HFL = 111.800 m
Groundlevel = 106.300 m
Lake Bed Level = 103.000 m
Water level of lake = 105.700 m
Floor level of platform = 105.250 m
top level of Diaphragm wall = 104.000 m
top level of Diaphragm wall D1 = 106.300 m
Scour calculation
Q = 4247.527 cumec
Increasing 20% for concentration of flow
1.2*Q = 5097.032 cumec
q= 13.08609
Normal scour R = 1.35*(q2/f)1/3
= 8.075642 m
Probable max scour = 1.5*R = 12.113 m
Scour Level = 99.687 m
Thickness of stone pitching 't' = 0.06*Q1/3
= 1m
Launching Apron
Provide 600x600x600 mm cement concrete block over 1.0m thick layer of stone in
a length of 10.0m
105.700
105.250 w3
w1 0.000
3.250 w4 2.800
103.000
3.25 3.250
w5
102.450
0.450 m.
102.000 w2
0.40 m.
0.50 m. 1.80 m.
2.70 m.
2.70
3.700 12 3.700
13 0.000
Uplift presure
105.700
0.450
105.250
14
15
3.250
3.700 16
17
102.000
Earth pressure
105.700 105.700
3.700
3.700
102 102
9 0.50.33*0.9*3.25*3.25= 3.25/3=
1.57 1.08 1.7
e' is +ve when xbar is < (b/2).It means eccentricity is towards drain side.
e' is -ve when xbar is > (b/2).It means eccentricity is towards earth fill side.
b/2= 1.350 m.
e = 1.35-1.255= 0.095 m.
Stress
Stress = (∑P/A)*(1±6*e/b)
8.05/2.7(1+6*(0.095)/2.7)and 8.05/2.7(1-6*(0.095)/2.7)
CONDITION :- Backfill is saturated and water level is at the bed level of lake
105.250 w3
w1 1.500
3.250 w4 2.800
103.000
0.55 1.750
w5
102.450
0.450 m.
102.000 w2
0.40 m.
0.50 m. 2.00 m.
2.90 m.
2.90
1.000 12 1.000
13 0.750
Uplift presure
105.250
1.500 14
15
3.250 103.750
1.750 16
17
102.000
Earth pressure
103.000 103.750
1.750
1.000
102 102
(D) Uplift
6 2.9*1= 2.9/2=
-2.9 1.45 4.21
7 0.5*2.9*0.75= 2.9*2/3=
-1.09 1.93 2.11
TOTAL (D) -3.99 6.32
(E) Earth pressure ( Horizontal)
8 0.33*1.8*1.2*3.25= 3.25/2=
2.32 1.63 3.78
9 0.50.33*1.9*1.5*1.5= 1.75+1.5/3=
0.71 2.25 1.6
10 0.33*1.9*1.5*1.75= 1.75/2=
1.65 0.88 1.45
11 0.5*0.33*0.9*1.75*1.75= 1.75/3=
0.45 0.58 0.26
TOTAL (E) 5.13 7.09
e' is +ve when xbar is < (b/2).It means eccentricity is towards drain side.
e' is -ve when xbar is > (b/2).It means eccentricity is towards earth fill side.
b/2= 1.450 m.
e = 1.45-1.217= 0.233 m.
Stress
Stress = (∑P/A)*(1±6*e/b)
17.31/2.9(1+6*(0.233)/2.9)and 17.31/2.9(1-6*(0.233)/2.9)
Kp = 3
ϒs = 0.9
h1 = 0.70
μs = 0.578
μ = 0.45
F = 9.677
Fs = 6.16
Factor of safety against sliding = 0.9*9.677/6.16 = 1.414
Taking moment of horizontal forces about cetre of cross section of stem at base
surcharge = 0.33*1.2*1.8*2.8*2.8/2 = 2.794176 tm
Saturated earth = 0.5*0.33*1.9*1.5*1.5*(1.3+1.5/3) = 1.269675 tm
Saturated earth = 1.0*0.33*1.9*1.5*1.3*1.3/2 = 0.7947225 tm
water pressure = 0.5*1.3*1.3*1.3/3 = 0.3661667 tm
water pressure = -0.5*0.55*0.55*0.55/3 = -0.027729 tm
5.197011 tm
EARTHQUAKE CONSIDERATION
Proposed structure is situated in zone III for earth quake design consideration.
