You are on page 1of 26

S,NO

1.0

2
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
3
3.1
3.2
3.3
3.4
3.3.1

3.5
3.6
4
4.1
4.2
4.3
4.4
5
5.1
5.2
5.3
5.4
5.5
5.6
5.7
5.8
5.9
5.10
5.11
5.12
5.13
5.14
5.15
5.16

6
6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
6.8.1
6.9
6.9.1
6.10
6.11
6.11.1
6.11.2
6.12
6.13
6.14
6.15
6.16
6.17
6.18
6.19

6.20
6.20.1
6.21
6.21.1
6.22
6.23
6.24
6.25
6.25.1
6.25.2
6.25.3
6.26
6.27
6.28
6.28.1
6.28.2
6.28.3
7.0
8.0

PR
Activity
Survey Work

Ground Preparation
Backfilling mixed meterial with sand & rocks
Rock Breaking
Marl Caping for Camp Ploat 20cm
Acces Roads outside camp fence Backfilling with sand
Acces Roads outside camp fence Backfilling with Marl
Patrol Roads Backfilling with Sand
Patrol Roads Backfilling with Marl
Construction of Asphalt Roads inside camp fence
Construction of Walk Ways
Construction of Acces Asphalt Roads
Backfilling of Trenching
Backfilling of Drainage trenching with sand
Backfilling of Drainage trenching with Marl
Backfilling of Raw water trenching with sand
Backfilling of Raw water trenching with Marl
Installation of Valve Box

Backfilling of Fire Water Line with sand


Backfilling of Fire Water Line with Marl
Fence Installation
Excavation & Rock Breaking for Fence Foundation
Concrete Post Foundation Installation
Line Post Installation
Fence Gates
Errection of Portacabins
A.hak office
Labour Accomodation
labour Dinning area
Guard house
Laundry unit
Camp office
Clinic
Mosque
Recreational Building
Junior staff dinning Area
Fen staff accomodation
Senior staff accomodation
Senior staff dinning area
Kitchen & Store
Toilets for Labour
Total Portacabins

Trenching for Raw Water Line


Trenching for Drainage Pipe Line
Trenching for Fire water Line
Installation of Drainage Pipe Line
Installation of Raw water Pipe Line
Installation of Fire water Pipe Line
Conections With Portacabins
Drainage Line Connections with portacabins
Connecctions of FEN Staff Accommodation
Raw Water Line Connections with Portacabins
Connecctions of FEN Staff Accommodation
Fire Water Line Connections with Portacabins

Main Holes
Plastring of Main Holes
Backfilling of Main Holes with Marl
Communication System
Gen Set Installation
Electrical Trenches
Grounding Work Trenches
MPD and DP installation
Installation of Electrical Cable
Electrical Connections
Solar Lighting System (street, bb court & fence)

Installation of Raw Water Tanks


Installation of Raw Water Tank on concerete pad
Installation of Septic Tank
Backfilling of Septic Tank With sand
Installation of Fire Water Tanks
Installation of Utility Area Pumps and Controls
Installation of Diesel Tanks
Installation of HVAC system
Installation of Window AC Units
Installation of Siplit Units AC
Installation / Fabrication of External Concrete Pad for
Installation of Kitchen Equipment
Installation of Office Furniture
Installation of Accomodation Furniture
Installation Beds For Labor Accommodation
Delivery Beds For Senior Staff Accommodation

Dilvery of Bed Matress For Fen & Labor Accommodat


Fire Hose Cabnits
Installation of Electric Water Heater

OGRESS REPORT KHURAIS CAM


Scope

Completed
100%

Civil Work

Building

Pieces

Building

10

12

40

12

14

28

14

22

22

22

64

132

64

MEP Work

13

13

__

20%

__

100%

700 LM
900LM

__

NYS

__

procured & delivered 100%

__

NYS

__

procured & delivered 100%

__

3 ea

Procured & 1 unit Delivered

3 ea

2 units installed

1 ea

20%
__

1 ea
185

240 (160 Double,80 single)

22 Pieces

Delivered
Delivered

URAIS CAMP CONSTRUCTION


Completed

Remaining

100%

__

Pieces

Building

Pieces

10

__

__

40

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

__

28

__

__

22

__

__

__

__

__

__

__

__

132

__

__

MEP Work

13

20%

80%

100%
__

__

__

__

__

__

__

__

__

__

__

ed & 1 unit Delivered

units installed

2 units TBD

1 unit RTI

20%

80%

__

__
TBD

UCTION

Date: 06-11-016
UOM

Scope

Previous

Today

Cumulative

m3

23500

23500

23500

m3

3937

3937

3937

m3

6480

6480

6480

m3

2256

2256

2256

m3

678

678

678

m3

710

710

710

m3

142

142

142

m2

5600

m3

63

m2

2000

m3

1849

1849

1849

m3

288.9

288.9

m3

1302

1302

m3

232.05

232.05

0
0
0
0

No

288.9
1302
232.05
8

m3

1019

750

269

1019

m3

181.5

181.5

0-

181.5

m3

254

254

m3

19

19

QT

230

197

QT

m3

1547

1547

1547

m3

1926

1926

1926

m3

1210

1210

1210

LM

1303

1330

1330

LM

1247

1247

1247

LM

835

650

835

Con

52

50

Con

52

46

Con

29

29

QT

13

12

m3

26

QT

LM

600 Appx

LM

900

13

26

530

70

100

720

80

100

Delivered

Start

NYS
NYS
NYS

QT

3ea

2
1

1
1

QT

3ea

m3

2143

1650

350

143

QT

NO'S

80

70

10

NO'S

185

100

85

NO'S

185

NO'S

Appx
Appx
Appx
NO'S

240 Pieces

240

240

NO'S

22 Pieces

22

22

NO'S

454+22

450

NO'S

30 Units

NO'S

66 Units

26

454+22

Delivered
45

21

06-11-016
Percent Comlete

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

100.00%
100.00%
100.00%
100.00%
100.00%

100.00%
100.00%
100.00%
100.00%
86.00%

0.00%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

99.00%

93.00%

100.00%
100.00%
100.00%

100.00%
95.00%
93.00%

100.00%

67.00%
67.00%
100.00%
93.00%
100.00%

90.00%
70.00%

100.00%
Ongoing
80.00%
ongoing
100.00%

100.00%
100%
100%
68.00%

LOOK AHEAD FOR MONDAY 07 NOV


Activty Name
1

MEP connenction to Delivered Fen Staff Accommodation (Raw water)

7/11/2016

EXPECTATION

Crew Actual % Complete

2 Buildings

Compete Remaining Connection

80% Complete

Complete at Monday 07 Nov

700 metrs Complete

Start trenching Building to Building for Installation of Cables

20

6 Electric Cable installation

Start

10

7 Trenching For Grounding

Ongoing

2 Installation of Furniture for A.HAK Office


3 Trenching For Electrical cables
4 Installation of Out Door Siplit Units in (A.hak Office)

9 Delivery of Furniture For Accommodations


11 Start Finshing Work in Delivered Portocabins
12 Delivery of Kitchen Equipments

AS Per Schedule
Fen Staff Area
Ongoing

10 units Installation Complete


As per MEP crew Schedule
800 Lm Also Completed, Trenching start inside Labor Accommodation Area
70% Furniture Delivered

4
4

AS Per RJCC Schedule


As per Saudi Elan Schedule(Freezer & Chiler rooms install )

ACTIVITIES FOR SUNDAY 06-Nov


Acivity Name
1
2
3

Installation of Electric Cable


Start MEP connenction to Fen Staff . (Raw)
Installation of Electric Water Heater

Trenching For Electric cables

Installation of out door Siplit Units in (H.hak office)

Furniture Installation in A.HAK office

Concrete Pad Installation for Outdoor AC units to Senior Staff Accommdation.

Trenching/ Rock breaking For Grounding

Date:06-11-016

Actual Complete

Crew

Ongoing

10

Remarks
Installation As Per MEP Crew Schedule

2 Units

Monday 07 Nov Complete Raw Water Connection

49 Units

Remaining 17

700 metrs appx

700 metrs complete, Building to Building ongoing

10 Units

Ongoing installation of Outdoor AC Units

80% Complete

After office furniture Installation start of Senior staff accommodation furniture

Ongoing

900 metrs appx

900 metrs complete(Trenching start inside Labor Accommodation Area)

You might also like