-QSF-A030-R0
STABILITY ANALYSIS OF ABUTMENT AT ELEVATION: 600.160 m
RL + 603.755
0.300 m 6
0.950 m
0.650 m
GE (CTC) AT CH: 7+882 OF BABALESHWAR BRANCH CANAL RL + 602.730
4
0.300 m 8 5 0.300 m RL + 602.430

2.120 m
2 2.120 m
0.80:1

3
1
A RL 600.310
0.150 m RL 600.160
0.250 m 0.400 m 1.700 m
0.300 m
0.150 m 0.150 m
2.650 m
2.950 m

Design Data :-
Particulars Height Base width
Abutment cap 0.300 0.400
Dirt wall 0.650 0.300
Outer side wall 2.120 0.250
Canal side sloped wall 2.120 1.700
Total 3.070 2.650

Levelling Course offset = 0.15 m


Levelling course thickness = 0.15 m
Frictional Coefficient= 0.6
Angle of internal friction (d ) = 30 °
Rankine's Coefficient (Ka) = 1/3
M15 M10 Soil(g)
Unit weight of Concrete & soil :
2500 2400 2000
LIVE LOAD CALCULATION :-

11400 x 10.60 + 11400 x 9.40 + 6800 x 5.10 + 6800 x 2.10 + 6800 x -0.90+ 6800 x -3.90 = 23049.060 kg
RA =
10.600

Impact factor = 0.5


Reaction with Impact factor = 34573.59 kg

Force (Kg)
Sl. Moment About
Particulars Lever Arm (m)
No. Vertical Horizontal "A" (Kgm)

A.Weight of Concrete
1 (1/2) x 1.700 x 2.120 x 2500 4505.00 1.133 5104.17
2 0.700 x 2.120 x 2500 3710.00 2.050 7605.50
3 (1/2) x 0.250 x 2.120 x 2500 662.50 2.480 1643.00
4 0.950 x 0.300 x 2500 712.50 2.250 1603.13
5 0.400 x 0.300 x 2500 300.00 1.900 570.00
6 0.550 x 0.300 x 2500 412.50 2.450 1010.63
B.Weight of Earth
7 1/2 x 0.250 x 2.120 x 2000 530.00 2.567 1360.35
8 0.250 x 0.950 x 2000 475.00 2.525 1199.38
C.Earth Pressure
10 (1/2) x 3.370 x 3.370 x 2000 x 1/3 -3456.13 1.289 -4454.95
D.Reaction
11 Dead load = 2795.00 x 10.60 x (1/2) 14813.5 1.900 28145.65
12 Live Load = 34573.59 / 6.40 5402.12 1.900 10264.03
Total 31523.123 -3372.8 1.715 54050.87
13 F.Frictional Force
0.50x14813.50 -7406.75 2.570 -19035.35
Total 31523.123 -10779.55 1.111 35015.53
SM
x =
SV
B = 2.950 m 2B/3 = 1.967 m
B/3 = 0.983 m B/6 = 0.492 m
B/2 = 1.475 m
Case I (Without considering frictional force)
e = B/2 - X = 0.240 m

B/6 > e ; 0.492 > 0.240


B/3 < x < 2B/3 ; 0.983 < x < 1.967 HENCE SAFE

Check for Foundation stress :-


V 6xe
s= 1±
A B
sMax= 15901.93 kg/m²
sMin = 5469.68 kg/m²

Case II (With considering frictional force)

e = B/2 s X = 0.364 m
B/6 > e ; 0.492 > 0.364
B/3 < x < 2B/3 ; 0.983 < x < 1.967 HENCE SAFE

Required foundation stress :-


sMAX = 18596.92 kg/m²
sMIN = 2774.69 kg/m²
S RM
Factor of safety against Overturning =
S OR
54050.87
=
23490.30
= 2.300 > 2.00

m x SV
Factor of safety against Sliding =
SH
0.60 x 31523.12
= = 1.755 > 1.50
10779.55 Hence Safe
Length

SPACING (mm)
Bar Dia (mm)
of Total Unit

Bar Type
Member
No. of Total Wt.

