You are on page 1of 38

CAPITOL HILL

Light Rail Station Sites


Urban Design Framework

AFT
DR May 9, 2011
EXECUTIVE SUMMARY

Though a series of engaging workshops, meetings and Key elements of the vision include:
conversations and the advocacy of many community
■■ Sustainable and collaborative design and
leaders, a clear community vision is emerging for the sites
development
surrounding the future Broadway light rail station:
■■ Design and development of a civic quality,
■■ A dynamic heart for the Capitol Hill Community- mixing resulting in a dynamic place people want to be,
vibrant retail, community services, active public places ■■ A dynamic place that houses people and
and residences with the new Sound Transit light rail activities reflective of the diversity and vibrancy
station. of Capitol Hill.
■■ A model for transit-oriented communities; new The Urban Design Framework provides a tool
development that integrates good urban design for the City and the Capitol Hill Community
and placemaking with the opportunity to provide to work together with Sound Transit, Seattle
affordable housing and community services that Central Community College and other partners
support the diversity of the neighborhood. to leverage public and private actions to achieve
■■ An opportunity to grow the Broadway Corridor, the community’s overall vision for the immediate
connecting it to Cal Anderson Park and reaching south Broadway Station area.
to Seattle Central Community College and the Pike Pine
corridor.

This once-in-a-generation opportunity demands a bold


and compelling vision; one that succinctly articulates the
aspirations and ambitions of the Capitol Hill community. This
Urban Design Framework describes that vision – providing
direction and guidance to the future developers of the
Sound Transit owned properties in the immediate vicinity of
the light rail station.
TABLE OF CONTENTS

Overview
Purpose and process . . . . . . . . . . . . . . . . . . . . . . 3
Guiding Principles . . . . . . . . . . . . . . . . . . . . . . 4

Context
Policy Background . . . . . . . . . . . . . . . . . . . . . . 5
Physical Setting and Development Potential . . . . . . . . . . . . . . . 5
Site Organization and Hierarchy . . . . . . . . . . . . . . . . . . 6
Sound Transit’s response to community comments . . . . . . . . . . . . . 7

Recommendations
Desired Uses . . . . . . . . . . . . . . . . . . . . . . . . 8
Retail, Service, and Community Space . . . . . . . . . . . . . . 8
Housing . . . . . . . . . . . . . . . . . . . . . . . 9
Bicycle Parking . . . . . . . . . . . . . . . . . . . . . 10
Automobile Parking . . . . . . . . . . . . . . . . . . . . 11
Design Quality and Scale . . . . . . . . . . . . . . . . . . . . 16
Context and Site . . . . . . . . . . . . . . . . . . . . 16
Public Life . . . . . . . . . . . . . . . . . . . . . . 17
Design Concept . . . . . . . . . . . . . . . . . . . . . 19
Scale . . . . . . . . . . . . . . . . . . . . . . . . 22
Streetscape . . . . . . . . . . . . . . . . . . . . . . 25
Management, Programming and Maintenance of Publicly Accessible Space . . . . . 28

Other Great Ideas . . . . . . . . . . . . . . . . . . . . . . . . 30

Implementation . . . . . . . . . . . . . . . . . . . . . . . . . 32

Contributors . . . . . . . . . . . . . . . . . . . . . . . . . . 33

Technical Appendix and Related Resources — see separate document


OVERVIEW

Purpose and Process case of the Capitol Hill light rail station sites, the
Framework also addresses uses, programming
The purpose of this Urban Design Framework and maintenance desirable to the community.
(Framework) is to memorialize a shared vision This Framework builds upon the work and
for the Sound Transit-owned properties on discussions of the community to date including
Capitol Hill with the goal of that vision being the efforts of the Schemata Workshop|Makers
implemented through Sound Transit’s Request consultant team hired by the Capitol Hill Chamber
for Qualifications and Proposals process for the of Commerce as summarized in the February
disposition and eventual development of those 2010 “Capitol Hill – Broadway TOD Development
properties. This Framework will not only inform Guidelines and Urban Design Recommendations
the future developers of these sites, but provide Report” as well as the summary of the August
a foundation of design guidance for reviewing 3rd 2010 Nagle Place Extension Workshop. Three
future redevelopment proposals. The Framework workshops were convened between October
is not a regulatory mechanism but represents a 2010 and February 2011 to discuss the essential
detailed vision for these properties shared by the elements of the Framework – programming and
community, the City and Sound Transit. design of the four Sound Transit-owned sites
This Urban Design Framework provides a set on Capitol Hill. The workshops were comprised
of recommendations focused on addressing a of Capitol Hill Champion Steering committee
range of physical planning opportunities (urban members and other interested community
design, land use mix, street and public spaces, members; invited professionals suggested by
sustainable design, etc.). The Framework is a community members; as well as relevant City
“bridge” connecting broad goals and policies staff and Sound Transit staff. A core group of
in the Seattle Comprehensive Plan and Capitol community members, City and Sound Transit staff,
Hill Neighborhood Plan to specific physical participated in all three sessions.
planning and development recommendations.
The Framework focuses on the integration of
urban design and place-making into zoning and
other land use tools. The Framework addresses
how the physical development on the light rail
station sites will affect quality of life and the
role that place-making and urban design play
in creating a successful neighborhood. In the

Capitol Hill Light Rail Station Sites Urban Design Framework Page 3 DRAFT - May 9, 2011
Seattle Department of Planning and Development
OVERVIEW

Guiding Principles Collaborative Development Projects of the


Highest Quality
Seize upon this is a once-in-a-generation opportunity to Collaboratively design this development. Should
shape the future of the Broadway retail district, create the properties be developed by more than one
community-oriented public uses and spaces around the development team, ensure all teams collaborate
station, and set the stage for high-quality architecture early regarding programming, design direction and
and urban development that can be a model for other decisions. Respond to the neighborhood context
transit oriented communities in the city. while recognizing that redevelopment will set a design
precedent for future redevelopment along Broadway.
Community and Sustainability
Build community through the innovative and A Station Plaza that becomes the civic heart of Capitol
collaborative development of these parcels, providing Hill
an assembly of the highest quality buildings and Design and program the Station Plaza so that is
public spaces capable of housing the diversity of attracts and sustains vibrant public life.
uses identified by the community as priorities and
Affordable Housing and Business Space
the diversity of community members of Capitol Hill,
Provide residential and commercial spaces that meet
improving the livability and quality of life in the
the needs of a diversity of Capitol Hill residents.
neighborhood. Seek opportunities for innovative and
integrated sustainable building practices across the A Cultural Center and Community Space
development sites. Pursue the inclusion of a community cultural /
gathering space in the redevelopment.
Public Participation
Engage in an inclusive, open and on-going public Low-Ratio Parking
participation process in the development and Provide a lower ratio of parking to residential
application of the Urban Design Framework vision to units in recognition of the proximity to transit and
the Sound Transit-owned parcels. Continue to actively neighborhood enthusiasm for alternate modes of
engage the Capitol Hill community in the physical space transportation.
developed above the light rail facility through high
quality and context-responsive design and innovative,
inclusive programming of the public spaces.

DRAFT - May 9, 2011 Page 4 Capitol Hill Light Rail Station Sites Urban Design Framework
Seattle Department of Planning and Development
CONTEXT

Policy Background Physical Setting and Development


Potential
The recommendations in this framework are
consistent with and guided by Comprehensive The assembled sites acquired by Sound Transit in
Plan and Capitol Hill Neighborhood Plan goals and order to construct the Capitol Hill light rail station,
the February 2010 Capitol Hill-Broadway Transit will include three at-grade station entries to the
Oriented Development Guidelines and Urban Design below grade transit facility. Capitol Hill prides itself
Recommendations Report. in being one of the densest and most transit friendly
neighborhoods in Seattle. The significant Broadway
As an Urban Center Village, Capitol Hill’s functional frontage of the sites, especially at the key intersection
designation is primarily residential. The goals of Broadway and E John Street, combined with ready
of the Capitol Hill community as stated in the access to a variety of public transportation choices and
Comprehensive and Neighborhood plans are to proximity to Cal Anderson park emphasize the once in
achieve a neighborhood character with “distinct a generation opportunity presented by redevelopment.
The Site
residential areas, active business districts, accessible
transportation services, and strong institutions, which
Capitol Hill Station Project Area
is diverse and densely populated.” (Comprehensive Sound Transit parcel assemblage represented by the designation of Site A, B, C & D shown in the map below.

