EBSM UPGRADING PROJECT DAILY REPORT

TO CC.
1.00 2.00

Report No : Date :

2013/ENS/TET/D-093 5 April 2013 4 April 2013 8.00-22.00


21.00 S 22.00 S 23.00

Rev. 2

K. Surachead P. Worachart P. , Preecha K., Chotepong S., Aphichart S., K. Kawin T., Krisada B., Leartsak Ch., Deaunphen R.
WEATHER CONDITION 3.00 4.00 5.00 6.00 7.00 8.00 S 9.00 S 10.00 S Symbols Yesterday = 11.00 S 12.00 S 13.00 S Cloudy (C), 14.00 S 15.00 S 16.00 S 17.00 S 18.00 S

Working Date Working Time


19.00 S 20.00 S

24.00

Sunshine (S),

Rainy (R) Today

MANPOWER REPORT Normal Time man hours Over Time man hours Normal Time man hours Over Time man hours

No.

Description

Total M/D

Total MH

No.

Description

Total M/D

Total MH

ENSURE INTERNATIONAL CO., LTD. A 1 2 3 4 5 6 7 8 9 10 11 B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Foreman Welder Fitter Pipe Fitter Structure Helper Driver Scaffolder Fire wach man Insulation Safety Technic Qc Inspector Carpenter Mason Electrician Total A+B No. 1 2 3 No. 1 2 3 4 5 6 7 8 9 10 Griding M/C 4" Griding M/C 7" Activities (Yesterday) Install Steel Structure Trim Cooler Remove sand Bag From Gutter Install Formwork Foundation Cooling water Install Steel Structure Reactor 03R003 Remove Overhead Crane Installation Insulation For 05T009 Welding Pipe 24",28" 304H Fabrication Pipe 800HT Shop Fabrication Steel Structure Unload Steel Structure Area 03A 03B 03A 03B 03B 05 Shop Shop Shop Shop Description Welding M/C 300 Amp. Unit ea ea ea Unit Set Set Set Set Set Set DB DB Kg. Kg. Q'ty 4 12 9 Q'ty 1 1 26 1 1 1 24 28 8778 9000 No. 4 5 6 No. 1 2 3 4 5 6 7 8 Drill Generator Haib 5 T CONSTRUCTION ACTIVITIES Activities (Today) Install Steel Structure Trim Cooler Remove sand Bag From Gutter Install Formwork Foundation Trim Cooler Preparation Area For Lifting Trim cooler Install Steel Structure Reactor 03R003 First Alignment For Pump 03P020A Installation Insulation For 05T009 Fabrication Pipe 24",28" 304H Area 03A 03B 03A 03A 03B 03B 05 Shop Unit Set Set Set Set Set Set Set DB Q'ty 1 1 6 1 1 1 1 24 No. 1 2 3 4 5 6 7 Activities (Tomorrow) Install Steel Structure Trim Cooler Grouting Foundation Trim Cooler Grouting Foundation Cooling Water Remove sand Bag From Gutter Install Steel Structure Reactor 03R003 Installation Insulation For 05T009 Fabrication Pipe 24",28" 304H Area 03A 03A 03A 03B 03B 05 Shop Unit Set Set Set Set Set Set DB Q'ty 1 6 26 1 1 1 28 Project Manager Site Manager Site Engineer Safety Office QA/QC Manager Draftman Material Control Administrator Storekeeper Document Control Supervisor Direct 6 5 15 12 8 2 15 4 4 3 3 5 4 1 48 40 120 96 64 16 120 32 32 24 24 40 32 8 2 2 5 4 1 6 5 15 12 8 2 18 15 45 60 24 6 3 8 6 15 12 6 5 15 12 8 2 15 4 4 3 3 5 4 1 107 66 55 165 156 88 22 120 35 32 32 30 55 44 8 1,098 Description 2 2 2 5 Indirect 1 2 3 1 1 1 8 16 24 8 8 8 16 16 16 40 3 1 1 1 2 1 1 3 6 3 3 3 3 9 1 2 3 1 1 1 2 2 2 5 8 19 30 11 11 8 19 19 16 49 A 1 2 3 4 5 6 7 8 9 10 11 B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Foreman Welder Fitter Pipe Fitter Structure Helper Driver Scaffolder Fire wach man Insulation Safety Technic Qc Inspector Carpenter Mason Electrician Total A+B Unit ea ea ea Q'ty 3 3 1 No. 7 8 9 Crane 55T. Crane 70T. Trailer Description Project Manager Site Manager Site Engineer Safety Office QA/QC Manager Draftman Material Control Administrator Storekeeper Document Control Supervisor Direct 6 6 18 12 8 2 19 4 4 3 4 6 4 1 48 48 144 96 64 16 152 32 32 24 32 48 32 8 6 6 18 12 8 2 19 4 4 3 4 6 4 1 117 Unit ea ea ea 48 48 144 96 64 16 152 32 32 24 32 48 32 8 936 Q'ty 1 2 2 2 5 Indirect 1 2 3 1 1 1 8 16 24 8 8 8 16 16 16 40 1 2 3 1 1 1 2 2 2 5 8 16 24 8 8 8 16 16 16 40

EQUIPMENT AND MACHINERY REPORT

ENSURE INTERNATIONAL CO., LTD. (Sub-contractor)


Prepared By : ... ( ........) Date : . / . / Note : The sub-contractors have to sumit this report to TET before 9.00 am every working day.

TECHNIP ENG. (THAILAND) CO., LTD. (Contractor)


Checked By : ... ( Surachead....Pudjareon....) Date : . / . /

IRPC PUBLIC CO., LTD. (Owner)


Approved By : ... ( ........) Date : . / . /

Page 1 of 1