Work Plan
Project No.:
Client:
Al Arif Contracting
Work Description
Sagging
Schedule
ID
ACTIVITY
START DATE
1 Packing
FINISH DATE
9-Apr-16
9-Apr-16
10-Apr-16
10-Apr-16
10-Apr-16
10-Apr-16
10-Apr-16
10-Apr-16
10-Apr-16
10-Apr-16
10-Apr-16
10-Apr-16
10-Apr-16
10-Apr-16
Mixing of repair material
10-Apr-16
10-Apr-16
Sealing of cracks
10-Apr-16
10-Apr-16
10-Apr-16
10-Apr-16
Submision of Work Inspection Request
to Consultant through Client's Engineer
10-Apr-16
10-Apr-16
Obtain Approval for Completed Works
10-Apr-16
10-Apr-16
10-Apr-16
10-Apr-16
Mobilization to site
2
Notification of Client's Engineer, PM,
and Consultant of commencement of
3 work
Submission Method statement and TDS
to consultant (if required)
Survey and identification of cracks to
5 repair
Opening up of identified cracks
6
7 Cleaning of opened cracks
8
9
Final Inspection/Making good of works
10 completed
11
12
13 De-mobilize from site
Project Team
Name
S/No
Responsibiity
1 Abdul Rahim
Project Engineer
Mason
Driver
Authorization
Abdul Rahim is named Project Engineer for the crack repair. He is hereby authorized to delegate responsibilities
within the framework of the project, and to communicate with the client team and management, as required, to
completion of the activities planned. Success of the project will be determined by the Clients Consultant who wi
Work Inspection Request, He is hereby urged to take into considerations the comments made by the consutant
planned activities.
Approved by:
Name and Signature
Location:
Date:
Activities Details
Cracks Repair
RESPONSIBILITY
REQUIREMENT
Project Engineer
10 Bags Mapei KeraFlex; 1
Angle Grinder; 1 Pencil
Grinder; 1 Vaccum Cleaner; 1
Paddle Mixer; 1 Mixing
Bucket; 1 Trowel; 1 Steel
Float; 1 Measuring Cup;
Driver + Car
Project Engineer
Project Engineer
Project Team
Project Team
Angle Grinder, Pencil Grinder
Project Team
Vaccum Cleaner
Project Team
Mixing Bucket, Paddle Mixer,
Measuring Cup
Project Team
Mapei Keraflex, Hand Trowel,
Steel Float
Project Engineer
Project Engineer
Project Engineer
Project Engineer
WIR Form (Al Arif Format)
rized to delegate responsibilities and use all resources provided
and management, as required, to ensure successful and timely
by the Clients Consultant who will give his approval after a
mments made by the consutant earlier on when completing all
Date