Professional Documents
Culture Documents
Link :
Roads Number Road Type FROM
Start Kilometre Date TO
PAVEMENT TYPE
PAVEMENT WIDTH m
SHOULDER WIDTH m
SHOULDER TYPE
URGENT No.
SPOT IMPROVEMENT m
Grass sq.m
VEGETATION
Shrubs sq.m
Unlined - Clear m
Unlined - Re-dig m
Unlined - Construct m
DRAINAGE
Lined - Clear m
Lined - Re-dig m
Lined - Construct m
Drain lining m
Mitres m
SPECIAL DRAINAGE
Spillways No.
Re shape m
Fill cu. m.
Protection - height m
SLOPES
Protection - length m
Grade sq.m
Clear sq. m
Fill cu. m.
SHOULDER
Cut cu. m.
Concrete - construct cu. m.
Seal cracks sq.m
Edge repairs m
Fill potholes sq.m
Cut and patch sq.m
CARRIAGEWAY
Pavement replacement sq.m
Backlog Minim - Corrector m
Backlog Minim - Primerseal sq.m
Backlog Minim - Small Agg. sq.m
Number No.
CULVERTS Existing Clear No.
Repair aprons, h'walls No.
Provide No.
CULVERTS New Length m
Size cm
Inspect No.
Repair-deck, approach sq.m
BRIDGES Existing
BRIDGES Existing
Repair - safety rail m
River protection m
Provide No.
BRIDGES New Length m
Size cm
Missing/damaged furniture No.
SAFETY
Missing/damaged guardrail m
Page : of :
Remarks :
FORMULIR PERHITUNGAN PEMELIHARAAN - JALAN ASPAL HALAMAN : DARI :
RUAS :
PEMELIHARAAN RUTIN
Rumput sq.m
TANAMAN
Semak sq.m
Pembersihan - Drainase m
Panjang m
Tinggi m
Timbunan cu.m
Panjang m
DINDING PENAHAN TANAH
Tebal m
Tinggi m
Timbunan cu.m
Panjang m
Tinggi m
Panjang m
Tinggi m
NOMOR RUAS : RUAS JALAN : Batauga - Sampolawa DARI 00+000 00+200 00+400 00+600 00+800 01+000 01+200 01+400 01+600 01+800
TIPE PERKERASAN JALAN Perkerasan lentur ( Aspal ) / Perkerasan Kaku (Beton) Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal
TIPE BAHU JALAN (Agregat Kelas S / Beton K-175) Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S
LEBAR BAHU JALAN m 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
RM - PEMELIHARAAN RUTIN
Penambalan Lubang dengan Aspal / Patching (< 40x40 cm) m3 35.66 0.3x0.3x0.06 0.3x0.3x0.06 0.3x0.3x0.06 0.3x0.3x0.06 10.1.(1)2
Penambalan Lubang dengan Agregat Kelas A / Rekonstruksi (< 40x40 cm) m3 8.1.(1)
PERKERASAN JALAN Penambalan Tepi Perkerasan dengan Aspal / Patching (< 40x40 cm) m3 0.2x0.6x0.06 0.2x0.7x0.06 0.2x0.7x0.06 0.2x0.7x0.06 10.1.(1)2
Penambalan Tepi Perkerasan dengan Agregat Kelas A/ Rekonstruksi (< 40x40 cm) m3 8.1.(1)
Laburan Aspal / seal coating / crack sealing (< 10% / 100m) m2 2x10 2x10 2x10 2x10 2x10 10.1.(1)1
Penambalan Lubang dengan Aspal / Patching (> 40x40 cm) m3 1x4x0.06 2x2x0.06 2x2x0.06 2x5x0.06 2x2x0.06 2x5x0.06 1x3x0.06 8.1.(5)
Penambalan Lubang dengan Agregat Kelas A / Rekonstruksi (> 40x40 cm) m3 1x4x0.2 2x5x0.2 8.1.(1)
PERKERASAN JALAN Penambalan Tepi Perkerasan dengan Aspal / Patching (> 40x40 cm) m3 0.3x10x0.06 0.3x10x0.06 0.5x15x0.06 0.5x5x0.06 8.1.(5)
Penambalan Tepi Perkerasan dengan Agregat Kelas A / Rekonstruksi (> 40x40 cm) m3 0.3x10x0,2 8.1.(1)
Laburan Aspal / seal coating / crack sealing (> 10% / 100m) m2 4.5x20 4.5x20 4.5x20 4.5x20 8.1.9
HT - HOLDING TREATMENT
CATATAN :
FORMULIR SURVEY 01 KONDISI PERKERASAN HAL : 1 /
NOMOR RUAS : RUAS JALAN : Batauga - Sampolawa DARI 00+000 00+200 00+400 00+600 00+800 01+000 01+200 01+400 01+600 01+800
SATUAN
KOORDINAT GIS KM AWAL : KE 00+200 00+400 00+600 00+800 01+000 01+200 01+400 01+600 01+800 02+000
TIPE PERKERASAN JALAN Perkerasan lentur ( Aspal ) / Perkerasan Kaku (Beton) Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal
TIPE BAHU JALAN (Agregat Kelas S / Beton K-175) Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S
LEBAR BAHU JALAN m 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
RM - PEMELIHARAAN RUTIN
Penambalan Lubang dengan Aspal / Patching (< 40x40 cm) m3 0.0096 0.0072 0.0072 0.024 10.1.(11)
Penambalan Lubang dengan Agregat Kelas A / Rekonstruksi (< 40x40 cm) m3 10.1.(4)
PERKERASAN JALAN Penambalan Tepi Perkerasan dengan Aspal / Patching (< 40x40 cm) m3
Penambalan Tepi Perkerasan dengan Agregat Kelas A/ Rekonstruksi (< 40x40 cm) m3
Laburan Aspal / seal coating / crack sealing (< 10% / 100m) m2 4.2.(1)
Penambalan Lubang dengan Aspal / Patching (> 40x40 cm) m3 2.13 3.2178 0.2679 5.6157 10.1.(11)
PERKERASAN JALAN Penambalan Tepi Perkerasan dengan Aspal / Patching (> 40x40 cm) m3
Penambalan Tepi Perkerasan dengan Agregat Kelas A / Rekonstruksi (> 40x40 cm) m3
Laburan Aspal / seal coating / crack sealing (> 10% / 100m) m2 1200 846 1200 1200 4446 4.2.(1)
HT - HOLDING TREATMENT
CATATAN :
FORMULIR SURVEY 01 KONDISI PERKERASAN HAL : 1 /
NOMOR RUAS : RUAS JALAN : Batauga - Sampolawa DARI 02+000 02+200 02+400 02+600 02+800 03+000 03+200 03+400 06+700 06+800
SATUAN
KOORDINAT GIS KM AWAL : KE 02+200 02+400 02+600 02+800 03+000 03+200 03+400 03+500 06+800 07+000
TIPE PERKERASAN JALAN Perkerasan lentur ( Aspal ) / Perkerasan Kaku (Beton) Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal
TIPE BAHU JALAN (Agregat Kelas S / Beton K-175) Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S
LEBAR BAHU JALAN m 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
