Professional Documents
Culture Documents
Problem:
Most of the problems occurring in cashiering system is the time that takes
too long to compute daily income and a hard to compute multi-service
ordered by the costumer and also the proper storing of the data, income
for the day in their database because sometimes due to negligence
employee forgot to save and record it in their database.
Objective:
The main Objective is to come up on a system that can input and compute
multi-service ordered by the customer and to lessen the time when it
takes to compute the daily income, and to have an accurate and stable
database that will store and secure its data that must be convenient and
user friendly.
Disadvantages
The waterfall model is the oldest and the most widely used paradigm.
However, many projects rarely follow its sequential flow. This is due to the
inherent problems associated with its rigid format. Namely:
3. The customer only sees a working version of the product after it has
been coded. This may result in disaster if any undetected problems
are precipitated to this stage.
Analysis and
Information
Requirements
Designing and
Development
Testing and
Implementations
System Support
and Maintenance
Like a waterfall flow down from a mountain can never flow up again, the
process taken in waterfall method can not be done again. Water fall
diagram s allow for departmentalization and managerial control. On the
other hand its most serious disadvantage is that it does not allow revision.
design and development. it also include of finding out more detail on what
the system’s problems are and what users require in the new and
improved system. In systems design functions and operations are
described in detail, including screen layouts, business rules, process
diagrams and other documentation. The output of this stage will describe
the new system as a collection of modules or subsystems.
Tools and techniques were become the aid and the bases of the group in
determining the system requirements. This included the use of the
dataflow diagrams (DFD’s) containing all the data items that will be used
in the system as well as their specifications. At this point, the group
prepared a system proposal that has been summarized; the group able to
define alternative solution for the cost and benefit, and how the group will
met the expectations and objectives of the company or organization.
In this phase, monitoring and filtering out errors for connection were
done on the prototype system. The system may gain enhancements or
upgrades if needed, it depends on the management if they want to adapt
the changes in the environment and for some more advanced system and
conversion to a more innovative and faster system. The deployment of the
system includes changes and enhancements before the decommissioning
or sunset of the system. Maintaining the system is an important aspect of
SDLC. As key personnel change positions in the organization, new
changes will be implemented, which will require system updates.
Conclusion: