Professional Documents
Culture Documents
Department
Name of lake BBMP zone Extent Status Restoration plan Time in years Estimated Cost Remarks
Sketch certified by Tahsildar; fencing is almost complete After encroachment is
except in encroached areas and letter has been sent to DC removed, development work
Abbigere kere Dasarahalli 47-13 (Urban) to take action to evict encroachments Comprehensive Development 3 340 can be started
Sketch certified by Tahsildar; fencing is almost complete After encroachment is
except in encroached areas and letter has been sent to DC removed, development work
Agrahara lake Byatarayanapura 15-33 (Urban) to take action to evict encroachments Comprehensive Development 3 110 can be started
After encroachment is
removed, development work
Bellahalli Byatarayanapura 18-32 Survey completed Comprehensive Development 3 135 can be started
After encroachment is
removed, development work
Chikka Banawara 104.4 To be surveyed Comprehensive Development 3 820 can be started
Sketch certified by Tahsildar; fencing is almost complete
except in encroached areas and letter has been sent to DC
Chokkanahalli lake Byatarayanapura 8-2 (Urban) to take action to evict encroachments Comprehensive Development 3 65
Handrahalli Dasarahalli 16-6 Fencing in progress Comprehensive Development 2 120
Kammagondanahalli Dasarahalli 22.29 Certified, fencing yet to start Comprehensive Development 3 305
After encroachment is
removed, development work
Kattiganahalli kere Byatarayanapura 25 Sketch certified by Tahsildar, fencing to be started Comprehensive Development 3 180 can be started
Kattiganahalli kere Byatarayanapura 20-10 Sketch certified by Tahsildar, fencing is nearing completion Comprehensive Development 3 145
Sketch submitted to Tahsildar for certification, fencing in
Kogilu lake Byatarayanapura 73-28 progress Comprehensive Development 3 540
Sketch certified by Tahsildar; fencing is almost complete After encroachment is
except in encroached areas and letter has been sent to DC removed, development work
Lakshmipura lake East 10-20 (Urban) to take action to evict encroachments Comprehensive Development 3 75 can be started
Lingadiranahalli Dasarahalli 11-32 Fencing in progress Comprehensive Development 2 70
Mallasandra Gudde lake Dasarahalli 17-11 Fencing in progress Improvements 2 240
Medi Agrahara 13-15 Survey in progress Comprehensive Development 3 300
Rajarajeshwari
Nagarabhavi Nagar 17-39 Survey in progress 215
After encroachment is
Lake land is acquired for NH-7, other roads and railway removed, development work
Shivanahalli Byatarayanapura 18-12 embankment. To be handed over to BDA Comprehensive Development 3 400 can be started
Sketch certified by Tahsildar; fencing is almost complete After encroachment is
except in encroached areas and letter has been sent to DC removed, development work
Singapura kere 66-18 (Urban) to take action to evict encroachments Comprehensive Development 3 470 can be started
After encroachment is
removed, development work
Srigandadakaval 6-33 Fencing in progress Comprehensive Development 3 55 can be started
After encroachment is
removed, development work
Srinivasapura kere Byatarayanapura 3-4 To be surveyed Comprehensive Development 3 25 can be started
After encroachment is
Fencing not started as acquisition data on the lake area is not removed, development work
Thirumenahalli Byatarayanapura 23-8 available Comprehensive Development 3 170 can be started
Vaderahalli Byatarayanapura 9-34 Sketch certified by Tahsildar, fencing in progress Comprehensive Development 3 70
Sketch certified by Tahsildar. Fencing is almost complete
except for an encroachment, letter has been sent to DC
Veerasagara lake Byatarayanapura 21-14 (Urban) to evict encroachment Comprehensive Development 3 145
Parappara Agrahara 16-11 Fenced by KFD, afforestation works are in progress Comprehensive Development 3 232
Sketch signed by BBMP surveyors. Encroachments by slum After encroachment is
dwellers wil be shifted from the tank. Afforestation work is in removed, development work
Gangasetty kere Mahadevpura 21-27 progress Comprehensive Development 3 290 can be started
Sketch certified by Tahsildar. Some encroachments are
evicted and tank is partly fenced. Afforestation works are
Kudlu doddakere 43-39 progressing Comprehensive Development 3 612
Sketch submitted to Tahsildar, yet to be certified. Some land After encroachment is
was granted to individuals, DC has to verify that. Partly fenced removed, development work
Nalluralli tank Mahadevpura 47-39 and afforestation
Sketch certified byworks are in Tank
Tahsildar. progress
is completed, all Comprehensive Development 3 668 can be started
encroachments evicted and afforestation works are in
Kudlu chikere 13-15 progress Comprehensive Development 2 187