BAR
Description Each Length Wt.
Bars (kg)
Bar (m) (kg/m)
(mm)
1 2
Main 1 10 200 33 x 1 10900 6300 12500 412.50 0.617 254.40

800

800

800

800
DECK SLAB

Dist 2 10 200 56 x 1 10Ø @ 200mm (Main) 10Ø @ 200mm (Dist) 7900 442.40 0.617 272.80
3 4
Main 3 25 120 54 x 1 940 9060 6300 12010 648.54 3.854 2499.40

800

800
800
121
0
25Ø @ 120mm (Main) 10Ø @ 80mm (Dist.)
Dist. 4 10 80 115 x 7900 908.50 0.617 560.20
5 325
Main 5 10 200 56 x 2 100 6 3250 364.00 0.617 224.50
Kerb

1150 1200
10900
Dist 6 10 200 5x2 375 10Ø @ 200mm (Main) 10Ø @ 200mm (Dist) 10900 109.00 0.617 67.30
100
Long. 7 10 200 56x2 100 7 8 3420 383.04 0.617 236.20
Side wall

150

150
1110 1110
10900
400
Trans. 8 10 200 13x2 10Ø @ 200mm (Long.) 10Ø @ 200mm (Trans.) 11200 291.20 0.617 179.60
9 10
APPROACH

Dist. Main

9 12 150 43 x 2 2900 6300 3200 275.20 0.8879 244.40


SLAB

150

150

150

150
12Ø @ 150mm 12Ø @ 150mm
10 12 150 21 x 2 6600 277.20 0.8879 246.20
Length

SPACING (mm)
Bar Dia (mm)
of Total Unit

Bar Type
Member
No. of Total Wt.

BAR
Description Each Length Wt.
Bars (kg)
Bar (m) (kg/m)
(mm)
Long 11 10 200 33x2 600 11 12 5653 373.10 0.617 230.10
.
LHS and RHS

0
Abutment

150

150
(skin

203
Tran 12 10 200 28x2 6300 6600 369.60 0.617 228.00

5
18
s. 200 10Ø @ 200mm (Trans.)

26
10Ø @ 200mm (Long. (skin))
600
Abutment Cap

Long. 13 10 200 33x2 13 100 14 1800 118.80 0.617 73.30

100

100
200 200
6300
Trans. 14 10 - 10x2 10Ø 10 nos (Trans.) 6500 130.00 0.617 80.20
10Ø @ 200mm (Long.)
15 200
Long. 15 10 200 33x2 100 16 2300 151.80 0.617 93.70

100
Dirt wall

850 850
6300
Trans. 16 10 - 4x2 10Ø @ 200mm (Long.) 10Ø 4 nos (Trans.) 6500 52.00 0.617 32.10
Length

SPACING (mm)
Bar Dia (mm)
of Total Unit

Bar Type
Member
No. of Total Wt.

BAR
Description Each Length Wt.
Bars (kg)
Bar (m) (kg/m)
(mm)
200
(Near Approach
Cutoff wall U/S

Long. 21 10 200 33x1 100 21 22 2400 79.20 0.617 48.90

100
900 900
6300
Trans. 22 10 200 10x1 10Ø @ 200mm (Long.) 10Ø @ 200mm (Trans.) 6500 65.00 0.617 40.10
Length

SPACING (mm)
Bar Dia (mm)
of Total Unit

Bar Type
Member
No. of Total Wt.

BAR
Description Each Length Wt.
Bars (kg)
Bar (m) (kg/m)
(mm)
200
(Near Approach
Cutoff wall D/S

Long. 25 10 200 33x1 100 25 26 2400 79.20 0.617 48.90

100
900 900
6300
Trans. 26 10 200 10x1 10Ø @ 200mm (Long.) 10Ø @ 200mm (Trans.) 6500 65.00 0.617 40.10

TOTAL #DIV/0!
ADD 5% WASTAGE #DIV/0!
TOTAL #DIV/0!
SAY #DIV/0!
GOVERNMENT OF KARNATAKA
WATER RESOURCES DEPARTMENT- MINOR IRRIGATION
DETAILED ESTIMATION FOR THE CONSTRUCTION OF CART TRACK CROSSING FOR DC UNDER
LIFT OF KALVITANDA LIFT IRRIGATION SCHEME
No. DESCRIPTION OF WORK UNIT No L B D QUANTITY REMARKS
1 2 3 4 5 6 7 8 9
1 Excavation in all kinds of soil including
boulders upto 0.60 m dia. (0.113 cum) for
foundations of canal cross drainage and
other appurtenant structures and placing
excavated stuff neatly in specified dump
area or disposing off the same as directed
etc., complete with initial lead upto 50 m
and initial lift upto 1.5 m
WRD SR - 2018 - 2019, Item No 4.1, Page
No.79 cum
a) Lift 0.00 m to 1.50 m
Abutment U/S & D/S 2 7.700 3.450 1.500 79.695

