CPKO
Total Production Volume: 20,258 MT (FY2009) 16,513 MT (FY2010) 6,396 MT (1H2011)
The Promise
The Promise
Bangka-Belitung short of Electricity. Bangka Belitung was then identified as area of electricity crisis by Ministry of Energy and Mineral Resources Free palm biomass and readily available
100% diesel power plant means state electricitys cost to generate 1 kWh > Rp. 2,000 Realization of zero waste Viable Downstream project
7
Renewable Quest
Biomass Powerplants
Listrindo Kencana, Tempilang BANGKA
Installed Capacity: 6MW Commisioned in 2008 Feedstock: Empty Fruit Bunch (EFB) and Palm Kernel Shell (PKS) Technology: Traveling grate biomass fired boiler supplying 35 tph steam @ 38 bar 450C to 6MW condensing turbine Registered as CDM project by UNFCCC on 8 December 2008 Envisioned as 2 x 6 MW power plant built in 2 phases First project in Indonesia to receive biomass PPA and first to provide electricity from biomass to national grid Bangka grid: 80MW Diesel powered Electricity rate: Rp. 766 / kWh
Biomass Powerplants
Belitung Energy, Mempaya BELITUNG
Installed capacity: 7.5 MW Feedstock: Empty Fruit Bunch (EFB) and Palm Kernel Shell Technology: Vibrating grate biomass fired boiler supplying 45 tph steam @ 38 bar 415C to 7.5MW fully condensing turbine Registered as CDM project by UNFCCC on 16 December 2010 Envisioned as 2 x 7.5 MW power plant built in 2 phases The first project to provide electricity from renewable sources to the Belitung electricity grid Belitung grid: 59MW Diesel powered Electricity rate: Rp.787/ kWh
10
Lessons learnt
11
External
Perusahaan Listrik Negara: Lengthy Power Purchase Agreement; Powerplant had to be built while PPA process is on-going Fixed electricity price, variable feedstock cost Grid reliability Troubleshooting and coordination with PLN operators Licenses: Lack of understanding by local authority for PPA process and other required licenses Overlapping and contradicting regulations between Ministry, Government and PLN Local Community and Villagers: Socialization how the cooperative with PLN work
12
13
Financing
Financial institution lack of understanding in renewable sector Not many interested Less appetite for small projects Self Financing , refinancing later Strict financial covenants Demand for Long Term PPA
14
15
Possibilities
Better rates through a dedicated biomass pricing scheme from PLN and Ministry of Energy and Mineral Resources Securing biomass supply through provincial domestic obligation Domestic biomass pricing scheme so variable electricity price can be a reality More understanding of fuel characteristics for higher efficiency power plant. Integration of Palm Oil Mill steam requirement and Powerplant electricity requirement through a single Cogen Plant: Savings in fuel, lower operation cost and higher production of electricity Biogas plant from effluent pond to generate more electricity
16
Present technology is real, Biomass are abundant, prices and policies are set. Lets work together for a brighter and cleaner Indonesia!