Sketch submitted to tahsildar. Encroachment of 2.18 acres
already evicted; rest encroachment by BEML Housing Society, After encroachment is
case pending in HC. Tank is partly fenced and afforestation removed, development work
Siddapura kere South 27-35 works are in progress Comprehensive Development 3 385 can be started
Sketch certified by Tahsildar. Encroachments evicted, fencing
Panathur kere Mahadevpura 6-31 complete and afforestation works in progress Comprehensive Development 3 54
Sketch certified by Tahsildar. Some encroachments are to be After encroachment is
removed. Tank is fully fenced and afforestation work is in removed, development work
Bhoganalli kere Bommanahalli 12-24 progress Comprehensive Development 3 89 can be started
Sketch certified by Tahsildar. All encroachments except that of
road are evicted. Fencing is complete and afforestation is
Devara bisenalli kere Bommanahalli 13-31 progressing Comprehensive Development 3 189
Sketch certified by Tahsildar. Encroachments evicted, fencing
Gunjur palya kere Mahadevpura 36-27 complete and afforestation works in progress Comprehensive Development 3 514
Sketch certified by Tahsildar. Encroachments evicted except After encroachment is
Christian missionary area, fencing complete and afforestation removed, development work
Gunjur kere (Carmelarm) Mahadevpura 9-17 works in progress Comprehensive Development 2 68 can be started
After encroachment is
Sketch certified by Tahsildar. Partly fenced, Encroachment of removed, development work
KR Puram (BEML) East 45-39 30 guntas should be evicted; afforestation progressing Comprehensive Development 2 87 can be started
Sketch certified by Tahsildar. Fencing work progressing. DC After encroachment is
has been asked to remove the permanent structures that have removed, development work
Vibhuthipura kere Mahadevpura 45-18 encroached the lake Comprehensive Development 3 395 can be started
Sketch submitted to Tahsildar. Fencing work progressing. After encroachment is
Encroached by permanent constructions/houses, some cases removed, development work
Horamavu kere Byatarayanapura 37-14 pending in HC Comprehensive Development 3 528 can be started
Sketch submitted to Tahsildar. A govt school building and After encroachment is
other constructions have encroached the lake and sewage is removed, development work
Vijanapura kere Mahadevpura 11-28 entering the lake Comprehensive Development 2 91 can be started
After encroachment is
Sketch certified by Tahsildar. Entire lake is encroached, used removed, development work
Junnsandra kere Bommanahalli 24-33 for eucalyptus plantation. Case is pending in court Comprehensive Development 3 118 can be started
Sketch certified by Tahsildar, fencing and afforestation in
Konnappana agrahara Bommanahalli 5-17 progress Comprehensive Development 2 73
Sketch submitted to Tahsildar; fencing and afforestation in
Chikka Bellandur kere Mahadevpura 67-14 progress. Encroachment by way of agriculture/garden Comprehensive Development 3 479
Sketch certified by Tahsildar. Afforestation progressing and After encroachment is
fencing work will be completed after removing encroachments removed, development work
Doddakanenahalli kere Bommanahalli 18-14 on north east side Comprehensive Development 3 257 can be started
Sketch submitted to Tahsildar. Fencing and afforestation After encroachment is
progressing; encroachment near waist weir by way of removed, development work
Haraluru kere Bommanahalli 34-7 compound wall to be evicted. Comprehensive Development 3 483 can be started
Hoodi kere Mahadevpura 15-10 Fencing done by KFD and BBMP. Afforestation progressing Comprehensive Development 2 110
Survey map submitted to East Tahsildar. Fencing partly
Hoodi kere (Giddana kere) Mahadevpura 28-31 completed, afforestation progressing Comprehensive Development 2 399
After encroachment is
Sketch submitted to East Tahsildar; fencing and afforestation removed, development work
Garudachar palya (Achanakere) Mahadevpura 5-14 progressing Comprehensive Development 3 75 can be started
After encroachment is
Sketch certified by East Tahasildar. Encroaching building to be removed, development work
Devsandra kere Mahadevpura 16-8 evicted; fencing and afforestation progressing Comprehensive Development 3 230 can be started
After encroachment is
removed, development work
Chikkabasavanapura kere Mahadevpura 14-7 Sketch submitted
certified bytoEast
EastTahsildar
Tahsildar;except
fencingthe
under
lakeprogress
area in Comprehensive Development 3 103 can be started
Doddakanahalli sy no.68; fencing and afforestation
Sowl kere Bommanahalli 61-37 progressing Comprehensive Development 3 850
After encroachment is
Sketch submitted to East Tahsildar. Encroachment is by way removed, development work
