Grid
General General
General 145 kV GIS
General 120 kV Surge Arrestor for Block Transformers 2, 3, 4 and 5
General 120 kV Surge Arrestor for Block Transformer # 1
General 120 kV Surge Arrestor for Power Transformers 3
General 120 kV Surge Arrestor for Power Transformers 4
General 120 kV Surge Arrestor for Power Transformer 1
General 120 kV Surge Arrestor for Power Transformer 2
General 120 kV Surge Arrestor for Transmission Line Korangi West
General 120 kV Surge Arrestor for Transmission Line Baloch
General 120 kV Surge Arrestor for Transmission Lines Pipri
General 120 kV Surge Arrestor for Transmission Lines Gul Ahmed
General 145 kV Under Ground Cables and Accessories of Power T/F # 3
General 145 kV Under Ground Cables and Accessories of Block T/F # 2
General 145 kV Under Ground Cables and Accessories of Korangi Line
General 145 kV Under Ground Cables and Accessories of Block T/F # 3
General 145 kV Under Ground Cables and Accessories of Block T/F # 4
General 145 kV Under Ground Cables and Accessories of Block T/F # 5
General 145 kV Under Ground Cables and Accessories of Power T/F # 4
General 145 kV Under Ground Cables and Accessories of Baloch Line
General 145 kV Under Ground Cables and Accessories of Block T/F # 1
General 145 kV Under Ground Cables and Accessories of Power T/F # 1
General 145 kV Under Ground Cables and Accessories of Power T/F # 2
General 145 kV Under Ground Cables and Accessories of Pipri Line
General 145 kV Under Ground Cables and Accessories of Gul Ahmed Line
General Sergi System
General 11 kV Power Cable for PTR # 3
General 11 kV Power Cable for PTR # 4
General 11 kV Power Cable from Auxiliary Transformer to MV Switch
General 11 kV Power Cable from Capacitor Bank to MV Switch
General 11 kV Power Cable from GEJB Section 4 to Block T/F # 2
General Loop Testing of DC & LV Control and Power Cable
General Capacitor Bank
General NGR
General Earthing Work
General 220 VDC Batteries & Chargers
General 48 VDC Batteries & chargers
General Control & Protection Panels
General 220 VDC Distribution Panel
General Auxiliary Transformer (500 kVA)
General 400 VAC System
General Fiber Optic Cable for Line Differential Relay
General HVAC System
General Overhead Gantry Crane
General Fire Detection & Protection System
General RTU
General SCADA Equipment
General GPS Clock & HMI
General 132 kV Line Trap, 1250 Ampere Korangi Line
General 132 kV Line Trap, 1250 Ampere Pipri Line
General 132 kV Line Trap, 1250 Ampere Gul Ahmed Line
General 132 kV Coupling Capacitor, >6000 pF Pipri Line
General 132 kV Coupling Capacitor, >6000 pF Gul Ahmed Lline
General Testing of GIS Bay Alarm, Status and Trip contact for PTR # 3
General Testing of GIS Bay Alarm, Status and Trip contact for Block T/F 2
General Testing of GIS Bay Alarm, Status and Trip contact for Korangi Line
General Testing of GIS Bay Alarm, Status and Trip contact for Block T/F 3
General Testing of GIS Bay Alarm, Status and Trip contact for Block T/F 4
General Testing of GIS Bay Alarm, Status and Trip contact for Block T/F 5
General Testing of GIS Bay Alarm, Status and Trip contact for PTR # 4
General Testing of GIS Bay Alarm, Status and Trip contact for Baloch Line
General Testing of GIS Bay Alarm, Status and Trip contact for Block T/F 1
General Testing of GIS Bay Alarm, Status and Trip contact for PTR # 1
General Testing of GIS Bay Alarm, Status and Trip contact for PTR # 2
General Testing of GIS Bay Alarm, Status and Trip contact for Pipri Line
General Testing of GIS Bay Alarm, Status and Trip contact for Gul Ahmed Line
General Energization of 145KV GIS
Medium Voltage / 11 kV Panels Medium Voltage / 11 kV Panels
Medium Voltage / 11 kV Panels 11 kV Incoming Panel # 1
Medium Voltage / 11 kV Panels 11 kV Incoming Panel # 2
Medium Voltage / 11 kV Panels 11 kV Incoming Panel # 3
Medium Voltage / 11 kV Panels 11 kV Incoming Panel # 4
Medium Voltage / 11 kV Panels 11 kV Outgoing Panel for 4 MVAR Capacitor Bank
Medium Voltage / 11 kV Panels 11 kV Outgoing Panel for 500 KVA Auxiliary Transformer
Tubular Bus Bar Tubular Bus Bar
Tubular Bus Bar For Block Transformer
Tubular Bus Bar For Power Transformer
Line Conductor/String Assemblies for Transmission Line Line Conductor/String Assemblies for Transmission Line
Line Conductor/String Assemblies for Transmission Line For Balouch Circuit
Line Conductor/String Assemblies for Transmission Line For Pipri Circuit
Line Conductor/String Assemblies for Transmission Line For Korangi Circuit
Line Conductor/String Assemblies for Transmission Line For Gul Ahmed Circuit
PLC (Power Line Carrier) PLC (Power Line Carrier)
PLC (Power Line Carrier) For KTGT to Pipri Grid Station Circuit
PLC (Power Line Carrier) For KTGT to Korangi Grid Station Circuit
PLC (Power Line Carrier) For KTGT to Balouch Grid Station Circuit
