You are on page 1of 2

Activity ID

Activity Description

Orig Rem Dur Dur

Early Start

Early Finish

MAY 1 18 25 1 8

2013 JUN 15

JUL 22 29 6 13

Minor Constructon at Three Faculties


Key Dates
100 110 120 Assumed Start Date of project Prject duration Finish Date of project 0 60* 0 0 60* 0 0 15MAY13 0 15MAY13 0 13JUL13 13JUL13

Construction
Mobilization
130 Mobilization for FoHE Balkh, Faryab, Jawzjan Provide proper slope in Balkh FoHE for the balco Roof Leakage Repair Correction of electrical wiring system Installation of laboratory sinks Installation of 6Kg portable Extinguisher enlargement of existing fuel tank pad Conec of FoHE Balkh bldg to the local electrical Installation of 250KVA transformer Installation of fence arround the existing fuel Roof Leakage Repair Correction of electrical wiring system Installation of laboratory sinks Installation of 6Kg portable Extinguisher enlargement of existing fuel tank pad Conec of FoHE Farya bldg to the local electrical Installation of fence arround the existing fuel
15MAY13 13JUL13 15MAY13 18APR13 09:10

10

10

0 15MAY13

24MAY13

Balkh FoHE
180 260 150 190 140 170 200 210 160 10 20 20 10 4 10 6 5 5 10 20 20 10 4 10 6 5 5 0 25MAY13 0 04JUN13 0 06JUN13 0 16JUN13 0 22JUN13 0 24JUN13 0 26JUN13 0 02JUL13 0 04JUL13 03JUN13 23JUN13 25JUN13 25JUN13 25JUN13 03JUL13 01JUL13 06JUL13 08JUL13

Faryab FoHE
271 272 273 274 275 276 278
Start Date Finish Date Data Date Run Date

20 20 10 4 10 6 5

20 20 10 4 10 6 5

0 25MAY13 0 27MAY13 0 06JUN13 0 12JUN13 0 14JUN13 0 16JUN13 0 24JUN13

13JUN13 15JUN13 15JUN13 15JUN13 23JUN13 21JUN13 28JUN13


USAD Sheet 1 of 2

Early Bar Progress Bar Critical Activity

FCEC Minor Constructon at Three Faculties Initial Schedule Layout

Date

Revision

Checked

Approved

Primavera Systems, Inc.

Activity ID

Activity Description Provide proper slope in Jawzjan Fo for the balco Roof Leakage Repair Correction of electrical wiring system Installation of laboratory sinks Installation of 6Kg portable Extinguisher enlargement of existing fuel tank pad Conec of Jawzjan Fo bldg to the local electrical Installation of 250KVA transformer Installation of fence arround the existing fuel Demobilization for FoHE Balkh, Faryab, Jawzjan

Orig Rem Dur Dur 10 20 20 10 4 10 6 5 5 10 20 20 10 4 10 6 5 5

Early Start 0 25MAY13 0 04JUN13 0 06JUN13 0 16JUN13 0 22JUN13 0 24JUN13 0 26JUN13 0 02JUL13 0 04JUL13

Early Finish 03JUN13 23JUN13 25JUN13 25JUN13 25JUN13 03JUL13 01JUL13 06JUL13 08JUL13

MAY 1 18 25 1 8

2013 JUN 15

JUL 22 29 6 13

Jawzjan FoHE
279 280 281 282 283 284 285 286 287

Demobilization
297 5 5 0 09JUL13 13JUL13

Start Date Finish Date Data Date Run Date

15MAY13 13JUL13 15MAY13 18APR13 09:10

Early Bar Progress Bar Critical Activity

USAD

Sheet 2 of 2

FCEC Minor Constructon at Three Faculties Initial Schedule Layout