You are on page 1of 27

pencil

09

lvaro Siza
TERRAOS DE BRAGANA
LISBOA - Portugal

LVARO SIZA

siza@mail.telepac.pt COORDINATING ARCHITECTS CONTRACTOR COLLABORATING ARCHITECTS 1st phase: Clemente Menres 2nd phase: Miguel Nery Ferrovial - Agromn, S.A. Ashton Richards Francesca Montalto Cladia Vogel Cristina Ferreirinha Vitor Oliveira Michele Gigante Maria Moita Mitsunori Nakamura Atsushi Ueno Tomoko Kawai Jose Rodrigues

PHOTOGRAPHY

COLLABORATORS Project Management Structure Electrical Installation Mechanical, Plumbing, Drainage and Gas Landscape architecture Client STA - Segades Tavares Associados, Lda. Antnio Segades Tavares Antnio Vieira Pereira Carlos Palma Joo Gomes da Silva Imoplis - Sociedade Gestora de Fundos de Investimento Imobilirio, S. A.

DATES BEGINNING OF CONSTRUCTION END OF CONSTRUCTION 1992 2004

179

09

lvaro Siza

COLLECTIVE HOUSING LISBOA - Portugal

DESCRIPTIVE BRIEF
The housing, service and commercial complex Terraos de Bragana occupies a parcel of nearly 5000 m2 situated between Antnio Maria Cardoso and Alecrim, which arises in a perfectly consolidated area, like an interval that needs to be lled. Care was taken to establish a dialogue with the environment to nd the rst motivations for the denition of the project; as well as to make a conscientious reading of the terrain, its topography, and the footprints left by those who had lived there and given it meaning. Those footprints trace back at least to the beginning of the14th century, the period of completion of the Muralla Fernandina city wall. The construction of this defense structure clearly dened the border of the metropolis, reinforcing what once was a natural border - the strong existing slope in the terrain, previously assumed as the limit of the wall of the Convent of San Francisco da Cidade, from the 13th century (a Convent whose building still exists today and houses the Escola Superior de Belas Artes). These grounds had gradually been urbanized, on both the inside and the outside of the city walls, building new roads and buildings on the summit of the hillside, such as the palace of the Dukes of Bragana and, later, the Jansen Beer Factory The demolitions carried out on the site twenty years ago had left a section of the city wall exposed, nowadays clearly visible, along with the tower and the extreme southwest access door to the city, as well as an ensemble of brick foundations which presumably belonged to the Jansen Beer Factory. This ensemble sensibly divides the terrain in half longitudinally and parallel to the roads which, in the meantime had been opened: Rua Antnio Maria Cardoso, on the inside, above, and Rua do Alecrim on the lower side. This topological, geographical and historical fragmentation which divides the terrain in two, connecting the parts parallel to the access roads, is adopted by the project, both in morphological and programmatic terms. In this way, an ensemble of three buildings has been built on the terrain which borders the Rua do Alecrim, each facing the street and 15,5m in depth. The program is also similar: the ground oors (1 or 2 depending on the case) are intended for commerce, while the upper oors for ofces and housing. On the high part of the site, the area which borders Rua Antnio Maria Cardoso, two residential buildings were constructed. The two buildings contact the ground through columns, separated from each other by a large distance, dened to preserve the existing ruins of the Muralla Fernandina (city wall), historical testimony which greatly increases the value of the terrain. According to the previous inquiries made to IPPARNT, this will become a museum area, integrated in the open space of the housing and open to the public. All ve buildings share the same underground parking area (9002 m2), with three common entrances from Rua do Alecrim, while a circular ramp guarantees the connection between the various oors. The building has a reinforced concrete structure, made up of columns and continuous, mushroom-shaped slabs. On the basement level, the perimeter walls will be constructed according to the berlinesque shoring system with drained air cavity and double interior brick wall to avoid eventual inltrations. The construction above grade will have brick walls with air cavity and thermal insulation. The interior partitions will be brick to plaster and paint. The roofs will be at, waterproofed and thermally insulated with an inverted roof system. On Rua do Alecrim, exterior nish of the buildings will be Lioz stone up to the last oor of ofce or commercial spaces, and the remaining levels, which correspond to housing units, will be nished in tile. The buildings bordering Rua Antnio Maria Cardoso will have a Lioz stone base until the rst housing level and balconies of the buildings. The remaining wall surfaces will be nished in tile. The exterior windows are double, in enameled wood, with interior shutters for solar protection.

180

TECHNICAL DATA
SURFACE AREA OF SITE 4.849,00 m2 SURFACE AREA OF ENSEMBLE Building 1 Building 2 Building 3 Public passage Building 4 Building 5 Total CONSTRUCTED VOLUME Building 1 Building 2 Building 3 Public passage Building 4 Building 5 Total SURFACE AREA OF PAVEMENT Building 1 Building 2 Building 3 Public passage Building 4 Building 5 Total AREA OF PUBLIC SPACE 2.153,60 m2 INDEX OF RECLAMATION 2,86 INDEX OF OCCUPATION 0,55 DEPTH WATERPROOFED SURFACE AREA 2.934,10 m2 GROSS CONSTRUCTED SURFACE AREA 13.869,40 m2 GROSS CONSTRUCTED AREA ABOVE GRADE 9.002,60 m2 Building 1 Building 2 Building 3 Public passage Building 4 Building 5 15,00 m 15,50 m 15,50 m 15,50 m 15,50/19,20 m 12,40/14,90 m 1.587,00 m2 2.432,90 m2 3.993,20 m2 344,50 m2 4.220,10 m2 1.291,70 m2 13.869,40 m2 FAADE HEIGHT Building 1 Building 2 Building 3 Public passage Building 4 Building 5 17,50 m 16,80 m 17,80/14,70 m 17,20 m 18,20 m 17,00 m NUMBER OF STORAGE UNITS 41 NUMBER OF PARKING SPACES 187 4.847,00 m
2