RM - PEMELIHARAAN RUTIN
Penambalan Lubang dengan Agregat Kelas A / Rekonstruksi (< 40x40 cm) m3 10.1.(4)
PERKERASAN JALAN Penambalan Tepi Perkerasan dengan Aspal / Patching (< 40x40 cm) m3
Penambalan Tepi Perkerasan dengan Agregat Kelas A/ Rekonstruksi (< 40x40 cm) m3
Laburan Aspal / seal coating / crack sealing (< 10% / 100m) m2 4.2.(1)
Penambalan Lubang dengan Aspal / Patching (> 40x40 cm) m3 0.338 4.375 1.833 0.602 2.757 8.763 7.621 1.391 0.870 28.55031 10.1.(11)
PERKERASAN JALAN Penambalan Tepi Perkerasan dengan Aspal / Patching (> 40x40 cm) m3
Penambalan Tepi Perkerasan dengan Agregat Kelas A / Rekonstruksi (> 40x40 cm) m3
Laburan Aspal / seal coating / crack sealing (> 10% / 100m) m2 1200 1200 1200 1200 1200 1200 1200 600 9000 4.2.(1)
HT - HOLDING TREATMENT
CATATAN :
FORMULIR SURVEY 01 KONDISI PERKERASAN HAL : 1 /
NOMOR RUAS : RUAS JALAN : Batauga - Sampolawa DARI 07+000 07+200 07+400 07+600 07+800 08+000 08+200 08+400 08+600 08+800
SATUAN
KOORDINAT GIS KM AWAL : KE 07+200 07+400 07+600 07+800 08+000 08+200 08+400 08+600 08+800 09+000
TIPE PERKERASAN JALAN Perkerasan lentur ( Aspal ) / Perkerasan Kaku (Beton) Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal
TIPE BAHU JALAN (Agregat Kelas S / Beton K-175) Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S
LEBAR BAHU JALAN m 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
RM - PEMELIHARAAN RUTIN
Penambalan Lubang dengan Agregat Kelas A / Rekonstruksi (< 40x40 cm) m3 10.1.(4)
PERKERASAN JALAN Penambalan Tepi Perkerasan dengan Aspal / Patching (< 40x40 cm) m3
Penambalan Tepi Perkerasan dengan Agregat Kelas A/ Rekonstruksi (< 40x40 cm) m3
Laburan Aspal / seal coating / crack sealing (< 10% / 100m) m2 4.2.(1)
Penambalan Lubang dengan Aspal / Patching (> 40x40 cm) m3 12.3588 15.8736 0.5466 0.39 0.078 0.036 0.7605 30.0435 10.1.(11)
PERKERASAN JALAN Penambalan Tepi Perkerasan dengan Aspal / Patching (> 40x40 cm) m3
Penambalan Tepi Perkerasan dengan Agregat Kelas A / Rekonstruksi (> 40x40 cm) m3
Laburan Aspal / seal coating / crack sealing (> 10% / 100m) m2 KEGEMUKAN 4.2.(1)
HT - HOLDING TREATMENT
CATATAN :
FORMULIR SURVEY 01 KONDISI PERKERASAN HAL : 1 /
NOMOR RUAS : RUAS JALAN : Batauga - Sampolawa DARI 09+000 09+200 09+400 09+600 09+800 10+000 10+200 10+400 10+600 10+800
SATUAN
KOORDINAT GIS KM AWAL : KE 09+200 09+400 09+600 09+800 10+000 10+200 10+400 10+600 10+800 11+000
TIPE PERKERASAN JALAN Perkerasan lentur ( Aspal ) / Perkerasan Kaku (Beton) Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal
TIPE BAHU JALAN (Agregat Kelas S / Beton K-175) Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S
LEBAR BAHU JALAN m 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
RM - PEMELIHARAAN RUTIN
Penambalan Lubang dengan Agregat Kelas A / Rekonstruksi (< 40x40 cm) m3 10.1.(4)
PERKERASAN JALAN Penambalan Tepi Perkerasan dengan Aspal / Patching (< 40x40 cm) m3
Penambalan Tepi Perkerasan dengan Agregat Kelas A/ Rekonstruksi (< 40x40 cm) m3
Laburan Aspal / seal coating / crack sealing (< 10% / 100m) m2 4.2.(1)
Penambalan Lubang dengan Aspal / Patching (> 40x40 cm) m3 0.0759 0.042 0.285 0.4029 10.1.(11)
PERKERASAN JALAN Penambalan Tepi Perkerasan dengan Aspal / Patching (> 40x40 cm) m3
Penambalan Tepi Perkerasan dengan Agregat Kelas A / Rekonstruksi (> 40x40 cm) m3
Laburan Aspal / seal coating / crack sealing (> 10% / 100m) m2 1200 1200 1200 1200 4800 4.2.(1)
HT - HOLDING TREATMENT
CATATAN :
FORMULIR SURVEY 01 KONDISI PERKERASAN HAL : 1 /
NOMOR RUAS : RUAS JALAN : Batauga - Sampolawa DARI 11+000 11+200 11+400 11+600 11+800 12+000 12+200 12+400 12+600 12+800
SATUAN
KOORDINAT GIS KM AWAL : KE 11+200 11+400 11+600 11+800 12+000 12+200 12+400 12+600 12+800 13+000
TIPE PERKERASAN JALAN Perkerasan lentur ( Aspal ) / Perkerasan Kaku (Beton) Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal
TIPE BAHU JALAN (Agregat Kelas S / Beton K-175) Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S
LEBAR BAHU JALAN m 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
RM - PEMELIHARAAN RUTIN
Penambalan Lubang dengan Agregat Kelas A / Rekonstruksi (< 40x40 cm) m3 10.1.(4)
PERKERASAN JALAN Penambalan Tepi Perkerasan dengan Aspal / Patching (< 40x40 cm) m3
Penambalan Tepi Perkerasan dengan Agregat Kelas A/ Rekonstruksi (< 40x40 cm) m3
Laburan Aspal / seal coating / crack sealing (< 10% / 100m) m2 4.2.(1)
Penambalan Lubang dengan Aspal / Patching (> 40x40 cm) m3 2.136 0.108 0.2736 2.0604 0.12 3.732 0.0462 4.2552 12.7314 10.1.(11)
PERKERASAN JALAN Penambalan Tepi Perkerasan dengan Aspal / Patching (> 40x40 cm) m3
Penambalan Tepi Perkerasan dengan Agregat Kelas A / Rekonstruksi (> 40x40 cm) m3
Laburan Aspal / seal coating / crack sealing (> 10% / 100m) m2 1200 1200 KEGEMUKAN KEGEMUKANKEGEMUKAN KEGEMUKAN 2400 4.2.(1)
HT - HOLDING TREATMENT
CATATAN :
FORMULIR SURVEY 01 KONDISI PERKERASAN HAL : 1 /
NOMOR RUAS : RUAS JALAN : Batauga - Sampolawa DARI 13+000 13+200 13+400 13+600 13+800 14+000 14+200 14+400 14+600 14+800
