SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - August 2004)

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
Cast-In-Place Concrete Formwork Stripping Inspection SAIC-Q-1016 18-May-05 CIVIL-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

Unless otherwise specified in the project specifications, formwork and


shoring shall be left in place to support the mass of concrete in beams,
slabs and in-place structural members until the specified concrete
strength f'c is attained. SAES-Q-001
A1
(ACI 301, Sec. 2.3.2.5) Sec. 3.2
Note: The preferred method of determining stripping time is by testing
test cylinders that are cured on-site or testing concrete strength in the
field.

When no minimum concrete strength has been specified in the project


specifications for form removal, the following general guidelines may be
used for normal weight, regular strength concrete:
Walls, Columns, Sides of Beams & Girders 12 hours
Pan joist floors with 760mm wide pans 3 days
Pan joist floors over 760mm wide pans 4 days
Arch Centers with Live Load < Dead Load 14 days
Arch Centers with Live Load > Dead Load 7 days
Joists, Beams, Girders- Span < 3m & Live Load < Dead Load 7 days
Joists, Beams, Girders- Span < 3m & Live Load > Dead Load 4 days
SAES-Q-001
A2 Joists, Beams, Girders- Span 3-6m & Live Load < Dead Load 14 days
Sec. 3.2
Joists, Beams, Girders- Span 3-6m & Live Load > Dead Load 7 days
Joists, Beams, Girders- Span > 6m & Live Load < Dead Load 21 days
Joists, Beams, Girders- Span > 6m & Live Load > Dead Load 14 days
One-way floor slabs < 3m Span & Live Load < Dead Load 4 days
One-way floor slabs < 3m Span & Live Load > Dead Load 3 days
One-way floor slabs Span 3-6m & Live Load < Dead Load 7 days
One-way floor slabs Span 3-6m & Live Load > Dead Load 4 days
One-way floor slabs Span > 6m & Live Load < Dead Load 10 days
One-way floor slabs Span > 6m & Live Load > Dead Load 7 days
(ACI 347, Sec. 3.7.2.3)

When finishing is required, remove forms as soon as removal operations SAES-Q-001


A3
will not damage concrete. (ACI 301, Sec. 2.3.2.1) Sec. 3.2

Repairs and treatment on minor concrete damage shall be started SAES-Q-001


A4
immediately. (ACI 301, Sec. 2.3.2.5) Sec. 3.2

If a lower compressive strength (than specified in Item 1 or 2 above) is


proposed by the contractor prior to formwork removal, the contractor
SAES-Q-001
A5 shall submit detailed plans to Saudi Aramco for review and approval. If
Sec. 3.2
approved, written approval shall be kept on site for Saudi Aramco's
inspector. (ACI 301, Sec. 2.3.2.5)

Forms removal (stripping) shall be based on concrete's achieving


minimum strength requirements as set forth by the design engineer as SAES-Q-001
A6
verified by simple cylinders compressive strength results; Otherwise the Sec. 8.0
guidelines in item A2 above are to be followed. (ACI 347, Sec. 3.7.2.3)

Page 1 of 2
SAUDI ARAMCO ID/PID - 18-May-05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Cast-In-Place Concrete Formwork Stripping Inspection SAIC-Q-1016 18-May-05 Civil
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

REMARKS:

REFERENCE DOCUMENTS:
1- SAES-Q-001 -- Criteria for Design and Construction of Concrete Structures, 29 October 2003

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 2 of 2