Plan, Neighborhood Planning Element, Capitol Hill

EAST DENNY WAY

EAST JOHN STREET


Community Character Goal, (CH-G1)).
Site D

The community aspires to be a diverse and densely


populated neighborhood where a range of housing BROADWAY AVENUE EAST BROADWAY AVENUE EAST

types and levels of affordability are offered. Site C Site A

Additionally, a balanced transportation environment


is a goal, with an emphasis on the pedestrian NAGLE PLACE

Site B
environment while addressing the parking needs of
residents and visitors. 10TH AVENUE EAST

EAST JOHN STREET


EAST DENNY WAY
Lightrail Station Street-level Floor Plans courtesy of Hewitt

From the Capitol Hill - Broadway TOD Development Guidelines and Urban Design Recommendations Report
schemata workshop + MAKERS 9

Capitol Hill Light Rail Station Sites Urban Design Framework Page 5 DRAFT - May 9, 2011
Seattle Department of Planning and Development
CONTEXT

Site Organization and Hierarchy prominent station entry.


■ A location of secondary prominence is the vicinity
During the UDF process, community members and of the south station entry near Station Plaza and
design and planning professionals reviewed the the edge of Cal Anderson Park – an important
four sites and came to many of the same or similar human scaled, public space.
conclusions about overall site organization and ■ A sweeping pedestrian desire line, shown in a red
hierarchy. The diagram below is a summary of major diagonal line from the corner of Broadway Ave
site organization concepts around which many of and E John Street to Cal Anderson Park, should
the findings and recommendations in the UDF are connect the two locations of prominence and
organized. provide an inviting linkage through Station Plaza.
■ The overall development and massing should
■ Bordering street character is an important re-orient the sites to frame and define the central
determinant: Broadway and John Streets are busy Station Plaza. This informs recommendations for
and vibrant main streets, while 10th Ave. E, siting additional development potential and mass.
E. Denny Way and Nagle Pl. are quieter, more local
and green in character. ■ A continually linked sequence of public spaces
should connect the Park, across E. Denny Way,
■ The corner of Broadway and John St. is the most through Station Plaza, midblock crossings to
prominent focal point on the sites – a location station entrances.
to mark a key corner. It is adjacent to the most

DRAFT - May 9, 2011 Page 6 Capitol Hill Light Rail Station Sites Urban Design Framework
Seattle Department of Planning and Development
CONTEXT

■ The 10th Avenue frontage should gently community has championed. Sound Transit’s original
transition to the low-rise residential character site concept for their sites included an alley that would
of that street, while acknowledging that over separate development sites A and B. After hearing
time, additional density may be desirable in substantial community support for a permanent
the immediate vicinity of the transit station. home for the Broadway Farmers Market, Sound
Transit revisited their original site plan and proposed
Sound Transit’s Response to a significant public plaza, referred to as Station Plaza,
Community Comment between the two development sites. This Plaza meets
the community’s request as well as Sound Transit’s
Over the past several years Sound Transit has made operational requirements.
an exceptional good faith effort to partner with the Additionally, in recent conceptual site plans, Sound
Capitol Hill community to plan for development Transit has shown mid block crossings through the A
above their station. As a result Sound Transit and B sites, in response to community concern over a
has incorporated many of the good ideas the block-long uninterrupted street frontage and limited

Sound Transit properties site plan, modified per community input. June 2010

Capitol Hill Light Rail Station Sites Urban Design Framework Page 7 DRAFT - May 9, 2011
Seattle Department of Planning and Development
FRAMEWORK RECOMMENDATIONS

Recommendations within the community to further refine the vision of


the center and its identity as well as to continue to
Recommendations throughout are organized into explore funding mechanisms and partnerships. The
points of Development Guidance and points of following recommendations are intended to activate
Design Guidance. the streetscape around and plaza respecting residents
on the site, to realized a significant amount of affordable
Development Guidance describes expectations of housing and to help provide for a community /cultural
the community of actions and decisions that are gathering space.
critical to the realization of the overall vision.
Development Guidance for Sites A
Design Guidance refers to subjective or discretionary ■ Vibrant ground floor retail or active service should
elements of the sites’ development. front Broadway
Example of activating use spilling
onto pedestrian alley in Pike Place ■ If destination retail is part of the retail portfolio, orient
Market.
Desired Uses this use towards Broadway

D ■ Housing should be located on the third floor and


The following recommendations address the
above (possibly floor two as well if there are no
program and use of the sites, their design and scale
offices). See housing discussion for specifics.
and the programming and maintenance of the
C A A publicly accessible public spaces. ■ Locate smaller, more locally serving retail on midblock
crossing between Broadway and Station plaza. Design
Retail, Service and Community Space these spaces to be flexible to accommodate a variety
B B of potential uses and shared uses.
Retail uses should be distinguishable, diverse, active,
and occupied (by station opening) with spaces ■ Locate active uses on the ground floor fronting the
Site map with parcel designations
designed to accommodate a variety of retailers at a plaza and E Denny with the intention of helping
range of rental or ownership costs. Ideally retailers activate the Station Plaza and the Festival Street
and services that are not currently represented through the ground floor use. Design these spaces to
in the neighborhood (e.g. office supplies, home be flexible to accommodate a variety of potential uses
furnishings, hardware, men’s clothing, etc.) are and shared uses.
encouraged. A community/cultural gathering space
within the redevelopment is strongly supported by
Development Guidance for Sites B
the community, ideally located facing the Station
■ Provide affordable housing for a range of residents.
Plaza. This space could serve as a community
meeting and gathering space, contain office spaces ■ Consider families and the elderly in the range of
for non-profits and possible performance and/ residents seeking affordable housing.
An activated and interesting mid-block or arts spaces. Additional work needs to be done ■ Locate ground related housing with individual unit
crossing. Alley 24 Seattle.
entries on the 10th Avenue frontage.

DRAFT - May 9, 2011 Page 8 Capitol Hill Light Rail Station Sites Urban Design Framework
Seattle Department of Planning and Development
FRAMEWORK RECOMMENDATIONS

Design Guidance for Sites B Development Guidance for Station Plaza (see also
■ Provide for activating use (e.g. artist work and Management, Programming and Maintenance of Station
display spaces, active live-work units, services and Plaza section)
retail with robust foot traffic) in the ground level ■ Make the Station Plaza available to the Broadway
facades fronting the interior of the sites to provide Farmers market as a permanent home to host their
eyes on Station Plaza and other publicly accessible weekly or biweekly Farmers Market
spaces during the day and evening. ■ Make the plaza available to other public uses and
■ House a range of activating uses in the ground programs during non-market times.
level facades fronting the interior of the sites ■ Limit vehicular movements within the plaza to loading
to provide eyes on the Plaza and other publicly and unloading for the Farmers Market and other
accessible spaces during the day and evening. service and delivery functions.
Uses could include artist work and display spaces,
active live-work units, services and retail with ■ Consider uses that will activate the Station Plaza on
robust foot traffic. non-Farmers Market days such as
ƒ A food court using semi-permanent food vendors
■ Consider the southern, plaza facing end of this
site as a potential location for a community/ ƒ Art/craft markets
cultural gathering space. ƒ Performances
ƒ Buskers
Development Guidance for Sites C
■ Orient vibrant ground floor retail or active service Housing
along Broadway. Residential development is a high priority for both the
■ Provide housing on the third and above floors Capitol Hill community and Sound Transit, providing
(possibly floor two as well if there are no offices). increased ridership for the light rail and street car A market held during certain times in a
central plaza.
See housing discussion for specifics. lines and more housing options for Seattle’s densest
■ Locate active uses on the ground floor fronting E neighborhood. The 2010 Capitol Hill Chamber
Denny with the intention of helping activate the of Commerce’s Transit Oriented Development
Festival Street through the ground floor use. Subcommittee’s Development Guidelines and Urban
Design Report recommended to “encourage creative
Development Guidance for Site D partnerships between affordable housing developers
■ Provide affordable student housing and other uses and market rate developers to create a mixed-income
affiliated with the College according to the needs project...in an effort to bring investment to the
of the college.. community while mitigating displacement.” The idea that
the existing community should benefit from rather than
Recent infill housing development on
be displaced by any new development was prevalent Capitol Hill.
throughout the discussions of housing.

