THE COFFOR SYSTEM

Description Applications Tests performed - Certifications Advantages over other Systems Cost effective

February 2010

DESCRIPTION (1)

Integrated formwork System Two grids (riblathe) Vertical stiffeners every 20 cm strengthen the panel With or without thermal insulation Horizontal links connect the two sides together Hot dip galvanized steel

February 2010

DESCRIPTION (2)
Concrete is poured between the two grids Excess water is eliminated by gravity Air is also eliminated Concrete pressure is greatly reduced COFFOR remains in the wall after pouring

February 2010

CONCRETING

Less than 1-2% of concrete go through the grids


February 2010 4

CONCRETING

Concrete can be poured from the slab formwork of the upper floor
February 2010 5

CONCRETING

Even when concrete is poured horizontally and vibrated, less than 1-2% of concrete pass throuh the grids
February 2010 6

COFFOR
A CONSTRUCTION SYSTEM THAT IS FAST EASY TO USE COST EFFECTIVE

February 2010

All concrete constructions can be built with COFFOR


Individual houses

Buildings residential, commercial or industrial High rise buildings Hospital, schools and universities Some civil works
February 2010 8

House

China
February 2010 9

House

China
February 2010 10

House - Russia

February 2010

Russia

11

The same house completed

February 2010

Russia

12

Villa - Russia

Radius wall - Russia


February 2010 13

Villa - Russia

Murs courbes
February 2010 14

Extension of a medical center

France
February 2010 15

Villa

France
February 2010 16

Villa

Bahrain
February 2010 17

Social house

Egypt
February 2010 18

Same house completed

Egypt
February 2010 19

House

Kurdistan
February 2010 20

Villa

Thailand
February 2010 21

Villa

China
February 2010 22

Villa

February 2010

China

23

Development (52 villas)

China
February 2010 24

Development - 56 villas

France
February 2010 25

Residence

China
February 2010 26

Club house

Morocco
February 2010 27

Club house

Morocco
February 2010 28

High standing condominium

February 2010

France

29

Administrative building

February 2010

India

30

Administrative building

February 2010

India

31

Five story building with exterior insulation - China


The concrete shell is done in 28 days
(350 m2 per floor)

With only 25 workers

February 2010

32

The same building completed

February 2010

33

7-story building

China
February 2010 34

Residential building

France
February 2010 35

High standing Residential Building

Four story building with exterior insulation France (under construction)


February 2010 36

The same building completed

Four story building with exterior insulation (completed)


February 2010 37

Social housing (under construction)

Five story social building with exterior insulation under construction - China
February 2010 38

The same building completed

Five story social building with exterior insulation (completed)


February 2010 39

Residential development

Five 10-story buildings - China


The concrete shell (30.000 m2 floor space) was done in 58 days
February 2010 40

Residential development

Five 10-story buildings The concrete shell (30.000 m2 floor space) was done in 58 days
February 2010 41

Commercial/Residential Development

12-story building under construction - China The concrete shell was completed in 3 months
February 2010 42

Commercial/Residential Development

The same building after a mortar coating


February 2010 43

Commercial/Residential Development

The same building completed

February 2010

44

Commercial/Residential Development
Four 9-story buildings plus one 12-story building. In total, more than 40.000 m2 of floor space

The development was completed in 8 months 3 months for the concrete shell 5 months for the second work

February 2010

45

Commercial building

Ground floor (walls are 5 meter high) - China


February 2010 46

Residential building

6-story building - China


February 2010 47

Residential building

6-story building - China


February 2010 48

University dormitory - China

The walls are 3.50 m high The concrete structure (8400 m2 over 7 levels) was done in 7 weeks
February 2010 49

University dormitory

Building completed
February 2010 50

Residential development - China

February 2010

Development of 35 buildings 5-story and 10-story

51

Residential development - China

12-story buildings
February 2010 52

Residential development

Housing for the Military Hospital - Algeria


February 2010 53

Residential development

Housing for the Military Hospital - Algeria


February 2010 54

Residential development

Residential development of 47 buildings - Algeria


February 2010 55

Residential development

Residential development of 47 buildings


February 2010 56

Warehouse 12-meter high walls

China
February 2010 57

Warehouse 12-meter high walls

China - Completed
February 2010 58

University

University Amphitheater - France


February 2010 59

Office building

7-story tower France

February 2010

60

High Rise Building

Hotel extension (34 stories) - China


February 2010 61

INNOVATION COFFOR
All the components of COFFOR are already used in construction: riblathe, C channels, rebars The particularity of COFFOR is to assemble them together

COFFOR IS A SYSTEM

February 2010

62

CERTIFICATION
The first construction was done in 1996 (first generation of COFFOR) for the piles of the Hospital George Pompidou in Paris, France Over 5.000.000 m2 of constructions have been built COFFOR is certified: CSTB (France), CNERIB (Algeria), ITB (Poland), Switzerland, China, Russia, Thaland, Turkey, Saudi Arabia, UAE, Egypt, etc.)

February 2010

63

Laboratory tests
Several tests were performed in France, Switzerland, Egypt, China, Algeria) to measure: Resistance under compression Resistance under deflexion Bonding of the C profile to concrete Immediate shrinkage of concrete Concrete quality

February 2010

64

Deflexion test

The COFFOR panel 200 cm x 122 cm x 15 cm has no rebar reinforcement Under centered deflexion, the panel broke under a weight of 48 KN (4,8 T) In addition, the panel demonstrated high ductility
February 2010 65

Elimination of excess water improves concrete quality


The water/cement ratio is lower The resistance in compression is 8-10% higher The immediate shrinkage is 10 times lower: 2

vs. 20-25 for traditional waterproof formwork The elasticity modulus is 30-40% higher

February 2010

66

COFFOR is a construction System easy to use


COFFOR offers advantages: For the contractor For the controlling organization For the developer For the user
February 2010 67

ADVANTAGES (1)
No investment for the contractor Very light (10 kg/m2), COFFOR can be carried by hand Construction time is reduced by compared to traditional shutter Systems and 3-4 times compared to column and beams Systems
February 2010 68

ADVANTAGES (2)

Easy to use No qualified personnel is necessary contrary to other Systems No need for accessories (wires tubes are sufficient) contrary to shutters
acile

February 2010

69

ADVANTAGES (3)
Easy insertion of rebar (if necessary) No need to add rebar in current portion of walls Elimination of anticrack welded wire
acile

February 2010

70

ADVANTAGES (4)
Visual control of the pour (no segregation) Increased security no need for crane Easy insertion of conduits for plumbing and electricity Cost effective compared to other Systems
acile

February 2010

71

ADVANTAGES (5)
COFFOR allows all architectural creations Last minute changes are possible Other filling material is possible (flying ash) COFFOR is ecological: environment is not polluted (no wood burnt on constuction site, no need for cleaning oil), natural ressources are preserved by the elimination of extensive use of bricks
February 2010 72

ADVANTAGES (6)

Easy use of all type of finishing. Stucco bonds very well on the riblathe

February 2010

73

ADVANTAGES (7)
COFFOR is easily cut with a circular saw

February 2010

74

ADVANTAGES (8)

INSULATED COFFOR offers an exterior insulation that eliminates thermal bridges

February 2010

75

COFFOR can build all parts of constructions


Walls Slabs, roof Columns, beams Foundations

February 2010

76

Walls

Facade wall
February 2010 77

Walls

Facade wall
February 2010 78

Walls

Mur de faade

New Caledonia
February 2010 79

Walls

Mur de faade
February 2010

Bahrain

80

Walls

Mur de faade

USA
February 2010 81

Walls

Russia
February 2010 82

Walls

China
February 2010 83

Highly reinforced walls

With COFFOR single panels - Algeria


February 2010 84

Walls

Facade wall before concreting


February 2010 85

Walls

Facade wall after concreting - Algeria


February 2010 86

Walls

Facade wall after concreting


February 2010 87

Walls

Facade wall after concreting - France


February 2010 88

Walls

Facade wall after concreting - France


February 2010 89

Walls

Interior wall after concreting - France


February 2010 90

Walls

Inside wall after concreting - China


February 2010 91

Adjoining Walls

Wall 4.50 m high - France


February 2010 92

Radius walls

Rebar

Rebar is used to align COFFOR


February 2010 93

Walls

Radius wall - France


February 2010 94

Walls

Radius wall (staircase) - France


February 2010 95

Walls

Facade wall with exterior insulation - Russia


February 2010 96

Walls

Facade wall with exterior insulation - China


February 2010 97

COFFOR can build


Slab Roof flat or inclined

February 2010

98

Slabs

Slab before rebar placement - Egypt


February 2010 99

Slabs

Slab after rebar placement - Egypt


February 2010 100

Slabs

Exterior side of COFFOR wall panel is higher February 2010 Elimination of edge formwork - Egypt

101

Slabs

Slab over a corridor - China


February 2010 102

Slabs

Slab and lintel with COFFOR - China


February 2010 103

Roofs

COFFOR panel before concreting - France


February 2010 104

Roofs

Inclined roof after concreting China


February 2010 105

Roofs

Inclined roof after concreting - China


February 2010 106

Roofs

Inclined roof Exterior view - China


February 2010 107

Roofs

Inclined roof Exterior view - China


February 2010 108

Lintels

Lintel over a door - China


February 2010 109

Roofs

Inclined roof - France


February 2010 110

Roofs

Inclined roof - France


February 2010 111

COFFOR can build

Rectangular columns Round columns

February 2010

112

Columns

Rectangular column
February 2010 113

Columns

Rectangular column
February 2010 114

Columns

Round column
February 2010 115

Columns

Round column
February 2010 116

COFFOR can build

Tunnels

February 2010

117

Tunnel

February 2010

France

118

COFFOR can build

Sustaining walls

February 2010

119

Sustaining walls

Sustaining wall along motorway before concreting France


February 2010 120

Sustaining wall

Sustaining wall along a motorway after concreting France


February 2010 121

Sustaining wall

Reinforcement of road - France


February 2010 122

Surrounding wall

New Caledonia
February 2010 123

Walls for fitness center

Walls for 2 SPAS and slab around pools France


February 2010 124

Walls for fitness center

Walls for 2 SPAS and slab around pools


February 2010 125

Surrounding wall

27 km long - Russia
February 2010 126

COFFOR can build


Swimming pools Tanks Various piping projects

February 2010

127

Swimming pools - France

Private pools (5 x 10 m to 8 x 12 m) are built in 1-2 days (also delivered in kit)


February 2010 128

Swimming pool

COFFOR pool delivered in KIT


February 2010 129

Swimming pools

Insertion of reserves is easy

February 2010

130

Tank - China

Water purification tank


February 2010 131

COFFOR can be used for

Foundation Crawl space

February 2010

132

Foundations

With single COFFOR panels (one side)


February 2010 133

Foundations

With single COFFOR panels (one side)


February 2010 134

Foundations

With single COFFOR panels (one side)


February 2010 135

Foundations

With single COFFOR panels (one side)


February 2010 136

Crawl space

COFFOR panels placed horizontally - France


February 2010 137

Crawl space

The exterior side is higher than the interior side Elimination of edge formwork for the slab - France
February 2010 138

COFFOR can also build

Dikes

February 2010

139

Dikes

Without drying the area - France


February 2010 140

COFFOR can reinforce

Weak walls that need reinforcement

February 2010

141

Commercial building - France

Rehabilitation of an existing building Reinforcement of facade walls Exterior view


February 2010 142

Commercial building

Rehabilitation of an existing building Reinforcement of facade walls Interior view


February 2010 143

Historical wall

Before reinforcement - France


February 2010 144

Historical wall

Reinforcement with COFFOR


February 2010 145

ADVANTAGES/DISADVANTAGES OF COFFOR VS. SHUTTERS

February 2010

146

DISADVANTAGES OF COFFOR VS. SHUTTERS


A finishing is necessary COFFOR cannot be used again Necessity to wear gloves

February 2010

147

ADVANTAGES OF COFFOR VS. SHUTTERS (1)


No dismantling necessary Elimination of all problems related to shutters (investment, availability, transport, cleaning, maintenance, rotation, storing) No need for qualified workers No accessories

February 2010

148

ADVANTAGES OF COFFOR VS. SHUTTERS (2)


No crane necessary Increased security on the site Easy control of the rebar presence Easy control of the pour Possibility to pour one story including walls and upper slab in one pass Easy integration of second work reserves (piping for electricity and plumbing)
February 2010 149

COFFOR IS COST EFFECTIVE


Compared with traditional column and beams structure, COFFOR uses much less steel COFFOR uses a little more concrete but eliminates most of the bricks COFFOR saves on labor and on construction time

February 2010

150

COFFOR USES LESS STEEL


For a 5 story-building for example, 50 percent less steel with COFFOR compared with a column and beams structure No rebar in the current portion of the walls (compliance with EUROCODE) With COFFOR, only rebar in corners and around the opening Steel quantity in COFFOR panels corresponds to 60 kg/m3 (1 sqm weighs 11 kg)
February 2010 151

COFFOR USES A LITTLE MORE CONCRETE


With COFFOR most column and beams are eliminated Quantity of concrete with COFFOR is about 20-30 % greater than concrete in frame structure Approximately 60-70% of bricks are eliminated with COFFOR

February 2010

152

COFFOR SAVES ON LABOR AND ON CONSTRUCTION TIME


Man-hour with COFFOR is reduced by 70% compared to column and beams Less qualification of workers with COFFOR Construction time with COFFOR is 3 to 4 times faster:
one floor per week with COFFOR One floor per month with traditional column and beams

Savings in management and overhead is important for the contractor


February 2010 153

CONCLUSION
COFFOR builds shear wall ---> safer construction COFFOR is faster COFFOR is simpler COFFOR is cheaper

February 2010

154

THANK YOU FOR YOUR ATTENTION!