Project: West AJ Renovation Contractor: Barton Malow Date: 12/7/11 Report Number: 15 Day: Su M T W Th F S
Work Performed:
Due to the amount of rain in the past two day almost all of the work on the exterior has been stopped. Outside there were workers making sure certain material was covered correctly and that rain was not getting through. Most of the work was occurring inside as most of the Sub contractors onsite were dealing with interior systems.
Weather
Temp: 51 Degrees F Wind: Slight Condition: Heavy Rain Humidity: None
Equipment at Site All Terrain Forklifts (3) Hydraulic Scaffolding (2) Hydraulic Elevator (1) Connex (1) All Terrain Forklift (3)
McDaniel