As per clause 3.4.2.3(a) of IS 1893:1984
αh = β I α0
β = a coefficient depending upon the soil foundation system
= 1 for Raft foundation from table 3
= 1.2 for piles not covered under col 3of table3 and type III soft soils
I = Importance factor from table 4.
= 1
α0 = basic horizontal seismic coefficient
= 0.05
Raft foundation
αh = 1*1*0.05
= 0.050
αv = αh/2 = 0.025
Pile foundation
αh = 1.2*1*0.05
= 0.060
αv = αh/2 = 0.03
Pa = 1/2* w * h2 *Ca
Where Pa = active earth pressure in kg/m3
w= unit wt.of soil in kg./m3
h= height of wall in m, and
Ca=
(1± αv ) cos2 (ф - λ - α )
x
cos λ cos2α cos ( δ + α + λ )
2
1
1+ { sin (ф + δ ) sin (ф - i - λ )
cos ( α - i ) cos ( δ + α + λ )
} 1/2
where
αv = vertical seismic coefficient
ф = angle of internal friction of soil
λ = tan-1( αh / ( 1 ± αV ) )
α = angle which earth face of the wall makes with the vertical
i = slope of earth fill
δ = angle of friction between the wall and the earthfill
αh = horizontal seismic coefficient.
here
αh = 0.008 for raft ,
α = 0 deg , 0 rad
i = 0 rad
δ = ф *2/3 = 20 degree, ### rad
ws = 1.9 t/m2
for raft Ca = 0.30372 , with +ve sign & 0.300747 , with -ve sign
Ca = 0.3037 adopting greater value for design
When αh = αv
=λ = 0
Ka = 0.297309 , with +ve sign & 0.29731 , with -ve sign
Ka = 0.2973 adopting greater value for design
For submersed earth fill
λ = tan-1( αh / ( 1± αV )*( ws / (ws - 1 ) )
where
ws = saturated unit wt. of soil in gm/cc,
hence
for raft λ = 0.0168 rad, with +ve sign 0.017 rad, with -ve sign
for pile 0 rad, with +ve sign 0 rad, with -ve sign
submersed δ = δ / 2 for dry earth fill = ### rad
hence
for raft Ca' = 0.320049 , with +ve sign & 0.316967 , with -ve sign
Ca' = 0.32 adopting greater value for design
for pile Ca = 0.308459 , with +ve sign & 0.308459 , with -ve sign
Ca = 0.3085 adopting greater value for design
When αh = αv =λ = 0
K'a = 0.308459 , with +ve sign & 0.30846 , with -ve sign
K'a = 0.3085 adopting greater value for design
h = 6.853 m
h' = 5.673 m Lateral dynamic increment/ef -
h-h' = 1.18 m fective pressure
8
h'/h = 0.827813
Ka = 0.2973
7
Ka' = 0.3085
3*(Ca-Ka) = 0.0192
3*(Ca'-K'a) = 0.0345 6
3*(Ca-Ka)*h'/h = 0.015894
3*(Ca'-K'a)*h'/h = 0.02856
5
q = 2.16 t
ws = 2 t/m3
4
0
0 0.1 0.2 0.3 0.4 0.5 0.6
For structure in zone IV
R.C.C R.C.C sub structure
super structure Pier & abutment
without ductile detailing
Z 0.24 0.24
I 1 1
R 2 2.5
Sa/g 2.5 2.5
Ah 0.150 0.120
Av 0.1 0.080
Distance of centreline of Bridge from end of pucca floor = 40.675 m
fsl of Parent channel = 237.32 m
x y
0 5.673