PLC (Power Line Carrier) For Baluch to Gizri Grid Station Circuit
Generation
Testing and Commissioning of RO Plant Testing and Commissioning of RO Plant
Testing and Commissioning of RO Plant Commissioning of RO Plant Instruments and Motors
Testing and Commissioning of RO Plant Commissioning of RO Plant Control Valves
Testing and Commissioning of RO Plant Commissioning of RO Plant LV Panels / LCP/ MCC / Marshalling / JBs
Line flushing of Complete piping system Line flushing of Complete piping system
Line flushing of Complete piping system Line flushing of Complete piping system
Hot Commissioning of Boilers Hot Commissioning of Boilers
Hot Commissioning of Boilers Commissioning of Boilers
Hot Commissioning of Boilers Commissioning of Chemical Dosing and Sampling System
Hot Commissioning of Boilers Commissioning of Dampers
Hot Commissioning of Boilers Commissioning of Boiler Instruments, Analyzers and Control Valves
Hot Commissioning of Boilers Commissioning of Boiler LV Panels / LCP/ MCC / Marshalling / JBs
Steam turbine oil flushing/heating Steam turbine oil flushing/heating
Steam turbine oil flushing/heating Oil flushing/heating of Steam Turbine
Steam turbine commissioning Steam turbine commissioning
Steam turbine commissioning Overhead Crane Commissioning (ST Building)
Steam turbine commissioning Commissioning of ST Instruments and Control Valves
Steam turbine commissioning Commissioning of ST Auxiliary Motors
Steam turbine commissioning Commissioning & Energization of ST / Auxiliary MV Panel
Steam turbine commissioning Commissioning of ST LV Panels / Aux Control Panels /MCC / Marshalling / JBs
Steam turbine commissioning Complete loop test of all instruments (From field to HMI)
Steam turbine commissioning Testing & commissioning of ST logics, trips & interlocks
Steam turbine commissioning ST no load test
Steam turbine commissioning ST full load test
Generator testing & Commissioning Generator testing & Commissioning
Generator testing & Commissioning Testing and Commissioning of Generator
Air cooled condenser solo run Air cooled condenser solo run
Air cooled condenser solo run Commissioning of ACC Instruments and Control Valves
Air cooled condenser solo run Commissioning of ACC Fan and Auxiliary Motors
Air cooled condenser solo run Commissioning of ACC LV Panels / LCP / MCC / Marshalling / JBs
Power & Control cable testing Power & Control cable testing
Power & Control cable testing Testing of Power & Control Cable
Steam blowing of system Steam blowing of system
Steam blowing of system Steam Blowing of System
Distributed Control System (DCS) Commissioning Distributed Control System (DCS) Commissioning
Distributed Control System (DCS) Commissioning Commissioning of Control Panels (Servers, Controllers, I/O Cards etc.) & HMIs
Distributed Control System (DCS) Commissioning Complete loop test of all instruments (From field to HMI)
Distributed Control System (DCS) Commissioning Commissioning of DCS logics, trips & interlocks
Block Trafo-5 (ST) Commissioning Block Trafo-5 (ST) Commissioning
Block Trafo-5 (ST) Commissioning Commissioning & Energization
ST Auxiliary Trafo Commissioning ST Auxiliary Trafo Commissioning
ST Auxiliary Trafo Commissioning Commissioning & Energization
Air Compressor Commissioning Air Compressor Commissioning
Air Compressor Commissioning Air Compressor Commissioning
Air Compressor Commissioning Commissioning of Instrument Air Piping/Tubing Circuits
Balance of Plant (BOP) Equipment Commissioning Balance of Plant (BOP) Equipment Commissioning
Balance of Plant (BOP) Equipment Commissioning Commissioning of BOP Instruments & Control valves
Balance of Plant (BOP) Equipment Commissioning Commissioning of BOP Motors
Balance of Plant (BOP) Equipment Commissioning Commissioning of BOP LV Panels /LCP/ MCC / Marshalling / JBs
Fire Fighting System Commissioning Fire Fighting System Commissioning
Fire Fighting System Commissioning Fire Fighting System Commissioning
Commissioning of Battery Charger & Battery Bank Commissioning of Battery Charger & Battery Bank
Commissioning of Battery Charger & Battery Bank Commissioning of Battery Charger & Battery Bank
Generator synchronization with grid Generator synchronization with grid
Generator synchronization with grid Generator Synchronization with Grid
System Readiness & BOP Equipment Commissioning System Readiness & BOP Equipment Commissioning
System Readiness & BOP Equipment Commissioning Power Generation of System Readiness
System Readiness & BOP Equipment Commissioning Performance test and Reliability test of turbine
Commissioning of Plant Lighting & Earthing System Commissioning of Plant Lighting & Earthing System
Commissioning of Plant Lighting & Earthing System Commissioning of Plant Lighting System