TOTAL is proposing the Joslyn North Oil Sands Mine development in North-eastern Alberta. The construction phase is scheduled to begin in the winter 201112012 with the mining production phase proposed to start in early 2017 and continue until 2037. The Project is designed to produce about 16,000 cubic metres per day (100,000 barrels per day) of partially de-asphalted bitumen product.
TOTAL is proposing the Joslyn North Oil Sands Mine development in North-eastern Alberta. The construction phase is scheduled to begin in the winter 201112012 with the mining production phase proposed to start in early 2017 and continue until 2037. The Project is designed to produce about 16,000 cubic metres per day (100,000 barrels per day) of partially de-asphalted bitumen product.
TOTAL is proposing the Joslyn North Oil Sands Mine development in North-eastern Alberta. The construction phase is scheduled to begin in the winter 201112012 with the mining production phase proposed to start in early 2017 and continue until 2037. The Project is designed to produce about 16,000 cubic metres per day (100,000 barrels per day) of partially de-asphalted bitumen product.