FORMAT F5

SUMMARY : COST ESTIMATE

Name of Road : Anipur - Dullavcheera PMGSY Road to Mukamcherra Pt III


Package No: AS-13-187 District : Karimganj
Road Length (Km) : 1.486 Block : Dullavcherra

Sl. Rate Amount


DESCRIPTION OF ITEM Qty Unit Remarks
No. (Rs.) (Rs. in Lakhs)
A. Pavement
Earth work in filling in embankment #REF! Cum #REF!
Earth work in Subgrade & Shoulders #REF! Cum #REF!
Earth work in filling with Borrow Soil #REF! Cum #REF!
Earth work in cutting #REF! Cum #REF!
Compacting Original Ground #REF! Cum #REF!
Clearing, Grubing & Trees Cutting #REF! #REF! #REF!
Turfing with Sods #REF! Sqm #REF!
GSB #REF! Cum #REF!
WBM G2 #REF! Cum #REF!
WBM G3 #REF! Cum #REF!
Prime Coat #REF! Sqm #REF!
Tack Coat #REF! Sqm #REF!
PMC #REF! Sqm #REF!
Seal Coat #REF! Sqm #REF!
Trapezoidal RCC Side Drain (Pucca) 0.00 m #REF!
Surface Drain #REF! m #REF!
Passing Place 0 Nos. 0.00
Road Furniture & Road Safety #REF! Km #REF!
Total #REF! #REF!
B Protection Work
1.50m Retaining Wall 0.00 m 0.00
3.00m Retaining Wall 0.00 m 0.00
1.80m Gabion Wall 0.00 m 0.00
2.50m Breast Wall 0.00 m 0.00
0.00 Total 0.00 #REF!
C CD & Minor Bridge
Dismantling of Existing Culvert 0 Nos. 0.00
HP Culvert (1x1000)mm dia #REF! Nos. #REF!
HP Culvert (1x1000)mm dia with Chute 0 Nos. 0.00
Slab Culvert 1.50m 0 Nos. 0.00
Box Cell Culvert (1 x 2.00m x 2.00m) #REF! Nos. #REF!
Box Cell Culvert (1 x 3.00m x 3.00m) 0 Nos. #REF!
Box Cell Culvert (1 x 5.00m x 5.00m) #REF! Nos. 0.00
Box Cell Culvert (2 x 3.00m x 3.00m) 0 Nos. #REF!
Box Cell Culvert (2 x 5.00m x 5.00m) 0 Nos. #REF!
Box Cell Culvert (3 x 3.00m x 3.00m) 0 Nos. #REF!
Box Cell Culvert (3 x 4.00m x 4.00m) 0 Nos. #REF!
Box Cell Culvert (3 x 5.00m x 5.00m) 0 Nos. #REF!
Slab Culvert 3.00m 0 Nos. 0.00
Slab Culvert 4.00m 0 Nos. 0.00
Slab Culvert 6.00m 0 Nos. 0.00
10.00 m span RCC Bridge 0 Nos. 0.00
15.00 m span RCC Bridge 0 Nos. 0.00
#REF! Total #REF! #REF!
Total cost of Road works, CD works upto 15.00 m Span, Protection works Rs. : #REF!
D Long Span Bridges / Causeways
Long Span Bridge (1x21.75m) 0 0.00
0 Total 0.00
F Cost for DPR Preparation @ 16,500/Km #REF! Km #REF!
Total (Construction Cost) (i) + (F) = Rs. : #REF!
G Cost of Maintenance for 5 years #REF!
H Utility Shifting #REF! Nos. #REF!
Gross Total Cost = Rs. : #REF!
STATEMENT NO : 6

Name of Road : #REF!


Package No. : #REF! District : #REF!

Block : #REF!
State : Assam

Quantity of Single Side Surface Drain

Chainage Deduct
Deduct
Sl. Length of Length
Item Description Unit Length of Remarks
No. Trapezoidal (m)
From To CDs
Side Drain

1 3.19 (i) Surface Drains in Soil meter


(A) Construction of
unlined surface drains
of average cross-
sectional area 0.40
sqm in soil to specified
lines, grades, levels
and dimensions.
Excavated material to
be used in
embankment with a lift
upto 3m and lead of 50
m (average lead 25 m)
as per Technical
Specification Clause
307.
Manual Means

Total in m 0.00
2 3.19 (ii) Surface Drains in meter 0.00
(A) Ordinary Rock
Manual Means
Less for Embankment
Area Total in m 0.00
3 3.19 (iii) Surface Drains in Hard meter
Rock
STATEMENT NO : 9

Trapezoidal - Shaped PCC Side Drain

Name of Road : #REF!


Package No. : #REF! District : #REF!

Road Length : #REF! Km Block : #REF!


State : Assam

Chainage Deduct
Length
Sl. No. Description Unit Length Remarks
From To (m)
of CDs
1 PCC Side Drain 0.00
Concept : 0.00
0.00

meter

TOTAL in m : 0.00
Name of Road : #REF!
Package No. : #REF!
Road Length (Km): #REF!
Block : #REF!
District : #REF!

STATEMENT NO : 12

QNTY. STATEMENT FOR TURFING WITH SODS

Chainage in m Average Slope Length (m) Deduct


Distance Area
length of
in m in Sqm
From To LHS RHS Total CD & RW

Total Qnty. = 0.00 Sqm


ABSTRACT OF BREAST WALL, GABION WALL & RETAINING WALL

Name of Road : #REF!


Package No : #REF! District : #REF!
State : Assam Block : ###
Road Length (Km) : ###

PROVISION OF GABION WALL WITH BOULDER CRATES


Location of Gabion Wall - Positioning
Length of
Location Chainage Gabion Wall
Sl.
Positioning in m
No.
From To Ht : 1.80m

Total in Gross
0.00
Rm. Total
Estimated Cost as per Cost Estimate
0.00
(Attached) (Rs.)

Total Estimated Cost for Breast Wall


0.00
(Rs.)
PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY)
(Ministry of rural Development ,Govt of India)
Cost Estimate for Protective Works
Type of Protective works : Retaining Wall Height = 1.50 m

Name of Road : #REF! District : #REF!


Package No: #REF! State : Assam Block : #REF!

Area Rate
Sl SOR/MORD Length As per Total
Item Description Breadth Height Qty Unit
No. REF NO (M) SOR, Amount (Rs.)
(M) (M)
2016-17
1 2 3 4 5 6 7 8 9 10

Excavation for Structures


Earthwork in excavation for structures as per drawing
and technical specifications Clause 305.1 including
setting out, construction of shoring and bracing,
removal of stumps and other deleterious material and
1 11.1 / I disposal upto a lead of 50 m, dressing of sides and
bottom and backfilling in trenches with excavated
suitable material.
Upto 3 m depth

Ordinary soil 0.00 1.20 0.50 0.000 Cum 71.00 0.00

Providing concrete for plain/reinforced concrete in


open foundations complete as per drawings and
technical specifications Clause 802, 803, 1202 & 1203
2 11.4 / A / I P.C.C grade M 10
Nominal mix 1:3:6

Wall Base 0.00 0.240 0.000 Cum 5299.00 0.00

Plain/reinforced cement concrete in substructure


complete as per drawings and technical specification
12.5 / A / II Clauses 802, 804, 805, 806, 807, 1202 ans 1204 (Ref Quantity
3
(i) Caculation given
below)
P.C.C. grade M 20
0.00 0.776 0.000 Cum 6369.00 0.00
(i) Nominal mix (1:2:4)
Backfilling behind abutment, wing wall and return wall
complete as per drawings & technical specification
4 12.10 (I) Clause 1204.3.8 (Ref Appendix : B for
Back Fill)
(I) Granular material 0.00 0.301 0.000 Cum 815.00 0.00

Providing weepholes in brick masonry/stone masonry,


plain/reinforced concrete abutment, wing wall, return
wall with 100 mm dia AC pipe extending through the @
5 12.9 full width of the structures with slope of 1(V):20(H)
0.00
1.20
0 Each 182.00 0.00
towards drawing face complete as per drawing and
technical specification Clauses 614, 709, 1204.3.7

Total Rs. 0.00


Say Rs. 0.00
0.30

Granular Materials
Filling

1.20 1.20
1.50 4:1
E C

1:1
0.30 B 4:1
A D
0.20 F

0.15 0.30 0.30 0.30 0.15

1.20

Area = A+B+C+D+E :
= (21X0.30X0.30) + (0.30X 0.30) + (0.30X1.50) + (21X0.30X1.20) + (21X0.075X0.30)
= 0.045 + 0.09 + 0.45 + 0.18 + 0.011
= 0.776 Sqm
(F) PCC Area = 0.24 Sqm
PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY)
(Ministry of rural Development ,Govt of India)
Cost Estimate for Protective Works
Type of Protective works : Retaining Wall Height = 3.00 m

Name of Road : #REF! District : #REF!


Package No: #REF! State : Assam Block : #REF!

Area Rate
Sl SOR/MORD Length As per Total
Item Description Breadth Height Qty Unit
No. REF NO (M) SOR, Amount (Rs.)
(M) (M)
2016-17
1 2 3 4 5 6 7 8 9 10

Excavation for Structures


Earthwork in excavation for structures as per drawing
and technical specifications Clause 305.1 including
setting out, construction of shoring and bracing,
removal of stumps and other deleterious material and
1 11.1 / I disposal upto a lead of 50 m, dressing of sides and
bottom and backfilling in trenches with excavated
suitable material.
Upto 3 m depth

Ordinary soil 0.00 2.85 0.90 0.000 Cum 71.00 0.00

Providing concrete for plain/reinforced concrete in


open foundations complete as per drawings and
technical specifications Clause 802, 803, 1202 & 1203
2 11.4 / A / I P.C.C grade M 10
Nominal mix 1:3:6

Wall Base 0.00 0.675 0.000 Cum 5299.00 0.00

Plain/reinforced cement concrete in substructure


complete as per drawings and technical specification
12.5 / A / II Clauses 802, 804, 805, 806, 807, 1202 ans 1204 (Ref Quantity
3
(i) Caculation given
below)
P.C.C. grade M 20
0.00 3.098 0.000 Cum 6369.00 0.00
(i) Nominal mix (1:2:4)
Backfilling behind abutment, wing wall and return wall
complete as per drawings & technical specification
4 12.10 (I) Clause 1204.3.8 (Ref Appendix : B for
Back Fill)
(I) Granular material 0.00 0.538 0.000 Cum 815.00 0.00

Providing weepholes in brick masonry/stone masonry,


plain/reinforced concrete abutment, wing wall, return
wall with 100 mm dia AC pipe extending through the @
5 12.9 full width of the structures with slope of 1(V):20(H)
0.00
1.20
0 Each 182.00 0.00
towards drawing face complete as per drawing and
technical specification Clauses 614, 709, 1204.3.7

Total Rs. 0.00


Say Rs. 0.00
0.60

Granular Material filling


2.40 2.50
3.00
E C

0.60
A B D
F 0.30

0.15 0.60 0.60 0.60 0.15


2.25

Retaining Wall of Height 3.00 m


Area =A+B+C+D+E
=(21X0.60X0.60)+(0.60X0.60)+(0.6X3.00)+(21X0.15X0.50)+(21X0.60X2.40)
=0.18+0.36+1.80+0.038+0.72
=3.098 Sqm
(F) P.C.C Area = 0.675 Sqm
Name of Road : #REF! District : #REF!
Package No: #REF! Block : #REF!

CALCULATION FOR BREAST WALL 2.50m HEIGHT

 

 
 

  

      
           

 

     
  

  
  
          
          

184
          
          
Sl. Ref. to
Description A/U Nos. Length Width Depth Quantity Rate Amount
No. SoR
F SLOPE PROTECTION WORKS
1 11.1 / I Excavation for Structures
Earthwork in excavation for structures as per drawing and technical
specifications Clause 305.1 including setting out, construction of
shoring and bracing, removal of stumps and other deleterious
material and disposal upto a lead of 50 m, dressing of sides and
bottom and backfilling in trenches with excavated suitable material.
Upto 3 m depth

Total Volume of Earthwork in Excavation cum 1.0 0.00 1.60 0.90 0.00 71.00 0.00
2 11.4 / A / I Providing concrete for plain/reinforced concrete in open foundations
complete as per drawings and technical specifications Clause 802,
803, 1202 & 1203
cum 1.00 0.00 1.60 0.15 0.00 5299.00 0.00
P.C.C grade M 10
Nominal mix 1:3:6

3 12.5 / A / II Plain/reinforced cement concrete in substructure complete as per cum


(i) drawings and technical specification Clauses 802, 804, 805, 806,
807, 1202 ans 1204 (for coping on top of the Breast Wall)
A PCC Grade M 20
(p) Height upto 5m cum 1 0.00 0.60 0.075 0.00 6369.00 0.00
4 12.4 / III Stone masonry in cement mortar for substructure complete as per
drawing & technical specification Clauses 702, 704, 1202 and 1204
III) Random Rubble Masonry
In 1:4 cement mortar

(d)
Lower triangular part cum 1 0.00 Area= 0.20 0.00
Upper trapezoidal part cum 1 0.00 0.895 2.50 0.00
0.00 3207.00 0.00
5 12.10 Backfilling behind abutment, wing wall and return wall complete as
per drawings & technical specification Clause 1204.3.8

I Granular material cum 1 0.00 0.30 2.00 0.00 815.00 0.00


Therefore, Cost of Breast Wall 2.50m high= Rs. 0.00

185
FORMAT F-7
PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY)
COST ESTIMATE FOR ROADS CONSTRUCTION OF CROSS DRAINAGE WORKS

Road From : #REF!


District : #REF! Package No : #REF!
Block : #REF!
Type of Cross Drainage Works : Dismantle of Existing HP Culvert & Slab Culvert

SOR / Rate (Rs.)


Total
Sl MORD L B D
Item Description No. Qnty. Unit As per Amount
No. REF (m) (m) (m)
SOR (Rs.)
NO
2016-17
1 2 3 4 5 6 7 8 9 10 13
Dismantle of Existing Slab Culvert at different chainges.

Dismantling of existing structure


Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete,
wood work, steel work, including T&P and
scaffolding wherever necessary, sorting the
1 2.5/I
dismantled material, disposal of unserviceable
material and stacking the serviceable material
with all lifts and lead of 1000 m as per
Technical Specification Clause 202.
Manual Means
(B) Cement Concrete

PCC below Abutment 2 1.87 3.40 0.20 2.54


PCC below Return wall 0 1.25 1.00 0.20 0.00
c) CC In Flooring 1 1.00 3.40 0.10 0.34

2.88 Cum 291.00 838.08


( C) Reinforced cement concrete
Abutment cap 2 0.70 3.40 0.20 0.95
Dirt wall 2 3.40 0.40 0.20 0.54
Deck slab 1 1.07 3.40 0.20 0.73
End Pillar
2.22 Cum 716.00 1589.52

Dismantling Stone Masonry as per Technical


Specification Clause 202.
Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
2 2.7 comprising of stone masonry, including
disposal of unserviceable material and
stacking the serviceable material with all lift
and lead of 1000 m as per Technical
Specification Clause 202.

(B) Rubble Stone Masonry in Cement Mortar


Abutment 2 3.40 0.85 1.80 10.40
Return wall 0 1.25 0.85 1.80 0.00

10.40 Cum 159.00 1653.60


Cost for Each Dismantle of Existing Slab Culvert Rs. 4081.20
0 Nos. of dismantle for Existing Slab Culvert Rs. 0
SOR / Rate (Rs.)
Total
Sl MORD L B D
Item Description No. Qnty. Unit As per Amount
No. REF (m) (m) (m)
SOR (Rs.)
NO
2016-17
1 2 3 4 5 6 7 8 9 10 13
Dismantle of Existing HP Culvert at different chainges.

Dismantle of existing structure


Dismantling of existing structures like culverts,
bridges, retaining walls and other structure
comprising of masonry, cement concrete,
wood work, steel work, including T&P and
scaffolding wherever necessary, sorting the
1 2.5/I
dismantled material, disposal of unserviceable
material and stacking the serviceable material
with all lifts and lead of 1000 m as per
Technical Specification Clause 202.
Manual Means
(B) Cement Concrete

PCC Bed below Head wall 2 4.00 1.20 0.10 0.96

0.96 Cum 291.00 279.36

Dismantling Brick/Tile Work


Dismantling of existing structures like culverts,
bridges, retaining walls and other structures
2.6 comprising of brick masonry, including
2
(B) disposal of unserviceable material and
stacking the serviceable material with all lift
and lead of 1000 m as per Technical
Specification Clause 202.

(B) Cement mortar


Head wall 2 3.50 1.10 1.80 13.86

13.86 Cum 195.00 2702.70

Removing all types of Hume pipes and


2.13 stacking within a lead of 1000 m including
3
(B) Earthwork and Dismantling of Masonry Works
as per Technical Specification Clause 202.

Above 600 mm to 900 mm dia Hume pipe


HP Pipe 2 2.50 5.00

5.00 Rm 147.00 735.00


Total Rs. 3717.06
0 Nos. of dismantle for Existing HP Culvert Rs. 0.00
FORMAT F-7
PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY)
COST ESTIMATE FOR ROADS CONSTRUCTION OF CROSS DRAINAGE WORKS

Road From : #REF! Package No : #REF!


District : #REF! Block : #REF!

Type of Cross Drainage Works : 1000 mm dia (Single row) H.P. Culvert with Catch Pit & Chute
(Overall width = 7.50 m)
Proposed Culvert : 0 Nos.

Rate

Breadth (M)
(Rs.)

Length (M)

Height (M)
SOR /
Total
Sl MORD
Item Description No Qty Unit Amount
No. REF As per (Rs.)
NO SOR
2016-17

1 2 3 4 5 6 7 8 9 10 11

Excavation for Structures


Earthwork in excavation for foundation of
structures upto 3 m depth as per drawing
and technical specification Clause 1104
includding setting out, construction of shoring
and bracing, removal of stumps and other
deleterious matter, dressing of sides and
bottom and backfilling with approved
1 9.1 material.

U/S Head wall 1 5.10 2.170 1.25 13.83 Cum


D/S Head wall 1 5.10 2.412 1.30 15.99 Cum
Bedding 1 3.05 1.740 0.15 0.80 Cum
U/S Catch Pit 1 3.40 2.000 1.40 9.52 Cum
Base of D/S Chute & Side wall 1 3.20 2.100 0.30 2.02 Cum
Total 42.16 Cum 71.00 2993.36

Plain cement Concrete M10 (1:3:6


Nominal mix) in leveling course below
open foundation of Head walls as per
drawings & Technical Specification
Clause 1109
2 9.7 Below U/S Head wall 1 4.70 1.570 0.15 1.11 Cum
Below D/S Head wall 1 4.70 1.812 0.15 1.28 Cum
U/S Catch Pit PCC Base 1 2.80 1.400 0.15 0.59 Cum
Base of Side wall & D/S Chute 1 2.80 1.500 0.15 0.63 Cum
Total 3.61 Cum 5299.00 19129.39

Type B (First Class) Bedding


Laying (First Class) bedding on well
compacted sand, moorum or approved
9.2 (ii) granular material as per Clause 1105
3
(i)
Bedding 1 6.25 1.74 0.45 4.89 Cum
Deduct for embedded portion 1 6.25 0.2078 -1.30 Cum
Total 3.59 Cum 969.00 3478.71

Providing and Laying Reinforced


Cement Concrete Pipe NP3 as per
design in Single Row Providing and
4 9.3 (B) laying reinforced cement concrete pipe
NP3 for culverts on first class bedding
(B) 1000 mm dia
Pipe 3 2.50 7.50 Rm 6235.00 46762.50
Rate

Breadth (M)
(Rs.)

Length (M)

Height (M)
SOR /
Total
Sl MORD
Item Description No Qty Unit Amount
No. REF As per (Rs.)
NO SOR
2016-17

1 2 3 4 5 6 7 8 9 10 11

Providing concrete for plain/reinforced


concrete in open foundations complete
as per drawings and technical
11.4 / specifications Clause 802, 803, 1202 &
5 B / III) 1203

U/S Head wall below bed 1 4.50 1.204 1.100 5.96 Cum
D/S Head wall below bed 1 4.50 1.325 1.800 10.73 Cum
Deduct CC Bedding 2 1.74 1.098 0.150 -0.57 Cum
Total 16.12 Cum 5917.00 95382.04

Plain/reinforced cement concrete in


substructure complete as per drawings
and technical specification Clauses 802,
804, 805, 806, 807, 1202 ans 1204
12.5 /
6 U/S Head wall 1 4.50 0.734 2.10 6.93 Cum
B / III
D/S Head wall 1 4.50 0.734 2.10 6.93 Cum
Parapet wall 4 1.35 0.40 0.60 1.30 Cum
Deduct for pipe 2 0.885 1.131 -2.00 Cum
Deduct for Bedding embedded portion 2 1.022 0.314 -0.64 Cum
Total 12.52 Cum 6596.00 82581.92

Providing and laying of dry rubble flooring


complete as per drawings and technical
specifications Clause 1303.3

7 14.8
D/S Chute (step-1) 1 2.60 1.40 0.45 1.64 Cum
D/S Chute (step-2) 1 2.60 0.70 0.45 0.82 Cum
U/S Catch Pit 1 2.80 1.40 0.150 0.59 Cum
D/S Chute Bottom Soling 1 2.80 1.50 0.150 0.63 Cum
Total 3.68 Cum 1378.00 5071.04

Stone masonry in cement mortar for


substructure complete as per drawing &
technical specification Clauses 702, 704,
1202 and 1204
12.4 / Random rubble masonry
8
III In cement mortar (1:3)

Side wall of D/S Chute (Top) 2 1.13 0.30 0.450 0.31 Cum
Side wall of D/S Chute (Bottom) 2 0.70 0.30 0.450 0.19 Cum
Total 0.50 Cum 3512.00 1756.00

Stone masonry in cement mortar for


substructure complete as per drawing &
technical specification Clauses 702, 704,
1202 and 1204
9 12.4 / I Coursed rubble masonry (1st sort)

U/S Catch Pit Long Wall 1 2.60 1.10 0.300 0.86 Cum
U/S Catch Pit Side Wall 2 1.00 1.10 0.300 0.66 Cum
Total 1.52 Cum 4081.00 6203.12
Rate

Breadth (M)
(Rs.)

Length (M)

Height (M)
SOR /
Total
Sl MORD
Item Description No Qty Unit Amount
No. REF As per (Rs.)
NO SOR
2016-17

1 2 3 4 5 6 7 8 9 10 11

Filling in foundation trenches as per drawing


and technical specification Clause 305.3.9
Sand filling
10 11.2(I)
U/S Head wall Foundation Trenche 1 4.50 0.229 0.850 0.88 Cum
D/S Head wall Foundation Trenche 1 4.50 0.350 1.650 2.60 Cum
Total 3.48 Cum 968.00 3368.64
Total=Rs. 266726.72
For each unit Say ~ Rs. 266726.72
Total Cost for 0 Nos. of 1.00m HP Culvert (Catch Pit & Chute) Rs. 0.00

Asstt. Executive Engineer PWD


Silchar Rural Road Sub-Division-II
Silchar
FORMAT F-7
PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY)
COST ESTIMATE FOR ROADS CONSTRUCTION OF CROSS DRAINAGE WORKS

Road From : #REF!