Bhattralli kere 18-10 of slum. Fencing and afforestation progressing Comprehensive Development 3 258 can be started
Sketch certified by East Tahsildar; fencing and afforestation in After encroachment is
progress. Letter addressed to DC to evict buildings that removed, development work
Sigehalli Mahadevpura 31-13 encroach Comprehensive Development 3 441 can be started
Sketch certified by East Tahsildar; fencing and afforestation in After encroachment is
progress. Letter addressed to DC to evict buildings that removed, development work
Jimkenalli kere Mahadevpura 8-24 encroach Comprehensive Development 3 61 can be started
After encroachment is
Rajarajeshwari Sketch submitted to East Tahsildar; encroachment exists; removed, development work
Sitaram palya Nagar 23-37 fencing and afforestation progressing Comprehensive Development 3 174 can be started
After encroachment is
Sketch submitted to East Tahsildar; Encroachment is partly removed, development work
Pattandur Agrahara 16-35 removed and fencing and afforestation work is going on Comprehensive Development 3 117 can be started
Kasavanalli Bommanahalli 55-8 Fenced by KFD Comprehensive Development 3 766
Shilavantana kere Mahadevpura 19-32 Sketch countersigned by East Tahsildar; Fencing done by ZP Comprehensive Development 2 290
Nagareshwara-Nagenahalli lake Byatarayanapura 11-8 Yet to be surveyed and fenced Fencing 1 87
Sketch submitted for certification. Part of the area was granted After encroachment is
to private people, now sketch has to be corrected accordingly. removed, development work
Kalkere Rampura kere Byatarayanapura 187-31 Fencing and afforestation progressing Comprehensive Development 3 2624 can be started
After encroachment is
Fenced by KFD, part of lake is encroached by Fire station and removed, development work
Chennasandra East 47-38 buildings Comprehensive Development 3 344 can be started
After encroachment is
removed, development work
Pattandur Agrahara 12-37 Major part of lake is encroached Comprehensive Development 2 104 can be started
Mahadevpura Mahadevpura 13-11 Major part of lake is encroached 111
After encroachment is
removed, development work
Dubasipalya lake 23-35 Survey sketch certified; encroachment being evicted Comprehensive Development 2 500 can be started
Rajarajeshwari
H Gollahalli lake Nagar 21-18 Fencing and afforestation completed Comprehensive Development 3 400
Rajarajeshwari
Gattigere palya lake Nagar 1 ac 30 g Checked 17
Rajarajeshwari
Byappana palya kunte Nagar 2 ac 31 g Certified, encroachment to be removed 102
Rajarajeshwari
Chikkegowdana palya lake Nagar 1 ac 10 g Checked 14
Rajarajeshwari
Halagevaderahalli lake Nagar 17-10 Fencing existing Comprehensive Development 2 200
Kaggadasanapura East 35-19 Needs to be de-weeded and free of sewage DPR under preparation 3
Singasandra Bommanahalli 7-20 Water is opaque. Boundary to be demarcated. DPR under preparation 3
B Narayanapura Mahadevpura 3-8 Needs to be de-weeded and free of sewage DPR under preparation 3
Doddanakundi Mahadevpura 111-37 Very little water impounded DPR under preparation 3
Should be de-weeded, and made free of industrial waste and
Narasappanahalli 11-24 sewage DPR under preparation 3
Bheemanakuppe Water is clean. Dredging needed to increase capacity DPR under preparation 3
Water quality should be improved. De-weeding required and
Hosakere 38-16 sewage entry to be controlled DPR under preparation 3
Boundary not defined. Impounding capacity should be
Chikkabettahalli Byatarayanapura increased and de-weeding should be done DPR under preparation 3
Sulekere 15-7 Very small quantity of water impounded. Boundary to be fixed DPR under preparation 3
Kannenahalli 117-16 Very small quantity of water impounded. Boundary to be fixed DPR under preparation 3
Covered with weeds. Sewage entry should be stopped and
B Channasara lake 3-8 storage capacity should be increased DPR under preparation 3
Covered with weeds, there is heavy foaming. Sewage entry
Bellandur Bommanahalli 797-21 should be controlled DPR under preparation 3
High levels of organic pollution. Desilting and controlling
Varthur Mahadevpura 411-21 sewage entry is needed DPR under preparation 3
Konankunte Bommanahalli 19-18 Polluted, weed growth, solid waste dumped and encroached DPR under preparation 3
Rajarajeshwari
Hosakerehalli nagar 59-26 Dry, silted, weed growth, weir breached, encroached DPR under preparation 3
Byrasandra South 14-30 Dry, silted, weed growth, weir breached, encroached DPR under preparation 3
Arekere Bommanahalli 37-21 Polluted, weed growth, solid waste dumped and encroached DPR under preparation 3
Hulimavu Bommanahalli 130-17 Polluted, weed growth, solid waste dumped and encroached DPR under preparation 3
Vasanthapura Bommanahalli 7-10 Polluted, weed growth, solid waste dumped and encroached DPR under preparation 3