8/1/2013
TOTAL Qty Sch. Date Activity of Start date completio as per L2 n as per Sch L2
(A).
Unit
Tree felling Tree logging & delivering to NTPC Removal of roots from ground
(B). (1). (2). (3). (4). (4). (C.) (D) (D.) (G). (H). (I).
FENCING : Trench excavation Bottom PCC Brick Work below GL Brick Work above GL Fencing with chain link Land leveling
125 10560
Module Support Structure mounting Nos Fitting Modules on structures Module series cabling till JB Nos Nos 42240 3520
oughout day.
Cumulativ Qty Actual e Target for Complete start date complete tomorrow d today d 0 1 0 338 331 0 4
Remarks
Activity completed on 21-07-13 Activity completed on 27-07-13 Total qty unknown due to earlier cut trees.
0 0 0 0
De-watering done. Surveying to be done WBM laying under progress. After land leveling
8/2/2013
SITE PREPARATION WORK : Unit TOTAL Qty 331 Sch. Date Activity of Start date completio as per L2 n as per Sch L2
(A).
Tree felling Tree logging & delivering to NTPC Removal of roots from ground
(4).
Disposal of roots
Nos.
(B). (1). (2). (3). (4). (4). (C.) (D) (D.) (G). (H). (I).
FENCING : Trench excavation Bottom PCC Brick Work below GL Brick Work above GL Fencing with chain link Land leveling Temporary Main Road preparation Pile foundation Module Support Structure mounting Fitting Modules on structures Module series cabling till JB
Meter Meter Meter Metre Meter Acres Meter Nos Nos Nos Nos
125 10560
42240 3520
Remarks
338
Total qty unknown due to earlier cut trees. 30 Total qty unknown due to earlier cut trees. Total roots pending to be disposed shall be provided.
22
0 0 0 0
De-watering done. Surveying to be done tomorrow. WBM laying under progress. After land leveling
8/3/2013
TOTAL Qty Activity Start date as per L2 Sch
(A).
Unit
(1). (2).
Nos Tractor
331
(3).
Nos
(4).
Disposal of roots
Nos.
FENCING : Trench excavation Bottom PCC Brick Work below GL Brick Work above GL Fencing with chain link
(C.)
Land leveling
Acres
Temporary Main Road preparation Pile foundation Module Support Structure mounting Fitting Modules on structures Module series cabling till JB
125 10560
42240 3520
Sch. Date of Qty Actual Cumulative Target for completion Complete start date completed tomorrow as per L2 d today 0 331 0
Remarks
Activity completed on 21-07-13 Activity completed on 27-07-13 Total qty unknown due to earlier cut trees.
338
22
50
Total qty unknown due to earlier cut trees. Total roots pending to be disposed shall be provided.
0 0 0 0
1)Machinary mobilised at site. Temporary approach road for tractor movement to be started tomorrow.2) Surveyors arrived at site to verify and mark the coordinates. WBM laying under progress. After land leveling
8/4/2013
SITE PREPARATION WORK : Tree felling Tree logging & delivering to NTPC Unit Nos Tractor TOTAL Qty 331 Activity Start date as per L2 Sch
(3).
Nos
(4).
Disposal of roots
Nos.
FENCING : Trench excavation Bottom PCC Brick Work below GL Brick Work above GL Fencing with chain link
(C.)
Land leveling
Acres
Temporary Main Road preparation Pile foundation Module Support Structure mounting Fitting Modules on structures Module series cabling till JB
125 10560
42240 3520
PROGRESS REPORT for 10 MW PV PLANT NTPC UNCHAHAR Cloudy weather throughout day.
Sch. Date of Actual start completion date as per L2 Qty Completed today 0 Cumulative completed 331 Target for tomorrow 0
338
50
50
0 0 0 0
Total qty unknown due to earlier cut trees. Total qty unknown due to earlier cut trees. Total roots pending to be disposed shall be provided.
1)Machinary could not work due to slushy soil conditions.2)Dozer to be mobilised tomorrow for road formation.
8/5/2013
Activity Start date as per L2 Sch
(A).
Unit
TOTAL Qty
Tree felling Tree logging & delivering to NTPC Removal of roots from ground
331
(4).
Disposal of roots
Nos.
FENCING : Trench excavation Bottom PCC Brick Work below GL Brick Work above GL Fencing with chain link
(C.)
