Instruction Title Electrical works

Document Ref SIPL / PWI / QA / 02


Revision No 01 PROJECT WORK
Date of Revision 01.05.2009
Issue No. 01
INSTRUCTION
Issue date 01.10.2008
Department Quality Assurance

Electrical works:
Input: 1) Specification details-clauses etc.
2) Drawings applicable (Layouts, Installation details or working drawing).

Out put:

Work is expected to be carried out by a sub contractor.

1) Ensure that, drawing details are visible, readable, and dimensions are clearly mentioned on the drawings.

2) Ensure that, all electrical items like: D.B.Panel, H.T & L.T.cables, wires, glands, clips, U Clips, brackets, screws,
cable tray, P.V.C. Pipes, Flexible pipes, bulbs, tube lights, acrylic sheets, sockets, switches, plugs, etc. are available
as per job requirement. And if the material is found with any damages like scratch marks, cuts, cracks etc or with low
quality then inform to the project manager immediately.

3) Ensure that, all the equipments are available like screwdriver, chisel, and drill machine, measuring tape, hammer,
hacksaw blade with frame, Multimeter, ear thing checking instrument, tester, cutting pliers, insulation tape. Contactor
should provide sufficient and efficient manpower to carry out the work.

4) Ensure that, site layout and line out marking are matching the specifications given in the drawings. Also ensure that,
contractor should be used the self protecting equipments such as helmet, gloves, safety belts and shoes and keep the
area the area neat and clean while working.

5) Ensure that, after installation of all the electrical jobs it should be identified with markings, and insulated properly.

6) Ensure that, the contractor should certify all the electrical work (testing and commissioning) carried out.
Refer Inspection and Test Plan.

7) Keep the area clean and remove any scrap materials from the working area.

8) If the electrical work found damaged and with deviations in the dimensions then it will be treated, as “NON
CONFORMING PRODUCT” and Q.A. Coordinator will inform to the Project Manager / TL to take corrective actions.
After corrective actions it will be verified and recorded by the Q.A. Department.