You are on page 1of 5

O.ffi"'.

ELECTRICITY GENERATION COMPANY OF BANGLADESH LI]'JIITED


rk:,:{xr:a'ff
i,ff:iirff ifrr#,ff {ft fi ffiiffi{;##r;v"ff#fi"r",L.miff ;*'
Terms of Reference (TOR)
for
Consulting Service for Feasibility study for Combined Cycle Power Plant Development
Project at Munshiganj.

l. fntroduction

Bangladesh has committed through its National Energy Policy to provide reliable and affordable
power to all by 2021. To achieve this target, Government of Bangladesh (GOB) has taken several
initiatives. Target of generation capacity is 24,000 MW, 40,000 MW and 60,000 MW by 2021,2030 and
2041 respectively. To meet this demand, the generation capacity should be increased. This will be achieved
through variety of fuel-mixes, the projection of the primary energy supply in204l will be 20Yo from coal,
38% from natural gas,25o/o from oil, 9%o from nuclear, 8% from Hydro, Solar, Wind, Biofuel, waste and
power import.

Electricity Generation Company of Bangladesh (EGCB) Ltd. (An enterprise of BPDB) .is a government
owned company for electricity generation in Bangladesh. Currently EGCB operates three power plants
(Haripur 412 MW Combined Cycle Power Plant, Siddhirganl 2x120 MW Peaking Power Plant and
Siddhirganj 335 MW Combined Cycle Power Plant, the Gas Turbine is in operation from 0lMay'2018
and Steam Turbine is expected to start from October' 2019\.

As part of the generation target of Bangladesh Government, Electricity Generation Company of


Bangladesh Limited (EGCB) has started the process to acquire around 194 acres of land at Char Mashura
& Char Ramjanbeg, under Munshiganj Sadar & Gazaria Upazilla of Munshiganj District for
development of large base load power station. Earlier, EGCB Ltd. conducted a Pre-feasibility Study, Initial
Environmental Examination (IEE) and Initial Resettlement Action Plan (IRAP) for setting up of 600-800
MW Coal based Power Plant at that site.

2. Project Location

The project is located at Munshiganj having around 194 acres of land at Char Mashura & Char
Ramjanbeg, under Munshiganj Sadar & GazairaUpazilla of Munshiganj District.

The Latitude and Longitude of the project area are given below:

(t) 23'31',49.50"N, 90"34', 13.03"8


(2\ 23.31',48.65 "N, 90"34'. 5.27 "8
(3\ 23"3 t'. 32.99 "N, 90.3 4'. 5 .7 3 "8
(4) 23"31',34.08 "N, 90"34', t4.26"8
3. Objective

Through this EOI, EGCB intends to prepare a short-list of Consulting Firms having requisite eligibility
and experience in executing works of similar nature in line with scope as Sl. No. 4 below. Separate R.qr.it
for Proposal (RFP) shall be issued to short-listed Consulting Firms.

4. Scope ofService
The purpose of this study is to assess the technical, economic, and financial feasibility of the Combined
Cycle Power Plant project at Munshiganj along with environmental and social assessments complying
Bangladesh and World Bank / Equator Principles. The scope of this assessment include feasibilitystudy
and preliminary design, for best proven technology for the above power plant project at Munshiganj by
the bank of Meghna River. The Power Plant type shall be base load power station. In carrying out this
study, the consultant shall address the following study area considering all seasonal variation:

i. Detailed Feasibility Study (including Geotechnical investigation) towards implementation of base


load large power plant project.
ii. Environmental Impact Assessment (EIA) projecting cumulative impact assessment.
iii. Social Impact Assessment (SIA) fincluding Resettlement Action Plan (RAP)]
iv. Disaster Impact Assessment (DIA) projecting the proposed Combined Cycle power plant and
surrounding natural environment. .

v. Recommendation for best proven technology for Power Plant Development Project at that site.