0.0192 5.673
0.015894 5.673
0.0285595 5.673
0.0192 6.853
0.015894 5.673
0 6.853
0.0192 6.853
0 0
0.0285595 5.673
hx/(h-h') depth e press dy in/ep dy in in force l arm
m t/m2 t/m2 t m
1 2 3 4 5 6 7
0.00 0.000 2.160 0.019 0.041
0.10 0.118 2.396 0.019 0.045 0.005 6.793
0.20 0.236 2.632 0.019 0.049 0.006 6.675
0.30 0.354 2.868 0.018 0.052 0.006 6.557
0.40 0.472 3.104 0.018 0.055 0.006 6.439
0.50 0.590 3.340 0.018 0.059 0.007 6.321
0.60 0.708 3.576 0.017 0.062 0.007 6.204
0.70 0.826 3.812 0.017 0.064 0.007 6.086
0.80 0.944 4.048 0.017 0.067 0.008 5.968
0.90 1.062 4.284 0.016 0.070 0.008 5.850
1.00 1.180 4.520 0.016 0.072 0.008 5.732
Total 0.068 Total
Total Force = 0.586 t
Total Moment = 2.240 tm
Moment hx/(h-h') depth e press dy in/ep dy in in force l arm Moment
tm m t/m2 t/m2 t m tm
8 9 10 11 12 13 14 15 16
0 0.000 4.520 0.029 0.129
0.035 0.10 0.567 5.087 0.026 0.131 0.074 5.389 0.397
0.037 0.20 1.135 5.655 0.023 0.129 0.074 4.823 0.356
0.039 0.30 1.702 6.222 0.020 0.124 0.072 4.257 0.306
0.041 0.40 2.269 6.789 0.017 0.116 0.068 3.691 0.252
0.043 0.50 2.837 7.357 0.014 0.105 0.063 3.125 0.196
0.044 0.60 3.404 7.924 0.011 0.091 0.055 2.560 0.142
0.045 0.70 3.971 8.491 0.009 0.073 0.046 1.996 0.092
0.046 0.80 4.538 9.058 0.006 0.052 0.035 1.434 0.051
0.047 0.90 5.106 9.626 0.003 0.027 0.022 0.880 0.020
0.048 1.00 5.673 10.193 0.000 0.000 0.008 0.378 0.003
0.425 Total 0.518 Total 1.815
Grade of Concrete M 25
Grade of steel FE 415
σcbc = 8.5 N/mm2
σst = 184 N/mm2
m = 280/(3*σcbc) = 10.98
Kbal = mσcbc/(mσcbc+σst) = 0.337
J = 1- K/3 = 0.888
R = 1/2*σcbc*j*K = 1.27
105.250 w3
w6
1.500
w1
3.250 w4
w4 2.950
103.000 1.750
0.70
w5
102.300
w2 0.300 m
102.000
w7 w8
m.
0.50 0.20 2.00 m. ```
2.70 m.
2.70
1.000 12 1.000
13 0.750
Uplift presure
105.250
Pw3 104.950
5
1.500
6 7
3.250 Pw4 103.750
Pw6 8
1.750 Pw4'
9
Pp1 Pw5 102.000
Earth pressure
103.000 105.250
3.250
1.000
102.000 102.000
2*2.95*1.9= 0.5+0.2+1=
6
11.21 1.50 16.82
TOTAL (B) 15.53 24.16
C.O.G. of (B)= 24.16/15.53= 1.56
Earthquake Forces
NO DETAIL Vertical Horizontal Lever arm MSTAB MDESTAB
(t) (t) (m) (t-m) (t-m)
1 2 3 4 5 6 7
1 On w1 0 0 0.65 1.425 0 0
On Water in
0 0 1.8 2 0 0
Hell side
2 On w3 0.1728 0.3456 1.70 3.85 0.29376 1.33056
(D) Uplift
6 2.8*1= 2.8/2=
-2.7 1.35 3.65
7 0.5*2.8*0.75= 2.8*2/3=
-1.05 1.87 1.96
TOTAL (D) -3.75 5.61
e' is +ve when xbar is < (b/2).It means eccentricity is towards drain side.
e' is -ve when xbar is > (b/2).It means eccentricity is towards earth fill side.
b/2= 1.350 m.
e = 1.35-1.056= 0.294 m.
Stress
Stress = (∑P/A)*(1±6*e/b)
16.96/2.7(1+6*(0.294)/2.7)and 16.96/2.7(1-6*(0.294)/2.7)
103.00 103.750
1.500
105.250 w3
w6
w1
3.250 w4
w4 2.800
103.000
0.55
w5
102.450
w2 0.450 m
102.000
w7 w8
m.
0.50 0.30 2.00 m. ```
2.80 m.
2.80
1.0 12 1.000
13 0.00
Uplift presure
103.00 103.750
1.500 105.250
Pw3 104.950
Pae
Pw6 Pw4'
3.250
1.000
102.000 102.000
2*2.8*1.9= 0.5+0.3+1=
6
10.64 1.50 15.96
TOTAL (B) 14.96 23.74
C.O.G. of (B)= 23.74/14.96= 1.59
(C) Water in drain side
5 0.5*0.55*1= 0.5/2=
0.28 0.25 0.07
TOTAL (C) 0.28 0.07
(D) Uplift
6 2.8*1= 2.8/2=
-2.8 1.4 3.92
7 0.5*2.8*0= 2.8*2/3=
0 1.87 0.00
TOTAL (D) -2.8 3.92
e' is +ve when xbar is < (b/2).It means eccentricity is towards drain side.
e' is -ve when xbar is > (b/2).It means eccentricity is towards earth fill side.
b/2= 1.400 m.
e = 1.4-1.313= 0.087 m.
Stress
Stress = (∑P/A)*(1±6*e/b)
19/2.8(1+6*(0.087)/2.8)and 19/2.8(1-6*(0.087)/2.8)
105.250 w3
w6
1.500
w1
3.250 w4
w4 2.800
103.000 1.750
0.55
w5
102.450
w2 0.450 m
102.000
w7 w8
m.
0.50 0.30 2.00 m. ```
2.80 m.
2.80
1.000 12 1.000
13 0.750
Uplift presure
105.250
Pw3 104.950
5
1.500
6 7
3.250 Pw4 103.750
Pw6 8
1.750 Pw4'
9
Pp1 Pw5 102.000
Earth pressure
103.000 105.250
3.250
1.000
102.000 102.000
2*2.8*1.9= 0.5+0.3+1=
6
10.64 1.50 15.96
TOTAL (B) 14.96 23.74
C.O.G. of (B)= 23.74/14.96= 1.59
(D) Uplift
6 2.8*1= 2.8/2=
-2.8 1.4 3.92
7 0.5*2.8*0.75= 2.8*2/3=
-1.05 1.87 1.96
TOTAL (D) -3.85 5.88
(E) Earth pressure ( Horizontal)
8 Pw3 0.33*1.8*1.2*= 3.25/2=
2.32 1.63 3.78
9 0.5*0.33*1.9*1.2*1.2= +/3=
Pw4
0.45 0 0
Pw6
4.868 1.475 7.1795625
10 0.33*1.9*1.2*1.75= 1.75/2=
Pw4'
1.32 0.88 1.16
11 0.5*0.33*0.9*1.75*1.75= 1.75/3=
Pw5
0.45 0.58 0.26
TOTAL (E) 4.54 5.2
e' is +ve when xbar is < (b/2).It means eccentricity is towards drain side.
e' is -ve when xbar is > (b/2).It means eccentricity is towards earth fill side.
b/2= 1.400 m.
e = 1.4-1.07= 0.33 m.
Stress
Stress = (∑P/A)*(1±6*e/b)
17.95/2.8(1+6*(0.33)/2.8)and 17.95/2.8(1-6*(0.33)/2.8)