SATUAN
KOORDINAT GIS KM AWAL : KE 13+200 13+400 13+600 13+800 14+000 14+200 14+400 14+600 14+800 15+000
TIPE PERKERASAN JALAN Perkerasan lentur ( Aspal ) / Perkerasan Kaku (Beton) Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal
TIPE BAHU JALAN (Agregat Kelas S / Beton K-175) Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S
LEBAR BAHU JALAN m 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
RM - PEMELIHARAAN RUTIN
Penambalan Lubang dengan Agregat Kelas A / Rekonstruksi (< 40x40 cm) m3 10.1.(4)
PERKERASAN JALAN Penambalan Tepi Perkerasan dengan Aspal / Patching (< 40x40 cm) m3
Penambalan Tepi Perkerasan dengan Agregat Kelas A/ Rekonstruksi (< 40x40 cm) m3
Laburan Aspal / seal coating / crack sealing (< 10% / 100m) m2 4.2.(1)
PERKERASAN JALAN Penambalan Tepi Perkerasan dengan Aspal / Patching (> 40x40 cm) m3
Penambalan Tepi Perkerasan dengan Agregat Kelas A / Rekonstruksi (> 40x40 cm) m3
Laburan Aspal / seal coating / crack sealing (> 10% / 100m) m2 4.2.(1)
HT - HOLDING TREATMENT
CATATAN :
FORMULIR SURVEY 01 KONDISI PERKERASAN HAL : 1 /
NOMOR RUAS : RUAS JALAN : Batauga - Sampolawa DARI 15+000 15+200 15+400 15+600 15+800 16+000 16+200 16+400 16+600 16+800
SATUAN
KOORDINAT GIS KM AWAL : KE 15+200 15+400 15+600 15+800 16+000 16+200 16+400 16+600 16+800 17+000
TIPE PERKERASAN JALAN Perkerasan lentur ( Aspal ) / Perkerasan Kaku (Beton) Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal
TIPE BAHU JALAN (Agregat Kelas S / Beton K-175) Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S
LEBAR BAHU JALAN m 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
RM - PEMELIHARAAN RUTIN
Penambalan Lubang dengan Agregat Kelas A / Rekonstruksi (< 40x40 cm) m3 10.1.(4)
PERKERASAN JALAN Penambalan Tepi Perkerasan dengan Aspal / Patching (< 40x40 cm) m3
Penambalan Tepi Perkerasan dengan Agregat Kelas A/ Rekonstruksi (< 40x40 cm) m3
Laburan Aspal / seal coating / crack sealing (< 10% / 100m) m2 4.2.(1)
PERKERASAN JALAN Penambalan Tepi Perkerasan dengan Aspal / Patching (> 40x40 cm) m3
Penambalan Tepi Perkerasan dengan Agregat Kelas A / Rekonstruksi (> 40x40 cm) m3
Laburan Aspal / seal coating / crack sealing (> 10% / 100m) m2 4.2.(1)
HT - HOLDING TREATMENT
CATATAN :
FORMULIR SURVEY 01 KONDISI PERKERASAN HAL : 1 /
NOMOR RUAS : RUAS JALAN : Batauga - Sampolawa DARI 17+000 17+200 17+400 17+600 17+800 18+000 18+200 18+400 18+600 18+800
SATUAN
KOORDINAT GIS KM AWAL : KE 17+200 17+400 17+600 17+800 18+000 18+200 18+400 18+600 18+800 19+000
TIPE PERKERASAN JALAN Perkerasan lentur ( Aspal ) / Perkerasan Kaku (Beton) Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal
TIPE BAHU JALAN (Agregat Kelas S / Beton K-175) Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S
LEBAR BAHU JALAN m 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
RM - PEMELIHARAAN RUTIN
Penambalan Lubang dengan Agregat Kelas A / Rekonstruksi (< 40x40 cm) m3 10.1.(4)
PERKERASAN JALAN Penambalan Tepi Perkerasan dengan Aspal / Patching (< 40x40 cm) m3
Penambalan Tepi Perkerasan dengan Agregat Kelas A/ Rekonstruksi (< 40x40 cm) m3
Laburan Aspal / seal coating / crack sealing (< 10% / 100m) m2 4.2.(1)
PERKERASAN JALAN Penambalan Tepi Perkerasan dengan Aspal / Patching (> 40x40 cm) m3
Penambalan Tepi Perkerasan dengan Agregat Kelas A / Rekonstruksi (> 40x40 cm) m3
Laburan Aspal / seal coating / crack sealing (> 10% / 100m) m2 4.2.(1)
HT - HOLDING TREATMENT
CATATAN :
FORMULIR SURVEY 01 KONDISI PERKERASAN HAL : 1 /
NOMOR RUAS : RUAS JALAN : Batauga - Sampolawa DARI 19+000 19+200 19+400 19+600 19+800 20+000 20+200 20+400 20+600 20+800
SATUAN
KOORDINAT GIS KM AWAL : KE 19+200 19+400 19+600 19+800 20+000 20+200 20+400 20+600 20+800 21+000
TIPE PERKERASAN JALAN Perkerasan lentur ( Aspal ) / Perkerasan Kaku (Beton) Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal
TIPE BAHU JALAN (Agregat Kelas S / Beton K-175) Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S
LEBAR BAHU JALAN m 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
RM - PEMELIHARAAN RUTIN
Penambalan Lubang dengan Agregat Kelas A / Rekonstruksi (< 40x40 cm) m3 10.1.(4)
PERKERASAN JALAN Penambalan Tepi Perkerasan dengan Aspal / Patching (< 40x40 cm) m3
Penambalan Tepi Perkerasan dengan Agregat Kelas A/ Rekonstruksi (< 40x40 cm) m3
Laburan Aspal / seal coating / crack sealing (< 10% / 100m) m2 4.2.(1)
PERKERASAN JALAN Penambalan Tepi Perkerasan dengan Aspal / Patching (> 40x40 cm) m3
Penambalan Tepi Perkerasan dengan Agregat Kelas A / Rekonstruksi (> 40x40 cm) m3
Laburan Aspal / seal coating / crack sealing (> 10% / 100m) m2 4.2.(1)
HT - HOLDING TREATMENT
CATATAN :
FORMULIR SURVEY 01 KONDISI PERKERASAN HAL : 1 /
NOMOR RUAS : RUAS JALAN : Batauga - Sampolawa DARI 21+000 21+200 21+400 21+600 21+800 22+000
SATUAN
KOORDINAT GIS KM AWAL : KE 21+200 21+400 21+600 21+800 22+000 22+085
TIPE PERKERASAN JALAN Perkerasan lentur ( Aspal ) / Perkerasan Kaku (Beton) Aspal Aspal Aspal Aspal Aspal Aspal