Block : #REF! Package No : #REF!
District : #REF!
Type of Cross Drainage Works : Slab Culvert 1.50m Span (Overall width = 6.00 m, Road Way Width = 5.10 m)
Proposed Slab Culvert 0 Nos.

Rate (Rs.)

B (m)

D (m)
L (m)
Sl Total Amount

No.
SOR No. Item Description Qnty. Unit As per
No. (Rs.)
SOR
2016-17
1 2 3 4 5 6 7 8 9 10 11

Earthwork in excavation for structures as per


drawing and technical specifications Clause 305.1
including setting out, construction of shoring and
bracing, removal of stumps and other deleterious
1 11.1 / I (i) material and disposal upto a lead of 50 m, dressing
of sides and bottom and backfilling in trenches with
excavated suitable material.

Ordinary soil upto 3 m depth Qnty. As Per


Statement : A 102.89 Cum 71.00 7305.19
Providing concrete for plain/reinforced concrete in
open foundations complete as per drawings and
2 11.4 / A / I technical specifications Clause 802, 803, 1202 &
1203 Qnty. As Per
Nominal mix 1:3:6 [Hand Mixing] Statement : A 9.91 Cum 5284.00 52364.44

Providing concrete for plain / reinforced concrete in


foundations complete as per drawings and
11.4 / A / technical specifications Clauses 802, 803, 1202 &
3
III 1203
PCC Grade M 20
Qnty. As Per
Nominial mix (1:2:4) (Hand mixed)
Statement : A 33.62 Cum 6007.00 201955.34
Providing concrete for plain / reinforced concrete in
substructure complete as per drawings and
12.5 / A / II technical specifications Clauses 802, 804, 805,
4
(i) 806, 1202 & 1204
PCC Grade M 20 Qnty. As Per
Nominial mix (1:2:4) Statement : A 23.04 Cum 6369.00 146741.76

Providing weepholes in brick masonry/stone


masonry, plain/reinforced concrete abutment, wing
wall, return wall with 100 mm dia AC pipe extending
5 12.9 through the full width of the structures with slope of
1(V):20(H) towards drawing face complete as per
drawing and technical specification Clauses 614,
709, 1204.3.7 Qnty. As Per
Statement : A 6 Nos 182.00 1092.00

Providing and laying reinforced cement concrete in


superstructure as per drawing and technical
13.1 / A / specifications Clauses 800, 1205.4 and 1205.5.
6
III (a) R.C.C grade M 20
RCC Grade M 20 Qnty. As Per
Nominal Mix 1 : 2 : 4 Statement : A 6.18 Cum 7025.00 43414.50
Providing PCC M-20 architectural coping on the top
of wing wall, return wall etc. complete as per
7 12.13 (i)
drawing and technical specification Clauses 615, Qnty. As Per
710 and 1204.3.11 Statement : A 13.40 Rm 413.00 5534.20
Supplying, fitting and placing TMT bar
reinforcement (Fe 415) in substructrue complete as
8 12.7
per drawings and technical specification Clauses
1002, 1005, 1010 & 1202 Qnty. As Per
Statement : A 0.124 MT 65583.00 8132.29
Supplying, fitting, and placing TMT bar
reinforcement in superstructure complete as per
9 13.3
drawing and technical specifications Clauses 1002, Qnty. As Per
1010 and 1202 Statement : A 0.224 MT 66360.00 14864.64

Providing and laying filter media with granular


crushed aggregates as per specification to a
thickness of not less than 600 mm with smaller
size towards the soil and bigger size towards the
10 12.11 wall and providing over the entire surface behind
abutment, wing wall, return wall to the full height,
compacted to firm condition complete as per
drawing and technical specification Clause
1204.3.8 Qnty. As Per
Statement : A 6.13 Cum 1452.00 8900.76

Providing and laying curtain walls complete as per


11 14.9 / III drawing and technical specification Clause 1304
Cement concrete grade M 10 Qnty. As Per
Statement : A 0.34 Cum 5034.00 1711.56
Fillling in foundation trenches as per drawing and
12 11.2 (I) technical specification Clause 305.3.9 Qnty. As Per
Sand filling Statement : A 1.08 Cum 968.00 1045.44
Providing and fixing in position 20 mm thick
premoulded joint filler in expansion joint for fixed
Qnty. As Per
13 13.16 (III) ends of simply supported spans, covered with
Statement : A
sealant complete as per drawing and technical
specifications 24.00 Rm 285.00 6840.00
Total=Rs. 499902.12
Cost of 1.50m Slab Culvert Each Unit Say ~ Rs. 499902.00
For 0 Nos = Rs. 0.00

Asstt. Executive Engineer PWD


Patharkandi Rural Road Subdivision
Patharkandi
Statement : A

Item : Slab Culvert (As per IRC SP-20-2002) , 1.5 mtr. span,
I. ABUTMENT & WING WALL
1 Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other
deleterious material and disposal upto a lead of 50 m, dressing of side

a) Abutment = 2 x 2.740 x 6.500 x 1.600 = 56.99 Cum


b) Wing wall = 4 x 3.750 x 1.700 x 1.800 = 45.90 Cum
(T) 102.89 Cum

2 Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
Nominal mix 1:3:6 [Hand Mixing]
a) Abutment = 2 x 2.140 x 6.20 x 0.200 = 5.31 Cum
b) Wing wall = 4 x 3.450 x 1.10 x 0.200 = 3.04 Cum
a) CC In Flooring = 1 x 6.000 x 1.30 x 0.200 = 1.56 Cum
(T) 9.91 Cum
3 Providing concrete for plain / reinforced concrete in foundations complete as per drawings and technical specifications Clauses 802, 803, 1202 & 1203
PCC Grade M 20
Nominial mix (1:2:4) (Hand mixed)

a) Abutment
= 2 x 1.64 x 5.40 x 1.40 = 24.80 Cum
b) Return wall
= 4 x 3.15 x 0.700 x 1.00 = 8.82 Cum
Therefore, total volume : 33.62 Cum

4 Providing concrete for plain / reinforced concrete in substructure complete as per drawings and technical specifications Clauses 802, 804, 805, 806, 1202 & 1204
PCC Grade M 20
Nominial mix (1:2:4)
a) Abutment = 2 x( 0.70 + 1.14 )/2 x 1.320 x 6.000 = 14.57 Cum
b) Wing wall = 4 x( 0.40 + 0.40 )/2 x 1.580 x 3.350 = 8.47 Cum
(T) 23.04 Cum

163
Statement : A

Item : Slab Culvert (As per IRC SP-20-2002) , 1.5 mtr. span,

5 Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the
structures with slope of 1(V):20(H) towards drawing face complete as per drawing
(ii) cement mortar (1:4)

a) Abutment = 2 x 1 = 2 Nos
b) Wing wall = 4 x 1 = 4 Nos
(T) 6 Nos
II SUPERSTRUCTURE
6 Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5. R.C.C grade M 20
RCC Grade M 20
Nominal Mix 1 : 2 : 4
a) Abutment cap = 2 x 0.70 x 6.00 x 0.20 = 1.68 Cum
b) Dirt wall = 2 x 0.40 x 6.00 x 0.21 = 1.01 Cum
c) Deck slab = 1 x 2.10 x 6.00 x 0.21 = 2.65 Cum
d) End Piller = 2 x 0.40 x 0.40 x 0.60 = 0.19 Cum
Kerb over deck slab = 2 x 0.600 x( 0.30 + 0.45 )x 1/2 x 1.450 = 0.65 Cum
(T) 6.18 Cum

7 Providing PCC M-20 architectural coping on the top of wing wall, return wall etc. complete as per drawing and technical specification Clauses 615, 710 and 1204.3.11

For coping of return wall = 4 x 3.35 = 13.40 mtr

8 Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
AS PER ANNEXURE - R (T) 0.124 MT
9 Supplying, fitting, and placing TMT bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202

AS PER ANNEXURE - R (T) 0.224 MT


10 Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and
bigger size towards the wall and providing over the entire surface behind abutment, wing

(a) Abutment

(2)Back fill behind Abutment


= 2 x 1/2 x 0.600 x 1.320 x 0.450 = 0.36 Cum

(i) Cushion for Approach = 2 x 2.65 x 0.450 x 0.32 = 0.75 Cum


(b) Return Wall
(1) Back fill behind Wing wall
= 4 x 1/2 x 0.600 x 1.580 x 2.650 = 5.02 Cum

164
Statement : A

Item : Slab Culvert (As per IRC SP-20-2002) , 1.5 mtr. span,
(T) 6.13 Cum
III PROTECTION WORK
11 Providing and laying curtain walls complete as per drawing and technical specification Clause 1304
Cement concrete grade M 10
Side Protection = 2 x 1.200 x( 1.300 + 0.10 )x1/2 x 0.20 = 0.34 Cum
(T) 0.34 cum
12 Fillling in foundation trenches as per drawing and technical specification Clause 305.3.9 (i) Sand filling
Central Cavity Portion = 1 x ( 0.20 + 0.10 )x 1/2 1.20 x 6.00 = 1.08 cum

13 Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans, covered with sealant complete as per
drawing andslab
Below deck technical specifications
= 2 x 6.00 12.00 Rm
Between Slab & Dirt Wall 12.00
= 2 x 6.00 Rm
(T) 24.00 Rm

165
Annexure-R
REINFORCEMENT CALCULATION SHEET - [SLAB CULVERT-1.50m]

Length of
Sl Dia. Spacing Total length Wt. Total Wt. Wt.
Particular No each Bar
No. (mm) (m) (m) (kg/m) (kg/m) (MT)
(m)
A Abutment Cap & Dirt Wall
T 12 main bar at Bottom 12 2 3 6.14 36.82 0.89 32.66 0.033
T 10main bar at Top 10 2 4 6.14 49.09 0.62 30.24 0.030
T 8, @200 c/c at Abutment Cap 8 2 32 0.200 0.90 57.28 0.39 22.58 0.023
T 8, @200 c/c at Dirt Wall 8 2 32 0.200 1.52 96.56 0.39 38.07 0.038
Total 0.124 Ton

Length of
Sl Dia. Spacing Total length Wt. Total Wt. Wt.
Particular No each Bar
No. (mm) (m) (m) (kg/m) (kg/m) (MT)
(m)
A Deck Slab
T 12 mm @ 120 mm C/C (Bendup Top Bottom ) 12 1 62 0.120 1.80 111.84 0.89 99.21 0.099
Top Longitudional 10mm dia @ 300 mm C/C ( Top )-
Surface Steel 10 1 20 0.300 1.430 28.22 0.62 17.38 0.017

Top Traverse 10mm dia @ 300 mm C/C -Surface Steel


10 1 10 0.300 5.920 57.23 0.62 35.25 0.035
T 8, @160 c/c 8 2 14 0.160 6.14 167.21 0.39 65.92 0.066
Total 0.217 Ton
B End Pillar
T 12 mm - 4 Nos. 12 2 4 0.65 5.20 0.89 4.61 0.005
T 8 mm @ 200 mm C/C 8 1 4 0.200 1.42 5.13 0.39 2.02 0.002
Total 0.007 Ton
Total A+B = 0.224 Ton
FORMAT F-7
PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY)
COST ESTIMATE FOR ROADS CONSTRUCTION OF CROSS DRAINAGE WORKS

Road From : #REF! Package No : #REF!


Block : #REF! District : #REF!
Type of Cross Drainage Works : Single Cell Box culvert 3m x 3m (Overall width = 7.50 m, Road Way Width =
6.60 m)

Proposed Box Cell Culvert : 0 Nos.

Rate (Rs.)
Total

B (m)

D (m)
L (m)
Sl SOR

No.
Item Description Qnty. Unit As per SOR Amount
No. No.
2016-17 (Rs.)

1 2 3 4 5 6 7 8 9 10 11

Earthwork in excavation for structures as per


drawing and technical specifications Clause
305.1 including setting out, construction of
11.1 / shoring and bracing, removal of stumps and
1
I (i) other deleterious material and disposal upto
a lead of 50 m, dressing of side

Ordinary soil upto 3 m depth Qnty. As Per


Statement : 1C 91.38 Cum 71.00 6487.98

Providing concrete for plain/reinforced


concrete in open foundations complete as
11.4 /
2 per drawings and technical specifications
I(ii)
Clause 802, 803, 1202 & 1203
Nominal mix 1:3:6 [Hand Mixing] Qnty. As Per
Statement : 1C 8.41 Cum 5284.00 44438.44

Providing concrete for plain / reinforced


concrete in foundations complete as per
11.4 / drawings and technical specifications
3
A / III Clauses 802, 803, 1202 & 1203
PCC Grade M 20
Nominial mix (1:2:4) Qnty. As Per
Statement : 1C 16.64 Cum 6007.00 99956.48

Providing concrete for plain / reinforced


concrete in substructure complete as per
12.5 / drawings and technical specifications
4
II (i) Clauses 802, 804, 805, 806, 1202 & 1204
PCC Grade M 20
Nominial mix (1:2:4) Qnty. As Per
Statement : 1C 21.22 Cum 6369.00 135150.18

Providing weepholes in brick masonry/stone


masonry, plain/reinforced concrete abutment,
wing wall, return wall with 100 mm dia AC
5 12.9
pipe extending through the full width of the
structures with slope of 1(V):20(H) towards
drawing face complete as per drawing Qnty. As Per
Statement : 1C 20 Nos 182.00 3640.00

Providing and laying reinforced cement


13.1 / concrete in superstructure as per drawing
6 A / III and technical specifications Clauses 800,
(a) 1205.4 and 1205.5. R.C.C grade M 20
For design mix RCC M 20 Qnty. As Per
Statement : 1C 8.21 Cum 7025.00 57675.25
Rate (Rs.)
Total

B (m)

D (m)
L (m)
Sl SOR

No.
Item Description Qnty. Unit As per SOR Amount
No. No.
2016-17 (Rs.)

1 2 3 4 5 6 7 8 9 10 11

Providing PCC M-20 architectural coping on


the top of wing wall, return wall etc. complete
7 12.13
as per drawing and technical specification
Clauses 615, 710 and 1204.3.11 Qnty. As Per
Statement : 1C 4.00 Rm 413.00 1652.00

Supplying, fitting and placingTMT bar


reinforcement in foundation complete as per
8 11.8
drawings and technical specifications
Clauses 1000 and 1202 Qnty. As Per
Statement : 1C 0.812 MT 65489.00 53177.07

Supplying, fitting and placing TMT bar


reinforcement (Fe 415) in substructure
9 12.7 complete as per drawings and technical
specification Clauses 1002, 1005, 1010 &
1202 Qnty. As Per
Statement : 1C 2.199 MT 65583.00 144217.02

Supplying, fitting, and placing TMT bar


reinforcement in superstructure complete as
10 13.3
per drawing and technical specifications
Clauses 1002, 1010 and 1202 Qnty. As Per
Statement : 1C 0.021 MT 66360.00 1393.56

Providing and laying filter media with


granular crushed aggregates as per
specification to a thickness of not less than
11 12.11 600 mm with smaller size towards the soil
and bigger size towards the wall and
providing over the entire surface behind
abutment, wing Qnty. As Per
Statement : 1C 2.30 Cum 1452.00 3339.60

Providing concrete for plain/reinforced


concrete in open foundations complete as
11.4 /
12 per drawing and technical specification
IV
Clause 802, 803, & 1203
IV) R.C.C.grade M 20 Qnty. As Per
Statement : 1C 31.83 Cum 6297.00 200433.51

Construction of toe walls for protection of


slopes as per drawing and technical
14.11
13 specifications Clause 1302.5
/I
Random rubble masonry in case of stone
Qnty. As Per
pitching laid with cement mortar (1:5)
Statement : 1C 9.00 Cum 2876.00 25884.00

Providing and laying of dry rubble flooring


14 14.8 complete as per drawings and technical
Qnty. As Per
specifications Clause 1303.3
Statement : 1C 5.23 Cum 1378.00 7206.94

Filling in foundation trenches as per drawing


11.2
15 and technical specification Clause 305.3.9
(I) Qnty. As Per
Sand filling
Statement : 1C 28.42 Cum 968.00 27510.56
Analy
Prime Coat, Tack Coat, Premix Carpeting
16 sis Qnty. As Per
and Seal Coat (as a Wearing Coat)
Rate Statement : 1C 25.08 sqm #REF! #REF!
Total Rs. #REF!
Total Say ~ Rs. #REF!
Total Cost for 0 Nos. Single Cell Box culverts 3m x 3m Rs. #REF!
DETAILS OF MEASUREMENT

Item : Box culvert 3m x 3m (Single Cell) (As per IRC SP-20) , 3.80 mtr. span,
Statement : 1C

1 Earthwork in excavation
Box Cell = 2 x 7.400 x 0.300 x 0.300 = 1.33 Cum
Cutoff Wall Long = 2 x 6.800 x 0.900 x 1.650 = 20.20 Cum
Cutoff Wall Short = 2 x 3.800 x 0.900 x 1.650 = 11.29 Cum
Return wall = 4 x 1.600 x 2.687 x 1.600 = 27.51 Cum

D/S Appron
Toe Long Wall = 1 x 6.800 x 1.350 x 1.150 = 10.56 Cum
Toe Side Wall = 2 x 2.000 x 1.350 x 1.150 = 6.21 Cum

U/S Appron
Toe Long Wall = 1 x 6.800 x 1.350 x 1.150 = 10.56 Cum
Toe Side Wall = 2 x 1.200 x 1.350 x 1.150 = 3.73 Cum
(T) 91.38 Cum

2 Providing concrete for plain/reinforced concrete in open foundations


a) Below Raft of Box Cell = 1 x 6.800 x 3.80 x 0.100 = 2.58 Cum
b) Return wall = 4 x 2.087 x 1.00 x 0.200 = 1.67 Cum

Bottom of Cutoff Long Wall = 2 x 6.800 x 0.600 x 0.150 = 1.22 Cum


Bottom of Cutoff Short Wall = 2 x 3.800 x 0.600 x 0.150 = 0.68 Cum
Toe Long Wall = 2 x 6.800 x 0.750 x 0.150 = 1.53 Cum
Toe Side Wall = 2 x 2.000 x 0.750 x 0.150 = 0.45 Cum
Toe Side Wall = 2 x 1.200 x 0.750 x 0.150 = 0.27 Cum
(T) 8.41 Cum

169
DETAILS OF MEASUREMENT

Item : Box culvert 3m x 3m (Single Cell) (As per IRC SP-20) , 3.80 mtr. span,
3 Providing concrete for plain / reinforced concrete in foundations M 20

a) Box Wall Raft = 1 x 6.80 x 3.80 x 0.30 7.75 Cum


b) Return wall = 4 x 1.00 x 1.587 x 1.40 = 8.89 Cum
16.64 Cum

4 Providing concrete for plain / reinforced concrete in substructure M 20

a) Box Side Wall = 2 x 6.00 x 0.40 x 3.00 14.40 Cum


b) Box Mid Wall = 0 x 0.00 x 0.00 x 3.00 0.00 Cum
c) Return wall = 4 x( 0.45 + 1.09 )/2 x 1.00 x 2.22 = 6.82 Cum
(T) 21.22 Cum

5 Providing weepholes

b) Return wall = 4 x 5 = 20 Nos


(T) 20 Nos

6 Providing and laying reinforced cement concrete in superstructure RCC M 20

Deck slab = 1 x 6.00 x 3.80 x 0.30 = 6.84 Cum


Top Hunch = 2 x 6.00 x 0.15 x 0.15 x 1/2 = 0.14 Cum
End Piller = 4 x 0.40 x 0.40 x 0.60 = 0.38 Cum
RCC Kerb = 2 x 3.80 x 0.45 x 0.25 = 0.86 Cum
(T) 8.21 Cum

7 Providing PCC M-20 architectural coping on the top of wing wall, return wall etc.
For coping of return wall = 4 x 1.00 = 4.00 mtr

8 TMT bar reinforcement in foundation


Qty. As Per Annexure - R1C = (T) 0.812 MT

170
DETAILS OF MEASUREMENT

Item : Box culvert 3m x 3m (Single Cell) (As per IRC SP-20) , 3.80 mtr. span,
9 TMT bar reinforcement (Fe 415) in substructrue

Qty. As Per Annexure - R1C = (T) 2.199 MT


10 TMT bar reinforcement in superstructure

Qty. As Per Annexure - R1C = (T) 0.021 MT

11 Providing and laying filter material underneath pitching


D/S Appron
Filter material = 1 x 6.80 x 1.55 x 0.15 = 1.58 Cum

U/S Appron
Filter material = 1 x 6.80 x 0.70 x 0.15 = 0.71 Cum
(T) 2.30 Cum

12 Providing concrete for plain/reinforced concrete in open foundations M 20

Cutoff Long Wall = 2 x 6.80 x 0.30 x 1.50 = 6.12 Cum


Cutoff Short Wall = 2 x 3.80 x 0.30 x 1.50 = 3.42 Cum
RCC Raft = 1 x 6.80 x 3.80 x 0.30 = 7.75 Cum
End Wall = 2 x 6.00 x 0.40 x 3.00 = 14.40 Cum
Mid Wall = 0 x 0.00 x 0.00 x 3.00 = 0.00 Cum
Bottom Hunch = 2 x 6.00 x 0.15 x 0.15 x 1/2 = 0.14 Cum
(T) 31.83 Cum

13 Construction of toe walls for protection

D/S Appron
Toe Long Wall = 1 x 6.800 x 0.450 x 1.000 = 3.06 Cum
Toe Side Wall = 2 x 2.000 x 0.450 x 1.000 = 1.80 Cum

U/S Appron
Toe Long Wall = 1 x 6.800 x 0.450 x 1.000 = 3.06 Cum
Toe Side Wall = 2 x 1.200 x 0.450 x 1.000 = 1.08 Cum
(T) 9.00 Cum
171
DETAILS OF MEASUREMENT

Item : Box culvert 3m x 3m (Single Cell) (As per IRC SP-20) , 3.80 mtr. span,
14 Providing and laying of dry rubble flooring
D/S Appron
Over Filter material = 1 x 6.800 x 1.550 x 0.225 = 2.37 Cum
U/S Appron
Over Filter material = 1 x 6.800 x 0.700 x 0.600 = 2.86 Cum
(T) 5.23 cum

15 Filling in foundation trenches


Below PCC leveling Course = 1 x 6.800 x 3.800 x 1.100 = 28.42 Cum

16 Prime Coat, Tack Coat, Premix Carpeting and Seal Coat


= 1 x 3.800 x 6.600 = 25.08 Sqm

172
Annexure-R1C
REINFORCEMENT CALCULATION SHEET - Box culvert 3m x 3m (Single Cell)
A - Foundation

Length of
Sl Dia. Spacing Total length Wt. Total Wt. Wt.
Particular No each Bar
No. (mm) (m) (m) (kg/m) (kg/m) (MT)
(m)
1 Cut off Wall
4-T 10 mm Bottom bar 10 1 4 13.70 54.80 0.62 33.76 0.034
T 8 mm @ 250mm C/C vertical B/W 8 2 7 0.250 13.66 182.55 0.39 71.97 0.072
T 8mm , @200 c/c Stirrups 8 1 69 0.200 13.66 937.35 0.39 369.54 0.370
2 Surface Reinforcement
T10 mm @ 125 mm C/C B/W Surface reinforcement
Long way 10 1 48 0.125 3.90 188.60 0.62 116.18 0.116

T10 mm @ 125 mm C/C B/W Surface reinforcement


Shot way 10 1 48 0.125 6.10 295.00 0.62 181.72 0.182
Total 0.773 Ton
Add 5% for wastage = 0.039 Ton
Total 0.812 Ton

B - Sub-Structure

Length of
Sl Dia. Spacing Total length Wt. Total Wt. Wt.
Bar Mark No each Bar
No. (mm) (m) (m) (kg/m) (kg/m) (MT)
(m)
2 Box Cell
a 10 1 32 0.190 3.87 123.84 0.62 76.29 0.076
b 12 1 50 0.120 3.87 193.50 0.89 171.64 0.172
c 12 2 32 0.190 5.74 367.36 0.89 325.86 0.326
d 10 2 31 0.200 3.67 227.54 0.62 140.16 0.140
e 10 2 63 0.095 2.22 279.72 0.62 172.31 0.172
f 8 2 32 0.190 2.22 142.08 0.39 56.01 0.056
g 8 4 40 0.150 1.20 192.00 0.39 75.69 0.076
h 10 1 40 0.150 3.87 154.80 0.62 95.36 0.095
i 10 1 32 0.190 3.87 123.84 0.62 76.29 0.076
j 10 8 31 0.200 5.92 1468.16 0.62 904.39 0.904
Total 2.094 Ton
Add 5% for wastage = 0.105 Ton
Total 2.199 Ton
C - Super-Structure

3 End Pillar
T 12 mm - 4 Nos. 12 4 4 0.82 13.12 0.89 11.64 0.012
T 8 mm @ 200 mm C/C 8 4 4 0.200 1.42 20.51 0.39 8.08 0.008
Total 0.020 Ton
Add 5% for wastage = 0.001 Ton
Total 0.021 Ton
Name of Work : Construction of Road from Main Gate of Langlacherra T.E. to Main Road at Sibasthan for the
Year 2018-19

Cost Estimate for RCC 5Mx5MxSingle Cell Box culvert

(Overall width = 6.00 m, Road Way Width = 5.10 m)

Rate (Rs.)