4.1 Detailed Feasibility Study (including Geotechnical investigation & River Morphotogy Study)

The consultant shall ensure that all design and results conform to national and international standards
according to the projected impacts of the base load large power plant project.
The consultant will conduct the detailed feasibility study (including geotechnical investigation), which
will include the following (but not limited to):
a) Introduction including methodology.
b) Assessment of Current Power Generation Situation of Bangladesh and Justification of the Project
towards achievement of Sustainable Development Goal (SDG)
c) Assessment of Site
d) Suitability of Site for Proposed base load large power plant project
e) Preparation of Fuel Supply Plan
f) Preparation of Conceptual Design
g) Preparation of Optimum Design of the proposed plant including selection of water intake and
discharge system, including specifications of discharge tunnel, circulating water pipe
h) Study on Civil Construction Work requirement with Geotechnical investigation Plan
i) Preparation of Project Construction Plan
j) Economic and Financial Analysis

4.2 Environmental Impact Assessment (EIA)

The consultants shall submit a comprehensive Environmental Impact Assessment (EIA) report considering
the overall activity if the said Project in accordance with the TOR and time schedule indicated in the Initial
Environmental Examination (IEE) Report.
The consultants will conduct the Environmental Impact Assessment (EIA) based on guideline of
Department of Environment (DOE), Bangladesh. In addition, the suggestions from the Department of
Environment (DOE), requires to be incorporated in the report.
4.3 Social rmpact Assessment (srA) [including Resettlement Action plan (RAp)]

The consultant will conduct social impact, land acquisition and resettlement assessments, which will be
elaborated in the RFP document.

4.4 Disaster fmpact Assessment (DIA)

The consultant will conduct disaster impact assessment in line with National Disaster Management
Council's Guideline/Program and action plan, which will be elaborated in the RFP document.

5. Time Period

The consulting service duration shall be for six (6) months.

6. Report

(l) Inception Report: Consultant will submit an Inception Report within 2 weeks from signing of the
contract, stating their jobs understanding, concept on the requirements of the assignment,
readiness and strategy for undertaking the project.
(2) Interim Report: Consultant will submit Interim Report within 2 months from the date of Contract
signing.
(3) Draft Study: Consultant shall submit Draft Study within 5 months from the date of Contract
signing.
(4) Stakeholders Workshop: Consultant shall arrange a Stakeholders Workshop on Draft Study.
(5) Final Study: Consultant will submit the Final revised Study incorporating the comments of the
Workshop within 6 months from the date of signing of the Contract.

7. Facilitation and Reporting


EGCB will ensure access to the available pertinent information to the assignment. The consultant will
work under the direct supervision of the Project Director, Munshiganj 300-400 MW Super Critical Coal
Based Power Plant Project, EGCB Ltd.

8. Key Expert Requirement:


Considering the above scope of work and 6 months of duration of the project, a total of 60 person-months
of consulting services willbe required. Table I below gives the positions required.

Table l: Personnel Required

SI: No. Specification of required expertise/Position

Key Experts
1 Team Leader/Project Manager
2. Mechanical Engineer-1 (Gas Turbine)
J. Mecl.ranical Engineer-2 (Steam Turbine & HRSG)
4. Electrical Engineer (Power Plant)
5. Instrumentation & Control Engineer

3
SI. No. Speci licatio n of req ui red expertise/Positio n
6. Civil Engineer
7. Foundation Design Engineer
8. Environmental Specialist
9. Social & Resettlernent Specialist
10. Disaster Impact Assessment Specialist
l1 Embankment Protection Engineer
12. Lead Architect
13. Lead Power Plant Business Analyst/Economist/Financial Analyst
14. Other Experts (as per requirement of the stipulated study)

The preferred experiences of proposed key staffs are mentioned below:

1. Team Leader/ Project Manager: At least Bachelor degree/Equivalent in Mechanical/Electrical


Engineering with 20 years ofjob experience; l0 years of experience in the field of Consultancy in
Power sector; Experience as Team Leader/Project Manager in 04 nos. of Consultancy projects;
Experience in conducting detailed Feasibility study of 03 nos. of Combined Cycle Power Plant
Projects (Gas based) having capacity not less than225 MW each.

2. Mechanical Bngineer-l (Gas Turbine): At least Bachelor degree/Equivalent in Mechanical


Engineering with 15 years ofjob experience; l0 years of experience in the field of Consultancy in
Power sector; Experience in conducting detailed Feasibility study of02 nos. of Combined Cycle Power
Plant Projects (Gas based) having capacity not less than GT-150 MW / GT&ST-225 MW each.

3. Mechanical Engineer-2 (Steam Turbine & HRSG): At least Bachelor degree/Equivalent in


Mechanical Engineering with 15 years of job experience; l0 years of experience in the field of
Consultancy in Power sector; Experience in conducting detailed Feasibility study of 03 nos. of gas
based thermal power plant project having capacity not less than 150 MW (Single Unit); 05 years of
experience in Steam Turbine & Heat Recovery Steam Generator in design specification, installation,
maintenance etc. for combined cycle power plant.

4. Electrical Engineer @ower Plant): At least Bachelor degree/Equivalent in Electrical Engineering


with 15 years ofjob experience; l0 years of experience in the field of Consultancy in Power sector;
Experience in conducting detailed Feasibility study of 02 nos. of Combined Cycle Power Plant
Projects (Gas based) having capacity not less than 225 MW each; 05 years of experience in
operation/maintenance/design/erection/ commission/manufacture/consultancy etc. of electrical
system i.e. substation, switchgear, power evacuation facility etc. of power plant not less than 225 MW
Combined Cycle Power Plant.

5. Instrumentation & Control Engineer: At least Bachelor degree/Equivalent in Electrical Engineering


with 15 years ofjob experience; 05 years of experience in the field of Consultancy in Power sector;
Experience in conducting detailed Feasibility study of 02 nos. of Combined Cycle Power Plant
Projects (Gas based) having capacity not less than 225 MW each; 05 years of experience in the field
of Instrumentation & Control system of Combined Cycle Power Plant.
6. Civil Engineer: At least Bachelor degree/Equivalent in Civil Engineering with 20 years of job
experience; 05 years of experience in the field of Consultancy in Power sector; Experience in
conducting detailed Feasibility study of 01 no. of Combined Cycle Power Plant Projects (Gas based)
having capacity not less than 225 MW each; 10 years of experience in civil works related to
construction, erection, installation, design etc. of combined cycle Power Plant.

7. Foundation Design Engineer: At least Bachelor degreelEquivalent in Civil Engineering with 15


ofjob experience; 5 years ofexperience in design offoundation ofpower plant;
years

8. Environmental Specialist: At least Master degree/Equivalent in Environmental Science/Engineering


with 15 years of job experience; l0 years of experience in the field of Consultancy addressing
environmental issues; Experience in conducting Environmental Impact Assessment (EIA) of 02 nos.
of Combined Cycle Power Plant Projects (Gas or Liquid Fuel or Dual Fuel based) having capacity not
less than 225 MW each; Experience in conducting Environmental Impact Assessment (EIA) ofthermal
power plant project having capacity not less than 150 MW (Single Unit).

9. Social & Resettlement Specialist: At least Master's degree/Equivalent in Social Science/


Sociology/ Geography with 15 years of job experience; Experience in conducting Social Impact
Assessment (SIA) of 02 nos. of any project; Experience in conducting Resettlement Action Plan
(RAP)) of 02 nos. of any project; 10 years of experience in conducting Social Impact Assessment
(SlA), Socio-economic assessment, preparing Resettlement Action Plan (RAP) and Project Complaint
Mechanism (PCM), management of resettled inhabitants etc.

10. Disaster Impact Assessment Specialist: At least Master degree/Equivalent in relevant discipline such
as environmental science, social science, geography, disaster management etc. with 15 years ofjob
experience; Experience in conducting Disaster Impact Assessment (DIA) of 02 nos. of any project; 05
years of experience in the field of disaster (natural/manmade) management in the areas related to
climate change, natural hazards, disasters, flood management, vulnerability, and disaster related risk
etc. and post disaster situation management in any project.

11. Embankment Protection Engineer; At least Bachelor degree/Equivalent in Civil/Water Resources


Engineering with l5 years ofjob experience; Experience in conducting detailed Feasibility study of
02 nos. ofany project by the river or sea side; 05 years ofexperience in planning, design, construction
of Earth Dike, embankment etc.

12. Lead Architect: At least Bachelor degree/Equivalent in Architecture with l5 years ofjob experience;
10 years of experience in planning and design of infrastructure.

13. Lead Power Plant Business AnatysV Economist/ Financial Analyst: At least Master's degree/
Equivalent in Economics/Finance/Business Administration with l5 years ofjob experience; 05 years
of experience in economic and financial analysis of Combined Cycle/Thermal Power Plant Project.