TIPE BAHU JALAN (Agregat Kelas S / Beton K-175) Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S
RM - PEMELIHARAAN RUTIN
Penambalan Lubang dengan Agregat Kelas A / Rekonstruksi (< 40x40 cm) m3 10.1.(4)
PERKERASAN JALAN Penambalan Tepi Perkerasan dengan Aspal / Patching (< 40x40 cm) m3
Penambalan Tepi Perkerasan dengan Agregat Kelas A/ Rekonstruksi (< 40x40 cm) m3
Laburan Aspal / seal coating / crack sealing (< 10% / 100m) m2 4.2.(1)
PERKERASAN JALAN Penambalan Tepi Perkerasan dengan Aspal / Patching (> 40x40 cm) m3
Penambalan Tepi Perkerasan dengan Agregat Kelas A / Rekonstruksi (> 40x40 cm) m3
Laburan Aspal / seal coating / crack sealing (> 10% / 100m) m2 4.2.(1)
HT - HOLDING TREATMENT
CATATAN :
FORMULIR SURVEY 02 KONDISI DI LUAR PERKERASAN (BAHU JALAN, SALURAN, TPT) HAL : 1 / KIRI
NOMOR RUAS : RUAS JALAN: Batauga - Sampolawa DARI 00+000 00+200 00+400 00+600 00+800 01+000 01+200 01+400 01+600 01+800
TIPE PERKERASAN JALAN Perkerasan Lentur (Aspal) / Perkerasan Kaku (Beton) Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal
TIPE BAHU JALAN ( Agregat Kelas S / Beton K-175 ) Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S
LEBAR BAHU JALAN m 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
RM - PEMELIHARAAN RUTIN
SALURAN Pembersihan dan Pembuangan Lumpur pada Saluran Samping Diperkeras m'
Galian untuk Bahu Jalan (bahu jalan lebih tinggi dari permukaan aspal) m3
10.1.(3)/
Pasangan Batu untuk Tembok Penahan Tanah m3 15.4 15.4 10.1.
(16)
TEMBOK PENAHAN TANAH (TPT)
Timbunan Pilihan (backfill) dari Sumber Galian m3
CATATAN :
FORMULIR SURVEY 02 KONDISI DI LUAR PERKERASAN (BAHU JALAN, SALURAN, TPT) HAL : 1 / KIRI
NOMOR RUAS : RUAS JALAN: Batauga - Sampolawa DARI 02+000 02+200 02+400 02+600 02+800 03+000 03+200 03+400 06+700 06+800
TIPE PERKERASAN JALAN Perkerasan Lentur (Aspal) / Perkerasan Kaku (Beton) Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal
TIPE BAHU JALAN ( Agregat Kelas S / Beton K-175 ) Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S
LEBAR BAHU JALAN m 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
RM - PEMELIHARAAN RUTIN
SALURAN Pembersihan dan Pembuangan Lumpur pada Saluran Samping Diperkeras m' 100 100 200 10.1.(3).1
Galian untuk Bahu Jalan (bahu jalan lebih tinggi dari permukaan aspal) m3
10.1.(3)/
Pasangan Batu untuk Tembok Penahan Tanah m3 10.1.
(16)
TEMBOK PENAHAN TANAH (TPT)
Timbunan Pilihan (backfill) dari Sumber Galian m3
CATATAN :
FORMULIR SURVEY 02 KONDISI DI LUAR PERKERASAN (BAHU JALAN, SALURAN, TPT) HAL : 1 / KIRI
NOMOR RUAS : RUAS JALAN: Batauga - Sampolawa DARI 07+000 07+200 07+400 07+600 07+800 08+000 08+200 08+400 08+600 08+800
TIPE PERKERASAN JALAN Perkerasan Lentur (Aspal) / Perkerasan Kaku (Beton) Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal
TIPE BAHU JALAN ( Agregat Kelas S / Beton K-175 ) Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S
LEBAR BAHU JALAN m 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
RM - PEMELIHARAAN RUTIN
SALURAN Pembersihan dan Pembuangan Lumpur pada Saluran Samping Diperkeras m' 100 200 200 100 600 10.1.(3).1
Galian untuk Bahu Jalan (bahu jalan lebih tinggi dari permukaan aspal) m3
10.1.(3)/
Pasangan Batu untuk Tembok Penahan Tanah m3 9.18 9.18 18.36 10.1.
(16)
TEMBOK PENAHAN TANAH (TPT)
Timbunan Pilihan (backfill) dari Sumber Galian m3
CATATAN :
FORMULIR SURVEY 02 KONDISI DI LUAR PERKERASAN (BAHU JALAN, SALURAN, TPT) HAL : 1 / KIRI
NOMOR RUAS : RUAS JALAN: Batauga - Sampolawa DARI 09+000 09+200 09+400 09+600 09+800 10+000 10+200 10+400 10+600 10+800
TIPE PERKERASAN JALAN Perkerasan Lentur (Aspal) / Perkerasan Kaku (Beton) Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal
TIPE BAHU JALAN ( Agregat Kelas S / Beton K-175 ) Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S
LEBAR BAHU JALAN m 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
RM - PEMELIHARAAN RUTIN
SALURAN Pembersihan dan Pembuangan Lumpur pada Saluran Samping Diperkeras m'
Galian untuk Bahu Jalan (bahu jalan lebih tinggi dari permukaan aspal) m3
10.1.(3)/
Pasangan Batu untuk Tembok Penahan Tanah m3 10.1.
(16)
TEMBOK PENAHAN TANAH (TPT)
Timbunan Pilihan (backfill) dari Sumber Galian m3
CATATAN :
FORMULIR SURVEY 02 KONDISI DI LUAR PERKERASAN (BAHU JALAN, SALURAN, TPT) HAL : 1 / KIRI
NOMOR RUAS : RUAS JALAN: Batauga - Sampolawa DARI 11+000 11+200 11+400 11+600 11+800 12+000 12+200 12+400 12+600 12+800
TIPE PERKERASAN JALAN Perkerasan Lentur (Aspal) / Perkerasan Kaku (Beton) Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal
TIPE BAHU JALAN ( Agregat Kelas S / Beton K-175 ) Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S
LEBAR BAHU JALAN m 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
RM - PEMELIHARAAN RUTIN
SALURAN Pembersihan dan Pembuangan Lumpur pada Saluran Samping Diperkeras m'
Galian untuk Bahu Jalan (bahu jalan lebih tinggi dari permukaan aspal) m3
10.1.(3)/
Pasangan Batu untuk Tembok Penahan Tanah m3 10.1.