D (m)
B (m)
L (m)
Sl SOR Total Amount

No.
Item Description Qnty. Unit As per SOR
No. No. (Rs.)
2016-17
1 2 3 4 5 6 7 8 9 10 11

Earthwork in excavation for structures as per


drawing and technical specifications Clause
305.1 including setting out, construction of
11.1 / I shoring and bracing, removal of stumps and
1 other deleterious material and disposal upto a
(i)
lead of 50 m, dressing of side

Ordinary soil upto 3 m depth Qnty. As Per


Statement : 1E 108.18 Cum 102.00 11034.36

Providing concrete for plain/reinforced concrete


in open foundations complete as per drawings
2 11.4 / I and technical specifications Clause 802, 803,
1202 & 1203
Qnty. As Per
Nominal mix 1:3:6 [Hand Mixing]
Statement : 1E 11.14 Cum 5240.16 58375.38

Providing concrete for plain / reinforced


concrete in foundations complete as per
11.4 / drawings and technical specifications Clauses
3
A / III 802, 803, 1202 & 1203
PCC Grade M 20 Qnty. As Per
Nominial mix (1:2:4) Statement : 1E 29.65 Cum 5779.70 171368.11

Providing concrete for plain / reinforced


concrete in substructure complete as per
12.5 / drawings and technical specifications Clauses
4
II (i) 802, 804, 805, 806, 1202 & 1204
PCC Grade M 20
Qnty. As Per
Nominial mix (1:2:4)
Statement : 1E 40.24 Cum 6113.20 245995.17

Providing weepholes in brick masonry/stone


masonry, plain/reinforced concrete abutment,
wing wall, return wall with 100 mm dia AC pipe
5 12.9
extending through the full width of the
structures with slope of 1(V):20(H) towards
drawing face complete as per drawing Qnty. As Per
Statement : 1E 20 Nos 117.70 2354.00

Providing and laying reinforced cement concrete


13.1 / in superstructure as per drawing and technical
6 A / III specifications Clauses 800, 1205.4 and 1205.5.
(a) R.C.C grade M 20 Qnty. As Per
For design mix RCC M 20 Statement : 1E 16.37 Cum 7027.12 115033.95

Providing PCC M-20 architectural coping on the


top of wing wall, return wall etc. complete as
7 12.13
per drawing and technical specification Clauses
615, 710 and 1204.3.11 Qnty. As Per
Statement : 1E 6.00 Rm 395.10 2370.60

Supplying, fitting and placingTMT bar


reinforcement in foundation complete as per
8 11.8
drawings and technical specifications Clauses
Qnty. As Per
1000 and 1202
Statement : 1E 0.881 MT 47068.50 41467.35
Rate (Rs.)

D (m)
B (m)
L (m)
Sl SOR Total Amount

No.
Item Description Qnty. Unit As per SOR
No. No. (Rs.)
2016-17
1 2 3 4 5 6 7 8 9 10 11

Supplying, fitting and placing TMT bar


reinforcement (Fe 415) in substructure complete
9 12.7
as per drawings and technical specification
Clauses 1002, 1005, 1010 & 1202 Qnty. As Per
Statement : 1E 4.251 MT 47189.50 200602.56
Supplying, fitting, and placing TMT bar
reinforcement in superstructure complete as per
10 13.3
drawing and technical specifications Clauses Qnty. As Per
1002, 1010 and 1202 Statement : 1E 0.022 MT 48414.80 1065.13

Providing and laying filter media with granular


crushed aggregates as per specification to a
thickness of not less than 600 mm with smaller
11 12.11
size towards the soil and bigger size towards the
wall and providing over the entire surface
behind abutment, wing Qnty. As Per
Statement : 1E 1.37 Cum 1797.00 2461.89

Providing concrete for plain/reinforced concrete


in open foundations complete as per drawing
11.4 /
12 and technical specification Clause 802, 803, &
IV
1203
IV) R.C.C.grade M 20 Qnty. As Per
Statement : 1E 58.08 Cum 6108.90 354804.91
Construction of toe walls for protection of slopes
as per drawing and technical specifications
14.11 /
13 Clause 1302.5
I
Random rubble masonry in case of stone Qnty. As Per
pitching laid with cement mortar (1:5) Statement : 1E 9.00 Cum 3988.60 35897.40

Providing and laying of dry rubble flooring


14 14.8 complete as per drawings and technical Qnty. As Per
specifications Clause 1303.3 Statement : 1E 4.54 Cum 2216.80 10064.27

Filling in foundation trenches as per drawing


15 11.2(I) and technical specification Clause 305.3.9
Sand filling Qnty. As Per
Statement : 1E 40.80 Cum 1411.80 57601.44

Total Rs. 1310497.00

(Rupees Thirteen Lakhs Ten Thousand Four Hundred & Ninety Seven)Only

Junior Engineer, PWD, Asstt. Executive Engineer, PWD,


Silchar Rual Road Sub-Division-II, Silchar Rual Road Sub-Division-II,
Silchar Silchar
Name of Work : Construction of Road from Main Gate of Langlacherra T.E. to Main Road at Sibasthan for the Year 2018-19

DETAILS OF MEASUREMENT
Item : Box culvert 5m x 5m (Single Cell) (As per IRC SP-20) , 6.00 mtr. span,
Statement : 1E

1 Earthwork in excavation
Box Cell = 2 x 7.400 x 0.450 x 0.450 = 3.00 Cum
Cutoff Wall Long = 2 x 6.800 x 0.900 x 1.650 = 20.20 Cum
Cutoff Wall Short = 2 x 6.000 x 0.900 x 1.650 = 17.82 Cum
Return wall = 4 x 2.100 x 2.687 x 1.600 = 36.11 Cum

D/S Appron
Toe Long Wall = 1 x 6.800 x 1.350 x 1.150 = 10.56 Cum
Toe Side Wall = 2 x 2.000 x 1.350 x 1.150 = 6.21 Cum

U/S Appron
Toe Long Wall = 1 x 6.800 x 1.350 x 1.150 = 10.56 Cum
Toe Side Wall = 2 x 1.200 x 1.350 x 1.150 = 3.73 Cum
(T) 108.18 Cum

2 Providing concrete for plain/reinforced concrete in open foundations


Below Raft of Box Cell = 1 x 6.800 x 6.00 x 0.100 = 4.08 Cum
Return wall = 4 x 2.087 x 1.50 x 0.200 = 2.50 Cum
Bottom of Cutoff Long Wall = 2 x 6.800 x 0.600 x 0.150 = 1.22 Cum
Bottom of Cutoff Short Wall = 2 x 6.000 x 0.600 x 0.150 = 1.08 Cum
Toe Long Wall = 2 x 6.800 x 0.750 x 0.150 = 1.53 Cum
Toe Side Wall = 2 x 2.000 x 0.750 x 0.150 = 0.45 Cum
Toe Side Wall = 2 x 1.200 x 0.750 x 0.150 = 0.27 Cum
(T) 11.14 Cum
Name of Work : Construction of Road from Main Gate of Langlacherra T.E. to Main Road at Sibasthan for the Year 2018-19

DETAILS OF MEASUREMENT
Item : Box culvert 5m x 5m (Single Cell) (As per IRC SP-20) , 6.00 mtr. span,
3 Providing concrete for plain / reinforced concrete in foundations M 20
a) Box Wall Raft = 1 x 6.80 x 6.00 x 0.40 16.32 Cum
b) Return wall = 4 x 1.50 x 1.587 x 1.40 = 13.33 Cum
29.65 Cum

4 Providing concrete for plain / reinforced concrete in substructure M 20


a) Box Side Wall = 2 x 6.00 x 0.50 x 5.00 30.00 Cum
b) Box Mid Wall = 0 x 0.00 x 0.00 x 5.00 0.00 Cum
c) Return wall = 4 x( 0.45 + 1.09 )/2 x 1.50 x 2.22 = 10.24 Cum
(T) 40.24 Cum

5 Providing weepholes

b) Return wall = 4 x 5 = 20 Nos


(T) 20 Nos

6 Providing and laying reinforced cement concrete in superstructure RCC M 20

Deck slab = 1 x 6.00 x 6.00 x 0.40 = 14.40 Cum


Top Hunch = 2 x 6.00 x 0.20 x 0.20 x 1/2 = 0.24 Cum
End Piller = 4 x 0.40 x 0.40 x 0.60 = 0.38 Cum
RCC Kerb = 2 x 6.00 x 0.45 x 0.25 = 1.35 Cum
(T) 16.37 Cum

7 Providing PCC M-20 architectural coping on the top of wing wall, return wall etc.
For coping of return wall = 4 x 1.50 = 6.00 mtr

8 TMT bar reinforcement in foundation


Qty. As Per Annexure - R1E = (T) 0.881 MT
Name of Work : Construction of Road from Main Gate of Langlacherra T.E. to Main Road at Sibasthan for the Year 2018-19

DETAILS OF MEASUREMENT
Item : Box culvert 5m x 5m (Single Cell) (As per IRC SP-20) , 6.00 mtr. span,
9 TMT bar reinforcement (Fe 415) in substructrue

Qty. As Per Annexure - R1E = (T) 4.251 MT


10 TMT bar reinforcement in superstructure

Qty. As Per Annexure - R1E = (T) 0.022 MT

11 Providing and laying filter material underneath pitching


D/S Appron
Filter material over PCC Base = 1 x 5.90 x 1.55 x 0.15 = 1.37 Cum

U/S Appron
Filter material over PCC Base = 1 x 0.00 x 0.00 x 0.00 = 0.00 Cum
(T) 1.37 Cum

12 Providing concrete for plain/reinforced concrete in open foundations M 20

Cutoff Long Wall = 2 x 6.80 x 0.30 x 1.50 = 6.12 Cum


Cutoff Short Wall = 2 x 6.00 x 0.30 x 1.50 = 5.40 Cum
RCC Raft = 1 x 6.80 x 6.00 x 0.40 = 16.32 Cum
End Wall = 2 x 6.00 x 0.50 x 5.00 = 30.00 Cum
Bottom Hunch = 2 x 6.00 x 0.20 x 0.20 x 1/2 = 0.24 Cum
(T) 58.08 Cum
13 Construction of toe walls for protection

D/S Appron
Toe Long Wall = 1 x 6.800 x 0.450 x 1.000 = 3.06 Cum
Toe Side Wall = 2 x 2.000 x 0.450 x 1.000 = 1.80 Cum

U/S Appron
Toe Long Wall = 1 x 6.800 x 0.450 x 1.000 = 3.06 Cum
Toe Side Wall = 2 x 1.200 x 0.450 x 1.000 = 1.08 Cum
Name of Work : Construction of Road from Main Gate of Langlacherra T.E. to Main Road at Sibasthan for the Year 2018-19

DETAILS OF MEASUREMENT
Item : Box culvert 5m x 5m (Single Cell) (As per IRC SP-20) , 6.00 mtr. span,
(T) 9.00 Cum

14 Providing and laying of dry rubble flooring


D/S Appron
Over Filter material = 1 x 5.900 x 1.550 x 0.225 = 2.06 Cum
U/S Appron
Over Filter material = 1 x 5.900 x 0.700 x 0.600 = 2.48 Cum
(T) 4.54 cum

15 Filling in foundation trenches


Below PCC leveling Course = 1 x 6.800 x 6.000 x 1.000 = 40.80 Cum

16 Prime Coat, Tack Coat, Premix Carpeting and Seal Coat


= 1 x 6.000 x 5.100 = 30.60 Sqm

Junior Engineer, PWD, Asstt. Executive Engineer, PWD,


Silchar Rual Road Sub-Division-II, Silchar Rual Road Sub-Division-II,
Silchar Silchar
Annexure-R1E

Name of Work : Construction of Road from Main Gate of Langlacherra T.E. to Main Road at Sibasthan for the Year 2018-19

REINFORCEMENT CALCULATION SHEET - Box culvert 5m x 5m (Single Cell)


A - Foundation
Length of
Sl Dia. Spacing Total length Wt. Total Wt. Wt.
Particular No each Bar
No. (mm) (m) (m) (kg/m) (kg/m) (MT)
(m)
1 Cut off Wall
4-T 10 mm Bottom bar 10 1 4 13.70 54.80 0.62 33.76 0.034
T 8 mm @ 250mm C/C vertical B/W 8 2 7 0.250 13.66 182.55 0.39 71.97 0.072
T 8mm , @200 c/c Stirrups 8 1 69 0.200 13.66 937.35 0.39 369.54 0.370
2 Surface Reinforcement
T10 mm @ 125 mm C/C B/W Surface reinforcement
Long way 10 1 48 0.125 6.10 295.00 0.62 181.72 0.182

T10 mm @ 125 mm C/C B/W Surface reinforcement


Shot way 10 1 48 0.125 6.10 295.00 0.62 181.72 0.182
Total 0.839 Ton
Add 5% for wastage = 0.042 Ton
Total 0.881 Ton
B - Sub-Structure
Length of
Sl Dia. Spacing Total length Wt. Total Wt. Wt.
Bar Mark No each Bar
No. (mm) (m) (m) (kg/m) (kg/m) (MT)
(m)
2 Box Cell
a 10 1 38 0.160 6.07 230.66 0.62 142.09 0.142
b 16 1 38 0.160 6.07 230.66 1.58 363.74 0.364
c 16 2 38 0.160 9.14 694.64 1.58 1095.42 1.095
d 12 2 31 0.200 5.87 363.94 0.89 322.83 0.323
e 16 2 38 0.160 3.42 259.92 1.58 409.88 0.410
f 10 2 38 0.160 3.42 259.92 0.62 160.11 0.160
g 8 4 40 0.150 1.30 208.00 0.39 82.00 0.082
h 16 1 38 0.160 6.07 230.66 1.58 363.74 0.364
i 12 1 38 0.160 6.07 230.66 0.89 204.60 0.205
j 10 8 31 0.200 5.92 1468.16 0.62 904.39 0.904
Total 4.049 Ton
Add 5% for wastage = 0.202 Ton
Total 4.251 Ton
C - Super-Structure

3 End Pillar
T 12 mm - 4 Nos. 12 4 4 0.92 14.72 0.89 13.06 0.013
T 8 mm @ 200 mm C/C 8 4 4 0.200 1.42 20.51 0.39 8.08 0.008
Total 0.021 Ton
Add 5% for wastage = 0.001 Ton
Total 0.022 Ton

Junior Engineer, PWD, Asstt. Executive Engineer, PWD,


Silchar Rual Road Sub-Division-II, Silchar Rual Road Sub-Division-II,
Silchar Silchar
FORMAT F-7
PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY)
COST ESTIMATE FOR ROADS CONSTRUCTION OF CROSS DRAINAGE WORKS

Road From : #REF!


Block : #REF! Package No : #REF!
District : #REF!

Type of Cross Drainage Works : Slab Culvert 3.00m Span (Overall width = 6.00 m, Road Way Width = 5.10 m)

Proposed Slab Culvert 0 Nos.

Rate (Rs.)
Total

B (m)
D (m)
L (m)
Sl

No.
SOR No. Item Description Qnty. Unit As per Amount
No.
SOR (Rs.)
2016-17
1 2 3 4 5 6 7 8 9 10 11

Earthwork in excavation for structures as per


drawing and technical specifications Clause 305.1
including setting out, construction of shoring and
bracing, removal of stumps and other deleterious
1 11.1 / I (i) material and disposal upto a lead of 50 m, dressing
of side

Ordinary soil upto 3 m depth Qnty. As Per


Statement : B 145.10 Cum 71.00 10302.10

Providing concrete for plain/reinforced concrete in


open foundations complete as per drawings and
2 11.4 / I(ii) technical specifications Clause 802, 803, 1202 &
1203
Nominal mix 1:3:6 [Hand Mixing] Qnty. As Per
Statement : B 13.88 Cum 5284.00 73341.92

Providing concrete for plain / reinforced concrete in


foundations complete as per drawings and
11.4 / A / technical specifications Clauses 802, 803, 1202 &
3
III 1203
PCC Grade M 20
Nominial mix (1:2:4) Qnty. As Per
Statement : B 64.49 Cum 6007.00 387391.43

Providing concrete for plain / reinforced concrete in


substructure complete as per drawings and
technical specifications Clauses 802, 804, 805, 806,
4 12.5 / II (i)
1202 & 1204
PCC Grade M 20
Nominial mix (1:2:4) Qnty. As Per
Statement : B 42.07 Cum 6369.00 267943.83

Providing weepholes in brick masonry/stone


masonry, plain/reinforced concrete abutment, wing
wall, return wall with 100 mm dia AC pipe extending
5 12.9
through the full width of the structures with slope of
1(V):20(H) towards drawing face complete as per
drawing Qnty. As Per
Statement : B 14.00 Nos 182.00 2548.00

Providing and laying reinforced cement concrete in


superstructure as per drawing and technical
13.1 / A /
6 specifications Clauses 800, 1205.4 and 1205.5.
III (a)
R.C.C grade M 20
For design mix RCC M 20 Qnty. As Per
Statement : B 12.54 Cum 7025.00 88093.50

161
Providing PCC M-20 architectural coping on the top
of wing wall, return wall etc. complete as per
7 12.13
drawing and technical specification Clauses 615,
710 and 1204.3.11 Qnty. As Per
Statement : B 9.20 Rm 413.00 3799.60

Supplying, fitting and placing TMT bar reinforcement


(Fe 415) in substructure complete as per drawings
8 12.7
and technical specification Clauses 1002, 1005,
1010 & 1202 Qnty. As Per
Statement : B 0.129 MT 65583.00 8460.21

Supplying, fitting, and placing TMT bar


reinforcement in superstructure complete as per
9 13.3
drawing and technical specifications Clauses 1002,
Qnty. As Per
1010 and 1202
Statement : B 0.451 MT 66360.00 29928.36

Providing and laying filter media with granular


crushed aggregates as per specification to a
thickness of not less than 600 mm with smaller size
10 12.11
towards the soil and bigger size towards the wall
and providing over the entire surface behind
abutment, wing Qnty. As Per
Statement : B 16.78 Cum 1452.00 24364.56

Providing and laying curtain walls complete as per


11 14.9 / III drawing and technical specification Clause 1304
Cement concrete grade M 10 Qnty. As Per
Statement : B 1.15 Cum 5034.00 5789.10

Filling in foundation trenches as per drawing and


12 11.2(I) technical specification Clause 305.3.9
Qnty. As Per
Sand filling
Statement : B 17.02 Cum 968.00 16475.36

Providing and fixing in position 20 mm thick


premoulded joint filler in expansion joint for fixed
13 13.16 (III) ends of simply supported spans, covered with
sealant complete as per drawing and technical
specifications Qnty. As Per
Statement : C 24.00 Cum 285.00 6840.00
Total=Rs. 925277.97
Cost of 3.00m Slab Culvert Each Unit Say ~ Rs. 925278.00
For 0 Nos = Rs. 0.00

Asstt. Executive Engineer PWD


Nilambazar Rural Road Subdivision
Nilambazar

162
Statement : B
DETAILS OF MEASUREMENT

Item : Slab Culvert (As per IRC SP-20-2002) , 3.00 mtr. span,
I. ABUTMENT & RETURN WALL
1 Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and
other deleterious material and disposal upto a lead of 50 m, dressing of side

a) Abutment = 2 x 2.900 x 5.910 x 1.900 = 65.13 Cum


b) Return wall = 4 x 3.100 x 2.687 x 2.400 = 79.97 Cum
(T) 145.10 Cum

2 Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
Nominal mix 1:3:6 [Hand Mixing]
a) Abutment = 2 x 2.300 x 5.61 x 0.200 = 5.16 Cum
b) Return wall = 4 x 2.800 x 2.09 x 0.200 = 4.67 Cum
c) CC In Flooring = 1 x 6.000 x( 2.800 + 2.60 )x1/2 x 0.25 = 4.05 Cum
(T) 13.88 Cum
3 Providing concrete for plain / reinforced concrete in foundations complete as per drawings and technical specifications Clauses 802, 803, 1202 & 1203
PCC Grade M 20
Nominial mix (1:2:4)

a) Abutment
= 2 x 1.80 x 6.80 x 1.40 = 34.27 Cum
b) Return wall
= 4 x 3.40 x 1.587 x 1.40 = 30.22 Cum
(T) 64.49 Cum

4 Providing concrete for plain / reinforced concrete in substructure complete as per drawings and technical specifications Clauses 802, 804, 805, 806, 1202 & 1204
PCC Grade M 20
Nominial mix (1:2:4)
a) Abutment - = 2 x( 0.700 + 1.30 )/2 x 1.800 x 6.000 = 21.60 Cum
b) Return wall = 4 x( 0.450 + 1.09 )/2 x 2.220 x 3.000 = 20.47 Cum
(T) 42.07 Cum

5 Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the
structures
a) Abutmentwith slope of 1(V):20(H)
= 2 towards
x drawing
3 face complete as per drawing = 6 Nos
b) Return wall = 4 x 2 = 8 Nos
(T) 14 Nos