Land leveling
Acres
Temporary Main Road preparation Pile foundation Module Support Structure mounting Fitting Modules on structures Module series cabling till JB
125 10560
42240 3520
Cumulativ Sch. Date of Qty Actual e Target for completion Complete start date complete tomorrow as per L2 d today d 0 331 0
Remarks
338
Total qty unknown due to earlier cut trees. Total qty unknown due to earlier cut trees. Total roots pending to be disposed shall be provided.
22
25
0 0 0 0
1)Machinary could not work due to slushy soil conditions.2)Dozer to be mobilised tomorrow for road formation. WBM laying under progress. After land leveling
8/6/2013
TOTAL Qty Sch. Date Activity of Start date completio as per L2 n as per Sch L2
(A).
Unit
(1). (2).
Nos Tractor
331
(3).
Nos
(4).
Disposal of roots
Nos.
FENCING : Trench excavation Bottom PCC Brick Work below GL Brick Work above GL Fencing with chain link
(C.)
Land leveling
Acres
Temporary Main Road preparation Pile foundation Module Support Structure mounting Fitting Modules on structures Module series cabling till JB
125 10560
42240 3520
Cumulativ Qty Actual e Target for Complete start date complete tomorrow d today d 0 331 0
Remarks
Activity completed on 21-07-13 Activity completed on 27-07-13 Total qty unknown due to earlier cut trees. Total qty unknown due to earlier cut trees. Total roots pending to be disposed shall be provided.
338
16
15
0 0 0 0
1)Machinary could not work due to slushy soil conditions.2)Dozer to be mobilised tomorrow for road formation. WBM laying under progress. After land leveling
DAILY PROGRESS REPORT for 10 MW PV PLANT NTP Weather Details : Rain came at 4PM to 6PM.Cloudy
Report for Day
8/7/2013
SITE PREPARATION WORK : Unit TOTAL Qty 331 Sch. Date Activity of Start date Actual completio as per L2 start date n as per Sch L2
(A).
Tree felling Tree logging & delivering to NTPC Removal of roots from ground
(4).
Disposal of roots
Nos.
FENCING : Trench excavation Bottom PCC Brick Work below GL Brick Work above GL Fencing with chain link
(C.)
Land leveling
Acres
125 10560
Module Support Structure mounting Nos Fitting Modules on structures Module series cabling till JB Nos Nos 42240 3520
Remarks
338
Total qty unknown due to earlier cut trees. 7 Total qty unknown due to earlier cut trees. Total roots pending to be disposed shall be provided.
10
0 0 0 0
1)Machinary could not work due to slushy soil conditions and water logging. WBM laying under progress. After land leveling
8/8/2013
SITE PREPARATION WORK : Unit TOTAL Qty Sch. Date Activity of Start date Actual completio as per L2 start date n as per Sch L2
(A).
Tree felling Tree logging & delivering to NTPC Removal of roots from ground Disposal of roots
331
FENCING : Trench excavation Bottom PCC Brick Work below GL Brick Work above GL Fencing with chain link
(C.)
Land leveling
Acres
125 10560
Module Support Structure mounting Nos Fitting Modules on structures Module series cabling till JB Nos Nos 42240 3520
Remarks
338 0 7
Total qty unknown due to earlier cut trees. Total qty unknown due to earlier cut trees. Total roots pending to be disposed shall be provided.
0 0 0 0
1)Machinary could not work due to slushy soil conditions and water logging. WBM laying under progress. After land leveling
8/9/2013
SITE PREPARATION WORK : Unit TOTAL Qty 331 Sch. Date Activity of Start date Actual completio as per L2 start date n as per Sch L2
(A).
Tree felling
Nos
Tree logging & delivering to NTPC Tractor Removal of roots from ground Nos
(4).
Disposal of roots
Nos.
FENCING : Trench excavation Bottom PCC Brick Work below GL Brick Work above GL Fencing with chain link
(C.)
Land leveling
Acres
125 10560
Module Support Structure mounting Nos Fitting Modules on structures Module series cabling till JB Nos Nos 42240 3520
Remarks
338
Total qty unknown due to earlier cut trees. 7 Total qty unknown due to earlier cut trees. Total roots pending to be disposed shall be provided.
0 0 0 0
1)Machinary could not work due to slushy soil conditions and more water logging. WBM laying under progress. After land leveling
8/10/2013
SITE PREPARATION WORK : Unit TOTAL Qty 331 Sch. Date Activity of Start date completio as per L2 n as per Sch L2
(A).
Tree felling Tree logging & delivering to NTPC Removal of roots from ground
(4).
Disposal of roots
Nos.
FENCING : Trench excavation Bottom PCC Brick Work below GL Brick Work above GL Fencing with chain link
(C.)
Land leveling
Acres
125 10560
Module Support Structure mounting Nos Fitting Modules on structures Module series cabling till JB Nos Nos 42240 3520
Remarks
338
Total qty unknown due to earlier cut trees. Total qty unknown due to earlier cut trees. Total roots pending to be disposed shall be provided.
17
0 0 0 0
Machinary could not work due to slushy soil conditions and water logging. WBM laying under progress. After land leveling
DAILY PROGRESS REPORT for 10 MW PV PLANT NTPC U Weather Details : Cloudy weather throughout day.
Report for Day
8/11/2013
SITE PREPARATION WORK : Unit TOTAL Qty Sch. Date Activity of Start date Actual completio as per L2 start date n as per Sch L2
(A).
Tree felling
Nos
331
Tree logging & delivering to NTPC Tractor Removal of roots from ground Nos
(4).
Disposal of roots
Nos.
FENCING : Trench excavation Bottom PCC Brick Work below GL Brick Work above GL Fencing with chain link
(C.)
Land leveling
Acres
125 10560
Module Support Structure mounting Nos Fitting Modules on structures Module series cabling till JB Nos Nos 42240 3520
Remarks
338
Total qty unknown due to earlier cut trees. 17 Total qty unknown due to earlier cut trees. Total roots pending to be disposed shall be provided.
0 0 0 0
Machinary could not work due to slushy soil conditions and more water logging. WBM laying under progress. After land leveling
8/12/2013
SITE PREPARATION WORK : Unit TOTAL Qty 331 Sch. Date Activity of Start date Actual completio as per L2 start date n as per Sch L2
(A).
Tree felling
Nos
Tree logging & delivering to NTPC Tractor Removal of roots from ground Nos
(4).
Disposal of roots
Nos.
FENCING : Trench excavation Bottom PCC Brick Work below GL Brick Work above GL Fencing with chain link
(C.)
Land leveling
Acres
125 10560
Module Support Structure mounting Nos Fitting Modules on structures Module series cabling till JB Nos Nos 42240 3520
Remarks
338
Total qty unknown due to earlier cut trees. 18 Total qty unknown due to earlier cut trees. Total roots pending to be disposed shall be provided.
0 0 0 0
For storing the PV modules,50x20sq.m. ground leveling has started near Muslim Grave yard area. WBM laying under progress. After land leveling
8/13/2013
SITE PREPARATION WORK : Unit TOTAL Qty Sch. Date Activity of Start date completio as per L2 n as per Sch L2
(A).
Tree felling Tree logging & delivering to NTPC Removal of roots from ground
331
(4).
Disposal of roots
Nos.
FENCING : Trench excavation Bottom PCC Brick Work below GL Brick Work above GL Fencing with chain link
(C.)
Land leveling
Acres
125 10560
Module Support Structure mounting Nos Fitting Modules on structures Module series cabling till JB Nos Nos 42240 3520
Remarks
338
Total qty unknown due to earlier cut trees. Total qty unknown due to earlier cut trees. Total roots pending to be disposed shall be provided.
18
0 0 0 0
For storing the PV modules,50x20sq.m. ground leveling has started near Muslim Grave yard area. WBM laying under progress. After land leveling
8/14/2013
SITE PREPARATION WORK : Unit TOTAL Qty 331 Sch. Date Activity of Start date Actual completio as per L2 start date n as per Sch L2
(A).
Tree felling Tree logging & delivering to NTPC Removal of roots from ground
(4).
Disposal of roots
Nos.
FENCING : Trench excavation Bottom PCC Brick Work below GL Brick Work above GL Fencing with chain link
(C.)
Land leveling
Acres
125 10560
Module Support Structure mountingNos Fitting Modules on structures Module series cabling till JB Nos Nos 42240 3520
Remarks
338
Total qty unknown due to earlier cut trees. 18 Total qty unknown due to earlier cut trees. Total roots pending to be disposed shall be provided.
0 0 0 0
For storing the PV modules,50x20sq.m. ground leveling has started near Muslim Grave yard area. WBM laying under progress. After land leveling
8/16/2013
SITE PREPARATION WORK : Unit TOTAL Qty 331 Sch. Date Activity of Start date Actual completio as per L2 start date n as per Sch L2
(A).