(16)
TEMBOK PENAHAN TANAH (TPT)
Timbunan Pilihan (backfill) dari Sumber Galian m3
CATATAN :
FORMULIR SURVEY 02 KONDISI DI LUAR PERKERASAN (BAHU JALAN, SALURAN, TPT) HAL : 1 / KIRI
NOMOR RUAS : RUAS JALAN: Batauga - Sampolawa DARI 13+000 13+200 13+400 13+600 13+800 14+000 14+200 14+400 14+600 14+800
TIPE PERKERASAN JALAN Perkerasan Lentur (Aspal) / Perkerasan Kaku (Beton) Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal
TIPE BAHU JALAN ( Agregat Kelas S / Beton K-175 ) Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S
LEBAR BAHU JALAN m 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
RM - PEMELIHARAAN RUTIN
SALURAN Pembersihan dan Pembuangan Lumpur pada Saluran Samping Diperkeras m' 100 200 100 100 500 10.1.(3).1
Galian untuk Bahu Jalan (bahu jalan lebih tinggi dari permukaan aspal) m3
10.1.(3)/
Pasangan Batu untuk Tembok Penahan Tanah m3 10.1.
(16)
TEMBOK PENAHAN TANAH (TPT)
Timbunan Pilihan (backfill) dari Sumber Galian m3
CATATAN :
FORMULIR SURVEY 02 KONDISI DI LUAR PERKERASAN (BAHU JALAN, SALURAN, TPT) HAL : 1 / KIRI
NOMOR RUAS : RUAS JALAN: Batauga - Sampolawa DARI 15+000 15+200 15+400 15+600 15+800 16+000 16+200 16+400 16+600 16+800
TIPE PERKERASAN JALAN Perkerasan Lentur (Aspal) / Perkerasan Kaku (Beton) Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal
TIPE BAHU JALAN ( Agregat Kelas S / Beton K-175 ) Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S
LEBAR BAHU JALAN m 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
RM - PEMELIHARAAN RUTIN
SALURAN Pembersihan dan Pembuangan Lumpur pada Saluran Samping Diperkeras m' 100 100 100 100 100 500 10.1.(3).1
Galian untuk Bahu Jalan (bahu jalan lebih tinggi dari permukaan aspal) m3
10.1.(3)/
Pasangan Batu untuk Tembok Penahan Tanah m3 10.1.
(16)
TEMBOK PENAHAN TANAH (TPT)
Timbunan Pilihan (backfill) dari Sumber Galian m3
CATATAN :
FORMULIR SURVEY 02 KONDISI DI LUAR PERKERASAN (BAHU JALAN, SALURAN, TPT) HAL : 1 / KIRI
NOMOR RUAS : RUAS JALAN: Batauga - Sampolawa DARI 17+000 17+200 17+400 17+600 17+800 18+000 18+200 18+400 18+600 18+800
TIPE PERKERASAN JALAN Perkerasan Lentur (Aspal) / Perkerasan Kaku (Beton) Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal
TIPE BAHU JALAN ( Agregat Kelas S / Beton K-175 ) Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S
LEBAR BAHU JALAN m 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
RM - PEMELIHARAAN RUTIN
SALURAN Pembersihan dan Pembuangan Lumpur pada Saluran Samping Diperkeras m' 200 200 10.1.(3).1
Galian untuk Bahu Jalan (bahu jalan lebih tinggi dari permukaan aspal) m3
10.1.(3)/
Pasangan Batu untuk Tembok Penahan Tanah m3 10.1.
(16)
TEMBOK PENAHAN TANAH (TPT)
Timbunan Pilihan (backfill) dari Sumber Galian m3
CATATAN :
FORMULIR SURVEY 02 KONDISI DI LUAR PERKERASAN (BAHU JALAN, SALURAN, TPT) HAL : 1 / KIRI
NOMOR RUAS : RUAS JALAN: Batauga - Sampolawa DARI 19+000 19+200 19+400 19+600 19+800 20+000 20+200 20+400 20+600 20+800
TIPE PERKERASAN JALAN Perkerasan Lentur (Aspal) / Perkerasan Kaku (Beton) Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal
TIPE BAHU JALAN ( Agregat Kelas S / Beton K-175 ) Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S
LEBAR BAHU JALAN m 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
RM - PEMELIHARAAN RUTIN
SALURAN Pembersihan dan Pembuangan Lumpur pada Saluran Samping Diperkeras m' 200 200 10.1.(3).1
Galian untuk Bahu Jalan (bahu jalan lebih tinggi dari permukaan aspal) m3
10.1.(3)/
Pasangan Batu untuk Tembok Penahan Tanah m3 10.1.
(16)
TEMBOK PENAHAN TANAH (TPT)
Timbunan Pilihan (backfill) dari Sumber Galian m3
CATATAN :
FORMULIR SURVEY 02 KONDISI DI LUAR PERKERASAN (BAHU JALAN, SALURAN, TPT) HAL : 1 / KIRI
NOMOR RUAS : RUAS JALAN: Batauga - Sampolawa DARI 21+000 21+200 21+400 21+600 21+800 22+000
TIPE PERKERASAN JALAN Perkerasan Lentur (Aspal) / Perkerasan Kaku (Beton) Aspal Aspal Aspal Aspal Aspal Aspal
TIPE BAHU JALAN ( Agregat Kelas S / Beton K-175 ) Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S
RM - PEMELIHARAAN RUTIN
SALURAN Pembersihan dan Pembuangan Lumpur pada Saluran Samping Diperkeras m'
Galian untuk Bahu Jalan (bahu jalan lebih tinggi dari permukaan aspal) m3
10.1.(3)/
Pasangan Batu untuk Tembok Penahan Tanah m3 10.1.