164
Statement : B
DETAILS OF MEASUREMENT

Item : Slab Culvert (As per IRC SP-20-2002) , 3.00 mtr. span,
II SUPERSTRUCTURE
6 Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5. R.C.C grade M 20
For design mix RCC M 20
a) Abutment cap = 2 x 0.70 x 6 x 0.20 = 1.68 Cum
b) Dirt wall = 2 x 0.40 x 6.00 x 0.30 = 1.44 Cum
c) Deck slab = 1 x 3.60 x 6.00 x 0.30 = 6.48 Cum
d) End Pillar = 2 x 0.40 x 0.40 x 0.60 = 0.19 Cum
d) Kerb at return wall &
= 8 x 0.600 x( 0.30 + 0.45 )x 1/2 x 1.200 = 2.16 Cum
deck
Kerb over deck slab = 2 x 0.600 x( 0.30 + 0.45 )x 1/2 x 1.300 = 0.59 Cum
(T) 12.54 Cum

7 Providing PCC M-20 architectural coping on the top of wing wall, return wall etc. complete as per drawing and technical specification Clauses 615, 710 and 1204.3.11
For coping of return
= 4 x 2.30 = 9.20 mtr
wall

8 Providing PCC M-20 architectural coping on the top of wing wall, return wall etc. complete as per drawing and technical specification Clauses 615, 710 and 1204.3.11
AS PER ANNEXURE - RC1 (T) 0.129 MT
9 Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202

AS PER ANNEXURE - RC1 (T) 0.451 MT


10 Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger
size towards the wall and providing over the entire surface behind abutment, wing

(a) Abutment
(2)Back fill behind Abutment
= 2 x 1/2 x 0.600 x 1.800 x 3.620 = 3.91 Cum

(i) Cushion for Approach = 2 x 2.300 x 3.620 x 0.41 = 6.74 Cum


(b) Return Wall
(1)Back fill behind return wall
= 4 x 1/2 x 0.600 x 2.220 x 2.300 = 6.13 Cum
(T) 16.78 Cum

165
Statement : B
DETAILS OF MEASUREMENT

Item : Slab Culvert (As per IRC SP-20-2002) , 3.00 mtr. span,
III PROTECTION WORK
11 Providing and laying curtain walls complete as per drawing and technical specification Clause 1304
Cement concrete grade M 10

Side Protection = 2 x 1.150 x( 2.600 + 1.40 )x1/2 x 0.25 = 1.15 Cum


(T) 1.15 cum
12 Filling in foundation trenches as per drawing and technical specification Clause 305.3.9 (i) Sand filling

Central Cavity Portion = 1 x ( 2.600 + 1.40 )x 1/2 1.15 x 7.40 = 17.02 cum

13 Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans, covered with sealant complete as per
drawing andslab
Below deck = 2
technical specifications x 6.00 12.00 Rm
Between Slab & Dirt
12.00
Wall = 2 x 6.00 Rm
(T) 24.00 Rm

166
Annexure-RC1
REINFORCEMENT CALCULATION SHEET - [SLAB CULVERT-3.00m]

Length of
Sl Dia. Spacing Total length Wt. Total Wt. Wt.
Particular No each Bar
No. (mm) (m) (m) (kg/m) (kg/m) (MT)
(m)
A Abutment Cap & Dirt Wall
T 12 main bar at Bottom 12 2 3 6.14 36.82 0.89 32.66 0.033
T 10main bar at Top 10 2 4 6.14 49.09 0.62 30.24 0.030
T 8, @200 c/c at Abutment Cap 8 2 32 0.200 0.90 57.28 0.39 22.58 0.023
T 8, @200 c/c at Dirt Wall 8 2 32 0.200 1.70 107.97 0.39 42.56 0.043
Total 0.129 Ton

Length of
Sl Dia. Spacing Total length Wt. Total Wt. Wt.
Particular No each Bar
No. (mm) (m) (m) (kg/m) (kg/m) (MT)
(m)
A Deck Slab
16 mm dia. 47 nos @ 125 mm C/C (Bendup Top Bottom )-
Main bar 16 1 47 0.125 3.819 180.87 1.58 285.22 0.285
Top Longitudional 10mm dia @ 300 mm C/C ( Top )-
Surface Steel 10 1 20 0.300 2.928 57.78 0.62 35.59 0.036

Top Traverse 10mm dia @ 300 mm C/C -Surface Steel


10 1 12 0.300 5.920 71.04 0.62 43.76 0.044
Distribution bar 10mm dia @175 c/c -Bottom bar 10 1 21 0.175 6.040 127.53 0.62 78.56 0.079
Total 0.444 Ton
B End Pillar
T 12 mm - 4 Nos. 12 2 4 0.74 5.92 0.89 5.25 0.005
T 8 mm @ 200 mm C/C 8 1 4 0.200 1.42 5.13 0.39 2.02 0.002
Total 0.007 Ton
Total A+B = 0.451 Ton

167
FORMAT F-7
PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY)
COST ESTIMATE FOR ROADS CONSTRUCTION OF CROSS DRAINAGE WORKS

Name of Road : #REF!


Length of Bridge : 15.65m District : #REF!
Package No : #REF! Block : #REF!

Type of Cross Drainage Work : Construction of RCC Bridge (Span: 1 X 15.00m)

ESTIMATE FOR BRIDGE PROPER & PROTECTION WORK

Rate
(Rs.) Total
Sl.N Amount
Description of Item No. Quantity Unit As Per
o. (Rs.)
SOR [Col. 7*11]
LengtWidthDepth 2016-17
1 2 3 4 5 6 7 8 9 10
Foundation
Earthwork in excavation for structures
as per drawing and technical
specifications including setting out,
construction of shoring and bracing,
removal of stumps and other
deleterious matter, dressing of sides
and bottom backfilling in trenches with
excavated suitable material.

Ordinary soil
upto 3.0m depth 170.82 Cum 86.00 14690.52
1 16.66 / I / A (Depth 3.M to 6 m depth Qnty. As Per Statemen 97.37 Cum 113.00 11002.81

Bored cast-in-situ M35 grade R.C.C.


pile excluding reinforcement complete
as per drawing and technical
2 16.88 A 360.00 metre 6987.00 2515320.00
specifications nd removal of excavated
earth with all lifts and lead upto 1000
m. (Pile diameter-750 mm) Qnty. As Per Statemen

Pile load test on single vertical pile in


3 16.94 accordance with IS:2911(Part-IV) 195.000 MT 330.00 64350.00
(a) Initial and routine load test
Qnty. As Per Statemen

4 16.96 Leveling Course for Pile Cap 11.02 Cum 5776.00 63651.52
Qnty. As Per Statemen
Cement concrete for reinforced
concrete in pile cap complete as per
drawing and Technical Specification
B RCC Grade M25
5 16.94 (I) B (i (I) Using Concrete Mixer Qnty. As Per Statemen 60.30 Cum 7514.00 453094.20
Supplying, fitting and placing TMT bar
reinforcement in foundation complete
6 16.97 (a) as per drawings and technical 22.505 MT 72065.00 1621822.83
specifications
Qnty. As Per Statemen
Sub-structure
Plain/reinforced cement concrete in
substructure complete as per drawings
and technical specification Qnty. As Per
Statement - A
For height upto 5 m
7 16.103 (N) CR.C.C. grade M 25 134.85 Cum 7888 1063696.8
Supplying, fitting and placing TMT bar
reinforcement in substructrue complete
8 16.104 (a) as per drawings and technical 10.590 MT 72169.00 764269.71
specifications Qnty. As Per Statemen
Providing weepholes in brick
masonry/stone masonry,
plain/reinforced concrete abutment,
wing wall, return wall with 100 mm dia
9 16.106 AC pipe extending through the full 80 Nos. 191.00 15280.00
width of the structures with slope of
1(V):20(H) towards drawing face
complete as per drawing
Qnty. As Per Statemen
Backfilling behind abutment, wing wall
and return wall complete as per Qnty. As Per
drawings & technical specification Statement - A
10 16.107 A A) Granular material 578.88 Cum 1126 651818.88
Super-structure
Furnishing and placing
16.115 / Reinforced/Prestressed cement
N / (B) concrete in super-structure as per Qnty. As Per
11 89.50 Cum 8654.00 774533.00
case I (i) drawing and technical specifications Statement - A
(a) including steel shuttering formwork.
Supplying, fitting, and placing TMT bar
reinforcement in superstructure
12 16.116 (a) complete as per drawing and technical 7.235 MT 70685.00 511405.98
specifications Qnty. As Per Statemen
Providing and laying cement concrete
wearing course M 30 grade including
13 16.118 reinforcement complete as per drawing 7.43 Cum 14137.00 105037.91
and technical specifications Qnty. As Per Statemen
Construction ofprecast R.C.C. railing
of M 30 grade aggregate size not
exceeding 12mm, true to line and
grade, tolerance of vertical railing RCC
post not to exceed 1 in 500, centre-to-
14 16.120 centre spacing between vertical posts 43.40 Metre 2193.00 95176.20
not to exceed 2000 mm, leveling
adequate spacing between vertical
poss for expansion, complete as per
drawing and technical specifications
Qnty. As Per Statemen
Providing and laying a buried
expansion joint, covered with 12 mm
thick, 200 mm wide galvanised
weldable structrual steel plate as per
IS:2062, placed symmetrical to centre
line of the joint, resting freely over the
15 13.15 top surface of the deck concrete, 15.00 Metre 1297.00 19455.00
welding of 8 mm dia, 100 mm long
galvanised nails spaced 300 mm c/c
along the centre line of the plate, as
per technical specifications Clauses
1207.2.3
Qnty. As Per Statemen
Drainage spouts complete as per
16 16.123 drawing and technical specifications 6 Each 8615.00 51690.00
Qnty. As Per Statemen
PCC M15 ordinary grade (1:2.5:5) in
levelling course below approach slab
17 13.11 A I complete as per drawing and technical
specifications clause 800 and 1211 Qnty. As Per Statemen 3.75 Cum 5083.00 19061.25
Reinforced Cement Concrete M 25
grade approach slab including
18 13.12 / A reinforcement and formwork complete 10.73 Cum 10840.00 116313.20
as per drawing and technical
specifications Clauses 800 and 1211
Qnty. As Per Statemen
Protection Works :
Providing & laying of boulder apron laid
in wire crates with 14mm dia GI wire
conforming to IS : 280 in 100 mm x
19 14.2 100mm mesh (woven diagonally) 95.24 cum 1910.00 181908.40
including 10% extra for laps 7 joints
laid with stone boulder weighing not
less than 25 Kg each as per drawing
Qnty. As Per Statemen
Providing and laying Pitching on slopes
laid over prepared Filter media asper
20 14.5 / I drawing and technical specifications 63.28 cum 1166.000 73784.48
clause 1302 I. Stone Boulder
Qnty. As Per Statemen
Providing and laying Filter material
underneath Pitching in slopes complete
21 14.6 asper drawing and technical 31.64 cum 1332.00 42144.48
specifications clause 1302
Qnty. As Per Statemen
Estimated Cost Bridge Proper & Protection Total Rs. 9229507.17
Say ~ Rs 9229507.00
Total Cost for 0 No. of 15.00 m Minor Bridge Rs. 0.00

Asstt. Executive Engineer PWD


Patherkandi Rural Road Subdivision
Patherkandi
Bill of Quantities for Bridge Proper : Statement - A

Construction of RCC Bridge (Span : 15.00m)

Span Arrangement : 1 x 15.00 m


DL 100.00 m
Types of Foundation : RCC Pile Foundation Abt Cap top 99.23 m
No of Abt.= 2 No of Pile = 2 x 10 HFL = 98.18 m
LWL = 96.94 m
Types of Superstructure : Single Lane RCC LBL = 96.40 m
Carriage Way Width : 6.60 m
Width of Super Structure : 7.50 m
No Qty in each Total Qty

1 E/W in excavation in Abutment Location .


At Abutment AL & AR
Average Top GL at Foundation Location RL 99.060 M
Bottom of Pile cap = RL 94.500 M
Bottom Level of Excavation = RL 94.350 M

E/W in Excavation in Ordinary Soil :


Length = 7.800 M
Width = 3.650 M
Total Depth = 4.710 M
No = 2

Qty of E/W in excavation in Ordinary Soil (Up to depth 3.00m depth) = 170.820 Cum
Qty of E/W in excavation in Ordinary Soil (Depth beyond 3.0m) = 97.367 Cum
Total Qty of E/W in excavation in Ordinary Soil = 268.187 Cum

2 750mm Dia RCC Cast in Situ Bored Pile


At Abutment Location .
Cut off Level = RL 94.50 M FL = 76.50 M
Length of Each Pile = 18.00 M No of Pile= 10 Nos.
Qty of Pile = 180.00
For 2 no foundation Total = 360.00 M

Total Quantity = 360.00 M

3 Pile Load Test :


1 Routine Load test =1X 1.5 x 130 = 195.00 T

4 Base Course Below pile cap : ( PCC 1:3:6 )


At Abutment AL & AR
= 2 x 7.80 x 4.71 x 0.15
1 11.021 11.021 Cum

Total = 11.021 Cum


5 Pile Cap
At Abutment Location . No= 2
Length,= 7.50 M Breadth= 3.35 M
Depth = 1.20 M
Vol of Each pile Cap = 30.15 Cum
for 2 abutment = 60.300 Cum
Total Qty in Pile Cap = 60.300 Cum

6 Reinforcement Work :
In Foundation :
Pile at Abutment @ 1.5% of vol of conc = 18.718 Mt
Pile Cap @ 0.8% of conc vol 3.787 Mt
Total Quantity = 22.505 MT
7 Sub Structure :[ M-25 ]

Abutment Shaft :
At Abutment AL
Ht of Abutment Shaft = 5.93 M
Length of the Shaft 7.50 M
Width at top 1.10 M
Width at Base = 1.35 M
Vol = 54.436 Cum
At Abutment AR
Total Depth of Shaft = 5.93 M
Length of the Shaft 7.50 M
Width at top 1.10 M
Width at Base = 1.35 M
Vol = 54.436 Cum
Total Qty 108.872 Cum

Dirt Wall : Length = 7.50 m


Thk= 0.35 m
Depth = 0.78 m
Qty in each : 2.034 Cum
Total Qty 2 4.068 Cum

Braket of Dirt Wall :


Length = 7.50 m
Thk= 0.35 m
Avg Depth = 0.35 m
Qty in each : 0.919 Cum
Total Qty 2 1.838 Cum

Abutment Cap : At Abutment AL


Length = 7.50 m
Width, W1 = 1.30 m
Width,W2= 1.10 m
Depth,D1= 0.40 m
Depth,D2= 0.20 m
Vol = 5.70 Cum

At Abutment AR
Length = 7.50 m
Width, W1 = 1.30 m
Width,W2= 1.10 m
Depth,D1= 0.40 m
Depth,D2= 0.20 m
Vol = 5.70 Cum
Total Qty 11.400 Cum

Return Wall :
At Abutment AL
Top Rectangular Portion
Length = 3.00 m
Thk= 0.35 m
Depth= 0.60 m
No = 2
Vol = 1.260 Cum

At Abutment AR
Top Rectangular Portion
Length = 3.00 m
Thk= 0.35 m
Depth= 0.60 m
No = 2
Vol = 1.260 Cum 2.520 Cum
Top Trapazoidal Portion
At Abutment AL
Length at top = 3.00 m
Length at Bottom= 0.00 m
Thk= 0.35 m
Depth= 1.50 m
No = 2
Vol = 1.575 Cum
At Abutment AR
Length at top = 3.00 m
Length at Bottom= 0.00 m
Thk= 0.35 m
Depth= 1.50
No = 2
Vol = 1.575 Cum 3.150 Cum

Extra for Bearing Pedestal : 4 Nos 3.000 Cum

Total Qty = 134.848 Cum

8 Reinforcement Work :
For Sub Structure Work @ 1.00% of conc vol 10.59 MT
Total Quantity = 10.590 MT

9 75 dia Weep Holes in Abutment & Wing Wall


Qty = 80 Nos

10 Back Filling Behind Abutment & Wing Wall :


At Abutment AR
With of Backfilling at Top = 2.00 M
Widt of Back Filling at Base = 2.50 M
Total Ht of abutment = 6.70 M
Length of Abutment = 6.60 M
No = 1
Length of Wing Wall = 3.00 M
No = 2
Qty = 289.440 Cum
At Abutment AL
With of Backfilling at Top = 2 M
Widt of Back Filling at Base = 2.5 M
Total Ht of abutment = 6.70 M
Length of Abutment = 6.60 M
No = 1
Length of Wing Wall = 3.00 M
No = 2
Qty = 289.440 Cum

Total Qty = 578.880 Cum

11 RCC M-25 Grade Conc in Super Structure :


For Deck Slab + Kerb :
Qnty. As per IRC SP:20 (Plate No.-7.24)
89.5 Cum = 89.500 Cum

12 Reinforcement Work :
Super Structure Work
Qnty. As per IRC SP:20 (Plate No.-7.24) 7.235 MT

13 M-30 in Wearing Coat of avg 50mm thk


1 x 6.6 x 15.00 x 0.075 7.425 Cum
14 RCCHand Railling :
2 X (15.00 + 3.35+3.35) 43.40 Rm

15 Expansion Joint : Buried expansion joint


No = 2 Length= 7.50 m 15.00 M

16 Drainage Spout @ 6.00 M C/C 6 No

17 Levelling course below approach slab


Below Approach slab = 2 *7.50*2.5*0.1 = 3.75 Cum
Total Qty = 3.750 Cum
18 RCC M25 Approach Slab :
Length = 2.50 M
Width = 7.15 M
Depth = 0.30 M
No= 2
Qty = 10.725 Cum
Statement - B
Quantity Estimation of Protection Work :

Construction of RCC Bridge (Span : 15.00m)

[ Refer Design of Protection Work and GAD ]

HFL +0.6M

F
Slope 1:1.5

h t2
t1
LWL

L1 L2

Elevation

d1

Boulder
Apron
L1
B
L2

Boulder
Slope Pitching

L3

PLAN

Quantity Estimation for Protection work in each Abutment location .

1 Boulder Pitching Work :


Thickness of Boulder Pitching =S Avg GL in M = GL LWL in M= LWL
h = HFL +0.6-LWL L1 = 1.5*h
h1 = HFL+0.6-GL L3 = 10.0 d = dsl
d1= 1.5*h1
Qty in Each Abutment(Q bp) = (h^2+L1^2)^0.5*B*s +2*PI/4*(L1+d1)*0.5*s + 2xL3*(h^2+d1^2)^0.5*s
2 Filter Media :
Qty in Each Abutment(Q f ) = (Qbp/S)x f

3 Boulder Apron :
Qty in Each Abutment(Q bap) = [(L2 xB)+2x0.5x(PI/2)x0.5x(L1+d)]x0.5x(t1+t2)+2xdxL3xt1

RCC Br
[ refer hydraulic particulars & design of protection work ] GL = 99.06 m
h= 1.84 m h1 = 2.76 m L1 = 2.76 m
dsm = 2.00 m s= 0.30 m f= 0.15 m
t1 = 0.75 m t2 = 0.90 m L2 = 3.00 m
d1 = 4.14 m b= 8.30 m L3 = 8.00 m

1 Boulder Apron :
Qty in Each Abutment(Q bap) = 20.54 + 3.08 + 24.00
= 47.62 cum for 2 nos = 95.24 cum

2 Boulder Pitching :
Qty in Each Abutment(Q bp) = 8.26 + 1.63 + 21.75
= 31.64 cum for 2 nos = 63.28 cum
3 Filter Media :
Qty in Each Abutment(Q f ) = 15.82 cum for 2 nos = 31.64 cum
Construction of RCC Bridge (Span : 15.00m)
DESIGN OF STONE PITCHING AND LAUNCHING APRON AS PER IRC :89-1997
[ Refer Hydraulic datas & Hydraulic calculation calculations ]

Sl Bridge Design Mean Thickness of Slope Width of Launching Apron Thickness of Launc Thickn of Launch Thk.
No no Discharge Scour Dep pitching Reqd provided - hing Apron Reqd - ing Apron Provd of Filter
Q th dsm t=0.06Q^1/3 provd 1.5*dsm inner 1.5*t outer 2.25*t inner outer Media
cum/sec (m) (cm) (cm) (m) (m) (cm) (cm) (cm) (cm) (icm)
1 2 3 4 5 6 7 8 9 10 11 12 13
Br No
1 Br 78.65 2.00 25 30 3.00 3.00 38 57 75 90 15
FORMAT F-7
PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY)
COST ESTIMATE FOR ROADS CONSTRUCTION OF CROSS DRAINAGE WORKS

Name of Road : #REF! Package No : #REF!


Length of Bridge : 10.65m District : Cachar
Block : #REF!

Type of Cross Drainage Work : Construction of RCC Bridge (Span: 1 X 10.00m)

ESTIMATE FOR BRIDGE PROPER & PROTECTION WORK

Rate (Rs.)

As Per Total Amount


SOR (Rs.)
Sl.NoDescription of Item No. LengtWidthDepthQuantity Unit 2016-17 [Col. 7*11]
1 2 3 4 5 6 7 8 9 10
Foundation
Earthwork in excavation for structures
as per drawing and technical
specifications including setting out,
construction of shoring and bracing,
removal of stumps and other
deleterious matter, dressing of sides
and bottom backfilling in trenches with
excavated suitable material.