Capitol Hill Light Rail Station Sites Urban Design Framework Page 9 DRAFT - May 9, 2011
Seattle Department of Planning and Development
FRAMEWORK RECOMMENDATIONS

A May 2010 Sound Transit sponsored apartment study ■ Affordable student housing is recommended for
in the greater Capitol Hill area analyzed the area’s the upper levels of site D.
rental housing needs and affirmed the community’s ■ Population and unit type needs should be
prioritization of affordable housing. It identified considered in the RFQ/RFP. There is a need for
an unmet demand for 8,263 units affordable to more affordable housing that meets the needs of
households earning up to 60% AMI, which is expected seniors, families and artists in the neighborhood.
to increase to 9,982 units by 2016 when light rail Design Guidance
opens. The eventual development above the station ■ Townhome style units with individual unit
should absorb some of this demand. entries facing the 10th Ave E side of Site B could
be an appropriate location for affordable family
In 2008 Sound Transit first heard the community’s sized units as well as incorporating design
desire for affordable housing above the light rail features to better transition to the L3 zoned
station. The Sound Transit Capitol Hill Station TOD block to the east.
Sites Baseline Report stated “affordable housing ■ Activity generating uses should face Station
is market-driven and will be an issue that the Plaza on the ground floor. Should these uses
community will pursue. What constitutes a significant be housing, active live/work units should be
goal also needs to be defined.” The Urban Design considered.
Framework planning process successfully developed
A combination of development incentives and
consensus among stakeholders to define housing
subsidies is needed to implement the housing
goals and identified a set of clear strategies to
recommendations. Public subsidy will provide much
accomplish these goals.
of the capital needed to develop the affordable
housing units on Site B while the City of Seattle’s
Development Guidance
Multi-Family Tax Exemption Program and Residential
■ 50% of all housing units on sites A, B and C
Bonus Program will be critical to provide affordable
should be affordable for 50 years for households
that make at or less than 80% of area median units in the market rate residential developments on
income (AMI). Half of those units, 25% of the Site A and Site C. This analysis did not factor in the
total, should be affordable for households that student housing developed on Site D because no
make less than 50% of area median income. City housing funding can be used.
Make Site B available for the development of affordable
Bicycle Parking
housing built with public subsidy. Most of the
affordable housing units needed to achieve the overall Plentiful bicycle parking should serve a variety of
50% affordable housing goal should be provided on users, from long-term commuter/tenant parking to
Site B.Provide an amount of affordable housing within short-term transit/shopper (non-commute) parking.
Example of ground related housing
Image courtesy of Schemata development on sites A and/or C needed to reach the Short-term bicycle parking can be provided via bike
Workshop overall 50% affordable housing goal. racks, on-street bicycle parking and covered bike

DRAFT - May 9, 2011 Page 10 Capitol Hill Light Rail Station Sites Urban Design Framework
Seattle Department of Planning and Development
FRAMEWORK RECOMMENDATIONS

parking. Long-term bicycle parking should be provided ■ Accommodate at least 336 bicycle parking
with secured bicycle parking facilities via bike lockers, spaces by 2020 (a mix of long-term and short-
pre-fabricated modules with membership access, and term parking facilities).
BikeStation type of ground floor retail facility that ■ Locate bicycle parking at or as close as
could be arranged with the developers. As there will possible to station entrances.
be limited bike parking turnover for a relatively long ■ Make ground floor area within a building
period, a nearly a one-to-one correspondence between available for a potential BikeStation membership
parking demand and parking supply for long-term type of facility in order to accommodate bicycle
Secure bike storage in Leiden, the
(commuter) users is advisable. Light rail will generate parking demand that might not be able to Netherlands. Copyright SciFi Laura, Flickr.
many short trips to the stations that it is certain to be located within, due to limited space, close
increase levels of bicycling to gain access to the station. proximity to station entrances.
Adequate space and locations for bicycle parking, ■ Locate a pre-fabricated secured bicycle
is essential to making bicycling a convenient and parking facility within the project area in
desirable choice to access light rail. partnership with SDOT.

Although the Land Use Code states that at least 20


Automobile Parking
spaces should be provided for long-term bicycle
Parking strategies should promote light rail,
parking at rail transit facilities, the City may require
bus, and streetcar ridership and pedestrian and
more parking spaces based on the following factors:
bicycle use, as well as discourage automobile
area topography, pattern and volume of expected
use and commuter parking. Shared parking
bicycle users, nearby residential and employment Secure Bike parking in Denmark:
among developments is advantageous and Copyright Meaghan K, Flickr.
density, proximity to trails, projected transit ridership
necessary to reduce the number of stalls and
and expected access to transit by bicycle, and other
the cost of providing parking. Parking costs
relevant transportation and land use information.
should be unbundled from building rent costs.
Sound Transit supports actively promoting bicycling to
Sound Transit should require the developer
stations as a way of increasing ridership and reducing
to provide alternatives to car parking, such as
motor vehicle trips to the station (per the December
additional secured bicycle parking and the use
2008 Sound Transit Capitol Hill Station TOD Sites
of car sharing (Zipcar, etc.). Given the proximity
Baseline Report).
to transit, there should be less total parking than
market rate developments typically provide.
Development Guidance
SDOT will consider modifying Nagle Place current
■ Accommodate at least 169 bicycle parking spaces
in 2016 (a mix of long-term and short-term parking unrestricted parking and load zones prior to light
facilities) – see technical appendix for source for rail opening in 2016 to provide more short-term,
forecasted numbers. Mike thinks this may not be on-street parking spaces for retail customers.
On street bike racks are good for short
enough. term parking.
Any increase of automobile parking space is

Capitol Hill Light Rail Station Sites Urban Design Framework Page 11 DRAFT - May 9, 2011
Seattle Department of Planning and Development
FRAMEWORK RECOMMENDATIONS

inconsistent with Sound Transit’s mission of providing *A graphic of desired uses follows on pages 14
transit service. Sound Transit has indicated that and 15.
developers will not be asked to provide commuter
(park and ride) parking or additional parking to serve
the business district. Initial assumptions by Sound
Transit articulated in their December 2008 Baseline
Report regarding future transit oriented development
sites are that a minimum amount of parking equal
to less than one stall per unit would be supplied. The
adjacency of alternative modes of transportation
should encourage tenants and customers to arrive at
the developable sites without the use of a car, thus a
smaller demand for parking.

Development Guidance
■ Use on-street parking and shared parking
strategies to address retail parking demand.
■ Provide car sharing opportunities for tenants and
customers.
■ Provide less than 0.7 stalls/unit of housing, for
market rate housing – less for affordable housing
units.
■ Aim to provide less parking than the demand
suggested through standard modeling, given the
ready access to high capacity transit.
Design Guidance
■ Consider incorporating electric car charging
stations in the redevelopment.
■ Unbundle parking from residential and retail rental
cost.

DRAFT - May 9, 2011 Page 12 Capitol Hill Light Rail Station Sites Urban Design Framework
Seattle Department of Planning and Development
FRAMEWORK RECOMMENDATIONS

Page left intentionally blank

Capitol Hill Light Rail Station Sites Urban Design Framework Page 13 DRAFT - May 9, 2011
Seattle Department of Planning and Development
FRAMEWORK RECOMMENDATIONS

#APITOL(ILL4/$
$ESIRED5SES3EEGRAPHICOPPOSITE
(OUSING 0OTENTIAL,OCATION&OR &LEXIBLE"UILDING&ORMS3ITES
(OUSINGISEXPECTEDTOOCCUPYFLOORSANDABOVEOF #OMMUNITY#ULTURAL#ENTER
MOSTNEWDEVELOPMENTONSITES! " # 
!COMMUNITYCULTURALCENTERCOULDBELOCATEDONEITHER3ITE !LLOWFLEXIBILITYINDIVISIONSBETWEENBUILDINGSAND
!FFORDABLEHOUSINGTARGETISOFALLNEWHOUSING
!OR" ANDSHOULDHAVEANOVERSIGHTANDMANAGEMENT SITESTOALLOWBETTERDESIGNANDAPPROPRIATESITESIZESFOR
!FFORDABLEHOUSINGSHOULDBEVARIED ANDREFLECTTHE
RELATIONSHIPTOTHE0LAZA USES
#APITOL(ILLCOMMUNITY
)NCLUDECOMMUNITYMEETINGANDGATHERINGSPACE OFFICESPACES
)NCLUDE!FFORDABLE(OUSINGFORPOPULATIONS
FORNON PROFITSANDPOSSIBLYPERFORMANCEANDORARTSPACES
INCLUDINGFAMILIES SENIORSANDARTISTS
)MPLEMENTATIONANDFURTHERDETAILONTHECENTERDEPENDSON
THECOMMUNITYSABILITYTOORGANIZEANDRAISECAPITALFUNDS #OLLEGE5SES
4HECOMMUNITYCULTRUALCENTERISNOTEXPECTEDTOCO LOCATE
"ROADWAY2ETAIL WITHHOUSING 3ITE$SHOULDBEAUSEAFFILIATEDWITHTHE3EATTLE
#ENTRAL#OMMUNITY#OLLEGEACCORDINGTOTHE#OLLEGES
!LLSITESFRONTING"ROADWAYMUSTHAVEVIBRANTRETAIL PROGRAMNEEDS
ONTHEFIRSTFLOOR !FFORDABLESTUDENTHOUSINGISANENCOURAGEDCOLLEGE
)FLARGERORDESTINATIONRETAILISINCLUDEDITSHOULDBE %$ENNY7AY@&ESTIVAL3TREET RELATEDUSEFORTHISLOCATION
ORIENTEDTO"ROADWAY
"ROADWAY FRONTINGRETAILMAYBEMORE@AROUND THE #ONVERTTHEPORTIONOF%$ENNY7AYBETWEEN"ROADWAYAND
CLOCKTHANINTERIORRETAIL .AGLE0LACETOAFESTIVALSTREETWITHLIMITEDACCESSFORVEHICLES
4HEFESTIVALSTREETSHOULDBECONVERTIBLETOANEXTENSIONOFTHE
PLAZAATCERTAINTIMES
0USH0ULL ,OWER
$EVELOPMENTPOTENTIALSHOULDNOTBESUBSTANTIALLY
INCREASEDONPORTIONSOFSITES!  " AND#IMMEDI
&ARMERS-ARKET3TATION0LAZA ATELYFRONTINGTHE0LAZAAND%$ENNY7AY
.AGLE0LACEEXTENSIONABOVETHE3OUND4RANSIT -IXED&LEXIBLE5SES -ASSINGTOENSURETHATAMPLESUNLIGHTANDAIRREACH
STATIONBOXWILLBERETAINEDINASEPARTEOWNERSHIPTRACT THEPLAZAAND0ARKAREESSENTIALINTHESELOCATIONS
ASAPUBLIC&ARMERS-ARKET3TATION0LAZA
4HEPLAZAWILLACCOMMODATEOTHERPUBLICUSESAND
3OMEFRONTAGESMAYINCLUDEAMIXOFSEMI ACTIVEANDRETAIL
USESDEPENDINGONMARKETCONDITIONSANDECONOMICVIABILTYOF