(16)
TEMBOK PENAHAN TANAH (TPT)
Timbunan Pilihan (backfill) dari Sumber Galian m3
CATATAN :
FORMULIR SURVEY 03 KONDISI BANGUNAN PELENGKAP & ROAD SAFETY HAL : 1 /
NOMOR RUAS : RUAS JALAN : Sumbawa Besar - Semongkat - Batu Dulang DARI 00+000 00+200 00+400 00+600 00+800 01+000 01+200 01+400 01+600 01+800
TIPE PERKERASAN JALAN Perkerasan Lentur (Aspal) / Perkerasan Kaku (Beton) Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal
TIPE BAHU JALAN ( Agregat Kelas S / Beton K-175 ) Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S
RM - PEMELIHARAAN RUTIN
Baja Tulangan kg
CATATAN :
REKAPITULASI KUANTITAS HASIL SURVEY
Nama Ruas :
Panjang Ruas :
Tanggan Survey :
Tim Survey :
a b c d e
DIVISI 1. UMUM
1.2 Mobilisasi LS
1.8.(1a) Rangka Rambu Multi Pesan Buah
1.8.(3) Rambu Multi Pesan Buah
1.8.(4) Traffic Cone Buah
1.8.(5) Pagar Keselamatan dari Anyaman Plastik (Barrier Mesh) M1
1.8.(6) Pagar Keselamatan Buah
1.8.(7) Rambu Jalan Stop / Pelan-Pelan (Lolypop) Buah
1.8.(8) Bendera Oranye dengan Tali (Orange Bunting) M1
1.8.(9) Kendaraan untuk Pemeliharaan Jalan Buah
1.9.(1) Alat GPS Type Garmin GPS Map 78 atau sejenis Buah
Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 0.00
2.2.(1) Pasangan Batu dengan Mortar M3 0.00
2.3.(1) Gorong-gorong Pipa Beton Bertulang, diameter dalam 35 - 45 cm M1
2.3.(2) Gorong-gorong Pipa Beton Bertulang, diameter 55 - 65 cm M1
2.3.(3) Gorong-gorong Pipa Beton Bertulang, diameter dalam 75 - 85 cm M1
2.3.(4) Gorong-gorong Pipa Beton Bertulang, diameter dalam 95 - 105 cm M1
2.3.(5) Gorong2 Pipa Baja Bergelombang Ton
2.3.(6) Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 20 cm M1
2.3.(7) Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 25 cm M1
2.3.(8) Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 30 cm M1
2.3.(9) Saluran berbentuk U Tipe DS 1 M1
2.3.(10) Saluran berbentuk U Tipe DS 2 M1
2.3.(11) Saluran berbentuk U Tipe DS 3 M1
2.3.(12) Beton K250 (fc’ 20) untuk struktur drainase beton minor M3
2.3.(13) Baja Tulangan untuk struktur drainase beton minor Kg
2.3.(14) Pasangan Batu tanpa Adukan (Aanstamping) M3
2.4.(1) Bahan Porous untuk Bahan Penyaring (Filter) M3
2.4.(2) Anyaman Filter Plastik M2
2.4.(3) Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah Permukaan M1
Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DIVISI 7. STRUKTUR
7.1 (1) Beton mutu tinggi fc’50 Mpa M3
7.1 (2) Beton mutu tinggi fc’45 Mpa M3
7.1 (3) a Beton mutu tinggi fc’40 Mpa dengan traveler M3
7.1 (3) b Beton mutu tinggi fc’40 Mpa perancah M3
7.1 (4) Beton mutu tinggi fc’35 Mpa M3
7.1 (5) a Beton mutu sedang fc’30 MPa lantai jembatan M3
7.1 (5) b Beton mutu sedang fc’30 MPa untuk Slab Culvert M3 0.00
7.1 (6) Beton mutu sedang fc’25 Mpa (K-300) M3
7.1 (7) a Beton mutu sedang fc’20 MPa (K-250) M3 0.00
7.1 (7) b Beton mutu sedang fc’20 MPa yang dilaksanakan di air M3
7.1 (8) Beton mutu rendah fc’15 MPa (K-175) M3 0.00
7.1 (9) Beton Siklop fc’15 Mpa M3
7.1 (10) Beton mutu rendah fc’10 Mpa (K-125) M3
7.2 (1a) Penyediaan Unit Pracetak Gelagar Tipe 1 Bentang 16 meter Buah
7.2 (1b) Penyediaan Unit Pracetak Gelagar Tipe 1 Bentang 25 meter Buah
7.2 (1c) Penyediaan Unit Pracetak Gelagar Tipe 1 Bentang … meter Buah
7.2 (2a) Pemasangan Unit Pracetak Gelagar Tipe 1 Bentang 16 meter Buah
7.2 (2b) Pemasangan Unit Pracetak Gelagar Tipe 1 Bentang 25 meter Buah
7.2 (2c) Pemasangan Unit Pracetak Gelagar Tipe 1 Bentang … meter Buah
7.2 (3)a Penyediaan Unit Pracetak Gelagar Tipe U Bentang 16 meter Buah
7.2 (3)b Penyediaan Unit Pracetak Gelagar Tipe U Bentang … meter Buah
7.2 (4)a Pemasangan Unit Pracetak Gelagar Tipe U Bentang 16 meter Buah
7.2 (4)b Pemasangan Unit Pracetak Gelagar Tipe U Bentang … meter Buah
7.2.(5) Penyediaan Unit Pracetak Gelagar Box bentang ... meter lebar ……meter Buah
7.2.(6) Pemasangan Unit Pracetak Gelagar Box bentang ... meter lebar ……meter Buah
7.2.(7) Baja Prategang Kg
7.2.(8) Penyediaan Pelat Berongga (Voided Slab) Pracetak bentang ….. Meter Buah
7.2.(9) Pemasangan Pelat Berongga (Voided Slab) Pracetak bentang ….. Meter Buah
7.2.(10) Beton Diafragma fc’ 30 MPa termasuk pekerjaan penegangan setelah pengecoran (post tension) m3
7.2.(11).a Penyediaan balok gelagar Tee Beam bentang 60 m Buah
7.2.(11).b Pemasangan balok gelagar Tee Beam bentang 60 m Buah
7.2.(12).a Penyediaan panel full deph slab Buah
7.2.(12).b Pemasangan panel full deph slab Buah
7.3 (1) Baja Tulangan U 24 Polos Kg 0.00
7.3 (2) Baja Tulangan U 32 Polos Kg
7.3 (3) Baja Tulangan U 32 Ulir Kg
7.3 (4) Baja Tulangan U 39 Ulir Kg
7.3 (5) Baja Tulangan U 48 Ulir Kg
7.3 (6) Anyaman Kawat Yang Dilas (Welded Wire Mesh) Kg
7.4 (1) a
Penyediaan Baja Struktur BJ 34 (Titik Leleh 210 MPa) Kg
7.4 (1) b
Penyediaan Baja Struktur BJ 37 (Titik Leleh 240 MPa) Kg
7.4 (1) c
Penyediaan Baja Struktur BJ …. (Titik Leleh ….. MPa) Kg