Ordinary soil
upto 3.0m depth 170.82 Cum 86.00 14690.52
1 16.66 / I / A (Depth 3.M to 6 m depth Qnty. As Per Statemen 97.37 Cum 113.00 11002.81

Bored cast-in-situ M35 grade R.C.C.


pile excluding reinforcement complete
as per drawing and technical Qnty. As Per
2 16.88 A 300.00 metre 6987.00 2096100.00
specifications nd removal of excavated Statement - A
earth with all lifts and lead upto 1000
m. (Pile diameter-750 mm)

Pile load test on single vertical pile in


Qnty. As Per
3 16.94 accordance with IS:2911(Part-IV) 195.000 MT 330.00 64350.00
Statement - A
(a) Initial and routine load test

Qnty. As Per
4 16.96 Leveling Course for Pile Cap 11.02 Cum 5776.00 63651.52
Statement - A

Cement concrete for reinforced


concrete in pile cap complete as per
16.94 (I) B drawing and Technical Specification
5
(i)
B RCC Grade M25
(I) Using Concrete Mixer Qnty. As Per Statemen 60.30 Cum 7514.00 453094.20
Supplying, fitting and placing TMT bar
reinforcement in foundation complete
6 16.97 (a) as per drawings and technical 19.385 MT 72065.00 1396980.03
specifications
Qnty. As Per Statemen
Sub-structure
Plain/reinforced cement concrete in
substructure complete as per drawings
and technical specification

For height upto 5 m


7 16.103 (N) CR.C.C. grade M 25 Qnty. As Per Statemen 128.18 Cum 7888 1011083.84
Supplying, fitting and placing TMT bar
reinforcement in substructrue complete
8 16.104 (a) as per drawings and technical 10.060 MT 72169.00 726020.14
specifications Qnty. As Per Statemen
Providing weepholes in brick
masonry/stone masonry,
plain/reinforced concrete abutment,
wing wall, return wall with 100 mm dia
9 16.106 AC pipe extending through the full 80 Nos. 191.00 15280.00
width of the structures with slope of
1(V):20(H) towards drawing face
complete as per drawing
Qnty. As Per Statemen
Backfilling behind abutment, wing wall
and return wall complete as per
drawings & technical specification
10 16.107 A A) Granular material Qnty. As Per Statemen 578.88 Cum 1126 651818.88
Super-structure
Furnishing and placing
16.115 / Reinforced/Prestressed cement
N / (B) concrete in super-structure as per
11 61.87 Cum 8654.00 535422.98
case I (i) drawing and technical specifications
(a) including steel shuttering formwork.
Qnty. As Per Statemen
Supplying, fitting, and placing TMT bar
reinforcement in superstructure
12 16.116 (a) complete as per drawing and technical 3.684 MT 70685.00 260403.54
specifications Qnty. As Per Statemen
Providing and laying cement concrete
wearing course M 30 grade including
13 16.118 reinforcement complete as per drawing 4.95 Cum 14137.00 69978.15
and technical specifications
Qnty. As Per Statemen
Construction ofprecast R.C.C. railing
of M 30 grade aggregate size not
exceeding 12mm, true to line and
grade, tolerance of vertical railing RCC
post not to exceed 1 in 500, centre-to-
14 16.120 centre spacing between vertical posts 33.40 Metre 2193.00 73246.20
not to exceed 2000 mm, leveling
adequate spacing between vertical
poss for expansion, complete as per
drawing and technical specifications
Qnty. As Per Statemen
Providing and laying a buried
expansion joint, covered with 12 mm
thick, 200 mm wide galvanised
weldable structrual steel plate as per
IS:2062, placed symmetrical to centre
line of the joint, resting freely over the
15 13.15 top surface of the deck concrete, 15.00 Metre 1297.00 19455.00
welding of 8 mm dia, 100 mm long
galvanised nails spaced 300 mm c/c
along the centre line of the plate, as
per technical specifications Clauses
1207.2.3
Qnty. As Per Statemen
Drainage spouts complete as per
16 16.123 drawing and technical specifications 6 Each 8615.00 51690.00
Qnty. As Per Statemen
PCC M15 ordinary grade (1:2.5:5) in
levelling course below approach slab
17 13.11 A I complete as per drawing and technical
specifications clause 800 and 1211 Qnty. As Per Statemen 3.75 Cum 5083.00 19061.25
Reinforced Cement Concrete M 25
grade approach slab including
18 13.12 / A reinforcement and formwork complete 10.73 Cum 10840.00 116313.20
as per drawing and technical
specifications Clauses 800 and 1211
Qnty. As Per Statemen
Protection Works :
Providing & laying of boulder apron laid
in wire crates with 14mm dia GI wire
conforming to IS : 280 in 100 mm x
19 14.2 100mm mesh (woven diagonally) 95.24 cum 1910.00 181908.40
including 10% extra for laps 7 joints
laid with stone boulder weighing not
less than 25 Kg each as per drawing
Qnty. As Per Statemen
Providing and laying Pitching on slopes
laid over prepared Filter media asper
20 14.5 / I drawing and technical specifications 63.28 cum 1166.000 73784.48
clause 1302 I. Stone Boulder

Qnty. As Per Statemen


Providing and laying Filter material
underneath Pitching in slopes complete
21 14.6 asper drawing and technical 31.64 cum 1332.00 42144.48
specifications clause 1302
Qnty. As Per Statemen
Estimated Cost Bridge Proper & Protection Total Rs. 7947479.62
Say ~ Rs 7947480.00
Total Cost for 0 No. of 10.00 m Minor Bridge Rs. 0.00

Asstt. Executive Engineer PWD


Silchar Rural Road Sub-Division-II
Silchar
Bill of Quantities for Bridge Proper : Statement - A

Construction of RCC Bridge (Span : 10.00m)

Span Arrangement : 1 x 10.00 m


DL 100.00 m
Types of Foundation : RCC Pile Foundation Abt Cap top 99.23 m
No of Abt.= 2 No of Pile = 2 x 10 HFL = 98.18 m
LWL = 96.94 m
Types of Superstructure : Single Lane RCC LBL = 96.40 m
Carriage Way Width : 6.60 m
Width of Super structure : 7.50 m
No Qty in each Total Qty

1 E/W in excavation in Abutment Location .


At Abutment AL & AR
Average Top GL at Foundation Location RL 99.060 M
Bottom of Pile cap = RL 94.500 M
Bottom Level of Excavation = RL 94.350 M

E/W in Excavation in Ordinary Soil :


Length = 7.800 M
Width = 3.650 M
Total Depth = 4.710 M
No = 2

Qty of E/W in excavation in Ordinary Soil (Up to depth 3.00m depth) = 170.820 Cum
Qty of E/W in excavation in Ordinary Soil (Depth beyond 3.0m) = 97.367 Cum
Total Qty of E/W in excavation in Ordinary Soil = 268.187 Cum

2 750mm Dia RCC Cast in Situ Bored Pile


At Abutment Location .
Cut off Level = RL 94.50 M FL = 79.50 M
Length of Each Pile = 15.00 M No of Pile= 10 Nos.
Qty of Pile = 150.00
For 2 no foundation Total = 300.00 M

Total Quantity = 300.00 M

3 Pile Load Test :


1 Routine Load test =1 X 1.5 x 130 = 195.00 T

4 Base Course Below pile cap : ( PCC 1:3:6 )


At Abutment AL & AR
.= 2 x 7.80 x 4.71 x 0.15
1 11.021 11.021 Cum

Total = 11.021 Cum


5 Pile Cap
At Abutment Location . No= 2
Length,= 7.50 M Breadth= 3.35 M
Depth = 1.20 M
Vol of Each pile Cap = 30.15 Cum
for 2 abutment = 60.300 Cum
Total Qty in Pile Cap = 60.300 Cum

6 Reinforcement Work :
Pile at Abutment @ 1.5% of vol of conc = 15.598 Mt
Pile Cap @ 0.8% of conc vol 3.787 Mt
Total Quantity = 19.385 MT
7 Sub Structure :[ M-25 ]

Abutment Shaft :
At Abutment AL
Ht of Abutment Shaft = 5.93 M
Length of the Shaft 7.50 M
Width at top 1.10 M
Width at Base = 1.20 M
Vol = 51.103 Cum
At Abutment AR
Total Depth of Shaft = 5.93 M
Length of the Shaft 7.50 M
Width at top 1.10 M
Width at Base = 1.20 M
Vol = 51.103 Cum
Total Qty 102.206 Cum

Dirt Wall : Length = 7.50 m


Thk= 0.35 m
Depth = 0.78 m
Qty in each : 2.034 Cum
Total Qty 2 4.068 Cum

Braket of Dirt Wall :


Length = 7.50 m
Thk= 0.35 m
Avg Depth = 0.35 m
Qty in each : 0.919 Cum
Total Qty 2 1.838 Cum

Abutment Cap : At Abutment AL


Length = 7.50 m
Width, W1 = 1.30 m
Width,W2= 1.10 m
Depth,D1= 0.40 m
Depth,D2= 0.20 m
Vol = 5.70 Cum

At Abutment AR
Length = 7.50 m
Width, W1 = 1.30 m
Width,W2= 1.10 m
Depth,D1= 0.40 m
Depth,D2= 0.20 m
Vol = 5.70 Cum
Total Qty 11.400 Cum

Return Wall :
At Abutment AL
Top Rectangular Portion
Length = 3.00 m
Thk= 0.35 m
Depth= 0.60 m
No = 2
Vol = 1.260 Cum

At Abutment AR
Top Rectangular Portion
Length = 3.00 m
Thk= 0.35 m
Depth= 0.60 m
No = 2
Vol = 1.260 Cum 2.520 Cum
Top Trapazoidal Portion
At Abutment AL
Length at top = 3.00 m
Length at Bottom= 0.00 m
Thk= 0.35 m
Depth= 1.50 m
No = 2
Vol = 1.575 Cum
At Abutment AR
Length at top = 3.00 m
Length at Bottom= 0.00 m
Thk= 0.35 m
Depth= 1.50
No = 2
Vol = 1.575 Cum 3.150 Cum

Extra for Bearing Pedestal : 4 Nos 3.000 Cum

Total Qty = 128.182 Cum

8 Reinforcement Work :
For Sub Structure Work @ 1.00% of conc vol 10.06 MT
Total Quantity = 10.060 MT

9 75 dia Weep Holes in Abutment & Wing Wall


Qty = 80 Nos

10 Back Filling Behind Abutment & Wing Wall :


At Abutment AR
With of Backfilling at Top = 2.00 M
Widt of Back Filling at Base = 2.50 M
Total Ht of abutment = 6.70 M
Length of Abutment = 6.60 M
No = 1
Length of Wing Wall = 3.00 M
No = 2
Qty = 289.440 Cum
At Abutment AL
With of Backfilling at Top = 2.00 M
Widt of Back Filling at Base = 2.50 M
Total Ht of abutment = 6.70 M
Length of Abutment = 6.60 M
No = 1
Length of Wing Wall = 3.00 M
No = 2
Qty = 289.440 Cum

Total Qty = 578.880 Cum

11 RCC M-25 Grade Conc in Super Structure :


For Deck Slab + Kerb :
Qnty. As per IRC SP:20 (Plate No.-7.24)
61.87 Cum = 61.870 Cum

12 Reinforcement Work :
Super Structure Work
Qnty. As per IRC SP:20 (Plate No.-7.24) 3.684 MT

13 M-30 in Wearing Coat of avg 50mm thk


1 x 6.60 x 10.00 x 0.075 4.95 Cum
14 RCCHand Railling :
(2 X (10.00 + 3.35+3.35)) 33.40 Rm

15 Expansion Joint : Buried expansion joint


No = 2 Length= 7.50 m 15.00 M

16 Drainage Spout @ 6.00 M C/C 6 No

17 Levelling course below approach slab


Below Approach slab = 2 *7.50*2.5*0.1 = 3.75 Cum
Total Qty = 3.750 Cum
18 RCC M25 Approach Slab :
Length = 2.50 M
Width = 7.15 M
Depth = 0.30 M
No= 2
Qty = 10.725 Cum
Statement - B
Quantity Estimation of Protection Work :

Construction of RCC Bridge (Span : 10.00m)

[ Refer Design of Protection Work and GAD ]

HFL +0.6M

F
Slope 1:1.5

h t2
t1
LWL

L1 L2

Elevation

d1

Boulder
Apron
L1
B
L2

Boulder
Slope Pitching

L3

PLAN

Quantity Estimation for Protection work in each Abutment location .

1 Boulder Pitching Work :


Thickness of Boulder Pitching =S Avg GL in M = GL LWL in M= LWL
h = HFL +0.6-LWL L1 = 1.5*h
h1 = HFL+0.6-GL L3 = 10.0 d = dsl
d1= 1.5*h1
Qty in Each Abutment(Q bp) = (h^2+L1^2)^0.5*B*s +2*PI/4*(L1+d1)*0.5*s + 2xL3*(h^2+d1^2)^0.5*s
2 Filter Media :
Qty in Each Abutment(Q f ) = (Qbp/S)x f

3 Boulder Apron :
Qty in Each Abutment(Q bap) = [(L2 xB)+2x0.5x(PI/2)x0.5x(L1+d)]x0.5x(t1+t2)+2xdxL3xt1

RCC Br
[ refer hydraulic particulars & design of protection work ] GL = 99.06 m
h= 1.84 m h1 = 2.76 m L1 = 2.76 m
dsm = 2.00 m s= 0.30 m f= 0.15 m
t1 = 0.75 m t2 = 0.90 m L2 = 3.00 m
d1 = 4.14 m b= 8.30 m L3 = 8.00 m

1 Boulder Apron :
Qty in Each Abutment(Q bap) = 20.54 + 3.08 + 24.00
= 47.62 cum for 2 nos = 95.24 cum

2 Boulder Pitching :
Qty in Each Abutment(Q bp) = 8.26 + 1.63 + 21.75
= 31.64 cum for 2 nos = 63.28 cum
3 Filter Media :
Qty in Each Abutment(Q f ) = 15.82 cum for 2 nos = 31.64 cum
Construction of RCC Bridge (Span : 10.00m)
DESIGN OF STONE PITCHING AND LAUNCHING APRON AS PER IRC :89-1997
[ Refer Hydraulic datas & Hydraulic calculation calculations ]

Sl Bridge Design Mean Thickness of Slope Width of Launching Apron Thickness of Launc Thickn of Launch Thk.
No no Discharge Scour Dep pitching Reqd provided - hing Apron Reqd - ing Apron Provd of Filter
Q th dsm t=0.06Q^1/3 provd 1.5*dsm inner 1.5*t outer 2.25*t inner outer Media
cum/sec (m) (cm) (cm) (m) (m) (cm) (cm) (cm) (cm) (icm)
1 2 3 4 5 6 7 8 9 10 11 12 13
Br No
1 Br 78.65 2.00 25 30 3.00 3.00 38 57 75 90 15
Statement : D

Item : Slab Culvert (As per IRC SP-20-2002) , 4.00 mtr. span,
I. ABUTMENT & RETURN WALL
1 Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and
other deleterious material and disposal upto a lead of 50 m, dressing of side

a) Abutment = 2 x 3.995 x 5.908 x 1.900 = 89.69 Cum


b) Return wall = 4 x 3.315 x 3.714 x 2.400 = 118.19 Cum
(T) 207.88 Cum

2 Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
Nominal mix 1:3:6 [Hand Mixing]
a) Abutment = 2 x 3.395 x 5.61 x 0.200 = 7.62 Cum
b) Return wall = 4 x 3.015 x 3.11 x 0.200 = 7.51 Cum
c) CC In Flooring = 1 x 6.720 x( 2.770 + 2.57 )x1/2 x 0.25 = 4.49 Cum
(T) 19.61 Cum
3 Providing concrete for plain / reinforced concrete in foundations complete as per drawings and technical specifications Clauses 802, 803, 1202 & 1203
PCC Grade M 20
Nominial mix (1:2:4)

a) Abutment
= 2 x 2.70 x 7.52 x 1.40 = 56.81 Cum
b) Return wall
= 4 x 3.92 x 2.414 x 1.40 = 52.99 Cum
(T) 109.80 Cum

4 Providing concrete for plain / reinforced concrete in substructure complete as per drawings and technical specifications Clauses 802, 804, 805, 806, 1202 & 1204
PCC Grade M 20
Nominial mix (1:2:4)
a) Abutment - = 2 x( 0.700 + 2.25 )/2 x 3.090 x 6.000 = 54.60 Cum
b) Return wall = 4 x( 0.400 + 1.96 )/2 x 3.610 x 3.520 = 60.08 Cum
(T) 114.68 Cum

5 Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the
structures with slope of 1(V):20(H) towards drawing face complete as per drawing

a) Abutment = 2 x 8 = 16 Nos
b) Return wall = 4 x 5 = 20 Nos
(T) 36 Nos

218 218
Statement : D

Item : Slab Culvert (As per IRC SP-20-2002) , 4.00 mtr. span,
II SUPERSTRUCTURE
6 Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5. R.C.C grade M 20
For design mix RCC M 20
a) Abutment cap = 2 x 0.70 x 6 x 0.15 = 1.26 Cum
b) Dirt wall = 2 x 0.30 x 6.00 x 0.37 = 1.33 Cum
c) Deck slab = 1 x 4.80 x 6.00 x 0.37 = 10.66 Cum
d) End Pillar = 2 x 0.40 x 0.40 x 0.60 = 0.19 Cum
d) Kerb at return wall &
= 1 x 0.600 x( 0.30 + 0.45 )x 1/2 x 8.550 = 1.924 Cum
deck
Kerb over deck slab = 1 x 0.600 x( 0.30 + 0.45 )x 1/2 x 4.500 = 1.013 Cum
(T) 16.38 Cum

7 Providing PCC M-20 architectural coping on the top of wing wall, return wall etc. complete as per drawing and technical specification Clauses 615, 710 and 1204.3.11
For coping of return
= 4 x 2.82 = 11.28 mtr
wall

8 Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
AS PER ANNEXURE - RC4 (T) 0.132 MT
9 Supplying, fitting, and placing TMT bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202

AS PER ANNEXURE - RC4 (T) 0.689 MT


10 Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and
bigger size towards the wall and providing over the entire surface behind abutment, wing

(a) Abutment

(2)Back fill behind Abutment


= 2 x 1/2 x 0.600 x 3.090 x 2.334 = 4.33 Cum

(i) Cushion for Approach = 2 x 2.820 x 2.334 x 0.43 = 5.59 Cum


(b) Return Wall
(1)Back fill behind return wall
= 4 x 1/2 x 0.600 x 3.610 x 2.820 = 12.22 Cum
(T) 22.14 Cum
III PROTECTION WORK
11 Providing and laying curtain walls complete as per drawing and technical specification Clause 1304
Cement concrete grade M 10

Side Protection = 2 x 1.150 x( 2.570 + 1.17 )x1/2 x 0.25 = 1.08 Cum


(T) 1.08 cum
12 Filling in foundation trenches as per drawing and technical specification Clause 305.3.9 (i) Sand filling

Central Cavity Portion = 1 x ( 2.570 + 1.17 )x 1/2 1.15 x 8.12 = 17.47 cum

219 219
Statement : D

Item : Slab Culvert (As per IRC SP-20-2002) , 4.00 mtr. span,

13 Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans, covered with sealant complete as per
drawing andslab
Below deck = 2
technical specifications x 6.00 12.00 Rm
Between Slab & Dirt
12.00
Wall = 2 x 6.00 Rm
(T) 41.47 Rm

220 220
Annexure-RC4
REINFORCEMENT CALCULATION SHEET - [SLAB CULVERT-4.00m]

Length of
Sl Dia. Spacing Total length Wt. Total Wt. Wt.
Particular No each Bar
No. (mm) (m) (m) (kg/m) (kg/m) (MT)
(m)
A Abutment Cap & Dirt Wall
T 12 main bar at Bottom 12 2 3 6.14 36.82 0.89 32.66 0.033
T 10main bar at Top 10 2 4 6.14 49.09 0.62 30.24 0.030
T 8, @200 c/c at Abutment Cap 8 2 32 0.200 1.10 69.95 0.39 27.58 0.028
T 8, @200 c/c at Dirt Wall 8 2 32 0.200 1.64 104.16 0.39 41.07 0.041
Total 0.132 Ton

Length of
Sl Dia. Spacing Total length Wt. Total Wt. Wt.
Particular No each Bar
No. (mm) (m) (m) (kg/m) (kg/m) (MT)
(m)
A Deck Slab
16 mm dia. 57nos @ 105 mm C/C (Bendup Top Bottom )-
Main bar 16 1 57 0.105 4.858 276.91 1.58 436.67 0.437
Top Longitudional 10mm dia @ 300 mm C/C ( Top )-
Surface Steel 10 1 20 0.300 4.808 94.88 0.62 58.44 0.058

Top Traverse 10mm dia @ 300 mm C/C -Surface Steel


10 1 16 0.300 5.920 96.69 0.62 59.56 0.060
Distribution bar 12mm dia @200 c/c -Bottom bar 12 1 24 0.200 6.040 142.54 0.89 126.44 0.126
Total 0.681 Ton
B End Pillar
T 12 mm - 4 Nos. 12 2 4 0.81 6.48 0.89 5.75 0.006
T 8 mm @ 200 mm C/C 8 1 4 0.200 1.42 5.13 0.39 2.02 0.002
Total 0.008 Ton
Total A+B = 0.689 Ton

221
FORMAT F-7
PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY)
COST ESTIMATE FOR ROADS CONSTRUCTION OF CROSS DRAINAGE WORKS

Road From : #REF!


Block : #REF! Package No : #REF!
District : #REF!

Type of Cross Drainage Works : Slab Culvert 6.00m Span (Overall width = 6.00 m, Road Way Width = 5.10 m)

Proposed Slab Culvert : 0 Nos.

Rate (Rs.)
Total

B (m)

D (m)
L (m)
Sl

No.
SOR No. Item Description Qnty. Unit As per Amount
No.
SOR (Rs.)
2016-17
1 2 3 4 5 6 7 8 9 10 11

Earthwork in excavation for structures as per


drawing and technical specifications Clause 305.1
including setting out, construction of shoring and
bracing, removal of stumps and other deleterious
1 11.1 / I (i) material and disposal upto a lead of 50 m, dressing
of sides and bottom and backfilling in trenches with
excavated suitable material.