PROGRAMSATNON MARKETTIMES RETAILININTERIORLOCATIONS4HISMAYINCLUDELIVEWORKUNITS
6EHICLEMOVEMENTSWILLBELIMITEDTOLOADINGFORTHE OFFICES ORARTISTWORKSPACES
-ARKETANDOTHERSERVICEANDDELIVERYFUNCTIONS
0USH0ULL (IGHER
!LLOWDEVELOPABLEAREAANDBUILDINGMASSTOBE
REARRANGEDACROSSTHESITESTOFACILITATEPUBLICAMENITIES
)NTERIOR2ETAIL 'ROUND 2ELATED(OUSING ANDGOODDESIGN3ITES!AND"AREGOODLOCATIONSFORA
LIMITEDINCREASEINBUILDINGENVELOPEFROMTHECURRENT
4HEFIRSTFLOOROFBUILDINGSFACINGTHEINTERIOR 4HEFRONTAGESOF3ITES"AND"FACINGTH!VEAREEXPECTED .# AND.# ZONINGRESPECTIVELY3ITE!ISTEH
ESPECIALLYWHEREFRONTINGTHE0LAZASHOULDHAVEACTIVE TOBEPRIMARILYRESIDENTIALWITHGROUND RELATEDHOUSING INCLUDING MOSTAPPROPRIATELOCATIONFORINCREASEINMASS4HE
RETAILFRONTAGES STOOPSANDPORCHES3OMESEMI ACTIVEUSESMAYBEINCLUDED SOUTHERNPORTIONOFSITE# AWAYFROMTHEPLAZAISANOTHER
)NTERIORRETAILSHOULDBESMALLFLEXIBLESPACESTHATCAN LOCATIONFORAPOTENTIALMODERATEINCREASEFROMEXISTING
ACCOMMOATELOCALBUSINESSES .# ZONING
)NTERIORRETAILSHOULDBELESS@AROUND THE CLOCKTHAN
"ROADWAYRETAIL

DRAFT - May 9, 2011 Page 14 Capitol Hill Light Rail Station Sites Urban Design Framework
Seattle Department of Planning and Development
FRAMEWORK RECOMMENDATIONS

#APITOL(ILL4/$
$ESIRED5SES3EE,EGEND/PPOSITE

(OUSING
N
Capitol Hill Light Rail Station Sites Urban Design Framework Page 15 DRAFT - May 9, 2011
Seattle Department of Planning and Development
FRAMEWORK RECOMMENDATIONS

Design Quality and Scale Compatible Residential Character of the 10th


Ave. E. Frontage
Since design is inherently subjective and a variety ■ Development Guidance: Respond to the low-
of treatments can achieve desired intent, all rise multifamily zoning along 10th Ave. E. by
recommendation in the Design Quality and Scale providing ground-related or live-work housing
section are Design Guidance except those offering
on the first floor of the B sites facing 10th Ave.
E. with a townhouse or rowhouse character.
Development Guidance.

Context and Site Favorable Sun and Air Exposure onto the Station
Building mass and modulation The bordering street character, planned station Plaza and E. Denny Way Festival Street
can open up a plaza or open
facilities, Cal Anderson Park and the proposed ■ Allow for increased mass and scale away
space to sun and air. Image
courtesy of Schemata Workshop. Station Plaza establish a hierarchy of spaces within from the Station Plaza and the E. Denny Way
the sites. Broadway and John Streets are busy and Festival street on the north portions of site A
and B and the southernmost portion of site C.
vibrant main streets, and the most prominent station
entrance is the north entry near this intersection. ■ Reduce the scale of buildings directly on
This corner marks the most prominent focal point the plaza in ways that preserve solar access.
on the sites. A location of secondary prominence Include upper level setbacks on sites A-2, and
is the vicinity of the south station entry near the C, and step down the scale of building B-2
Station Plaza and the edge of Cal Anderson Park. towards the Plaza and park edge.
The proposed Station Plaza is an important linking
Taking advantage of the grade space at the heart of the sites. E. Denny Way and Capitalize on the Grade Change
change, providing places to sit 10th Ave. E. have quieter local residential character. The grade change - roughly a 7’ drop from the
and observe amidst activity.
Image courtesy of Schemata This general hierarchy of spaces drives many of the Broadway Ave. E. elevation to the Station Plaza
Workshop. following urban design recommendations. floor – is a critical site element.
■ Address the grade change as an integral
Key Corner at the Broadway Ave. E. & E. John St. feature of the design. Techniques may include
Intersection the use of stepped terraces, a prominent stair
■ Include a strong form or focus on site A-1 or ramp element on the plaza side of the A
at the intersection of Broadway Ave. E & E. sites, retail that steps down or an activated
John St. near the main (north) station entry. ‘loading dock’ type treatment that takes up 3
This could be a prominent retail entry, an to 4 feet of the grade change.
architectural expression or other feature.
Development Guidance
■ In no case should an exposed portion of a
parking structure, portion of a foundation,
A modern example of ground blank wall or similar result from the grade
–related housing. Alley 24 Seattle
change across the sites.

DRAFT - May 9, 2011 Page 16 Capitol Hill Light Rail Station Sites Urban Design Framework
Seattle Department of Planning and Development
FRAMEWORK RECOMMENDATIONS

Favorable Relationships of Buildings to Station ■ Design the drivecourt entry from E. John St. as
Entries and Facilities a shared pedestrian / vehicle space. Vehicles
The design of Sound Transit’s Station facilities and should be encouraged to move slowly, and
their associated functions are fixed elements of urban design elements and softening features
site context. Infill development should maximize such as pavement treatments, landscaping,
compatibility and synergy with these site lighting fixtures and other elements should be
elements. used to indicate it as a shared space.
■ Configure the base of the building at A-1
for an integrated connection with the Public Life
north station entry. Consider pulling design The following recommendations relate to public life.
elements from the station across the base of Proposed design features are intended to: support
the building on A-1, especially at the corner the use of public transit; contribute to the network Chicago’s Crown Fountain draws
of Broadway and E John Street as the building of public realm spaces around the site; create a participants and onlookers.
turns the corner onto Broadway. safe, comfortable and interesting environment that
■ Integrate the central vent shaft facility as a encourages walking; and encourage human activity
focal point of Station Plaza. Techniques could and interaction at the street level.
include information (potentially transit or
train related) or dynamic displays including A Sweeping Pedestrian Desire Line from
movies, green wall treatments, or public art the Broadway & John St. Intersection to Cal
installations. Anderson Park
■ Consider streetscape design near the south ■ Reinforce the site’s hierarchy by including a Shared right of way between
station entry that makes a clear link between sweeping pedestrian pathway leading from pedestrians, bikes and vehicles.
the station entry and the station plaza space the main station entry at the Broadway Ave
across E. Denny Way. E. and E John St. intersection through the
midblock crossing of Site A, through Station
Plaza to Cal Anderson Park.
Carefully Integrate Vehicle Accesses Points into
and Through the Sites ■ Consider a gradually increasing space along
■ Preferred locations for vehicle entry points to Broadway at site A-1 that leads pedestrians
parking, loading and service for and within the to the midblock crossing to help create the
sites are as follows: E. John St. in the midblock pedestrian desire line.
between Broadway and 10th Avenues E. (sites ■ Design the midblock crossing of Site A in a
A and B); Nagle Place (building C); local pick up way that invites visitors into Station Plaza.
and drop-offs including kiss and ride – Nagle Pl.
■ Consider pulling the building back from the
and E. Denny Way south of Station Plaza. A sweeping pedestrian desire line.
corner at the base of Building A-1 at the corner