Tree felling Tree logging & delivering to NTPC Removal of roots from ground
(4).
Disposal of roots
Nos.
FENCING : Trench excavation Bottom PCC Brick Work below GL Brick Work above GL Fencing with chain link
(C.)
Land leveling
Acres
125 10560
Module Support Structure mounting Nos Fitting Modules on structures Module series cabling till JB Nos Nos 42240 3520
Remarks
Activity completed on 21-07-13 Activity completed on 27-07-13 Total qty unknown due to earlier cut trees. Total qty unknown due to earlier cut trees. Total roots pending to be disposed shall be provided.
18
0 0 0 0
For storing the PV modules,50x20sq.m. ground leveling has started near Muslim Grave yard area. WBM laying under progress. After land leveling
8/17/2013
SITE PREPARATION WORK : Tree felling Tree logging & delivering to NTPC Removal of roots from ground Disposal of roots FENCING : Trench excavation Bottom PCC Brick Work below GL Brick Work above GL Fencing with chain link Land leveling Temporary Main Road preparation Pile foundation Module Support Structure mounting Fitting Modules on structures Module series cabling till JB Unit Nos Tractor Nos Nos. Activity Sch. Date of Start date TOTAL Qty completion as as per L2 per L2 Sch 331
Meter Meter Meter Metre Meter Acres Meter Nos Sets Nos Nos
NOTE :
0 0 0 0
0 0 0 0
For storing the PV modules, 50x20sq.m. ground leveling completed near Grave yard area. Completed. After land leveling After pile foundation After structure fixing Aftter module fitting
8/18/2013
SITE PREPARATION WORK : Tree felling Tree logging & delivering to NTPC Removal of roots from ground Disposal of roots FENCING : Trench excavation Bottom PCC Brick Work below GL Brick Work above GL Fencing with chain link Land leveling Temporary Main Road preparation Pile foundation Module Support Structure mounting Fitting Modules on structures Module series cabling till JB Unit Nos Tractor Nos Nos. Activity Sch. Date of Start date TOTAL Qty completion as as per L2 per L2 Sch 331
Meter Meter Meter Metre Meter Acres Meter Nos Sets Nos Nos
NOTE :
0 0 0 0
0 0 0 0
For storing the PV modules, 50x20sq.m. ground leveling completed near Grave yard area. Completed. After land leveling After pile foundation After structure fixing Aftter module fitting
8/19/2013
SITE PREPARATION WORK : Tree felling Tree logging & delivering to NTPC Removal of roots from ground Disposal of roots FENCING : Trench excavation Bottom PCC Brick Work below GL Brick Work above GL Fencing with chain link Unit Nos Tractor Nos Nos. Activity Start date TOTAL Qty as per L2 Sch 331
(C.)
Land leveling
Acres
Temporary Main Road preparation Pile foundation Module Support Structure mounting Fitting Modules on structures Module series cabling till JB
(D).
NOTE :
ther Details : Clear weather full day. Rain from 06:00PM to 06:20PM.
Sch. Date of Actual completion as start date per L2 Qty Completed today 0
0 0 0 0
0 0 0 0
For storing the PV modules, 50x20sq.m. ground leveling completed near Grave yard area. Due to rain soil got wet and spread dry soil carried out to make storage yard feasible. Completed. After land leveling After pile foundation After structure fixing Aftter module fitting
Out 4032 Nos, 768 Nos in 4 Lorry reached Unchahar. Shall be unloaded tomarrow. Balance on the way.
DAILY PROGRESS REPORT for 10 MW PV PLANT N Weather Details : Clear weather full day.
Report for Day (A). (1). (2). (3). (4). (B). (1). (2). (3). (4). (4).
8/20/2013
SITE PREPARATION WORK : Tree felling Tree logging & delivering to NTPC Removal of roots from ground Disposal of roots FENCING : Trench excavation Bottom PCC Brick Work below GL Brick Work above GL Fencing with chain link Unit Nos Tractor Nos Nos. Activity Start date TOTAL Qty as per L2 Sch 331
(C.)
Land leveling
Acres
Temporary Main Road preparation Pile foundation Module Support Structure mounting Fitting Modules on structures Module series cabling till JB
(D).