Ordinary soil upto 3 m depth Qnty. As Per


Statement : E 279.67 Cum 71.00 19856.57

Providing concrete for plain/reinforced concrete in


open foundations complete as per drawings and
2 11.4 / I(ii) technical specifications Clause 802, 803, 1202 &
1203
Nominal mix 1:3:6 [Hand Mixing] Qnty. As Per
Statement : E 20.08 Cum 5284.00 106102.72

Providing concrete for plain / reinforced concrete in


foundations complete as per drawings and
11.4 / A / technical specifications Clauses 802, 803, 1202 &
3
III 1203
PCC Grade M 20 Qnty. As Per
Nominial mix (1:2:4) Statement : E 135.24 Cum 6007.00 812386.68

Providing concrete for plain / reinforced concrete in


substructure complete as per drawings and
12.5 / II technical specifications Clauses 802, 804, 805,
4
(i) 806, 1202 & 1204
PCC Grade M 20
Nominial mix (1:2:4) Qnty. As Per
Statement : E 144.62 Cum 6369.00 921084.78

Providing weepholes in brick masonry/stone


masonry, plain/reinforced concrete abutment, wing
wall, return wall with 100 mm dia AC pipe
5 12.9 extending through the full width of the structures
with slope of 1(V):20(H) towards drawing face
complete as per drawing and technical
specification Clauses 614, 709, 1204.3.7
Qnty. As Per
Statement : E 44.00 Nos 182.00 8008.00

Providing and laying reinforced cement concrete in


superstructure as per drawing and technical
13.1 / A /
6 specifications Clauses 800, 1205.4 and 1205.5.
III (a)
R.C.C grade M 20
For design mix RCC M 20 Qnty. As Per
Statement : E 26.80 Cum 7025.00 188270.00
Rate (Rs.)
Total

B (m)

D (m)
L (m)
Sl

No.
SOR No. Item Description Qnty. Unit As per Amount
No.
SOR (Rs.)
2016-17
1 2 3 4 5 6 7 8 9 10 11

Providing PCC M-20 architectural coping on the top


of wing wall, return wall etc. complete as per
7 12.13 (i)
drawing and technical specification Clauses 615,
710 and 1204.3.11 Qnty. As Per
Statement : E 19.35 Rm 413.00 7991.55

Supplying, fitting and placing TMT bar


reinforcement (Fe 415) in substructrue complete as
8 12.7
per drawings and technical specification Clauses
1002, 1005, 1010 & 1202 Qnty. As Per
Statement : E 0.138 MT 65583.00 9050.45

Supplying, fitting, and placing TMT bar


reinforcement in superstructure complete as per
9 13.3
drawing and technical specifications Clauses 1002,
1010 and 1202 Qnty. As Per
Statement : E 2.313 MT 66360.00 153490.68

Providing and laying filter media with granular


crushed aggregates as per specification to a
thickness of not less than 600 mm with smaller
size towards the soil and bigger size towards the
10 12.11 wall and providing over the entire surface behind
abutment, wing wall, return wall to the full height,
compacted to firm condition complete as per
drawing and technical specification Clause
1204.3.8 Qnty. As Per
Statement : E 38.25 Cum 1452.00 55539.00

Providing and laying curtain walls complete as per


11 14.9 / III drawing and technical specification Clause 1304
Cement concrete grade M 10 Qnty. As Per
Statement : E 2.20 Cum 5034.00 11074.80

Fillling in foundation trenches as per drawing and


12 11.2(I) technical specification Clause 305.3.9
Sand filling Qnty. As Per
Statement : E 35.77 Cum 968.00 34625.36
Providing and fixing in position 20 mm thick
premoulded joint filler in expansion joint for fixed
13 13.16 (III) ends of simply supported spans, covered with
sealant complete as per drawing and technical
specifications Qnty. As Per Stat 24.00 Rm 285.00 6840.00
Total=Rs. 2334320.59
Cost of 6.00m Slab Culvert Each Unit Say ~ Rs. ###
For 0 Nos = Rs. 0.00

Asstt. Executive Engineer PWD


Patharkandi Rural Road Subdivision
Patharkandi
Statement : E
DETAILS OF MEASUREMENT

Type of Cross Drainage Works : Slab Culvert 6.00m Span (Overall width = 6.00 m, Road Way Width = 5.10 m)

Item : Slab Culvert (As per IRC SP-20-2002) , 6.00 mtr. span,
I. ABUTMENT & RETURN WALL
1
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious
a) Abutment = 2 x 3.910 x 5.908 x 1.900 = 87.78 Cum
b) Return wall = 4 x 5.382 x 3.714 x 2.400 = 191.89 Cum
(T) 279.67 Cum

2 Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
Nominal mix 1:3:6 [Hand Mixing]
a) Abutment = 2 x 3.310 x 5.61 x 0.200 = 7.42 Cum
b) Return wall = 4 x 5.082 x 3.11 x 0.200 = 12.66 Cum
c) CC In Flooring = 1 x 6.720 x( 4.730 + 4.53 )x1/2 x 0.25 = 7.78 Cum
(T) 20.08 Cum
3 Providing concrete for plain / reinforced concrete in foundations complete as per drawings and technical specifications Clauses 802, 803, 1202 & 1203
Nominial mix (1:2:4)
a) Abutment
= 2 x 2.61 x 7.52 x 1.40 = 54.96 Cum
b) Return wall
= 4 x 5.94 x 2.414 x 1.40 = 80.28 Cum
Therefore, total volume : 135.24 Cum

224
Statement : E
DETAILS OF MEASUREMENT

Type of Cross Drainage Works : Slab Culvert 6.00m Span (Overall width = 6.00 m, Road Way Width = 5.10 m)

Item : Slab Culvert (As per IRC SP-20-2002) , 6.00 mtr. span,

4 Providing concrete for plain / reinforced concrete in substructure complete as per drawings and technical specifications Clauses 802, 804, 805, 806, 1202 & 1204
PCC Grade M 20
Nominial mix (1:2:4)
a) Abutment - = 2 x( 0.700 + 2.16 )/2 x 2.920 x 6.000 = 50.11 Cum
b) Return wall = 4 x( 0.400 + 1.96 )/2 x 3.610 x 5.537 = 94.51 Cum
(T) 144.62 Cum

5 Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full
width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing
a) Abutment = 2 x 8 = 16 Nos
b) Return wall = 4 x 7 = 28 Nos
(T) 44 Nos
II SUPERSTRUCTURE
6 Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5. R.C.C grade M 20
For design mix RCC M 20
a) Abutment cap = 2 x 0.70 x 6.00 x 0.20 = 1.68 Cum
b) Dirt wall = 2 x 0.30 x 6.00 x 0.48 = 1.73 Cum
c) Deck slab = 1 x 6.80 x 6.00 x 0.48 = 19.58 Cum
d) End Piller = 2 x 0.40 x 0.40 x 0.60 = 0.19 Cum
d) Kerb at return wall &
= 1 x 0.600 x( 0.30 + 0.45 )x 1/2 x 11.050 = 2.49 Cum
deck
Kerb over deck slab = 1 x 0.600 x( 0.30 + 0.45 )x 1/2 x 5.000 = 1.13 Cum
(T) 26.80 Cum

225
Statement : E
DETAILS OF MEASUREMENT

Type of Cross Drainage Works : Slab Culvert 6.00m Span (Overall width = 6.00 m, Road Way Width = 5.10 m)

Item : Slab Culvert (As per IRC SP-20-2002) , 6.00 mtr. span,

7 Providing PCC M-20 architectural coping on the top of wing wall, return wall etc. complete as per drawing and technical specification Clauses 615, 710 and 1204.3.11

For coping of return


= 4 x 4.84 = 19.35 mtr
wall

8 Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
AS PER ANNEXURE - RC6 (T) 0.138 MT
9 Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202

AS PER ANNEXURE - RC6 (T) 2.313 MT


10 Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and
bigger size towards the wall and providing over the entire surface behind abutment, wing

(a) Abutment

(2)Back fill behind Abutment


= 2 x 1/2 x 0.600 x 2.920 x 2.334 = 4.09 Cum

(i) Cushion for Approach = 2 x 4.837 x 2.334 x 0.59 = 13.21 Cum


(b) Return Wall
(1)Back fill behind return wall
= 4 x 1/2 x 0.600 x 3.610 x 4.837 = 20.95 Cum
(T) 38.25 Cum
III PROTECTION WORK
11 Providing and laying curtain walls complete as per drawing and technical specification Clause 1304
Cement concrete grade M 10

Side Protection = 2 x 1.150 x( 4.530 + 3.13 )x1/2 x 0.25 = 2.20 Cum


(T) 2.20 cum
12 Fillling in foundation trenches as per drawing and technical specification Clause 305.3.9 (i) Sand filling

Central Cavity Portion = 1 x ( 4.530 + 3.13 )x 1/2 1.15 x 8.12 = 35.77 cum

13 Providing and fixing in position 20 mm thick premoulded joint filler in expansion joint for fixed ends of simply supported spans, covered with sealant complete as per
drawing andslab
Below deck technical specifications
= 2 x 6.00 12.00 Rm
Between Slab & Dirt
12.00
Wall = 2 x 6.00 Rm
(T) 24.00 Rm

226
Annexure-RC6
REINFORCEMENT CALCULATION SHEET - [SLAB CULVERT-6.00m]

Length of
Sl Dia. Spacing Total length Wt. Total Wt. Wt.
Particular each Bar
No. (mm) (m) (m) (kg/m) (kg/m) (MT)
No (m)
A Abutment Cap & Dirt Wall
T 12 main bar at Bottom 12 2 3 6.14 36.82 0.89 32.66 0.033
T 10main bar at Top 10 2 4 6.14 49.09 0.62 30.24 0.030
T 8, @200 c/c at Abutment Cap 8 2 32 0.200 1.10 69.95 0.39 27.58 0.028
T 8, @200 c/c at Dirt Wall 8 2 32 0.200 1.86 118.10 0.39 46.56 0.047
Total 0.138 Ton

Length of
Sl Dia. Spacing Total length Wt. Total Wt. Wt.
Particular each Bar
No. (mm) (m) (m) (kg/m) (kg/m) (MT)
No (m)
A Deck Slab
T 20 mm @ 115 mm C/C (Bendup Top Bottom ) 20 1 52 0.115 6.89 361.35 2.46 890.36 0.890
T 20 mm @ 115 mm C/C ( Top ) 20 1 52 0.115 7.08 371.55 2.46 915.49 0.915
T 12, @150 c/c 12 2 46 0.150 6.14 562.06 0.89 498.57 0.499
Total 2.304 Ton
B End Pillar
T 12 mm - 4 Nos. 12 2 4 0.92 7.36 0.89 6.53 0.007
T 8 mm @ 200 mm C/C 8 1 4 0.200 1.42 5.13 0.39 2.02 0.002
Total 0.009 Ton
Total A+B = 2.313 Ton
FORMAT F-7
PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY)
COST ESTIMATE FOR ROADS CONSTRUCTION OF CROSS DRAINAGE WORKS

Road From : #REF! Package No : #REF!


Block : #REF! District : #REF!
Type of Cross Drainage Works : Double Cell Box culvert 3m x 3m (Overall width = 7.50 m, Road Way Width =
6.60 m)

Proposed Box Cell Culvert : 0 Nos.

Rate (Rs.)
Total

B (m)

D (m)
L (m)
Sl SOR

No.
Item Description Qnty. Unit As per SOR Amount
No. No.
2016-17 (Rs.)

1 2 3 4 5 6 7 8 9 10 11

Earthwork in excavation for structures as per


drawing and technical specifications Clause
305.1 including setting out, construction of
11.1 / I shoring and bracing, removal of stumps and
1 other deleterious material and disposal upto a
(i)
lead of 50 m, dressing of side

Ordinary soil upto 3 m depth Qnty. As Per


Statement : 2C 141.38 Cum 71.00 10037.98

Providing concrete for plain/reinforced concrete


in open foundations complete as per drawings
11.4 /
2 and technical specifications Clause 802, 803,
I(ii)
1202 & 1203
Nominal mix 1:3:6 [Hand Mixing] Qnty. As Per
Statement : 2C 12.08 Cum 5284.00 63830.72

Providing concrete for plain / reinforced


concrete in foundations complete as per
11.4 / A drawings and technical specifications Clauses
3
/ III 802, 803, 1202 & 1203
PCC Grade M 20
Nominial mix (1:2:4) Qnty. As Per
Statement : 2C 34.92 Cum 6007.00 209764.44

Providing concrete for plain / reinforced


concrete in substructure complete as per
12.5 / II drawings and technical specifications Clauses
4
(i) 802, 804, 805, 806, 1202 & 1204
PCC Grade M 20
Nominial mix (1:2:4) Qnty. As Per
Statement : 2C 24.92 Cum 6369.00 158715.48

Providing weepholes in brick masonry/stone


masonry, plain/reinforced concrete abutment,
wing wall, return wall with 100 mm dia AC pipe
5 12.9
extending through the full width of the
structures with slope of 1(V):20(H) towards
drawing face complete as per drawing Qnty. As Per
Statement : 2C 4 Nos 182.00 728.00

Providing and laying reinforced cement


concrete in superstructure as per drawing and
13.1 / A
6 technical specifications Clauses 800, 1205.4
/ III (a)
and 1205.5. R.C.C grade M 20
For design mix RCC M 20 Qnty. As Per
Statement : 2C 15.03 Cum 7025.00 105585.75

Providing PCC M-20 architectural coping on


the top of wing wall, return wall etc. complete
7 12.13
as per drawing and technical specification
Clauses 615, 710 and 1204.3.11 Qnty. As Per
Statement : 2C 6.00 Rm 413.00 2478.00
Rate (Rs.)
Total

B (m)

D (m)
L (m)
Sl SOR

No.
Item Description Qnty. Unit As per SOR Amount
No. No.
2016-17 (Rs.)

1 2 3 4 5 6 7 8 9 10 11
Supplying, fitting and placingTMT bar
reinforcement in foundation complete as per
8 11.8
drawings and technical specifications Clauses
1000 and 1202 Qnty. As Per
Statement : 2C 0.915 MT 65489.00 59922.44

Supplying, fitting and placing TMT bar


reinforcement (Fe 415) in substructure
9 12.7
complete as per drawings and technical
specification Clauses 1002, 1005, 1010 & 1202 Qnty. As Per
Statement : 2C 2.820 MT 65583.00 184944.06

Supplying, fitting, and placing TMT bar


reinforcement in superstructure complete as
10 13.3
per drawing and technical specifications
Qnty. As Per
Clauses 1002, 1010 and 1202
Statement : 2C 0.021 MT 66360.00 1393.56

Providing and laying filter media with granular


crushed aggregates as per specification to a
thickness of not less than 600 mm with smaller
11 12.11
size towards the soil and bigger size towards
the wall and providing over the entire surface
behind abutment, wing Qnty. As Per
Statement : 2C 1.99 Cum 1452.00 2889.48

Providing concrete for plain/reinforced concrete


in open foundations complete as per drawing
11.4 /
12 and technical specification Clause 802, 803, &
IV
1203
Qnty. As Per
IV) R.C.C.grade M 20
Statement : 2C 47.06 Cum 6297.00 296336.82

Construction of toe walls for protection of


slopes as per drawing and technical
14.11 /
13 specifications Clause 1302.5
I
Random rubble masonry in case of stone
pitching laid with cement mortar (1:5) Qnty. As Per
Statement : 2C 9.00 Cum 2876.00 25884.00

Providing and laying of dry rubble flooring


14 14.8 complete as per drawings and technical
Qnty. As Per
specifications Clause 1303.3
Statement : 2C 4.54 Cum 1378.00 6256.12

Filling in foundation trenches as per drawing


15 11.2(I) and technical specification Clause 305.3.9
Sand filling Qnty. As Per
Statement : 2C 53.11 Cum 968.00 51410.48

Analysi Prime Coat, Tack Coat, Premix Carpeting and


16 Qnty. As Per
s Rate Seal Coat (as a Wearing Coat)
Statement : 2C 36.21 sqm #REF! #REF!
Total Rs. #REF!
Total Say ~ Rs. #REF!
Total Cost for 0 Nos. Double Cell Box culverts 3m x 3m Rs. #REF!
DETAILS OF MEASUREMENT

Item : Box culvert 3m x 3m (Double Cell) (As per IRC SP-20) , 7.10 mtr. span,
Statement : 2C
1 Earthwork in excavation
Box Cell = 2 x 7.400 x 0.300 x 0.300 = 1.33 Cum
Cutoff Wall Long = 2 x 6.800 x 0.900 x 1.650 = 20.20 Cum
Cutoff Wall Short = 2 x 7.100 x 0.900 x 1.650 = 21.09 Cum
Return wall = 4 x 2.100 x 2.687 x 3.000 = 67.71 Cum

D/S Appron
Toe Long Wall = 1 x 6.800 x 1.350 x 1.150 = 10.56 Cum
Toe Side Wall = 2 x 2.000 x 1.350 x 1.150 = 6.21 Cum

U/S Appron
Toe Long Wall = 1 x 6.800 x 1.350 x 1.150 = 10.56 Cum
Toe Side Wall = 2 x 1.200 x 1.350 x 1.150 = 3.73 Cum
(T) 141.38 Cum

2 Providing concrete for plain/reinforced concrete in open foundations


a) Below Raft of Box Cell = 1 x 6.800 x 7.10 x 0.100 = 4.83 Cum
b) Return wall = 4 x 1.500 x 2.09 x 0.200 = 2.50 Cum
Bottom of Cutoff Long Wall = 2 x 6.800 x 0.600 x 0.150 = 1.22 Cum
Bottom of Cutoff Short Wall = 2 x 7.100 x 0.600 x 0.150 = 1.28 Cum
Toe Long Wall = 2 x 6.800 x 0.750 x 0.150 = 1.53 Cum
Toe Side Wall = 2 x 2.000 x 0.750 x 0.150 = 0.45 Cum
Toe Side Wall = 2 x 1.200 x 0.750 x 0.150 = 0.27 Cum
(T) 12.08 Cum

3 Providing concrete for plain / reinforced concrete in foundations M 20

a) Box Wall Raft = 1 x 6.80 x 7.10 x 0.30 14.48 Cum


b) Return wall = 4 x 2.30 x 1.587 x 1.40 = 20.44 Cum
34.92 Cum

4 Providing concrete for plain / reinforced concrete in substructure M 20

a) Box Side Wall = 2 x 6.00 x 0.40 x 3.00 14.40 Cum


b) Box Mid Wall = 1 x 6.00 x 0.30 x 3.00 5.40 Cum
c) Return wall = 2 x( 0.45 + 1.09 )/2 x 1.50 x 2.22 = 5.12 Cum
(T) 24.92 Cum

230
DETAILS OF MEASUREMENT

Item : Box culvert 3m x 3m (Double Cell) (As per IRC SP-20) , 7.10 mtr. span,

5 Providing weepholes

b) Return wall = 4 x 1 = 4 Nos


(T) 4 Nos

6 Providing and laying reinforced cement concrete in superstructure RCC M 20

Deck slab = 1 x 6.00 x 7.10 x 0.30 = 12.78 Cum


Top Hunch = 4 x 6.00 x 0.150 x 0.150 x 1/2 = 0.27 Cum
End Piller = 4 x 0.40 x 0.40 x 0.60 = 0.38 Cum
RCC Kerb = 2 x 7.10 x 0.45 x 0.25 = 1.60 Cum
(T) 15.03 Cum

7 Providing PCC M-20 architectural coping on the top of wing wall, return wall etc.
For coping of return wall = 4 x 1.50 = 6.00 mtr

8 TMT bar reinforcement in foundation


Qty. As Per Annexure - R2C = (T) 0.915 MT

9 TMT bar reinforcement (Fe 415) in substructrue

Qty. As Per Annexure - R2C = (T) 2.820 MT


10 TMT bar reinforcement in superstructure

Qty. As Per Annexure - R2C = (T) 0.021 MT

11 Providing and laying filter material underneath pitching


D/S Appron
Filter material = 1 x 5.900 x 1.550 x 0.150 = 1.37 Cum

U/S Appron
Filter material = 1 x 5.900 x 0.700 x 0.150 = 0.62 Cum
(T) 1.99 Cum

231
DETAILS OF MEASUREMENT

Item : Box culvert 3m x 3m (Double Cell) (As per IRC SP-20) , 7.10 mtr. span,
12 Providing concrete for plain/reinforced concrete in open foundations M 20

Cutoff Long Wall = 2 x 6.800 x 0.300 x 1.500 = 6.12 Cum


Cutoff Short Wall = 2 x 7.100 x 0.300 x 1.500 = 6.39 Cum
RCC Raft = 1 x 6.800 x 7.100 x 0.300 = 14.48 Cum
End Wall = 2 x 6.000 x 0.400 x 3.000 = 14.40 Cum
Mid Wall = 1 x 6.000 x 0.300 x 3.000 = 5.40 Cum
Bottom Hunch = 4 x 6.000 x 0.150 x 0.150 x 1/2 = 0.27 Cum
(T) 47.06 Cum

13 Construction of toe walls for protection


D/S Appron
Toe Long Wall = 1 x 6.800 x 0.450 x 1.000 = 3.06 Cum
Toe Side Wall = 2 x 2.000 x 0.450 x 1.000 = 1.80 Cum

U/S Appron
Toe Long Wall = 1 x 6.800 x 0.450 x 1.000 = 3.06 Cum
Toe Side Wall = 2 x 1.200 x 0.450 x 1.000 = 1.08 Cum
(T) 9.00 Cum

14 Providing and laying of dry rubble flooring


D/S Appron
Over Filter material = 1 x 5.900 x 1.550 x 0.225 = 2.06 Cum
U/S Appron
Over Filter material = 1 x 5.900 x 0.700 x 0.600 = 2.48 Cum
(T) 4.54 cum

15 Filling in foundation trenches


Below PCC leveling Course = 1 x 6.800 x 7.100 x 1.100 = 53.11 Cum

16 Prime Coat, Tack Coat, Premix Carpeting and Seal Coat


= 1 x 7.100 x 5.100 = 36.21 Sqm

232
Annexure-R2C
REINFORCEMENT CALCULATION SHEET - Box culvert 3m x 3m (Double Cell)
A - Foundation

Length of
Sl Dia. Spacing Total length Wt. Total Wt. Wt.
Particular No each Bar
No. (mm) (m) (m) (kg/m) (kg/m) (MT)
(m)
1 Cut off Wall
4-T 10 mm Bottom bar 10 1 4 13.70 54.80 0.62 33.76 0.034
T 8 mm @ 250mm C/C vertical B/W 8 2 7 0.250 13.66 182.55 0.39 71.97 0.072
T 8mm , @200 c/c Stirrups 8 1 69 0.200 13.66 937.35 0.39 369.54 0.370
2 Surface Reinforcement
T10 mm @ 125 mm C/C B/W Surface
reinforcement Long way 10 1 48 0.125 7.20 348.19 0.62 214.49 0.214

T10 mm @ 125 mm C/C B/W Surface


reinforcement Shot way 10 1 48 0.125 6.10 295.00 0.62 181.72 0.182
Total 0.871 Ton
Add 5% for wastage = 0.044 Ton
Total 0.915 Ton
B - Sub-Structure

Length of
Sl Dia. Spacing Total length Wt. Total Wt. Wt.
Bar Mark No each Bar
No. (mm) (m) (m) (kg/m) (kg/m) (MT)
(m)
2 Box Cell
a 12 2 32 0.190 5.94 380.16 0.89 337.22 0.337
b 10 2 7 0.950 2.21 30.94 0.62 19.06 0.019
c 8 2 32 0.190 2.22 142.08 0.39 56.01 0.056
d 10 2 31 0.200 3.52 218.24 0.62 134.44 0.134
d1 10 4 24 0.300 5.92 568.32 0.62 350.09 0.350
d2 10 6 19 0.200 5.92 674.88 0.62 415.73 0.416
e 12 1 32 0.190 7.38 236.29 0.89 209.60 0.210
f 10 2 40 0.150 7.02 561.60 0.62 345.95 0.346
g 8 2 40 0.150 3.66 292.80 0.39 115.43 0.115
h 10 1 32 0.190 7.02 224.64 0.62 138.38 0.138
i 12 1 7 0.950 1.90 13.30 0.89 11.80 0.012
j 10 1 32 0.190 7.02 224.64 0.62 138.38 0.138
k 12 1 7 0.950 1.90 13.30 0.89 11.80 0.012
l 12 1 50 0.120 7.02 351.00 0.89 311.35 0.311
m 8 4 40 0.150 0.82 131.84 0.39 51.98 0.052
n 8 4 40 0.150 0.61 97.92 0.39 38.60 0.039
Total 2.686 Ton
Add 5% for wastage = 0.134 Ton
Total 2.820 Ton
C - Super-Structure

3 End Pillar
T 12 mm - 4 Nos. 12 4 4 0.82 13.12 0.89 11.64 0.012
T 8 mm @ 200 mm C/C 8 4 4 0.200 1.42 20.51 0.39 8.08 0.008
Total 0.020 Ton
Add 5% for wastage = 0.001 Ton
Total 0.021 Ton
FORMAT F-7
PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY)
COST ESTIMATE FOR ROADS CONSTRUCTION OF CROSS DRAINAGE WORKS

Road From : #REF! Package No : #REF!


Block : #REF! District : #REF!
Type of Cross Drainage Works : Double Cell Box culvert 5m x 5m (Overall width = 7.50 m, Road Way Width =
6.60 m)

Proposed Box Cell Culvert : 0 Nos.

Rate (Rs.)
Total

B (m)

D (m)
L (m)
Sl SOR

No.
Item Description Qnty. Unit As per SOR Amount
No. No.
2016-17 (Rs.)