TOTAL GROSS CONSTRUCTION AREA 22.872,00 m2 FLOOR LEVELS ABOVE GRADE 257,30 m2 639.55 m 929,70 m 705,20 m 260,50 m 2695,40 m
2 2

Building 1 Building 2 Building 3 Public passage Building 4 Building 5 FLOOR LEVELS BELOW GRADE Building 1,2 e 3 Building 4 e 5 NUMBER OF HOUSING UNITS

6 5 4/5 5 4

70,00 m2
2 2 2

3 5/2

7.807,00 m2 11.938,80 m2 2.128,30 m2 11.988,80 m2 4.397,50 m2 43.107,40 m2 NUMBER OF COMMERCIAL SPACES 7 NUMBER OF OFFICE UNITS 10 36

181

09

4 COLLECTIVE HOUSING - EDITORIAL PENCIL

TERRAOS DE BRAGANA lvaro Siza

West elevation
0 10 20m

1:700

182

183

09

4 COLLECTIVE HOUSING - EDITORIAL PENCIL

TERRAOS DE BRAGANA lvaro Siza

10

20m

1:700

East elevation

10

20m

184

1:500

South elevation

West elevation
0 10 20m

1:700

185

09

4 COLLECTIVE HOUSING - EDITORIAL PENCIL

TERRAOS DE BRAGANA lvaro Siza

186

187

09

4 COLLECTIVE HOUSING - EDITORIAL PENCIL

TERRAOS DE BRAGANA lvaro Siza

Interior East elevation


0 10 20m

1:700

188

189

09

4 COLLECTIVE HOUSING - EDITORIAL PENCIL

TERRAOS DE BRAGANA lvaro Siza

Section

1. Parking lot 2. Machine room 3. Storage room 4. Waste room 5. Room 6. Garden storage 7. Technical gallery 8. Antechamber 9. Access corridor 10. Ventilation room

10

20m

1:500

Section
190

Section

191

09

4 COLLECTIVE HOUSING - EDITORIAL PENCIL

TERRAOS DE BRAGANA lvaro Siza

10

20m

1:500

Floor level 0
192

1. Parking lot 2. Machine room 3. Pump room 4. Tank 5. Technical gallery 6. Stock area 7. Ventilation room 8. Waste room 9. Loading / Unloading area 10. Shop 1 (oor 1) 11. Shop 2 (oor 2) 12. Shop 3 13. Shop 4 14. Ventilator room 15. Storage room 16. Void 17. Desk 18. Small ofce 19. Medium ofce 20. Large ofce 21. Library 22. Reception 23. Archive 24. Meeting room 25. P. Trasf. 26. Garden storage

Floor level 3
193

09

4 COLLECTIVE HOUSING - EDITORIAL PENCIL

TERRAOS DE BRAGANA lvaro Siza

27. Lobby 28. Corridor 29. Single room 30. Hall 31. Living room 32. Dining room 33. Balcony 34. Laundry 35. Terrace 36. Service room 37. Water

10

20m

1:500

Partial oor plan, height level 32.94

194

Floor level 5

The two buildings contact the ground through columns, separated from each other by a large distance, dened to preserve the existing ruins of the Muralla Fernandina (city wall), historical testimony which greatly increases the value of the terrain.

195

09

4 COLLECTIVE HOUSING - EDITORIAL PENCIL

TERRAOS DE BRAGANA lvaro Siza


N

10

20m

1:500

27. Lobby 28. Corridor 29. Bedroom 30. Hall 31. Living room 32. Dining room 33. Balcony 34. Laundry 35. Terrace 36. Service room 37. Water

Floor level 6
196

197

MODULATION OF FAADES

D1

D2

Seccin D 3

D3
0 1 2 3 4 5m

1:150

1. Row of Stone,23cm from axis 2. Acerto Tiles 3. Alignmemt L. Special Stone type L U. Special Stone type U V. Special Stone type V M. Special Stone type M C. Special Stone type C Cut stone Brick Concrete

199

Section A

Section B

5m

Floorplan type

1:150

Ground oor level


200

Section C

Section D

Roof level 1

Roof level
201

Sliding window elevation

Sliding window section

D. 0

D. 1

D. 2
202

D. 3

D. 5

D. 7

D. 4

D. 6

D. 8

D. 9

1. Lioz Stone 2. Stainless steel corner board 80x55x5 mm 3. Prole vedante cruzfer m8115 4. Prole vedante cruzfer st. E2018.93 Concrete Brick Mortar Tile Wood Insulation Marble Steel Rell

203

You might also like