BESTWAY CEMENT LIMITED FAROOQIA

WHRPP Project
Activity Schedule for Steam Generation
S.No.

1st Week

Activities
1

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

E&I Installation - Cable trays & laying


Cable termination & configuration
Small size pipe erection works(Sampling and Dosing)
Hydrotesting of AQC and SP boiler
Insulation work on boiler casing & out door piping
Instruments installation on AQC & SP boilers
and termination of Cables
C.C.R civil works completion
Main cable laying from main grid to MV room
Supply power for MV room Energization
Ducts insulation work
Ducts refractory work
Compressed air piping & connections
Control cables laying & termination on panel side
MP &LP feed water Pumps Piping and Commissioning
Supervisors availability at site for DCS/E&I commissioning