Activity Description
Early Start
Early Finish
MAY 1 18 25 1 8
2013 JUN 15
JUL 22 29 6 13
Construction
Mobilization
130 Mobilization for FoHE Balkh, Faryab, Jawzjan Provide proper slope in Balkh FoHE for the balco Roof Leakage Repair Correction of electrical wiring system Installation of laboratory sinks Installation of 6Kg portable Extinguisher enlargement of existing fuel tank pad Conec of FoHE Balkh bldg to the local electrical Installation of 250KVA transformer Installation of fence arround the existing fuel Roof Leakage Repair Correction of electrical wiring system Installation of laboratory sinks Installation of 6Kg portable Extinguisher enlargement of existing fuel tank pad Conec of FoHE Farya bldg to the local electrical Installation of fence arround the existing fuel
15MAY13 13JUL13 15MAY13 18APR13 09:10
10
10
0 15MAY13
24MAY13
Balkh FoHE
180 260 150 190 140 170 200 210 160 10 20 20 10 4 10 6 5 5 10 20 20 10 4 10 6 5 5 0 25MAY13 0 04JUN13 0 06JUN13 0 16JUN13 0 22JUN13 0 24JUN13 0 26JUN13 0 02JUL13 0 04JUL13 03JUN13 23JUN13 25JUN13 25JUN13 25JUN13 03JUL13 01JUL13 06JUL13 08JUL13
Faryab FoHE
271 272 273 274 275 276 278
Start Date Finish Date Data Date Run Date
20 20 10 4 10 6 5
20 20 10 4 10 6 5
Date
Revision
Checked
Approved
Activity ID
Activity Description Provide proper slope in Jawzjan Fo for the balco Roof Leakage Repair Correction of electrical wiring system Installation of laboratory sinks Installation of 6Kg portable Extinguisher enlargement of existing fuel tank pad Conec of Jawzjan Fo bldg to the local electrical Installation of 250KVA transformer Installation of fence arround the existing fuel Demobilization for FoHE Balkh, Faryab, Jawzjan
Early Start 0 25MAY13 0 04JUN13 0 06JUN13 0 16JUN13 0 22JUN13 0 24JUN13 0 26JUN13 0 02JUL13 0 04JUL13
Early Finish 03JUN13 23JUN13 25JUN13 25JUN13 25JUN13 03JUL13 01JUL13 06JUL13 08JUL13
MAY 1 18 25 1 8
2013 JUN 15
JUL 22 29 6 13
Jawzjan FoHE
279 280 281 282 283 284 285 286 287
Demobilization
297 5 5 0 09JUL13 13JUL13
USAD
Sheet 2 of 2
Date
Revision
Checked
Approved