NOTE :
0 0 0 0
0 0 0 0
For storing the PV modules, 50x20sq.m. ground leveling completed near Grave yard area. Due to rain soil got wet and spread dry soil carried out to make storage yard feasible. Completed. After land leveling After pile foundation After structure fixing Aftter module fitting
DAILY PROGRESS REPORT for 10 MW PV PLANT N Weather Details : Clear weather full day.
Report for Day (A). (1). (2). (3). (4). (B). (1). (2). (3). (4). (4).
8/21/2013
SITE PREPARATION WORK : Tree felling Tree logging & delivering to NTPC Removal of roots from ground Disposal of roots FENCING : Trench excavation Bottom PCC Brick Work below GL Brick Work above GL Fencing with chain link Unit Nos Tractor Nos Nos. Activity Start date TOTAL Qty as per L2 Sch 331
(C.)
Land leveling
Acres
Temporary Main Road preparation Pile foundation Module Support Structure mounting Fitting Modules on structures Module series cabling till JB
(D).
NOTE :
0 0 0 0
0 0 0 0
For storing the PV modules, 50x20sq.m. ground leveling completed near Grave yard area. Due to rain soil got wet and spread dry soil carried out to make storage yard feasible. Completed. After land leveling After pile foundation After structure fixing Aftter module fitting
1536
DAILY PROGRESS REPORT for 10 MW PV PLANT N Weather Details : Clear weather full day.
Report for Day (A). (1). (2). (3). (4). (B). (1). (2). (3). (4). (4).
8/22/2013
SITE PREPARATION WORK : Tree felling Tree logging & delivering to NTPC Removal of roots from ground Disposal of roots FENCING : Trench excavation Bottom PCC Brick Work below GL Brick Work above GL Fencing with chain link Unit Nos Tractor Nos Nos. Activity Start date TOTAL Qty as per L2 Sch 331
(C.)
Land leveling
Acres
Temporary Main Road preparation Pile foundation Module Support Structure mounting Fitting Modules on structures Module series cabling till JB
(D).
MATERIAL RECEIPT
PV Moudles receipt
NOTE :
Nos
42240
0 0 0 0
0 0 0 0
For storing the PV modules, 50x20sq.m. ground leveling completed near Grave yard area. Due to rain soil got wet and spread dry soil carried out to make storage yard feasible. Completed. After land leveling After pile foundation After structure fixing Aftter module fitting
576
2112
DAILY PROGRESS REPORT for 10 MW PV PLANT N Weather Details : Clear weather full day.
Report for Day (A). (1). (2). (3). (4). (B). (1). (2). (3). (4). (4).
8/23/2013
SITE PREPARATION WORK : Tree felling Tree logging & delivering to NTPC Removal of roots from ground Disposal of roots FENCING : Trench excavation Bottom PCC Brick Work below GL Brick Work above GL Fencing with chain link Unit Nos Tractor Nos Nos. Activity Start date TOTAL Qty as per L2 Sch 331
(C.)
Land leveling
Acres
Temporary Main Road preparation Pile foundation Module Support Structure mounting Fitting Modules on structures Module series cabling till JB
(D).
MATERIAL RECEIPT
PV Moudles receipt
NOTE :
Nos
42240
0 0 0 0
0 0 0 0
For storing the PV modules, 50x20sq.m. ground leveling completed near Grave yard area. Due to rain soil got wet and spread dry soil carried out to make storage yard feasible. Completed. After land leveling After pile foundation After structure fixing Aftter module fitting
1152
3264
DAILY PROGRESS REPORT for 10 MW PV PLANT N Weather Details : Clear weather full day.
Report for Day (A). (1). (2). (3). (4). (B). (1). (2). (3). (4). (4).
8/24/2013
SITE PREPARATION WORK : Tree felling Tree logging & delivering to NTPC Removal of roots from ground Disposal of roots FENCING : Trench excavation Bottom PCC Brick Work below GL Brick Work above GL Fencing with chain link Unit Nos Tractor Nos Nos. Activity Start date TOTAL Qty as per L2 Sch 331
(C.)
Land leveling
Acres
Temporary Main Road preparation Pile foundation Module Support Structure mounting Fitting Modules on structures Module series cabling till JB
(D).