Cutoff Wall U/S and D/S Near approach 2 0.700 0.300 1.595 0.670

Total 80.365
Say 81.000
2 Excavation in soft rock without blasting
including boulders upto 0.60 m dia (0.113
cum) for foundations of canal cross
drainage and other appurtenant structures
and placing the excavated stuff neatly in
specified dump area or disposing off the
same as directed etc., complete with initial
lead upto 50 m and initial lift upto 1.5 m.
WRD SR - 2018 - 2019, Item No 4.2, Page
No.79 cum
a) Lift 0.00 m to 1.50 m
Abutment U/S & D/S 2 7.700 3.450 0.000 0.000
Total -0.040
Say 0.000
b) Lift 1.50 m to 3.00 m
Abutment U/S & D/S 2 7.700 3.450 1.500 79.695
Total 79.735
Say 80.000
Remaining quantity After deducting
SRRB Say 76.00
No. DESCRIPTION OF WORK UNIT No L B D QUANTITY REMARKS
1 2 3 4 5 6 7 8 9
3 Excavation in soft rock requiring
blasting including boulders upto 0.6 m dia
(0.113 cum) for foundations of canal
cross drainage and other apurtenant
structures and placng the excavated stuff
neatly in specified dump area or disposing
off the same as directed etc., complete
with initial lead upto 50 m and initial lift
upto 1.5 m.
( WRD SR - 2018-19, Item No 4.3, Page
No.79 ) Cum

Total SR Quantity = 79.96


SRRB quantity = 5 % SR quantity Total 4.00
Say 4.00
4 Providing and laying insitu vibrated M-10
(28 days cube compressive strength not
less than 10 N/Sqmm) grade cement
concrete using 40 mm down size
approved clean, hard, graded aggregates
for foundation filling including cost of all
materials, machinery, labour, form work,
cleaning, batching, mixing, placing in
position, levelling, vibrating, finishing,
curing etc. complete with initial lead up to
50 m and depth of foundation upto
1.5m from surface.(Cement content :
220kg/cum with use of super plasticiser)

( WRD SR 2018 - 2019 - Item. No 4.10 of


Page 81 ) cum
Approach slab U/S & D/S 2 2.400 6.000 0.150 4.320
Abutment U/S & D/S 2 6.700 2.950 0.150 5.930
Cutoff wall U/S & D/S at approach 2 6.700 0.450 0.150 0.905
Total 11.154
` Say 11.200
No. DESCRIPTION OF WORK UNIT No L B D QUANTITY REMARKS
1 2 3 4 5 6 7 8 9
5 Providing and laying insitu vibrated M-15
(28 days cube compressive strength not
less than 15 N/ sq mm ) grade cement
concrete using 20mm down approved,
clean, hard, graded aggregates for sub
structure works including cost of all
materials, machinery, labour, formwork,
scaffoloding, cleaning, batching, mixing,
placing in position, levelling, vibrating,
finishing, curing etc.., complete with lead
upto 50m and lift upto 1.5m from
surface. (cement content: 270 kg/cum
with use of super plasticiser).
( WRD SR 2018 - 2019 - Item. No 4.15 of
Page 82 ) cum
Cutoff wall U/S & D/S at approach 2 6.400 0.300 1.000 3.840
Total 3.840
Say 3.900
6 Providing and laying insitu vibrated M-15
(28 days cube compressive strength not
less than 15N / sq mm ) grade cement
concrete using 40mm downsize
approved, clean hard, graded aggregates
for gravity type retaining walls / abutments
including cost of all materials, machinery,
labour, formwork, cleaning, batching,
mixing placing in position, levelling,
vibrating, finishing, curing, etc., complete
with initial lead upto 50m and lift upto
1.5m from surface.(Cement Content :
240kg/cum of plum CC with use of super
plasticiser)
( WRD SR 2018 - 2019 - Item. No 4.26.2
of Page 86 ) cum
Abutment U/S & D/S
Trapezoidal portion 2 6.400 (0.7+0.95)/2 2.120 22.387
Triangular portioin 2 6.400 (2.12 x 1.7)/2 23.066
Total 45.453
Say 45.500
No. DESCRIPTION OF WORK UNIT No L B D QUANTITY REMARKS
1 2 3 4 5 6 7 8 9
7 Providing and laying insitu M-20 ( 28 days
cube compressive strength not less than
25 N / Sqmm ) grade cement concrete
using 20 mm down approved, clean, hard,
graded aggregates for sub-structure
works including cost of all materials,
machinery, labour, formwork, cleaning,
batching, mixing, placing in position,
levelling, compacting, finishing, curing
etc., complete with all leads and lifts.
(Cement content: 330 kg/cum with use of
super plasticiser)
( WRD SR for 2018 - 2019, Item.No 4.14,
Pg. No. 82 ) cum
Abutment cap 2 6.400 0.700 0.300 2.688
Dirt wall 2 6.400 0.300 0.650 2.496
Total 5.184
Say 5.200
8 Providing and laying insitu vibrated M-20
(28 days cube compressive strength not
less than 25 N/sqmm) grade cement
concrete using 20 mm down approved,
clean, hard, graded aggregates for deck
slab and kerb including cost of all
materials, machinery, labour, formwork,
scaffolding, cleaning, batching, mixing,
placing in position, levelling, vibrating,
finishing, curing etc., complete with lead
upto 50 m and lift upto 1.50m from
surface. (Cement content: 330 kg/cum
with use of super plasticiser)
(Deriving from WRD SR for 2018 - 2019,
Item.No 4.29, Pg. No. 87 & 88) cum

Deck slab 1 11.000 6.400 0.950 66.880


Kerb 2 11.000 (0.45+0.425)/2 0.300 2.888
Parapet Wall 2 11.000 0.200 0.860 3.784
Approach slab U/S & D/S 2 3.000 6.400 0.300 11.520
Total 85.072
Say 85.100
No. DESCRIPTION OF WORK UNIT No L B D QUANTITY REMARKS
1 2 3 4 5 6 7 8 9
9 Providing and laying insitu M-20 ( 28 days
cube compressive strength not less than
20 N / Sqmm ) grade cement concrete
using 20 mm down approved, clean, hard,
graded aggregates for wearing coat
including cost of all materials, machinery,
labour, formwork, cleaning, batching,
mixing, placing in position in alternate
panels, levelling, compacting, finishing,
curing, packing joints with asphalt mortar
etc., complete with all leads and lifts.
(Cement content: 360 kg/cum with use of
super plasticiser)
( WRD SR 2018 - 2019 - Item No 4.31 of
Cum
Page 88&89 )
Deck slab 1 11.000 5.500 0.075 4.538
Approach slab 2 3.000 5.500 0.075 2.588
Total 7.125
Say 7.200
10 Providing, fabricating and placing in
position reinforcement steel bars for
RCC works including cleaning,
straightening, cutting, bending, hooking,
lapping, welding wherever required, tying
with 1.25 mm dia soft annealed steel wire,
including cost of all materials, machinery,
labour etc. complete with initial lead up to
50 m and all lifts.
( WRD SR 2018 - 2019 - Item. No 4.6 of
Page. 80 ) Kgs
From Bar Bending Schedule #DIV/0!
Total #DIV/0!
11 Providing and fixing in position 20 mm
thick premoulded joint filler in
expansion joint for fixed ends of simply
supported spans not exceeding 10 m to
cater for a horizontal movement upto 20
mm, covered with sealant complete as per
drawing and Technical Specification
MORTH Specification No.2605
(As per Item No. 31.4, Pg 244 ,PW,P &
IWTD,North zone 2018-19,Dharwad ) Rmt
2 6.400 12.800
Total 12.800
Say 12.800
No. DESCRIPTION OF WORK UNIT No L B D QUANTITY REMARKS
1 2 3 4 5 6 7 8 9
12 Providing casing embankment using semi-
pervious / pervious soil collected in
embankment area in heaps as part of
disposal of excavated soil from canal in
layer of 250 to 300 mm (before
compaction) including cost of all materials,
machinery, labour, all operations such as
spreading soil in layer of specified
thickness, sorting-out, breaking clods,
levelling, sectioning edges/sides, watering
and compacting each layer to density
control of not less than 95 percent or as
stipulated using vibrating plate
compactors etc., complete with lead upto
1 Km for water.
( WRD SR - 2018 - 2019, Item No 3.13,
Page No.60 ) Cum
Abutment outer portion
Trapezoidal portion 2 1.200 (0.15 + 0.4)/2 2.120 1.399
Rectangular portion 2 1.200 0.400 0.750 0.720
Rectangular portion (Working space) 2 1.200 0.500 3.070 3.684
Total 5.803
Say 5.900
13 Providing and placing bituminous felt
paper of the thickness specified for
functioning as the bearing surface for the
road slab on abutments and peirs after
rubbing their tops smooth.
( PW,P & IWTD,North zone 2018 - 2019 -
Item. No.0031 of Page.IV of Dharwad ) sqm
At abutment 2 6.400 0.400 5.120
Total 5.120
Say 5.200

You might also like