7.4 (2) a Pemasangan Baja Struktur BJ 34 (Titik Leleh 210 MPa) Kg
7.4 (2) b
Pemasangan Baja Struktur BJ 37 (Titik Leleh 240 MPa) Kg
7.4 (2) c Pemasangan Baja Struktur BJ …. (Titik Leleh ….. MPa) Kg
7.4 (3) a
Pengadaan Struktur Jembatan Rangka Baja Panjang 40 m, Lebar 9 m Buah
7.4 (3) b
Pengadaan Struktur Jembatan Rangka Baja Panjang 50 m, Lebar 9 m Buah
7.4 (3) c
Pengadaan Struktur Jembatan Rangka Baja Panjang 60 m, Lebar 9 m Buah
7.4 (3) d
Pengadaan Struktur Jembatan Rangka Baja Panjang .... m, Lebar .. m Buah
7.4.(4).a Pemasangan jembatan rangka baja standar panjang 40 m, lebar 9 m Buah
7.4.(4).b
Pemasangan jembatan rangka baja standar panjang 50 m, lebar 9 m Buah
7.4.(4).c
Pemasangan jembatan rangka baja standar panjang 60 m, lebar 9 m Buah
7.4.(4).d
Pemasangan jembatan rangka baja standar panjang …. m, lebar …. m Buah
7.5 (1)
Pemasangan jembatan Rangka Baja Kg
7.5 (2)
Pengangkutan Bahan Jembatan Kg
7.6 (1) Fondasi Cerucuk Penyedian dan Pemancangan Cerucuk M1
7.6 (2)
Dinding Turap Kayu Tanpa Pengawetan M2
7.6 (3)
Dinding Turap Kayu Dengan Pengawetan M2
7.6 (4)
Dinding Turap Baja M2
7.6 (5)
Dinding Turap Beton M2
7.6 (6)
Penyediaan Tiang Pancang Kayu Tanpa Pengawetan Ukuran …. Mm M1
7.6 (7)
Penyediaan Tiang Pancang Kayu dengan Pengawetan Ukuran …. mm M1
7.6 (8) a
Penyediaan Tiang Pancang Baja Diameter 500 mm dengan tebal 10 mm M1
7.6 (8) b
Penyediaan Tiang Pancang Baja Diameter 500 mm dengan tebal … mm M1
7.6 (8) c
Penyediaan Tiang Pancang Baja Diameter ….. mm dengan tebal ... mm M1
7.6 (9) a
Penyediaan Tiang Pancang Baja H Beam Ukuran 300 mm x 300 mm x 10 mm x 15 mm M1
7.6 (9) b
Penyediaan Tiang Pancang Baja H Beam Ukuran …... mm x ….. mm x …. mm x …. mm M1
7.6 (10) a
Penyediaan Tiang Pancang Beton Bertulang Pracetak ukuran 350 mm x 350 mm M1
7.6 (10) b
Penyediaan Tiang Pancang Beton Bertulang Pracetak ukuran ….. mm x …... mm M1
7.6 (11) a
Penyediaan Tiang Pancang Beton Pratekan Pracetak ukuran 400 mm x 400 mm M1
7.6 (11) b Penyediaan Tiang Pancang Beton Pratekan Pracetak ukuran ….. mm x …... mm M1
7.6 (12) a
Penyediaan Tiang Pancang Beton Pratekan Pracetak diameter 450 mm M1
7.6 (12) b
Penyediaan Tiang Pancang Beton Pratekan Pracetak diameter ……mm M1
7.6 (13)
Pemancangan Tiang Pancang Kayu Ukuran …. mm M1
7.6 (14) a
Pemancangan Tiang Pancang Baja Diameter 500 mm M1
7.6 (14) b
Pemancangan Tiang Pancang Baja Diameter ..… mm M1
7.6 (15) a Pemancangan Tiang Pancang Baja H Beam Ukuran 300 mm x 300 mm x 10 mm x 15 mm M1
7.6 (15) b
Pemancangan Tiang Pancang Baja H Beam Ukuran …... mm x ….. mm x …. mm x …. mm M1
7.6 (16) a
Pemancangan Tiang Pancang Beton Bertulang Pracetak ukuran 350 mm x 350 mm M1
7.6 (16) b
Pemancangan Tiang Pancang Beton Bertulang Pracetak ukuran ….. mm x …... mm M1
7.6 (17) a
Pemancangan Tiang Pancang Beton Pratekan Pracetak ukuran 400 mm x 400 mm M1
7.6 (17) b Pemancangan Tiang Pancang Beton Pratekan Pracetak ukuran ….. mm x …... mm M1
7.6 (18) a
Pemancangan Tiang Pancang Beton Pratekan Pracetak diameter 450 mm M1
7.6 (18) b
Pemancangan Tiang Pancang Beton Pratekan Pracetak diameter …... mm M1
7.6 (19) a
Tiang Bor Beton, diameter 800 mm M1
7.6 (19) b
Tiang Bor Beton, diameter ….. mm M1
7.6 (20)
Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(13) s/d 7.6.(18) bila Tiang Pancang dikerjakan M1
di Tempat Yang Berair.
7.6 (21)
Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(19) bila Tiang Bor Beton dikerjakan M1
di Tempat Yang Berair.
7.6 (22)
Pengujian Pembebanan Pada Tiang Dengan Diameter sampai 600 mm buah
7.6 (23)
Pengujian Pembebanan Pada Tiang Dengan Diameter diatas 600 mm buah
7.6 (24)
Tiang Uji jenis …… ukuran ……. M1
7.6 (25) a
Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... dengan beban hidrolik Cara Beban Siklik buah
7.6 (25) b Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... dengan beban hidrolik Cara Beban Bertahap buah
7.6 (26) a
Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... dengan meja beban statis buah
Cara Beban Siklik
7.6 (26) b
Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... dengan meja beban statis buah
Cara Beban Bertahap
7.6 (27) a
Pengujian Crosshole sonic logging (CSL) pada Tiang bor beton diameter .... buah
7.6 (27) b Pengujian Pembebanan Dinamis Jenis PDLT (Pile Dynamic Load Testing) pada Tiangukuran / diameter .... buah
7.6 (28)
Pengujian Keutuhan Tiang dengan Pile Integrated Test (PIT) buah
7.7.(1)
Dinding Sumuran Silinder terpasang, Diameter ……………. M1
7.9.(1)
Pasangan Batu M3 0.00
7.10.(1) Pasangan Batu Kosong yang Diisi Adukan M3
7.10.(2)
Pasangan Batu Kosong M3
7.10.(3) a. Bronjong dengan kawat yang dilapisi galvanis M3
7.10.(3) b.
Bronjong dengan kawat yang dilapisi PVC M3
7.10.(3) c. Tambahan Biaya untuk Anyaman Penulangan Tanah dengan Kawat yang Dilapisi PVC M2
7.11.(1) a.
Expansion Joint Tipe Asphaltic Plug, Fixed M1
7.11.(1) b.