MATERIAL RECEIPT
PV Moudles receipt
Nos
42240
NOTE :
0 0 0 0
0 0 0 0
For storing the PV modules, 50x20sq.m. ground leveling completed near Grave yard area. Due to rain soil got wet and spread dry soil carried out to make storage yard feasible. Completed. After land leveling After pile foundation After structure fixing Aftter module fitting
3264
3 truck modules reached site. Since Crane got stuck 576 in soil, unloading could not take place.
DAILY PROGRESS REPORT for 10 MW PV PLANT N Weather Details : Clear weather full day.
Report for Day (A). (1). (2). (3). (4). (B). (1). (2). (3). (4). (4).
8/25/2013
SITE PREPARATION WORK : Tree felling Tree logging & delivering to NTPC Removal of roots from ground Disposal of roots FENCING : Trench excavation Bottom PCC Brick Work below GL Brick Work above GL Fencing with chain link Unit Nos Tractor Nos Nos. Activity Start date TOTAL Qty as per L2 Sch 331
(C.)
Land leveling
Acres
Temporary Main Road preparation Pile foundation Module Support Structure mounting Fitting Modules on structures Module series cabling till JB
(D).
MATERIAL RECEIPT
PV Moudles receipt
NOTE :
Nos
42240
0 0 0 0
0 0 0 0
For storing the PV modules, 50x20sq.m. ground leveling completed near Grave yard area. Due to rain soil got wet and spread dry soil carried out to make storage yard feasible. Completed. After land leveling After pile foundation After structure fixing Aftter module fitting
3840
192
DAILY PROGRESS REPORT for 10 MW PV PLANT N Weather Details : Clear weather full day.
Report for Day (A). (1). (2). (3). (4). (B). (1). (2). (3). (4). (4). (C.) (D) (D.) (G). (H). (I).
8/26/2013
SITE PREPARATION WORK : Tree felling Tree logging & delivering to NTPC Removal of roots from ground Disposal of roots FENCING : Trench excavation Bottom PCC Brick Work below GL Brick Work above GL Fencing with chain link Land leveling Temporary Main Road preparation Pile foundation Module Support Structure mounting Fitting Modules on structures Module series cabling till JB Unit Nos Tractor Nos Nos. Activity Start date TOTAL Qty as per L2 Sch 331
Meter Meter Meter Metre Meter Acres Meter Nos Sets Nos Nos
(D).
MATERIAL RECEIPT
PV Moudles receipt
NOTE :
Nos
42240
0 0 0 0
0 0 0 0
No work possible due to wet soil conditions. De-watering started for levelling preparation. Completed. After land leveling After pile foundation After structure fixing Aftter module fitting
3840
192
DAILY PROGRESS REPORT for 10 MW PV PLAN Weather Details :Cloudy weather full day.
Report for Day (A). (1). (2). (3). (4). (B). (1). (2). (3). (4). (4). (C.) (D) (D.) (G). (H). (I).
8/27/2013
SITE PREPARATION WORK : Tree felling Tree logging & delivering to NTPC Removal of roots from ground Disposal of roots FENCING : Trench excavation Bottom PCC Brick Work below GL Brick Work above GL Fencing with chain link Land leveling Temporary Main Road preparation Pile foundation Module Support Structure mounting Fitting Modules on structures Module series cabling till JB Unit Nos Tractor Nos Nos. Activity Sch. Date of Start date TOTAL Qty completion as as per L2 per L2 Sch 331
Meter Meter Meter Metre Meter Acres Meter Nos Sets Nos Nos
3150 3150 3150 3150 3150 125 10560 3520 42240 3520
(D).
Nos
42240
NOTE :
0 0 0 0
0 0 0 0
Completed. After land leveling After pile foundation After structure fixing Aftter module fitting
3840
8/28/2013
SITE PREPARATION WORK : Tree felling Tree logging & delivering to NTPC Removal of roots from ground Disposal of roots FENCING : Trench excavation Bottom PCC Brick Work below GL Brick Work above GL Fencing with chain link Land leveling Temporary Main Road preparation Pile foundation Module Support Structure mounting Fitting Modules on structures Module series cabling till JB Unit Nos Tractor Nos Nos. Activity Sch. Date of Start date TOTAL Qty completion as as per L2 per L2 Sch 331
Meter Meter Meter Metre Meter Acres Meter Nos Sets Nos Nos
3150 3150 3150 3150 3150 125 10560 3520 42240 3520
(D).
NOTE :
0 0 0 0
0 0 0 0
Completed. After land leveling After pile foundation After structure fixing Aftter module fitting
3840
192