1 2 3 4 5 6 7 8 9 10 11

Earthwork in excavation for structures as per


drawing and technical specifications Clause
305.1 including setting out, construction of
11.1 / I shoring and bracing, removal of stumps and
1 other deleterious material and disposal upto
(i)
a lead of 50 m, dressing of side

Ordinary soil upto 3 m depth Qnty. As Per


Statement : 2E 194.49 Cum 71.00 13808.79

Providing concrete for plain/reinforced


concrete in open foundations complete as
11.4 /
2 per drawings and technical specifications
I(ii)
Clause 802, 803, 1202 & 1203
Nominal mix 1:3:6 [Hand Mixing] Qnty. As Per
Statement : 2E 19.30 Cum 5284.00 101981.20

Providing concrete for plain / reinforced


concrete in foundations complete as per
11.4 / drawings and technical specifications
3
A / III Clauses 802, 803, 1202 & 1203
PCC Grade M 20
Nominial mix (1:2:4) Qnty. As Per
Statement : 2E 58.88 Cum 6007.00 353692.16

Providing concrete for plain / reinforced


concrete in substructure complete as per
12.5 / II drawings and technical specifications
4
(i) Clauses 802, 804, 805, 806, 1202 & 1204
PCC Grade M 20
Nominial mix (1:2:4) Qnty. As Per
Statement : 2E 78.30 Cum 6369.00 498692.70

Providing weepholes in brick masonry/stone


masonry, plain/reinforced concrete
abutment, wing wall, return wall with 100 mm
5 12.9 dia AC pipe extending through the full width
of the structures with slope of 1(V):20(H)
towards drawing face complete as per
drawing Qnty. As Per
Statement : 2E 20 Nos 182.00 3640.00

Providing and laying reinforced cement


13.1 / concrete in superstructure as per drawing
6 A / III and technical specifications Clauses 800,
(a) 1205.4 and 1205.5. R.C.C grade M 20
For design mix RCC M 20 Qnty. As Per
Statement : 2E 30.79 Cum 7025.00 216299.75
Rate (Rs.)
Total

B (m)

D (m)
L (m)
Sl SOR

No.
Item Description Qnty. Unit As per SOR Amount
No. No.
2016-17 (Rs.)

1 2 3 4 5 6 7 8 9 10 11

Providing PCC M-20 architectural coping on


the top of wing wall, return wall etc. complete
7 12.13
as per drawing and technical specification
Clauses 615, 710 and 1204.3.11 Qnty. As Per
Statement : 2E 8.00 Rm 413.00 3304.00

Supplying, fitting and placingTMT bar


reinforcement in foundation complete as per
8 11.8
drawings and technical specifications
Clauses 1000 and 1202 Qnty. As Per
Statement : 2E 1.821 MT 65489.00 119255.47

Supplying, fitting and placing TMT bar


reinforcement (Fe 415) in substructure
9 12.7 complete as per drawings and technical
specification Clauses 1002, 1005, 1010 &
1202 Qnty. As Per
Statement : 2E 8.144 MT 65583.00 534107.95

Supplying, fitting, and placing TMT bar


reinforcement in superstructure complete as
10 13.3
per drawing and technical specifications
Clauses 1002, 1010 and 1202 Qnty. As Per
Statement : 2E 0.022 MT 66360.00 1459.92

Providing and laying filter media with


granular crushed aggregates as per
specification to a thickness of not less than
11 12.11 600 mm with smaller size towards the soil
and bigger size towards the wall and
providing over the entire surface behind
abutment, wing Qnty. As Per
Statement : 2E 6.85 Cum 1452.00 9946.20

Providing concrete for plain/reinforced


concrete in open foundations complete as
12 11.4 / IV per drawing and technical specification
Clause 802, 803, & 1203
IV) R.C.C.grade M 20 Qnty. As Per
Statement : 2E 89.87 Cum 6297.00 565911.39

Construction of toe walls for protection of


slopes as per drawing and technical
13 14.11 / I specifications Clause 1302.5
Random rubble masonry in case of stone
pitching laid with cement mortar (1:5) Qnty. As Per
Statement : 2E 13.14 Cum 2876.00 37790.64

Providing and laying of dry rubble flooring


14 14.8 complete as per drawings and technical
Qnty. As Per
specifications Clause 1303.3
Statement : 2E 8.07 Cum 1378.00 11120.46

Filling in foundation trenches as per drawing


15 11.2(I) and technical specification Clause 305.3.9
Sand filling Qnty. As Per
Statement : 2E 77.52 Cum 968.00 75039.36

Construction of R.C.C. railing of M 25 grade


in cast-in-situ with 20 mm nominal size
aggregate, true to line and grade, tolerance
of vertical railing post not to exceed 1 in 500,
16 13.6
centre-to-centre spacing between vertical
posts not to exceed 2000 mm as per
drawing and technical specifications Clauses
800, 900 and 1208.3
Qnty. As Per
Statement : 2E 30.80 Rm 2584.00 79587.20

Analysis Prime Coat, Tack Coat, Premix Carpeting


16 Qnty. As Per
Rate and Seal Coat (as a Wearing Coat)
Statement : 2E 75.24 sqm #REF! #REF!
Rate (Rs.)
Total

B (m)

D (m)
L (m)
Sl SOR

No.
Item Description Qnty. Unit As per SOR Amount
No. No.
2016-17 (Rs.)

1 2 3 4 5 6 7 8 9 10 11
Total=Rs. #REF!
Total Say ~ Rs. #REF!
Total Cost for 0 Nos. Double Cell Box culverts 5m x 5m Rs. #REF!
DETAILS OF MEASUREMENT

Item : Box culvert 5m x 5m (Double Cell) (As per IRC SP-20) , 11.40 mtr. span,
Statement : 2E

1 Earthwork in excavation
Box Cell = 2 x 7.400 x 1.500 x 1.500 = 33.30 Cum
Cutoff Wall Long = 2 x 11.400 x 0.900 x 1.650 = 33.86 Cum
Cutoff Wall Short = 2 x 6.800 x 0.900 x 1.650 = 20.20 Cum
Return wall = 4 x 2.600 x 3.714 x 1.600 = 61.80 Cum

D/S Appron
Toe Long Wall = 1 x 11.400 x 1.350 x 1.150 = 17.70 Cum
Toe Side Wall = 2 x 2.000 x 1.350 x 1.150 = 6.21 Cum

U/S Appron
Toe Long Wall = 1 x 11.400 x 1.350 x 1.150 = 17.70 Cum
Toe Side Wall = 2 x 1.200 x 1.350 x 1.150 = 3.73 Cum
(T) 194.49 Cum

2 Providing concrete for plain/reinforced concrete in open foundations


Below Raft of Box Cell = 1 x 6.800 x 11.40 x 0.100 = 7.75 Cum
Return wall = 4 x 3.114 x 2.00 x 0.200 = 4.98 Cum
Bottom of Cutoff Long Wall = 2 x 11.400 x 0.600 x 0.150 = 2.05 Cum
Bottom of Cutoff Short Wall = 2 x 6.800 x 0.600 x 0.150 = 1.22 Cum
Toe Long Wall = 2 x 11.400 x 0.750 x 0.150 = 2.57 Cum
Toe Side Wall = 2 x 2.000 x 0.750 x 0.150 = 0.45 Cum
Toe Side Wall = 2 x 1.200 x 0.750 x 0.150 = 0.27 Cum
(T) 19.30 Cum

239
DETAILS OF MEASUREMENT

Item : Box culvert 5m x 5m (Double Cell) (As per IRC SP-20) , 11.40 mtr. span,
3 Providing concrete for plain / reinforced concrete in foundations M 20

a) Box Wall Raft = 1 x 6.80 x 11.40 x 0.40 31.01 Cum


b) Return wall = 4 x 2.00 x 2.489 x 1.40 = 27.88 Cum
58.88 Cum

4 Providing concrete for plain / reinforced concrete in substructure M 20


a) Box Side Wall = 2 x 6.00 x 0.50 x 5.00 30.00 Cum
b) Box Mid Wall = 1 x 6.00 x 0.40 x 5.00 12.00 Cum
c) Return wall = 4 x( 0.40 + 2.11 )/2 x 2.00 x 3.61 = 36.30 Cum
(T) 78.30 Cum

5 Providing weepholes
b) Return wall = 4 x 5 = 20 Nos
(T) 20 Nos

6 Providing and laying reinforced cement concrete in superstructure RCC M 20

Deck slab = 1 x 6.00 x 11.40 x 0.40 = 27.36 Cum


Top Hunch = 4 x 6.00 x 0.20 x 0.20 x 1/2 = 0.48 Cum
End Piller = 4 x 0.40 x 0.40 x 0.60 = 0.38 Cum
RCC Kerb = 2 x 11.40 x 0.45 x 0.25 = 2.57 Cum
(T) 30.79 Cum

7 Providing PCC M-20 architectural coping on the top of wing wall, return wall etc.
For coping of return wall = 4 x 2.00 = 8.00 mtr

8 TMT bar reinforcement in foundation


Qty. As Per Annexure - R2E = (T) 1.821 MT

240
DETAILS OF MEASUREMENT

Item : Box culvert 5m x 5m (Double Cell) (As per IRC SP-20) , 11.40 mtr. span,
9 TMT bar reinforcement (Fe 415) in substructrue

Qty. As Per Annexure - R2E = (T) 8.144 MT


10 TMT bar reinforcement in superstructure

Qty. As Per Annexure - R2E = (T) 0.022 MT

11 Providing and laying filter material underneath pitching


D/S Appron
Filter material = 1 x 10.50 x 1.55 x 0.15 = 2.44 Cum

U/S Appron
Filter material = 1 x 10.50 x 0.70 x 0.60 = 4.41 Cum
(T) 6.85 Cum

12 Providing concrete for plain/reinforced concrete in open foundations M 20

Cutoff Long Wall = 2 x 11.40 x 0.30 x 1.50 = 10.26 Cum


Cutoff Short Wall = 2 x 6.80 x 0.30 x 1.50 = 6.12 Cum
RCC Raft = 1 x 6.80 x 11.40 x 0.40 = 31.01 Cum
End Wall = 2 x 6.00 x 0.50 x 5.00 = 30.00 Cum
Mid Wall = 1 x 6.00 x 0.40 x 5.00 = 12.00 Cum
Bottom Hunch = 4 x 6.00 x 0.20 x 0.20 x 1/2 = 0.48 Cum
(T) 89.87 Cum

241
DETAILS OF MEASUREMENT

Item : Box culvert 5m x 5m (Double Cell) (As per IRC SP-20) , 11.40 mtr. span,
13 Construction of toe walls for protection

D/S Appron
Toe Long Wall = 1 x 11.400 x 0.450 x 1.000 = 5.13 Cum
Toe Side Wall = 2 x 2.000 x 0.450 x 1.000 = 1.80 Cum

U/S Appron
Toe Long Wall = 1 x 11.400 x 0.450 x 1.000 = 5.13 Cum
Toe Side Wall = 2 x 1.200 x 0.450 x 1.000 = 1.08 Cum
(T) 13.14 Cum

14 Providing and laying of dry rubble flooring


D/S Appron
Over Filter material = 1 x 10.500 x 1.550 x 0.225 = 3.66 Cum
U/S Appron
Over Filter material = 1 x 10.500 x 0.700 x 0.600 = 4.41 Cum
(T) 8.07 cum

15 Filling in foundation trenches


Below PCC leveling Course = 1 x 6.800 x 11.400 x 1.000 = 77.52 Cum

16 Construction of R.C.C. railing of M 25

R.C.C. railing = 2 x 15.40 = 30.80 Rm

16 Prime Coat, Tack Coat, Premix Carpeting and Seal Coat


= 1 x 11.400 x 6.600 = 75.24 Sqm

242
Annexure-R2E
REINFORCEMENT CALCULATION SHEET - Box culvert 5m x 5m (Double Cell)
A - Foundation

Length of
Sl Dia. Spacing Total length Wt. Total Wt. Wt.
Particular No each Bar
No. (mm) (m) (m) (kg/m) (kg/m) (MT)
(m)
1 Cut off Wall
4-T 10 mm Bottom bar 10 1 4 22.90 91.60 0.62 56.43 0.056
T 8 mm @ 250mm C/C vertical B/W 8 2 7 0.250 22.86 305.46 0.39 120.43 0.120
T 8mm , @200 c/c Stirrups 8 1 115 0.200 22.86 2620.21 0.39 1032.99 1.033
2 Surface Reinforcement
T10 mm @ 125 mm C/C B/W Surface reinforcement
Long way 10 1 48 0.125 11.50 556.14 0.62 342.58 0.343

T10 mm @ 125 mm C/C B/W Surface reinforcement


Shot way 10 1 48 0.125 6.10 295.00 0.62 181.72 0.182
Total 1.734 Ton
Add 5% for wastage = 0.087 Ton
Total 1.821 Ton
B - Sub-Structure

Length of
Sl Dia. Spacing Total length Wt. Total Wt. Wt.
Bar Mark No each Bar
No. (mm) (m) (m) (kg/m) (kg/m) (MT)
(m)
2 Box Cell
a 16 2 38 0.160 8.84 671.84 1.58 1059.46 1.059
b 16 2 38 0.160 4.61 350.36 1.58 552.50 0.553
c 8 2 38 0.160 2.82 214.32 0.39 84.49 0.084
d 12 4 31 0.200 5.72 709.28 0.89 629.16 0.629
d1 10 2 39 0.300 5.92 461.76 0.62 284.44 0.284
d2 (Hoz. Way) 10 2 39 0.300 5.92 461.76 0.62 284.44 0.284
d2 (Vert. Way) 10 6 20 0.300 5.92 710.40 0.62 437.61 0.438
e 16 1 38 0.160 23.81 904.70 1.58 1426.68 1.427
f 16 2 38 0.160 11.32 860.32 1.58 1356.69 1.357
g 8 2 38 0.160 5.86 445.36 0.39 175.58 0.176
h 12 1 38 0.160 11.32 430.16 0.89 381.57 0.382
i 20 1 38 0.160 3.00 114.00 2.46 280.90 0.281
j 10 1 60 0.100 11.32 679.20 0.62 418.39 0.418
k 20 1 38 0.160 3.00 114.00 2.46 280.90 0.281
m 8 4 40 0.150 0.96 152.80 0.39 60.24 0.060
n 8 4 40 0.150 0.68 109.28 0.39 43.08 0.043
Total 7.756 Ton
Add 5% for wastage = 0.388 Ton
Total 8.144 Ton

C - Super-Structure

3 End Pillar
T 12 mm - 4 Nos. 12 4 4 0.92 14.72 0.89 13.06 0.013
T 8 mm @ 200 mm C/C 8 4 4 0.200 1.42 20.51 0.39 8.08 0.008
Total 0.021 Ton
Add 5% for wastage = 0.001 Ton
Total 0.022 Ton
FORMAT F-7
PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY)
COST ESTIMATE FOR ROADS CONSTRUCTION OF CROSS DRAINAGE WORKS

Road From : #REF! Package No : #REF!


Block : #REF! District : #REF!
Type of Cross Drainage Works : Triple Cell Box culvert 3m x 3m (Overall width = 7.50 m, Road Way Width
= 6.60 m)

Proposed Box Cell Culvert : 0 Nos.

Rate (Rs.)
Total

B (m)

D (m)
L (m)
Sl SOR

No.
Item Description Qnty. Unit As per SOR Amount
No. No.
2016-17 (Rs.)

1 2 3 4 5 6 7 8 9 10 11

Earthwork in excavation for structures as per


drawing and technical specifications Clause
305.1 including setting out, construction of
11.1 / I shoring and bracing, removal of stumps and
1 other deleterious material and disposal upto
(i)
a lead of 50 m, dressing of side

Qnty. As Per
Ordinary soil upto 3 m depth
Statement : 3C 210.45 Cum 71.00 14941.95

Providing concrete for plain/reinforced


concrete in open foundations complete as
11.4 /
2 per drawings and technical specifications
I(ii)
Clause 802, 803, 1202 & 1203
Nominal mix 1:3:6 [Hand Mixing] Qnty. As Per
Statement : 3C 16.57 Cum 5284.00 87555.88

Providing concrete for plain / reinforced


concrete in foundations complete as per
11.4 / drawings and technical specifications
3
A / III Clauses 802, 803, 1202 & 1203
PCC Grade M 20
Nominial mix (1:2:4) Qnty. As Per
Statement : 3C 43.88 Cum 6007.00 263587.16

Providing concrete for plain / reinforced


concrete in substructure complete as per
12.5 / drawings and technical specifications
4
II (i) Clauses 802, 804, 805, 806, 1202 & 1204
PCC Grade M 20
Nominial mix (1:2:4) Qnty. As Per
Statement : 3C 32.02 Cum 6369.00 203935.38

Providing weepholes in brick masonry/stone


masonry, plain/reinforced concrete
abutment, wing wall, return wall with 100 mm
5 12.9 dia AC pipe extending through the full width
of the structures with slope of 1(V):20(H)
towards drawing face complete as per
drawing Qnty. As Per
Statement : 3C 4 Nos 182.00 728.00

Providing and laying reinforced cement


13.1 / concrete in superstructure as per drawing
6 A / III and technical specifications Clauses 800,
(a) 1205.4 and 1205.5. R.C.C grade M 20
For design mix RCC M 20 Qnty. As Per
Statement : 3C 21.85 Cum 7025.00 153496.25
Rate (Rs.)
Total

B (m)

D (m)
L (m)
Sl SOR

No.
Item Description Qnty. Unit As per SOR Amount
No. No.
2016-17 (Rs.)

1 2 3 4 5 6 7 8 9 10 11

Providing PCC M-20 architectural coping on


the top of wing wall, return wall etc. complete
7 12.13
as per drawing and technical specification
Clauses 615, 710 and 1204.3.11 Qnty. As Per
Statement : 3C 8.00 Rm 413.00 3304.00

Supplying, fitting and placingTMT bar


reinforcement in foundation complete as per
8 11.8
drawings and technical specifications
Clauses 1000 and 1202 Qnty. As Per
Statement : 3C 1.592 MT 65489.00 104258.49

Supplying, fitting and placing TMT bar


reinforcement (Fe 415) in substructure
9 12.7 complete as per drawings and technical
specification Clauses 1002, 1005, 1010 &
1202 Qnty. As Per
Statement : 3C 4.016 MT 65583.00 263381.33

Supplying, fitting, and placing TMT bar


reinforcement in superstructure complete as
10 13.3
per drawing and technical specifications
Clauses 1002, 1010 and 1202 Qnty. As Per
Statement : 3C 0.021 MT 66360.00 1393.56

Providing and laying filter media with


granular crushed aggregates as per
specification to a thickness of not less than
11 12.11 600 mm with smaller size towards the soil
and bigger size towards the wall and
providing over the entire surface behind
abutment, wing Qnty. As Per
Statement : 3C 3.21 Cum 1452.00 4660.92

Providing concrete for plain/reinforced


concrete in open foundations complete as
11.4 /
12 per drawing and technical specification
IV
Clause 802, 803, & 1203
IV) R.C.C.grade M 20 Qnty. As Per
Statement : 3C 56.90 Cum 6297.00 358299.30

Construction of toe walls for protection of


slopes as per drawing and technical
14.11 /
13 specifications Clause 1302.5
I
Random rubble masonry in case of stone
Qnty. As Per
pitching laid with cement mortar (1:5)
Statement : 3C 12.24 Cum 2876.00 35202.24

Providing and laying of dry rubble flooring


14 14.8 complete as per drawings and technical
Qnty. As Per
specifications Clause 1303.3
Statement : 3C 7.30 Cum 1378.00 10059.40

Filling in foundation trenches as per drawing


15 11.2(I) and technical specification Clause 305.3.9
Sand filling Qnty. As Per
Statement : 3C 77.79 Cum 968.00 75300.72

Construction of R.C.C. railing of M 25 grade


in cast-in-situ with 20 mm nominal size
aggregate, true to line and grade, tolerance
of vertical railing post not to exceed 1 in 500,
16 13.6
centre-to-centre spacing between vertical
posts not to exceed 2000 mm as per
drawing and technical specifications Clauses
800, 900 and 1208.3
Qnty. As Per
Statement : 3C 28.80 Rm 2584.00 74419.20

Analysi Prime Coat, Tack Coat, Premix Carpeting


17 Qnty. As Per
s Rate and Seal Coat (as a Wearing Coat)
Statement : 2E 68.64 sqm #REF! #REF!
Rate (Rs.)
Total

B (m)

D (m)
L (m)
Sl SOR

No.
Item Description Qnty. Unit As per SOR Amount
No. No.
2016-17 (Rs.)