Expansion Joint Tipe Asphaltic Plug, Moveable M1
7.11.(2) Expansion Joint Tipe Rubber 1 M1
7.11.(3)
Expansion Joint Tipe Rubber 2 M1
7.11.(4)
Expansion Joint Tipe Rubber 2 M1
7.11.(5) Joint Filler untuk Sambungan Konstruksi M1
7.11.(6)
Expansion Joint Tipe Baja Bersudut M1
7.11.(7) Expansion Joint Tipe Modular Lebar …… M1
7.12.(1a)
Perletakan Logam Tipe Fixed 150 Ton buah
7.12.(1b)
Perletakan Logam Tipe Moveable 150 Ton buah
7.12.(1c)
Perletakan Logam Tipe ….. buah
7.12.(2)
Perletakan Elastomerik Alam Ukuran ……mm x ……. mm x ……. mm buah
7.12.(3) Perletakan Elastomerik Sintetis Ukuran ……mm x ……. mm x ……. mm buah
7.12.(4)
Perletakan Strip M1
7.13.(1)
Sandaran (Railing) M1
7.14.(1)
Papan Nama Jembatan buah
7.15.(1)
Pembongkaran Pasangan Batu M3
7.15.(2)
Pembongkaran Beton M3
7.15.(3) Pembongkaran Beton Pratekan M3
7.15.(4)
Pembongkaran Bangunan Gedung M2
7.15.(5)
Pembongkaran Rangka Baja M2
7.15.(6)
Pembongkaran Balok Baja (Steel Stringers) M'
7.15.(7)
Pembongkaran Lantai Jembatan Kayu M2
7.15.(8)
Pembongkaran Jembatan Kayu M2
7.15.(9)
Pengangkutan Hasil Bongkaran yang melebihi 5 km M3 per Km
7.16.(1)
Deck drain Unit
7.16.(2).a
Pipa Drainase Baja diameter 75 mm M'
7.16.(2).b
Pipa Drainase Baja diameter ….. mm M'
7.16.(3).a
Pipa Drainase PVC diameter 75 mm M'
7.16.(3).a
Pipa Drainase PVC diameter …. mm M'
7.16.(4)
Pipa Penyalur PVC M'
Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
Jumlah Harga Pekerjaan DIVISI 9 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
10.1 (3) Pemeliharaan Rutin Selokan, Saluran Air, Galian dan Timbunan
1. Pembersihan dan pembuangan lumpur pada selokan samping diperkeras. M' 0.00
2. Pemotongan rumput / semak pada ruang manfaat jalan. M2 0.00 ( x 3 putaran selama pelaksanaan)
3. Pembersihan dan pembuangan lumpur pada gorong - gorong / box culvert. M' 0.00
NOMOR RUAS : RUAS JALAN : Sumbawa Besar - Semongkat - Batu Dulang DARI 02+000 02+200 02+400 02+600 02+800 07+500 07+700 07+900 08+100 08+500
TIPE PERKERASAN JALAN Perkerasan Lentur (Aspal) / Perkerasan Kaku (Beton) Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal
TIPE BAHU JALAN ( Agregat Kelas S / Beton K-175 ) Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S
RM - PEMELIHARAAN RUTIN
Baja Tulangan kg
CATATAN :
FORMULIR SURVEY 03 KONDISI BANGUNAN PELENGKAP & ROAD SAFETY HAL : 1 /
NOMOR RUAS : RUAS JALAN : Sumbawa Besar - Semongkat - Batu Dulang DARI 09+100 09+500 09+700 09+900 10+100 10+300 10+500 10+700 11+100 11+300
TIPE PERKERASAN JALAN Perkerasan Lentur (Aspal) / Perkerasan Kaku (Beton) Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal
TIPE BAHU JALAN ( Agregat Kelas S / Beton K-175 ) Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S
RM - PEMELIHARAAN RUTIN
Baja Tulangan kg
CATATAN :
FORMULIR SURVEY 03 KONDISI BANGUNAN PELENGKAP & ROAD SAFETY HAL : 1 /
NOMOR RUAS : RUAS JALAN : Sumbawa Besar - Semongkat - Batu Dulang DARI 11+500 11+700 11+900 12+100 12+300 12+500 12+700 12+900 13+100 13+300
TIPE PERKERASAN JALAN Perkerasan Lentur (Aspal) / Perkerasan Kaku (Beton) Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal
TIPE BAHU JALAN ( Agregat Kelas S / Beton K-175 ) Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S
RM - PEMELIHARAAN RUTIN
Baja Tulangan kg
CATATAN :
FORMULIR SURVEY 03 KONDISI BANGUNAN PELENGKAP & ROAD SAFETY HAL : 1 /
NOMOR RUAS : RUAS JALAN : Sumbawa Besar - Semongkat - Batu Dulang DARI 13+500 14+100 14+700 15+300 15+500 16+600 17+200 19+200 19+400 19+600
TIPE PERKERASAN JALAN Perkerasan Lentur (Aspal) / Perkerasan Kaku (Beton) Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal
TIPE BAHU JALAN ( Agregat Kelas S / Beton K-175 ) Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S
RM - PEMELIHARAAN RUTIN
Baja Tulangan kg
CATATAN :
FORMULIR SURVEY 03 KONDISI BANGUNAN PELENGKAP & ROAD SAFETY HAL : 1 /
NOMOR RUAS : RUAS JALAN : Sumbawa Besar - Semongkat - Batu Dulang DARI 19+800 20+000 20+200 20+600 21+000 21+200 21+400 21+600 21+800 22+000
TIPE PERKERASAN JALAN Perkerasan Lentur (Aspal) / Perkerasan Kaku (Beton) Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal
TIPE BAHU JALAN ( Agregat Kelas S / Beton K-175 ) Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S
RM - PEMELIHARAAN RUTIN
Baja Tulangan kg
CATATAN :
360
420
FORMULIR SURVEY 02 KONDISI DI LUAR PERKERASAN (BAHU JALAN, SALURAN, TPT) HAL : 1 / KANAN
NOMOR RUAS : RUAS JALAN : Batauga - Sampolawa DARI 00+000 00+200 00+400 00+600 00+800 01+000 01+200 01+400 01+600 01+800
SATUAN
KOORDINAT GIS KM AWAL : KE 00+200 00+400 00+600 00+800 01+000 01+200 01+400 01+600 01+800 02+000
TIPE PERKERASAN JALAN Perkerasan Lentur (Aspal) / Perkerasan Kaku (Beton) Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal Aspal
LEBAR PERKERASAN JALAN m 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5
TIPE BAHU JALAN ( Agregat Kelas S / Beton K-175 ) Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S Kelas S
LEBAR BAHU JALAN m 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
RM - PEMELIHARAAN RUTIN
BAHU JALAN
Pemotongan Rumput / Semak pada RUMAJA m2 1x200 1x200 1x200 1x200 1x200 1x50 1x200 10.1.(3).2
SALURAN Pembersihan dan Pembuangan Lumpur pada Saluran Samping Diperkeras m' 50 50 40 100 10.1.(3).1
Galian untuk Bahu Jalan (bahu jalan lebih tinggi dari permukaan aspal) m3 1x25x0.1 1x25x0.1 8.2.(1)
BAHU JALAN Pengisian Bahu Jalan dengan Agregat Kelas S m3 1x50x0.1 4.2.(2b)
Betok K-175 untuk Bahu Jalan m3 1x25x0.15 1x50x0.15 1x20x0.15 1x10x0.15 7.1.(8)
Galian untuk Selokan Drainase dan Saluran Air m3 0.49x200 0.99x200 0.99x50 0.99x200 0.49x50 2.1.(1)
SALURAN
Pasangan Batu untuk Tembok Penahan Tanah m3 H2 / L10 H2 / L15 H3 / L15 7.9.(1)
Timbunan Pilihan (backfill) dari Sumber Galian m3 2x0.5x10 2x0.5x15 3x0.5x15 3.2.(2a)
CATATAN :