Capitol Hill Light Rail Station Sites Urban Design Framework Page 17 DRAFT - May 9, 2011
Seattle Department of Planning and Development
FRAMEWORK RECOMMENDATIONS
of Broadway Ave E and E John Street, to ■ Development Guidance: Provide
facilitate pedestrian movement from the main continuous overhead weather protection
(north) station egress to the south. along all building edges fronting Station
Plaza.
Create a Network of Public Space Connections ■ Within Station Plaza consider appropriate
between all Public Spaces on the Sites sub-structures and built elements to inhabit
■ Development Guidance: Restrict vehicular the plaza space to provide interest and
access on E. Denny Way between Broadway variety in Station Plaza.
Ave and Nagle Place (see Streetscape section ■ Explore architectural features within ground
for additional detail) Designate E Denny Way level facades at the Plaza such as recesses,
between 10th Ave. and Broadway as a Festival bays, colonnades, to ensure interest and
Street. Design the Festival Street as a curbless variety. Consider placing prominent
environment for seamless linkage between the building entries directly on Station Plaza
Festival Street and the Station Plaza. where feasible – especially on site B-2.
■ Consider high interior transparency on site
B-2 that enhances the link from Cal Anderson Include Upper Level Overlooks of the Station
Park to Station Plaza. Consider a light ‘jewel- Plaza for Oversight
box’ concept for the structure or portion of ■ Include amenity areas on upper levels of
Plazas are activated through
adjacent use and building design. the structure on B-2, and explore a design structures around the station plaza that
Image courtesy of Schemata contribute to eyes-on-the-plaza. Explore
Workshop.
that enables the plaza to extend through the
the inclusion of shared upper level patios
B-2 building. Explore this site/structure for a
and decks with vistas over the plaza.
potential focus for the civic and community
functions. ■ Include useable balconies and terraces
associated with individual housing units
facing onto the plaza to provide oversight
Intensely Activate Station Plaza with Adjacent and to contribute to architectural interest
Building Design facing the plaza.
■ The ground levels of buildings A-2, B-2 and C
where facing Station Plaza and the E. Denny
Way Festival Street should house retail spaces Highly Civic Broadway Streetscape Character
with strong potential for interaction with the Enhance Broadway’s character as a vibrant
public realm. Design features to reinforce this shopping and public life main street.
interaction might include: space for sidewalk ■ Include substantial retail spaces on the
cafes\ storefront windows and doors that Broadway Ave.-facing ground floors
Balconies provide eyes on the plaza
below, artfully done they provide completely open; generous canopies; and/or of buildings A-1, A-2 and C. Consider
visual interest. Image courtesy of associated vendor kiosks and stalls. designing flexible retail spaces facing
Schemata Workshop. Broadway Ave. to potentially accommodate
a larger ‘anchor’ or destination retail tenant.
DRAFT - May 9, 2011 Page 18 Capitol Hill Light Rail Station Sites Urban Design Framework
Seattle Department of Planning and Development
FRAMEWORK RECOMMENDATIONS

■ Design a civic streetscape facing Broadway. ■ Retain existing zoning on the south of
Consider a palette of streetscape elements sites A-2 and B-2 (NC3-65 and NC2-40
that includes: special pavers and detailing; respectively).
abundant planting in appropriate locations; ■ Provide upper level setbacks on the north
pedestrian lighting; signage and wayfinding; end of site C at the 4th story level, and at the
and street furniture. 6th story level stepping down towards the
plaza.
Design Concept ■ Provide an upper level setback on the plaza
The following recommendations relate to an overall side of building A-2 at the 4th story level.
design concept. The direction and guidance is ■ Retain a moderate scale of building on Site
intended to encourage: B-2 – explore design treatments (such as
■ an optimized arrangement of uses and transparency) that minimize bulk and scale
activities on the sites; and integrate the structure into the fabric of
■ unified, balanced and harmonious building Station Plaza.
forms that fit with their surroundings;
■ an architectural concept that results in Pursuit of Environmentally Sustainable Design
functional and harmonious design; and Programming Solutions
■ open spaces integrated with building design; ■ Development Guidance: Work with efforts
and already underway to explore the viability
of shared design solutions that result in
■ use of civic-quality materials for the building more environmentally responsible form
and open spaces. and function, such as the use of district Broadway is Capitol Hill’s main
commercial street.
energy, water and stormwater resources,
A Massing Concept that Steps Down Towards the management of “waste”, optimizing food
Central Station Plaza production & composting, etc. Explore flow
Development Guidance: To orient structures to through ventilation, maximization of passive
Station Plaza, an overall massing concept that steps heating and cooling systems.
down towards or addresses the Central Station
Plaza / E. Denny Way Festival Street / Cal Anderson Edges That Respond to Context
Park edge is recommended. ■ All buildings facing outward to the street
■ Increased building mass and scale should be should respond to the context of those edges.
focused at the north of sites A1 and B1 (to NC3-85 ■ The 10th Ave. E. frontage should visually
and NC3-65 respectively) and the south edge of integrate with low-rise multifamily across
site C (NC3-85). the street, and strengthen the residential
character of the area. Individual unit entries An example of building forms
stepping down towards a public
place.

Capitol Hill Light Rail Station Sites Urban Design Framework Page 19 DRAFT - May 9, 2011
Seattle Department of Planning and Development
FRAMEWORK RECOMMENDATIONS

facing 10th Ave. E. should incorporate features


such as stoops, porches or other features Flexibility in Mid-Block Crossings for Creative Solutions
that enhance residential character. A setback The location of the midblock crossings between the building
is recommended at the 3rd or 4th story of volumes within the A site and the B site should be flexible
building B-2 along 10th Ave. E. to create a to encourage creative design solutions to this connection.
scale compatible with low-rise development Designers are encouraged to explore creative treatments
across the street. A setback of at least 10’ is
and configurations that make the mid-block crossings an
recommended. Address possibility of change in
important element of the design concept. Treatments could
zoning in the future.
include:
■ Enhance Broadway’s character as one of Capitol ■ An inviting entry feature such as cascading stair or
Hill’s most prominent and vibrant shopping terrace (especially Site A)
and public life main streets. Facades facing
Broadway should hold the street edge, and ■ Commercial and retail uses that activate the street
buildings may go to allowed height limits at and that ‘turn-the-corner’ into the mid-block crossing.
the streetwall as consistent with other newer (especially Site A)
An example of a midblock crossing developments on the street. ■ Using the mid-block crossing as a transition point of
that retains buildable space above.
Alley 24 Seattle
building character, scale or mass.
Midblock Crossings to Strengthen Plaza ■ Treatment of the midblock crossings as a penetration
Orientation and Break Up Building Mass of a linked building form (Within A-1 to A-2, or B1 to
Development Guidance: While flexibility in the B-2). However in this scenario, the crossing should
specific location and form of the midblock crossings is remain open to the public, be of a highly transparent
encouraged, mid-block crossings within site A and B nature, and be a prominent feature of building design.
should help achieve the following design objectives:
■ Enhance orientation to Station Plaza. Midblock
crossings are expected to have a relationship to Inspired Design of Exemplary Station Plaza
the plaza. The central Station Plaza is a focal point of future
development and the Capitol Hill community as a whole;
■ The two midblock crossings should create
it should be designed as a unique and special public
a logical pedestrian link through the block
space. The relationship of Station Plaza to the surrounding
between Broadway and 10th Ave. E.
buildings as well as to the E. Denny Festival Street and Cal
Anderson Park is a primary design consideration – one
that will orient and raise the bar for the design of adjacent
An example of expressive streets and building facades.
architectural expression. Image
courtesy of Kanner Architects.

DRAFT - May 9, 2011 Page 20 Capitol Hill Light Rail Station Sites Urban Design Framework
Seattle Department of Planning and Development
FRAMEWORK RECOMMENDATIONS

■ Design of Station Plaza should inform and be


informed by that of the E Denny Festival Street.
Collaboration between designers of these two
spaces is essential.
■ Design of Station Plaza should ideally accommodate
and not preclude provisions for erecting temporary
overhead protection across the Plaza.
■ Integrally accommodate programming needs of the
plaza such as access to electricity and water for the
functional program of future users.
Treatments to consider may include: (See also Sound
Transit Nagle Place Extension Workshop summary)
■ A progression of treatments from green/soft at the
park edge to more urban/hard at Broadway.
■ Textures and interest in the ground plane.
■ Places to sit, gather and rest
■ Restrict vehicular access across Station Plaza
■ Explore integration of an artistic, removable weather
protection cover/canopy over Station Plaza.

Opportunity for Expressive Architectural Treatments


This is a special location in a unique neighborhood.
Designers are encouraged to propose expressive
and creative architecture and site design within the
parameters of the urban design framework.

Bird’s eve concept diagrams of the development


sites follow on pages 22 and 23. Please note these
diagrams are meant to convey one of many massing
configurations that would achieve the overall vision of
the redevelopment. These diagrams are a starting point An example of bold architectural
for future developers, rather than a proscriptive design. expression. Image courtesy of
Schemata Workshop.

Capitol Hill Light Rail Station Sites Urban Design Framework Page 21 DRAFT - May 9, 2011
Seattle Department of Planning and Development
FRAMEWORK RECOMMENDATIONS

#APITOL(ILL4/$
3CALE$ESIGN
-ASSISINCREASEDONTHENORTHPORTION
)NCLUDEAFEATUREOFINTERESTONTHESOUTHFACADEOFTHE OF3ITE!  WITHSTEPPINGDOWN
CENTRALVENTSHAFTMAKINGITAFOCALPOINTOFTHEPLAZA)DEAS TOWARDSTHEPLAZA
INCLUDEUSINGTHEFACADEFORARTISTICDISPALYS MOVIESOR -ASSISINCREASEDONTHENORTHPORTIONOF
TRANSIT RELATEDINFORMATION ORGREENWALLTREATMENTS SITE"  ANDSTEPSDOWNTOBUILDING
-IDBLOCKCROSSINGOFSITE!ISASTRONGLINKTO"ROADWAY " MAX NEARTHESOUTHFACADEOFTHE
INVITINGPASSERSBYINTOTHEPLAZA CENTRALVENTSHAFT

2ETAINSEXISTING MASSINGWITHUPPERLEVELSETBACKSTO 2ESIDENTIALFACINGTH!VEHAS


PERSERVELIGHTANDAIRONTOPLAZA INDIVIDUALROWHOUSESCALEDUNITSWITH
STOOPSANDPORCHES
6ARIETYOFTREATMENTSAREUSEDTOACTIVATETHE3TATION0LAZA
INCLUDINGACTIVERETAILSTOREFRONTSUSES BUILDINGENTRIESAND
ARCHITECTURALTREATEMENTSATTHEBASEOFALLBUILDINGSFACINGTHE
PLAZAAND%$ENNY7AYFESTIVALSTREET

-ASSISINCREASEDONSOUTHPORTIONOF
3ITE# WITHUPPERLEVELSETBACKS
TOWARDSTHE0ARKAND0LAZASPACES

3ITE$ISRECOMMENDEDFOR3###
RELATEDDEVELOPMENT#ONSOLIDATION /04)/.2ETAINSSTORY LIMIT
WITHTHELOTTOTHESOUTHISINDICATED ONBUILDING" FORLOWEREDSCALE
ANDTRANSITIONTOTHEPARKAND
PLAZA)NTHISOPTION" ISA
HIGHLYTRANSPARENTCIVICSTRUCTURE
WITHOFFICESANDSERVICES

/,
)6%
7!
9

%
6%
!
4(
%$


%.
.9
7 !SERIESOFLINKEDOPENSPACES
!9

ns
BETWEEN0LAZA %$ENNY7AY

io
pt
FESTIVAL3TANDTHE0ARK4HE

O
B
FESTIVALSTREETHASLIMITEDVEHICLE
6% ACCESS ANDISACURBLESSENVIRON
!9! MENTRAISEDTOTHELEVELOFTHE
$7 PLAZA
/!
"2
3EE"/PTIONSON
,

PAGE
%0
',
.!

DRAFT - May 9, 2011 Page 22 Capitol Hill Light Rail Station Sites Urban Design Framework
Seattle Department of Planning and Development
FRAMEWORK RECOMMENDATIONS

.OTE4HESEBIRDSEYEDIAGRAMSARECONCEPTSFORGENERALILLUSTRATIVEPURPOSESONLY #APITOL(ILL4/$
$IAGRAMSDEPICTONEOFMANYMASSINGCONFIGURATIONSTHATCOULDRESULTFROMDESIGN 3CALE$ESIGN
PRINCIPLESOFTHE5RBAN$ESIGN&RAMEWORK6OLUMESAREINTENDEDTOSHOWGENERAL
MASSANDSCALE ANDARENOTTOSUGGESTPARTICULARARCHITECTURALDESIGNCONCEPTS
/VERALLMASSINGSCHEMESHOULDSTEP
DOWNTOTHEPLAZATOREINFORCETHEFOCUS
ONTHEPLAZA ANDMAXIMIZELIGHTANDAIR
#ONSIDERSUNEXPOSUREANDSHADOW ONTOTHESPACE
EFFECTSOFMASSING ESPECIALLYWITH
RESPECTTOTHEPLAZAAND%$ENNY7AY
5PPERLEVELCONNECTIONSBETWEENBUILDINGS
FESTIVAL3TREET
! ! ANDOR" " PRESERVEPERCEPTIBLE
MASSINGBREAKSWITHINSITES!AND"
/VERSIGHTANDVIEWSONTOTHEPLAZAFROM
ADJACENTBUILDINGS#ONSIDEROVERLOOKS
BALCONIESETC 3ITE$ISRECOMMENDEDFOR3###RELATEDUSES
"ESTUSEOFTHESITEREQUIRESCONSOLIDATIONWITH
THEADJACENTPROPERTYASINDICATED

&LEXIBLEMIDBLOCKCROSSING!MIDBLOCKCROSSINGMUSTBE
INCLUDEDTHROUGHSITE!AND" BUTITSLOCATIONISFLEXIBLE !SWEEPINGPEDESTRIANDESIRE
DEPENDINGONTHEDESIGNCONCEPT4HEMIDBLOCKCROSSING LINEWITHIN3ITE!CREATINGA

,
%0
SHOULDBENEARTHECENTRALVENTSHAFT STRONGPEDESTRIANCONNECTION

',
BETWEENTHE*OHN"ROADWAY

.!
INTERSECTIONTHROUGHTOTHE
"ALANCED SHAREDPEDESTRIAN VEHICLE
3TATION0LAZA
SPACEBETWEENTHE" SITEANDTHE
NORTHSTATIONENTRY

%$%.
.97!9
&OCALPOINTATTHEPROMINENT
"ROADWAY*OHNINTERSECTION
ADJACENTTOTHEMAINSTATION
6%

ENTRY
9!
$7!
/!

6%%
"2

!2$!

%%
!6

(!26
4(


%*/(
.34

Capitol Hill Light Rail Station Sites Urban Design Framework Page 23 DRAFT - May 9, 2011
Seattle Department of Planning and Development
FRAMEWORK RECOMMENDATIONS

Capitol Hill TOD Note: These bird’s eye diagrams are concepts for general illustrative purposes only.
Scale & Design Diagrams depict one of many massing configurations that could result from design
B-Site Options principles of the Urban Design Framework. Volumes are intended to show general mass
and scale, and are not to suggest particular architectural design concepts.

Option Concept: 3 Part-Step Down Option Concept: Stand Alone ‘Jewel Box’
The B site is broken into 3 masses that stair-step down towards the park and plaza. Two midblock crossings The portion of the B site facing the park and plaza is occupied by a small stand-alone retail pavilion
are included to further reduce the scale of buildings fronting 10th Ave. This concept accommodates a suite that is incorporated into the chain of public spaces. Development on the B sites is configured in two
of uses on the B sites that do not include a sizeable community / cultural center. primary masses with a midblock crossing. The concept also accommodates a suite of uses that do not
include a substantial community / cultural center.

6 story mixed use.


5 story mixed use.
‘Jewel box’ retail pavilion.
4 and 3 story mixed use.

VE E
YA AV
WA WAY
A D D
B RO OA
BR

EE.
AV
E.

H
E

T
AV

10
TH
10

L.
EP E.
D L.
GL EN
NA NY EP E. D
W GL EN
AY NA NY
WA
Y

DRAFT - May 9, 2011 Page 24 Capitol Hill Light Rail Station Sites Urban Design Framework
Seattle Department of Planning and Development
FRAMEWORK RECOMMENDATIONS

Design Quality and Scale that the character of the right-of-way should
change. The goals for the space include:
Streetscape ■ Pedestrian and bicycle focused
■ Limited access for local circulation and
Active, ground floor commercial uses should commercial load zones
face on Broadway Ave., E John St and E Denny
■ Contiguous surface with Station Plaza
Way. The 10th Ave E façade should continue
to incorporate the feel and character of a ■ ADA accessible
residential street and access to parking should ■ Ability to close the entire street for specific
be discouraged from 10th Ave E. Provide active events “Festival Street designation”
uses (artist live/work) along the west side of site
Creation of a pedestrian plaza, through the
B1 to help activate the area between the northern
re-purposing of the right-of-way, attempts to
station entrance, the alley access to parking from
increase not only walkability, but the livability
E John St and the north portion of Station Plaza.
of the neighborhood. The vision for E Denny
It is understood that this area would need to
Way is one that creates a sense of place and
accommodate vehicles for service and parking as
interconnects visually with Station Plaza, while
well as pedestrians traveling to Station Plaza from
accommodating spillover of events taking place
the E John St station entrance. A shared festival
there, such as live music and performances,
street is recommended for E Denny Way between
kid-friendly activities, and promotion of local
Broadway Ave and 10th Ave E and should have
businesses. It can be a public gathering place
a special pedestrian-focused design with café,
for residents and visitors, a place for shoppers to
restaurant or other use providing outdoor seating
rest and eat in the public realm, a vibrant open
to activate the right-of-way.
space, with adjacent ground floor commercial
uses to keep the space active. An example of
The goal for E Denny Way is to make walking
the character sought on E Denny Way is that of
and biking to the E Denny Way Link Light Rail
Pike Place. The sense of place is apparent and
station entrance more comfortable, convenient
vehicles are able to enter onto the space, but do
and safe. The vision for E. Denny Way between
not overwhelm nor dominate the space. East of
Broadway and Nagle Place is a flexible public right
Broadway, E Denny Way becomes a residential
of way that accommodates pedestrians, bikes
street with a very different feel than Denny
and occasionally cars; an extension of Station
Way to the west of Broadway - slower moving
Plaza and a gateway to Cal Anderson Park. While
traffic, a pleasant pedestrian environment with
there are differing opinions regarding the specific
Cal Anderson Park to the south, large street Woonerf, shared street
operational function of E. Denny Way, it is clear
trees and on-street parking on both sides of the
street announce this change in character.
Capitol Hill Light Rail Station Sites Urban Design Framework Page 25 DRAFT - May 9, 2011
Seattle Department of Planning and Development
FRAMEWORK RECOMMENDATIONS

The Seattle Streetcar First Hill line will terminate on Broadway and Nagle Place. Local circulation
Broadway Ave. south of E. Denny Way adjacent to the can still proceed adjacent to the Sound
west Sound Transit station entry. Streetscapes should Transit owned properties by use of 10th
be designed to enhance pedestrian connectivity Ave E, E Denny Way and Nagle Place. 10th
between the streetcar stop, the station plaza and other Ave E will act more positively as a bicycle
portions of the redevelopment. This may include future boulevard with less traffic using E Denny
enhancement of crosswalks at the Broadway and John Way as a cut-through opportunity. Allow
intersection. Consistency of streetscape elements commercial load zone parking spaces along
including paving materials, street furnishings and the south side of E Denny Way between
lighting fixtures between the streetcar stop area and Nagle Place and Broadway in order to
the E. Denny Way Festival Street and Station Plaza are service the developments on Sites A.
recommended for visual continuity. The consistency ƒ Aesthetic design: Prioritize pedestrians
should extend southward along the length of college- and bicyclists. Use planters and/or lighted
related development on site D. A widened sidewalk is bollards to reflect pedestrian space versus
recommended along Broadway for the length of the Site vehicular space. Use removable bollards
D college-related development. to close the roadway for specific events or
for spillover events at Nagle Plaza. Create
Development Guidance a curbless environment in which the right-
■ Design E Denny Way between Broadway and of-way height matches that of Nagle Plaza
Nagle Place to reflect the desire for an enhanced to establish a strong link between the two
pedestrian and bicycle environment which allows spaces. The change in grade (speed humps)
the street to operate with “restricted access.” Design will help to distinguish E Denny Way as a
considerations: special space that requires lower speeds.
ƒ Operational design: Design E. Denny Way Install “do not enter” signs at E Denny Way
between Nagle Place and Broadway with the and Broadway. Additional details:
intention to prioritize pedestrian and bicycle ƒ Pedestrian-scaled lighting
access and provide commercial vehicle access
only. Main access for the new development ƒ Trees
should be from 10th Ave. E. and E. John St. ƒ Natural drainage/landscaping
Depending on site development configurations, ƒ Utility connections to facilitate
determine if the E. Denny closure requires opportunities for mobile vending and
revisiting to allow one lane for westbound traffic “Festival Street” programming
as well as commercial load zones to support the
new TOD development (approximately 17 feet ƒ Pavers or other materials to distinguish
of drivable surface). Prohibit non-emergency placemaking
vehicular eastbound traffic on E Denny between ƒ Secured bike parking facility
DRAFT - May 9, 2011 Page 26 Capitol Hill Light Rail Station Sites Urban Design Framework
Seattle Department of Planning and Development
FRAMEWORK RECOMMENDATIONS

%$ENNY7AY /PPORTUNITYFORACTIVATINGRETAILUSES
3TATION0LAZAMATERIALSANDDESIGNIS
&ESTIVAL3TREET#ONCEPT .OTE4HISFIGUREISTOILLUSTRATECONCEPTLEVEL CONTINUOUSWITHTHEFESTIVALSTREET
STREETSCAPEDESIGNRECOMMENDATIONSONLY #ONSIDERPLANTERSANDREMOVABLE
BOLLARDSTOLIMITVEHICLEACCESS
N &ESTIVAL3TREETAREAISACURBLESSENVIRONMENTAT
"ROADWAY 3TATION
THELEVELOFTHE3TATION0LAZA
6ARIEDMATERIALSANDTEXTURES
&ARMERS
2AMPUPTOPLAZALEVEL
3ITE!  -ARKET
0LAZA

TH
3ITE" 

7ESTBOUND2ESTRICTED!CCESS/NLY %$ENNY7AY
 7AY#YCLE

3ITE#
3OUTH
4RACK

3TATION
%NTRY .AGLE0L #AL!NDERSON
7EST 0ARK
3ECUREDBIKEPARKINGLOCATION
3TATION 3TANDALONEORWITHINABUILDING
%NTRY 0EDESTRIANSCALELIGHTINGTHROUGHOUT

#OMMERCIALLOADZONE
3EATTLESTREETCARSTOP#ONSIDERMATERIALSANDDESIGNCONSISTENCYWITH3TATION0LAZA
ANDFESTIVALSTREET INCLUDINGTHEFRONTAGESOFCOLLEGE RELATEDDEVELOPMENTONSITE$

Capitol Hill Light Rail Station Sites Urban Design Framework Page 27 DRAFT - May 9, 2011
Seattle Department of Planning and Development
FRAMEWORK RECOMMENDATIONS

ƒ Continuous awnings for weather Design Guidance


protection ■ Engage existing community organization
ƒ Signage and wayfinding such as the Broadway Business
Improvement Association, the Capitol Hill
■ Design the Station Plaza alley (between E John
Housing Public Development Authority,
Street and Station Plaza) as a woonerf type
the Greater Seattle Business Association,
of street to allow for a shared environment
or other entity to manage and program
for pedestrians/bicyclists and vehicles. This
the space. Create an advisory board of
area should safely accommodate pedestrian
members from other existing organizations,
movement and vehicular access - both
property owners and residents. The
service/maintenance and parking - for the
managing entity should be integrally
development. Active uses on the ground floor
connected to the neighborhood. Ideally
of site B could help generate foot traffic and
entity offices would be located on site.
maintain the space as evenly shared between
pedestrians, Bicycles and automobiles. ■ Assure compatibility between uses on the
plaza with resident’s life above. Develop
an agreement between Sound Transit and
Management, Programming and property owners that establishes criteria for
Maintenance of Station Plaza space activation that considers the comfort
of nearby residents.
It is well understood that the success of the
redevelopment will be greatly influenced by the ■ Consider requiring all users of non
function of Station Plaza. An active and vibrant residential space to covenant management
station plaza can act as a magnet, drawing people and programming.
into the space and therefore the ground floor uses
bordering the plaza. An empty plaza may have the Procedural Site Redevelopment:
opposite effect, deterring people from entering. Redevelopment of sites owned by a transit
The commitment to house the Broadway Farmers agency above a light rail station presents complex
Market will bring activity to the plaza as well as help procedural and organizational challenges. The
introduce people to the space when it first opens. following recommendations relate to procedural
It is critical that the plaza be managed, maintained steps that can help to realize successful reuse of
and actively programmed so it becomes the civic the sites for the mutual benefit of the community,
heart of the development on Broadway. City, and Sound Transit.

DRAFT - May 9, 2011 Page 28 Capitol Hill Light Rail Station Sites Urban Design Framework
Seattle Department of Planning and Development
FRAMEWORK RECOMMENDATIONS

Design Guidance
■ Consider a Master Developer for sites A, B
and C. Absent a Master Developer, combine
the A sites (A1 with A2) and the B sites (B1
with B2) into consolidated singular parcels
for the purposes of development. This will
encourage more coordinated development.
Site configuration for shared features such
as continuous below grade parking (below
the A site, and below the B site), and upper
level building connections for circulation.
■ If a Master Developer is not selected for
sites A, B and C, structure a process by
which individual development teams
can collaborate, share design ideas and
coordinate efforts throughout design and
construction so the development reads as a
comprehensive whole.
■ In the RFQ/RFP, ask proposing development
teams for demonstrated experience
collaborating with other developer teams and
programming spaces similar to Station Plaza.

Capitol Hill Light Rail Station Sites Urban Design Framework Page 29 DRAFT - May 9, 2011
Seattle Department of Planning and Development
OTHER GREAT IDEAS

Other Great Ideas Design Quality and Scale


■ Raise the height limit on A1 to between
In the course of the workshops and other 240’and 400’ tall, with 45 to 48’ podiums
community meetings that informed and on sites A2, B1, B2 and C. Assume 10,500
shaped the recommendations in this report, SF floor plates so as to avoid overly bulky
several other great ideas emerged. These mass. Make the development on A1 a
ideas are noted below for further comment stellar, singular and iconic tower that
and exploration as well as to provide future serves as a beacon for this civic town
developers of the sites with the range of fertile, square (Station Plaza)
creative ideas from the community regarding ■ Keep the height of site C at 65’ and step
redevelopment of these sites. down to 45’ at the edges fronting E. Denny
Way and Cal Anderson Park.
Desired Uses
■ Hotel on sites A or C ■ Explore opportunities for cantilevers
over the station entries so as to
■ Community center located on southern increase available square footage for
portion of site A
redevelopment and better integrate
■ Food carts in the plaza the single story station entries with the
■ Transparent and removable/retractable roof surrounding development.
over Station Plaza during inclement weather
■ Publicly accessible rooftop plaza on A or C Management, Programming and
■ Locate a LGBTQ community center here Maintenance of Publicly Accessible Space
that provides services as well as generates ■ Solicit from groups interested in managing
additional business by becoming a LGBTQ and programming Station Plaza a financial
destination. plan to program space. Community
■ Accommodate jobs instead of primarily organizations could then propose these
housing. Office space would help plans to potential developers to provide
concentrate the number of people in the services as well as to generate additional
neighborhood and thereby better activate business by becoming a LGBTQ destination.
the redevelopment and neighborhood
during business hours.

An example of the type of slender


tower supported by some participants
for the A-1 site. Image courtesy of
Calatrava Turning Torso Malmö: Copyright
teteracomonde, Flickr.

DRAFT - May 9, 2011 Page 30 Capitol Hill Light Rail Station Sites Urban Design Framework
Seattle Department of Planning and Development
OTHER GREAT IDEAS

Consider a parking management district


A parking management district for the
Broadway neighborhood could reduce parking
needs at the light rail station sites. This strategy
has allowed other cities more efficient use of
local parking capacity, and reduced congestion.
It offers savings in overall parking development,
allowing more affordable housing. Parking
management coordinates supply and demand
of parking stalls within an area, with devices
such as synchronized signs to available spaces.
It can offer parking owners a more round-the-
clock market for their stalls. While an innovation
for Seattle, the Broadway neighborhood could
provide an appropriate demonstration of
this approach. The Capitol Hill neighborhood
holds the notably lowest percentage of car-
ownership in the city. An organization such as
the Capitol Hill Chamber of Commerce might
be appropriate to explore potential parking
management for the Light Rail Station /
Broadway neighborhood.

Capitol Hill Light Rail Station Sites Urban Design Framework Page 31 DRAFT - May 9, 2011
Seattle Department of Planning and Development
IMPLEMENTATION

Implementation
Housing
Partnership options between City and The City of Seattle Office of Housing will
Sound Transit pursue opportunities with Sound Transit to
■ The City and Sound Transit will continue incorporate the affordable housing goals
to pursue partnership opportunities that into the development of these properties.
will implement the direction and offer the Any developer who is selected by Sound
guidance provided in this Framework to Transit through their RFQ/RFP process to
the future developer(s) of these properties. build subsidized affordable housing will be
eligible to apply for Seattle Housing Levy
Streetscape Concept Plans Rental Preservation and Production Program
■ SDOT will develop streetscape concept funds, federal funds, and other fund sources
plans for E Denny Way, Nagle Place, administered by OH. At least once per year, OH
Broadway (abutting Site A frontage) and publishes a Notice of Funds Available (NOFA) for
10th Ave E. Design approval, Director’s the Rental Housing Program. In addition, any
rule. Amendments to the Right of Way developer selected by Sound Transit can apply
Improvement Manual (ROWIM) should to use the City’s Multi-Family Tax Exemption
occur before Sound Transit issues the RFP Program, providing 20% of all units affordable to
for the developable parcels to ensure households making 85% of median income or
that private entities build the streetscape below in exchange for property tax exemption
as envisioned for each street. Include on all residential improvements.
consideration of green stormwater
infrastructure. Develop appropriate design Ecodistrict effort by CHH ($50K funding)
and management practices for “Festival ■ Capitol Hill Housing (CHH) is exploring
Streets”. Neighborhood groups will be the creation of an ecodistrict on Capitol
responsible for activating these streets Hill at the properties over the future
through regular events. light rail station. Focusing on shared
sustainable, environmentally responsible
Design Guidelines and well-designed new development
■ When finalized, guidance offered in this CHH will convene stakeholders and
Framework will be amended to the Capitol research possible solutions for the mixed
Hill Neighborhood Design Guidelines so use buildings on the site, including the
as to guide future development as it goes possibility of using district energy.
through the City’s Design Review process.

DRAFT - May 9, 2011 Page 32 Capitol Hill Light Rail Station Sites Urban Design Framework
Seattle Department of Planning and Development
CONTRIBUTORS

Contributors

This Framework was developed by City of Seattle staff , the Capitol Hill Champion – a joint committee
of the Capitol Hill Chamber of Commerce and the Capitol Hill Community Council – and Sound Transit
staff, building on findings and comments stemming from community meetings and workshops held
over the past several years including the Sound Transit sponsored four community forums in 2009 and
the August 2010 Nagle Place Extension TOD workshop and three workshops held between October of
2010 and February 2011 by City of Seattle staff.

Capitol Hill Champion Steering Committee


Catherine Hillenbrand, Chair
John Feit, Architect, Capitol Hill resident
Betsy Hunter, Chief Real Estate Development Officer, Capitol Hill Housing
Mike Kent, Capitol Hill Community Council
Mike Mariano, Architect, Capitol Hill Chamber of Commerce member
Jen Power, Capitol Hill Community Council
Chip Ragen, Capitol Hill Chamber of Commerce
Alison Van Gorp, Urban Policy Director, Cascade Land Conservancy; Creative Crossroads Project Manager
Zev Wagner, Capitol Hill Community Council
Michael Wells, Executive Director, Capitol Hill Chamber of Commerce

Capitol Hill Light Rail Station Sites Urban Design Framework Page 33 DRAFT - May 9, 2011
Seattle Department of Planning and Development
CONTRIBUTORS

Workshop Participants
Leslie Bain Andy Fife Teresa Mozur
Maria Barrientos Becki Frestedt Brianna Murray
Kathryn Beck Daniel Goddard Michael Oaksmith
Pamela Belyea Sandy Ha Tony Ogilvie
Ellen Blair Catherine Hillenbrand Jen Power
Christina Bollo Betsy Hunter Chip Ragen
Josh Brevoort Paul Iano Matt Rowe
Rachel Brister Todd Illy Tony Russo
Melissa Burchett Douglas Ito Dennis Saxman
Dawn Bushnaq Aaron Jacobs Douglas Smith
Jim Castanes Cheryl Jacobs Ian Story
Louise Chernin Marty Jacobs Sharon Sutton
Bob Corwin Allan Jones Janice Tufte
Chris Curtis Mike Kent Alison Van Gorp
Michael Dobie Paul Killpatrick Cathryn Vandenbrink
Randy Engstrom Laura Mansfield Don Vehige
John Feit Mike Mariano Zef Wagner
Pat Fels Jonathan Morely Michael Wells

City of Seattle
Vanessa Murdock, Department of Planning and Development
Geoff Wentlandt, Department of Planning and Development
Ryan Curren, Office of Housing
Sara Robertson, Seattle Department of Transportation

Sound Transit
Scott Kirkpatrick, TOD Program Manager
Kate Lichtenstein, Project Coordinator
Jeff Munnoch, Community Outreach Specialist

DRAFT - May 9, 2011 Page 34 Capitol Hill Light Rail Station Sites Urban Design Framework
Seattle Department of Planning and Development
Page left intentionally blank
AFT
DR
CAPITOL HILL
Light Rail Station Sites
Urban Design Framework

MAY 9, 2011