1 2 3 4 5 6 7 8 9 10 11
Total=Rs. #REF!
Total Say ~ Rs. #REF!
Total Cost for 0 Nos. Triple Cell Box culverts 3m x 3m Rs. #REF!
DETAILS OF MEASUREMENT

Item : Box culvert 3m x 3m (Triple Cell) (As per IRC SP-20) , 10.40 mtr. span,
Statement : 3C

1 Earthwork in excavation
Box Cell = 2 x 7.400 x 1.500 x 1.500 = 33.30 Cum
Cutoff Wall Long = 2 x 10.400 x 0.900 x 1.650 = 30.89 Cum
Cutoff Wall Short = 2 x 6.800 x 0.900 x 1.650 = 20.20 Cum
Return wall = 4 x 2.600 x 2.687 x 3.000 = 83.83 Cum

D/S Appron
Toe Long Wall = 1 x 10.400 x 1.350 x 1.150 = 16.15 Cum
Toe Side Wall = 2 x 2.000 x 1.350 x 1.150 = 6.21 Cum

U/S Appron
Toe Long Wall = 1 x 10.400 x 1.350 x 1.150 = 16.15 Cum
Toe Side Wall = 2 x 1.200 x 1.350 x 1.150 = 3.73 Cum
(T) 210.45 Cum

2 Providing concrete for plain/reinforced concrete in open foundations


Below Raft of Box Cell = 1 x 6.800 x 10.40 x 0.100 = 7.07 Cum
Return wall = 4 x 2.000 x 2.09 x 0.200 = 3.34 Cum
Bottom of Cutoff Long Wall = 2 x 10.400 x 0.600 x 0.150 = 1.87 Cum
Bottom of Cutoff Short Wall = 2 x 6.800 x 0.600 x 0.150 = 1.22 Cum
Toe Long Wall = 2 x 10.400 x 0.750 x 0.150 = 2.34 Cum
Toe Side Wall = 2 x 2.000 x 0.750 x 0.150 = 0.45 Cum
Toe Side Wall = 2 x 1.200 x 0.750 x 0.150 = 0.27 Cum
(T) 16.57 Cum

3 Providing concrete for plain / reinforced concrete in foundations M 20

a) Box Wall Raft = 1 x 6.80 x 10.40 x 0.30 21.22 Cum


b) Return wall = 4 x 2.55 x 1.587 x 1.40 = 22.66 Cum
43.88 Cum

248
DETAILS OF MEASUREMENT

Item : Box culvert 3m x 3m (Triple Cell) (As per IRC SP-20) , 10.40 mtr. span,
4 Providing concrete for plain / reinforced concrete in substructure M 20

a) Box Side Wall = 2 x 6.00 x 0.40 x 3.00 14.40 Cum


b) Box Mid Wall = 2 x 6.00 x 0.30 x 3.00 10.80 Cum
c) Return wall = 2 x( 0.45 + 1.09 )/2 x 2.00 x 2.22 = 6.82 Cum
(T) 32.02 Cum

5 Providing weepholes

b) Return wall = 4 x 1 = 4 Nos


(T) 4 Nos

6 Providing and laying reinforced cement concrete in superstructure RCC M 20

Deck slab = 1 x 6.00 x 10.40 x 0.30 = 18.72 Cum


Top Hunch = 6 x 6.00 x 0.150 x 0.150 x 1/2 = 0.41 Cum
End Piller = 4 x 0.40 x 0.40 x 0.60 = 0.38 Cum
RCC Kerb = 2 x 10.40 x 0.45 x 0.25 = 2.34 Cum
(T) 21.85 Cum

7 Providing PCC M-20 architectural coping on the top of wing wall, return wall etc.
For coping of return wall = 4 x 2.00 = 8.00 mtr

8 TMT bar reinforcement in foundation


Qty. As Per Annexure - R3C = (T) 1.592 MT

9 TMT bar reinforcement (Fe 415) in substructrue

Qty. As Per Annexure - R3C = (T) 4.016 MT


10 TMT bar reinforcement in superstructure

Qty. As Per Annexure - R3C = (T) 0.021 MT

249
DETAILS OF MEASUREMENT

Item : Box culvert 3m x 3m (Triple Cell) (As per IRC SP-20) , 10.40 mtr. span,

11 Providing and laying filter material underneath pitching


D/S Appron
Filter material = 1 x 9.500 x 1.550 x 0.150 = 2.21 Cum

U/S Appron
Filter material = 1 x 9.500 x 0.700 x 0.150 = 1.00 Cum
(T) 3.21 Cum

12 Providing concrete for plain/reinforced concrete in open foundations M 20

Cutoff Long Wall = 2 x 10.400 x 0.300 x 1.500 = 9.36 Cum


Cutoff Short Wall = 2 x 6.800 x 0.300 x 1.500 = 6.12 Cum
RCC Raft = 1 x 6.800 x 10.400 x 0.300 = 21.22 Cum
End Wall = 2 x 6.000 x 0.400 x 3.000 = 14.40 Cum
Mid Wall = 1 x 6.000 x 0.300 x 3.000 = 5.40 Cum
Bottom Hunch = 6 x 6.000 x 0.150 x 0.150 x 1/2 = 0.41 Cum
(T) 56.90 Cum

13 Construction of toe walls for protection


D/S Appron
Toe Long Wall = 1 x 10.400 x 0.450 x 1.000 = 4.68 Cum
Toe Side Wall = 2 x 2.000 x 0.450 x 1.000 = 1.80 Cum

U/S Appron
Toe Long Wall = 1 x 10.400 x 0.450 x 1.000 = 4.68 Cum
Toe Side Wall = 2 x 1.200 x 0.450 x 1.000 = 1.08 Cum
(T) 12.24 Cum

14 Providing and laying of dry rubble flooring


D/S Appron
Over Filter material = 1 x 9.500 x 1.550 x 0.225 = 3.31 Cum
U/S Appron
Over Filter material = 1 x 9.500 x 0.700 x 0.600 = 3.99 Cum
(T) 7.30 cum
250
DETAILS OF MEASUREMENT

Item : Box culvert 3m x 3m (Triple Cell) (As per IRC SP-20) , 10.40 mtr. span,
15 Filling in foundation trenches
Below PCC leveling Course = 1 x 6.800 x 10.400 x 1.100 = 77.79 Cum

16 Construction of R.C.C. railing of M 25


R.C.C. railing = 2 x 14.40 = 28.80 Rm

17 Prime Coat, Tack Coat, Premix Carpeting and Seal Coat


= 1 x 10.400 x 6.600 = 68.64 Sqm

251
Annexure-R3C
REINFORCEMENT CALCULATION SHEET - Box culvert 3m x 3m (Triple Cell)
A - Foundation

Length of
Sl Dia. Spacing Total length Wt. Total Wt. Wt.
Particular No each Bar
No. (mm) (m) (m) (kg/m) (kg/m) (MT)
(m)
1 Cut off Wall
4-T 10 mm Bottom bar 10 1 4 20.90 83.60 0.62 51.50 0.051
T 8 mm @ 250mm C/C vertical B/W 8 2 7 0.250 20.86 278.74 0.39 109.89 0.110
T 8mm , @200 c/c Stirrups 8 1 105 0.200 20.86 2182.37 0.39 860.38 0.860
2 Surface Reinforcement
T10 mm @ 125 mm C/C B/W Surface reinforcement
Long way 10 1 48 0.125 10.50 507.78 0.62 312.79 0.313

T10 mm @ 125 mm C/C B/W Surface reinforcement


Shot way 10 1 48 0.125 6.10 295.00 0.62 181.72 0.182
Total 1.516 Ton
Add 5% for wastage = 0.076 Ton
Total 1.592 Ton
B - Sub-Structure

Length of
Sl Dia. Spacing Total length Wt. Total Wt. Wt.
Bar Mark No each Bar
No. (mm) (m) (m) (kg/m) (kg/m) (MT)
(m)
2 Box Cell
a 12 2 32 0.190 5.94 380.16 0.89 337.22 0.337
b 10 2 7 0.950 2.21 30.94 0.62 19.06 0.019
c 8 2 32 0.190 2.22 142.08 0.39 56.01 0.056
d 10 2 31 0.200 3.52 218.24 0.62 134.44 0.134
d1 10 4 35 0.300 5.92 828.80 0.62 510.54 0.511
d2 10 8 19 0.200 5.92 899.84 0.62 554.30 0.554
e 12 2 32 0.190 7.38 472.58 0.89 419.19 0.419
f 10 2 40 0.150 10.32 825.60 0.62 508.57 0.509
g 8 4 40 0.150 3.66 585.60 0.39 230.87 0.231
h 10 1 32 0.190 10.32 330.24 0.62 203.43 0.203
i 12 2 7 0.950 1.90 26.60 0.89 23.60 0.024
j 10 1 32 0.190 10.32 330.24 0.62 203.43 0.203
k 12 2 7 0.950 1.90 26.60 0.89 23.60 0.024
l 12 1 50 0.120 10.32 516.00 0.89 457.71 0.458
m 8 8 40 0.150 0.82 263.68 0.39 103.95 0.104
n 8 4 40 0.150 0.61 97.92 0.39 38.60 0.039
Total 3.825 Ton
Add 5% for wastage = 0.191 Ton
Total 4.016 Ton

C - Super-Structure

3 End Pillar
T 12 mm - 4 Nos. 12 4 4 0.82 13.12 0.89 11.64 0.012
T 8 mm @ 200 mm C/C 8 4 4 0.200 1.42 20.51 0.39 8.08 0.008
Total 0.020 Ton
Add 5% for wastage = 0.001 Ton
Total 0.021 Ton
FORMAT F-7
PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY)
COST ESTIMATE FOR ROADS CONSTRUCTION OF CROSS DRAINAGE WORKS

Road From : #REF! Package No : #REF!


Block : #REF! District : #REF!
Type of Cross Drainage Works : Triple Cell Box culvert 4m x 4m (Overall width = 7.50 m, Road Way Width =
6.60 m)

Proposed Box Cell Culvert : 0 Nos.

Rate (Rs.)
Total

B (m)

D (m)
L (m)
Sl SOR

No.
Item Description Qnty. Unit As per SOR Amount
No. No.
2016-17 (Rs.)

1 2 3 4 5 6 7 8 9 10 11

Earthwork in excavation for structures as


per drawing and technical specifications
Clause 305.1 including setting out,
construction of shoring and bracing,
11.1 / I removal of stumps and other deleterious
1
(i) material and disposal upto a lead of 50 m,
dressing of side

Ordinary soil upto 3 m depth Qnty. As Per


Statement : 3D 207.85 Cum 71.00 14757.35

Providing concrete for plain/reinforced


concrete in open foundations complete as
11.4 /
2 per drawings and technical specifications
I(ii)
Clause 802, 803, 1202 & 1203
Nominal mix 1:3:6 [Hand Mixing] Qnty. As Per
Statement : 3D 21.68 Cum 5284.00 114557.12

Providing concrete for plain / reinforced


concrete in foundations complete as per
11.4 / A drawings and technical specifications
3
/ III Clauses 802, 803, 1202 & 1203
PCC Grade M 20
Nominial mix (1:2:4) Qnty. As Per
Statement : 3D 60.24 Cum 6007.00 361861.68

Providing concrete for plain / reinforced


concrete in substructure complete as per
12.5 / II drawings and technical specifications
4
(i) Clauses 802, 804, 805, 806, 1202 & 1204
PCC Grade M 20
Nominial mix (1:2:4) Qnty. As Per
Statement : 3D 74.70 Cum 6369.00 475764.30

Providing weepholes in brick


masonry/stone masonry, plain/reinforced
concrete abutment, wing wall, return wall
5 12.9 with 100 mm dia AC pipe extending through
the full width of the structures with slope of
1(V):20(H) towards drawing face complete
as per drawing Qnty. As Per
Statement : 3D 20 Nos 182.00 3640.00

Providing and laying reinforced cement


concrete in superstructure as per drawing
13.1 / A
6 and technical specifications Clauses 800,
/ III (a)
1205.4 and 1205.5. R.C.C grade M 20
For design mix RCC M 20 Qnty. As Per
Statement : 3D 32.72 Cum 7025.00 229858.00
Rate (Rs.)
Total

B (m)

D (m)
L (m)
Sl SOR

No.
Item Description Qnty. Unit As per SOR Amount
No. No.
2016-17 (Rs.)

1 2 3 4 5 6 7 8 9 10 11

Providing PCC M-20 architectural coping on


the top of wing wall, return wall etc.
7 12.13 complete as per drawing and technical
specification Clauses 615, 710 and
1204.3.11 Qnty. As Per
Statement : 3D 8.00 Rm 413.00 3304.00

Supplying, fitting and placingTMT bar


reinforcement in foundation complete as
8 11.8
per drawings and technical specifications
Clauses 1000 and 1202 Qnty. As Per
Statement : 3D 2.382 MT 65489.00 155994.80

Supplying, fitting and placing TMT bar


reinforcement (Fe 415) in substructure
9 12.7 complete as per drawings and technical
specification Clauses 1002, 1005, 1010 &
1202 Qnty. As Per
Statement : 3D 9.510 MT 65583.00 623694.33

Supplying, fitting, and placing TMT bar


reinforcement in superstructure complete
10 13.3
as per drawing and technical specifications
Clauses 1002, 1010 and 1202 Qnty. As Per
Statement : 3D 0.021 MT 66360.00 1393.56

Providing and laying filter media with


granular crushed aggregates as per
specification to a thickness of not less than
11 12.11 600 mm with smaller size towards the soil
and bigger size towards the wall and
providing over the entire surface behind
abutment, wing Qnty. As Per
Statement : 3D 4.29 Cum 1452.00 6229.08

Providing concrete for plain/reinforced


concrete in open foundations complete as
11.4 /
12 per drawing and technical specification
IV
Clause 802, 803, & 1203
IV) R.C.C.grade M 20 Qnty. As Per
Statement : 3D 89.85 Cum 6297.00 565785.45

Construction of toe walls for protection of


slopes as per drawing and technical
14.11 /
13 specifications Clause 1302.5
I
Random rubble masonry in case of stone
pitching laid with cement mortar (1:5) Qnty. As Per
Statement : 3D 15.12 Cum 2876.00 43485.12

Providing and laying of dry rubble flooring


14 14.8 complete as per drawings and technical
Qnty. As Per
specifications Clause 1303.3
Statement : 3D 9.76 Cum 1378.00 13449.28

Filling in foundation trenches as per


drawing and technical specification Clause
15 11.2(I)
305.3.9
Qnty. As Per
Sand filling
Statement : 3D 97.10 Cum 968.00 93992.80

Construction of R.C.C. railing of M 25 grade


in cast-in-situ with 20 mm nominal size
aggregate, true to line and grade, tolerance
of vertical railing post not to exceed 1 in
16 13.6
500, centre-to-centre spacing between
vertical posts not to exceed 2000 mm as
per drawing and technical specifications
Clauses 800, 900 and 1208.3
Qnty. As Per
Statement : 3D 35.20 Rm 2584.00 90956.80
Rate (Rs.)
Total

B (m)

D (m)
L (m)
Sl SOR

No.
Item Description Qnty. Unit As per SOR Amount
No. No.
2016-17 (Rs.)

1 2 3 4 5 6 7 8 9 10 11

Analysi Prime Coat, Tack Coat, Premix Carpeting


17 Qnty. As Per
s Rate and Seal Coat (as a Wearing Coat)
Statement : 2E 89.76 sqm #REF! #REF!
Total=Rs. #REF!
Total Say ~ Rs. #REF!
Total Cost for 0 Nos. Triple Cell Box culverts 4m x 4m Rs. #REF!
DETAILS OF MEASUREMENT

Item : Box culvert 4m x 4m (Triple Cell) (As per IRC SP-20) , 13.60 mtr. span,
Statement : 3D

1 Earthwork in excavation
Box Cell = 2 x 7.400 x 1.500 x 1.500 = 33.30 Cum
Cutoff Wall Long = 2 x 13.600 x 0.900 x 1.650 = 40.39 Cum
Cutoff Wall Short = 2 x 6.800 x 0.900 x 1.650 = 20.20 Cum
Return wall = 4 x 2.600 x 3.714 x 1.600 = 61.80 Cum
Toe Long Wall = 2 x 13.600 x 1.350 x 1.150 = 42.23 Cum
Toe Side Wall = 2 x 2.000 x 1.350 x 1.150 = 6.21 Cum
Toe Side Wall = 2 x 1.200 x 1.350 x 1.150 = 3.73 Cum
(T) 207.85 Cum

2 Providing concrete for plain/reinforced concrete in open foundations


a) Below Raft of Box Cell = 1 x 6.800 x 13.60 x 0.100 = 9.25 Cum
b) Return wall = 4 x 2.000 x 3.11 x 0.200 = 4.98 Cum
Bottom of Cutoff Long Wall = 2 x 13.600 x 0.600 x 0.150 = 2.45 Cum
Bottom of Cutoff Short Wall = 2 x 6.800 x 0.600 x 0.150 = 1.22 Cum
Toe Long Wall = 2 x 13.600 x 0.750 x 0.150 = 3.06 Cum
Toe Side Wall = 2 x 2.000 x 0.750 x 0.150 = 0.45 Cum
Toe Side Wall = 2 x 1.200 x 0.750 x 0.150 = 0.27 Cum
(T) 21.68 Cum

3 Providing concrete for plain / reinforced concrete in foundations M 20

a) Box Wall Raft = 1 x 6.80 x 13.60 x 0.35 32.37 Cum


b) Return wall = 4 x 2.00 x 2.489 x 1.40 = 27.88 Cum
60.24 Cum

257
DETAILS OF MEASUREMENT

Item : Box culvert 4m x 4m (Triple Cell) (As per IRC SP-20) , 13.60 mtr. span,
4 Providing concrete for plain / reinforced concrete in substructure M 20

a) Box Side Wall = 2 x 6.00 x 0.45 x 4.00 21.60 Cum


b) Box Mid Wall = 2 x 6.00 x 0.35 x 4.00 16.80 Cum
c) Return wall = 4 x( 0.40 + 2.11 )/2 x 2.00 x 3.61 = 36.30 Cum
(T) 74.70 Cum

5 Providing weepholes

b) Return wall = 4 x 5 = 20 Nos


(T) 20 Nos

6 Providing and laying reinforced cement concrete in superstructure RCC M 20

Deck slab = 1 x 6.00 x 13.60 x 0.35 = 28.56 Cum


Top Hunch = 6 x 6.00 x 0.20 x 0.20 x 1/2 = 0.72 Cum
End Piller = 4 x 0.40 x 0.40 x 0.60 = 0.38 Cum
RCC Kerb = 2 x 13.60 x 0.45 x 0.25 = 3.06 Cum
(T) 32.72 Cum

7 Providing PCC M-20 architectural coping on the top of wing wall, return wall etc.
For coping of return wall = 4 x 2.00 = 8.00 mtr

8 TMT bar reinforcement in foundation


Qty. As Per Annexure - R3D = (T) 2.382 MT

9 TMT bar reinforcement (Fe 415) in substructrue

Qty. As Per Annexure - R3D = (T) 9.510 MT


10 TMT bar reinforcement in superstructure

Qty. As Per Annexure - R3D = (T) 0.021 MT

258
DETAILS OF MEASUREMENT

Item : Box culvert 4m x 4m (Triple Cell) (As per IRC SP-20) , 13.60 mtr. span,

11 Providing and laying filter material underneath pitching


D/S Appron
Filter material = 1 x 12.70 x 1.55 x 0.15 = 2.95 Cum

U/S Appron
Filter material = 1 x 12.70 x 0.70 x 0.15 = 1.33 Cum
(T) 4.29 Cum

12 Providing concrete for plain/reinforced concrete in open foundations M 20

Cutoff Long Wall = 2 x 13.60 x 0.30 x 1.50 = 12.24 Cum


Cutoff Short Wall = 2 x 6.80 x 0.30 x 1.50 = 6.12 Cum
RCC Raft = 1 x 6.80 x 13.60 x 0.35 = 32.37 Cum
End Wall = 2 x 6.00 x 0.45 x 4.00 = 21.60 Cum
Mid Wall = 2 x 6.00 x 0.35 x 4.00 = 16.80 Cum
Bottom Hunch = 6 x 6.00 x 0.20 x 0.20 x 1/2 = 0.72 Cum
(T) 89.85 Cum

13 Construction of toe walls for protection

D/S Appron
Toe Long Wall = 1 x 13.600 x 0.450 x 1.000 = 6.12 Cum
Toe Side Wall = 2 x 2.000 x 0.450 x 1.000 = 1.80 Cum

U/S Appron
Toe Long Wall = 1 x 13.600 x 0.450 x 1.000 = 6.12 Cum
Toe Side Wall = 2 x 1.200 x 0.450 x 1.000 = 1.08 Cum
(T) 15.12 Cum

259
DETAILS OF MEASUREMENT

Item : Box culvert 4m x 4m (Triple Cell) (As per IRC SP-20) , 13.60 mtr. span,
14 Providing and laying of dry rubble flooring
D/S Appron
Over Filter material = 1 x 12.700 x 1.550 x 0.225 = 4.43 Cum
U/S Appron
Over Filter material = 1 x 12.700 x 0.700 x 0.600 = 5.33 Cum
(T) 9.76 cum

15 Filling in foundation trenches


Below PCC leveling Course = 1 x 6.800 x 13.600 x 1.050 = 97.10 Cum

16 Construction of R.C.C. railing of M 25

R.C.C. railing = 2 x 17.60 = 35.20 Rm

17 Prime Coat, Tack Coat, Premix Carpeting and Seal Coat


= 1 x 13.600 x 6.600 = 89.76 Sqm

260
Annexure-R3D
REINFORCEMENT CALCULATION SHEET - Box culvert 4m x 4m (Triple Cell)
A - Foundation

Length of
Sl Dia. Spacing Total length Wt. Total Wt. Wt.
Particular No each Bar
No. (mm) (m) (m) (kg/m) (kg/m) (MT)
(m)
1 Cut off Wall
4-T 10 mm Bottom bar 10 1 4 27.30 109.20 0.62 67.27 0.067
T 8 mm @ 250mm C/C vertical B/W 8 2 7 0.250 27.26 364.25 0.39 143.60 0.144
T 8mm , @200 c/c Stirrups 8 1 137 0.200 27.26 3724.26 0.39 1468.25 1.468
2 Surface Reinforcement
T10 mm @ 125 mm C/C B/W Surface reinforcement
Long way 10 1 48 0.125 13.70 662.53 0.62 408.12 0.408

T10 mm @ 125 mm C/C B/W Surface reinforcement


Shot way 10 1 48 0.125 6.10 295.00 0.62 181.72 0.182
Total 2.269 Ton
Add 5% for wastage = 0.113 Ton
Total 2.382 Ton
B - Sub-Structure

Length of
Sl Dia. Spacing Total length Wt. Total Wt. Wt.
Bar Mark No each Bar
No. (mm) (m) (m) (kg/m) (kg/m) (MT)
(m)
2 Box Cell
a 12 2 39 0.156 8.84 689.52 0.89 611.63 0.612
b 16 1 39 0.156 4.61 179.79 1.58 283.52 0.284
c 10 2 20 0.310 2.82 112.80 0.62 69.48 0.069
d 10 4 28 0.220 5.72 640.64 0.62 394.63 0.395
d1 10 2 46 0.300 5.92 544.64 0.62 335.50 0.335
d2 (Hoz. Way) 10 2 69 0.200 5.92 816.96 0.62 503.25 0.503
d2 (Vert. Way) 10 8 24 0.200 5.92 1136.64 0.62 700.17 0.700
e 16 2 39 0.155 23.81 1857.02 1.58 2928.45 2.928
f 12 2 39 0.155 13.52 1054.56 0.89 935.44 0.935
g 10 2 39 0.155 5.86 457.08 0.62 281.56 0.282
h 10 1 39 0.155 13.52 527.28 0.62 324.80 0.325
i 16 1 39 0.155 3.00 117.00 1.58 184.50 0.185
j 10 1 39 0.155 13.52 527.28 0.62 324.80 0.325
k 16 1 39 0.155 3.00 117.00 1.58 184.50 0.185
l 16 1 39 0.155 13.52 527.28 1.58 831.50 0.831
m 8 8 40 0.150 0.96 305.60 0.39 120.48 0.120
n 8 4 40 0.150 0.68 109.28 0.39 43.08 0.043
Total 9.057 Ton
Add 5% for wastage = 0.453 Ton
Total 9.510 Ton

C - Super-Structure

3 End Pillar
T 12 mm - 4 Nos. 12 4 4 0.87 13.92 0.89 12.35 0.012
T 8 mm @ 200 mm C/C 8 4 4 0.200 1.42 20.51 0.39 8.08 0.008
Total 0.020 Ton
Add 5% for wastage = 0.001 Ton
Total 0.021 Ton
FORMAT F-7
PRADHAN MANTRI GRAM SADAK YOJANA (PMGSY)
COST ESTIMATE FOR ROADS CONSTRUCTION OF CROSS DRAINAGE WORKS

Road From : #REF! Package No : #REF!


Block : #REF! District : #REF!
Type of Cross Drainage Works : Triple Cell Box culvert 5m x 5m (Overall width = 7.50 m, Road Way Width =
6.60 m)

Proposed Box Cell Culvert : 0 Nos.

Rate (Rs.)
Total

B (m)

D (m)
L (m)
Sl

No.
SOR No. Item Description Qnty. Unit As per SOR Amount
No.
2016-17 (Rs.)

1 2 3 4 5 6 7 8 9 10 11

Earthwork in excavation for structures as per


drawing and technical specifications Clause
305.1 including setting out, construction of
shoring and bracing, removal of stumps and
11.1 / I
1 other deleterious material and disposal upto
(i)
a lead of 50 m, dressing of side

Ordinary soil upto 3 m depth Qnty. As Per


Statement : 3E 252.88 Cum 71.00 17954.48

Providing concrete for plain/reinforced


concrete in open foundations complete as
2 11.4 / I(ii) per drawings and technical specifications
Clause 802, 803, 1202 & 1203
Nominal mix 1:3:6 [Hand Mixing] Qnty. As Per
Statement : 3E 24.21 Cum 5284.00 127925.64

Providing concrete for plain / reinforced


concrete in foundations complete as per
11.4 / A / drawings and technical specifications
3
III Clauses 802, 803, 1202 & 1203
PCC Grade M 20
Nominial mix (1:2:4) Qnty. As Per
Statement : 3E 73.57 Cum 6007.00 441934.99

Providing concrete for plain / reinforced


concrete in substructure complete as per
12.5 / II drawings and technical specifications
4
(i) