You are on page 1of 4

Bio-Xpress Decentralised Systems

Bio-Xpress—Accelerated Aerobic Action

How they work


Bio-Xpress Reactors operate on a
continuous aerobic digestion
principle.
In essence, this mimics nature
with all important improvements in
speed, space and safety.
Raw sewage is passed to the multi-
Integrated Control Station stage Bio-Xpress Reactor after it
has been screened for non biodegradable waste. The Bio-Xpress Reactor continually aerates
Special points of interest: and processes the sewage until it is separated into Recycled Water and valuable Biosludge.
• High performance, A typical complete installation is described on page 3 along with two example illustrations of
maintenance free dual Bio-Xpress Decentralised Wastewater Stations. A more complete description can be found
purpose Bio-Xpress micro
at:
media with 20 year
guarantee. http://bio-xpress.blogspot.com
• Ready to reclaim water In a Bio-Xpress Decentralised Wastewater Station, all equipment is installed above ground
within hours of delivery. and housed typically in an unobtrusive building designed to be in harmony with its
• A complete solution: 2 surrounding environment. This means that there is simply no opportunity for untreated
Phase Bio-Xpress Sewer effluent to enter the environment and water table, and Kuma Sewer Mining Stations will not
Mining Stations, can impact negatively on the community.
recycle waste back to pure,
potable water.

• Highest quality
construction, built to
Typical Installation Scenarios
provide greater than 20
years continuous operation.
Bio-Xpress Reactor systems are especially suited for:
• Lowest Total Cost of
Operation of any Office buildings Cluster Housing projects Parks
comparable comprehensive
Resorts Sports arenas RV areas
sewage treatment system.
Indigenous housing Race tracks Airports
• No consumables in primary communities
stage, no service breaks
Schools Island communities
Condominiums
whatsoever. Retirement villages Sanatoriums
Mining sites
• Electricity and sewage IN Hospitals Remote rural communities
High quality Biosludge and Hotels
Aged Care homes Residential areas
Recycled and/or potable Military camps
Spas Shopping malls
water OUT.
Gated communities
Industrial estates Apartment buildings
• Fully upgradeable as needs Refugee Camps
increase. Golf Clubs Factories
Caravan Parks
Campgrounds Gas stations
• 9 models for all sizes of
Prisons
projects for 300 to more Marinas Bus depots
than 1800 people. Stadiums
Recreational areas
• Bio-Xpress Reactors can
be installed in multiples to
accommodate upgrades and Bio-Xpress Reactors can be retrofitted to existing buildings or provide a comprehensive
larger communities. solution for water saving and recycling in Green Building projects.
• Safety ++: no long distance
pumping to remote sewage
farms with the danger of Installations have minimal space requirement and environmental impact in
pipe/pump failure.
terms of noise, odour and power consumption.

http://bio-xpress.blogspot.com
Reactor model specifications
PERFORMANCE PER 24 HOURS
Model 300 500 700 850 1050 1250 1450 1600 1800

Litres treated 73,000 101,000 147,000 174,000 211,000 248,000 284,000 330,000 360,000

Average number of
persons served
367 504 734 871 1055 1238 1422 1651 1800
based on: 200

Phase 1 Bio-Reactor litres/person/day

Max power daily 100 110 120 132 150 160 180 200 210

Av. duty cycle 60 66 72 80 90 96 108 120 126

( kW hrs.)

Bio-Xpress Media 1500 2100 3000 3600 4400 5100 5900 6800 7400
installed — Kg

Length — Metres 2.44 3.66 4.88 5.87 7.32 8.53 9.75 10.97 11.96

Width 2.39 2.39 2.39 2.39 2.39 2.39 2.39 2.39 2.39
Recycled water fit for re-use
Height 2.24 2.24 2.24 2.24 2.24 2.24 2.24 2.24 2.24

Shipping weight — 1286 2143 3000 3643 4500 5357 6214 6857 7714
Kg

Operational weight 11000 16000 21000 26000 32000 38000 43000 48000 53000

About our manufacturing standards


Bio-Xpress reactors are manufactured in Thailand by Kuma with the highest quality components and raw
materials.
2nd Phase potable water
Only ISO standard components and fittings from the USA are used along with International Standards
based high grade steel to ensure every Bio-Xpress Reactor will provide at least a full 20 years operational
lifetime.
Welding is completed to the highest level and exceeds all international and military standards.
After fabrication is completed, the entire unit is sandblasted back to white metal before precision coat-
ing with a coal tar based epoxy resin.
There are 9 standard sizes ranging from 2.5 metres in length for an average of 300+ persons to 12 me-
tres length catering for over 1800. Our factory is open for inspection by appointment to all government
officials, environmental delegations, community organisations and current and prospective customers.
Rapid shipment
Orders are completed under firm contract with agreed delivery times and costs.

Rapid shipment worldwide in 20’ & 40’ ISO containers


All Kuma Bio-Xpress Reactors and ancillary systems have been designed to fit and be readily packed in
standard ISO shipping containers.
This means complete systems can be delivered worldwide to your location and be fully operational in a
matter of hours from their arrival on-site.
New Thailand — Laos
When the requirement to upgrade or downsize a Station arises, Kuma Bio-Xpress systems can be quickly
Friendship Bridge across
de-commissioned, sanitised and packed for removal and use elsewhere. This deployment flexibility ensures
the Mekong at;
the fastest time to service and minimises operational and capital cost and space requirements.
Muhkdahan/Savanakeht
opened 2006 Northern Thailand offers one of the most central world delivery centres with excellent road freight from
our factory to ports in Bangkok and, with the completion of the new ASEAN Trans Asia Highway, provid-
A vital link in the new
ing an east west-coast to coast road, we will further speed delivery to Asia, The Middle East, Europe and
ASEAN Trans-Asia
the American continents.
Highway

http://bio-xpress.blogspot.com
Bio-Xpress Decentralised systems

1st Phase Bio-Xpress Wastewater Station — serving 700 persons

• Buffer tank to balance shock loading


• non-biodegradable waste automatically loaded
in eco friendly, transportable disposal contain-
ers
• Biosludge outlet
• Low BOD Recycled Water for gardens, car
washing, toilet flushing and general building
exterior cleansing

What is the role of the buffer tank?


The role of the buffer tank in a Bio-Xpress Sewer Mining Station is two fold. Firstly it is the place where non-biodegradable objects that
find there way into the system are screened out for instant incineration or returned via appropriate containers as approved landfill. The
secondary role is to ensure that the sewage received will never overflow the 1st Phase treatment system. By designing the capacities to
adequately cope for the community being served, any chance of sewage overflow is eliminated.

2 Phase Bio-Xpress Sewer Mining Station — serving 2000 persons

• On site staff amenities if


required

• Optional power backup or


self contained primary
power source

• Destruction of non-
biodegradable waste in a
high energy incinerator

• Biosludge pathogen re-


moval, pelletising, packing
and storage station (in
development)

• Recycled Water for


Sports Grounds, parks,
gardens, car washing,
toilet flushing and gen-
eral exterior cleansing

• Optional Class A potable


water processing in a 2nd
Phase membrane technol-
ogy, UV and Ozone
treatment system

http://bio-xpress.blogspot.com
Bio-Xpress Decentralised Systems

Treating How safe is low BOD Recycled Water?


Industrial and Biochemical Oxygen Demand is the primary measure and performance yardstick of water safety for
humans. With a BOD of less than 8 mg/L, the accelerated treatment provided by the innovative multi
hazardous waste
-stage Bio-Xpress Reactor ensures the lowest BOD of any primary (1st Phase) sewage treatment
water system. This extremely low BOD ensures you and your family's health for responsible Recycled
Water re-use, and very importantly, saves costly membrane consumables and lowers maintenance
• Food industry when going on to 2nd Phase treatment for the return to Class A potable water.
• Paper and pulp
• Petro-chemical Reclaiming for your choice of water re-use
• Pharmaceutical By keeping the Class A water treatment as a separate 2nd Phase, Bio-Xpress clients and operators
are able to decide how much of the treated Recycled Water is set aside for Class A potable water
• Beverage industry production. This means in those times when water is in abundance, primary treated, very low BOD
• Meat packing Recycled Water can be mined and recycled. With Bio-Xpress Sewer Mining Stations you have the
flexibility to ensure you are always operating for the minimum cost and the maximum effectiveness,
• Fish farming
irrespective of water availability or demand.
• Slaughter houses
• Land fills About our Bio-Media
• Packaging The Bio-Xpress Micro-Media provides a lifetime of operation and eliminates the need for
consumables in the primary treatment Phase. The micro construction ensures the maximum surface
• Sugar Cane Processing area to house the bacteria. The serrated external surface provide a highly effective series of
cutting edges to speed the break-down of suspended solids and ensure the minimum cycle time from
sewage to low BOD Recycled Water.
Bio-Xpress Reactors can be
fitted with additional dousing,
screening and flocculation Total Cost of Operation
systems in the primary stages for When we quote for the installation of a Bio-Xpress Sewer Mining station you will be provided with a
the removal of heavy metals, Total Cost of Operation financial plan that spells out in fine detail every aspect of both the capital
chemicals, detergents,
and on-going expenses. With this useful tool, you are provided with a yardstick that ensures all your
pharmaceuticals and other competitive quotes are providing the maximum comparative financial detail. Call us any time for an
contaminants when catering for
obligation free TCO for your project.
industrial and hazardous waste
water.
Minimising on-going maintenance and consumables
Bio-Xpress Sewer Mining Stations can be designed with 2nd Phase treatment facilities. This means
call us: that the bulk of the treatment task (1st Phase) is handled by the Primary Bio-Xpress Reactor
equipped with Kuma Micro Bio-Media with no need whatever for consumables. The optional 2nd Phase
Kuma can provide solutions water purification system takes the low BOD Recycled Water from the Bio-Xpress Reactor and
for any water treatment returns it to Class A potable water as required using reverse osmosis and membrane technology
situation, especially where coupled with proven UV and Ozone sterilisation.
portability or immediate “in
service” is needed. These Australia:
solutions are delivered with Kuma Group Pty Ltd
the industry’s most competi- 18 Emily Street
tive TCO. Seymour Victoria
3660
Australia

Total Cost of Operation report


Melbourne: 04 11 22 3336
Email: info@kuma-grouponline.com

Website: http://bio-xpress.blogspot.com

You might also like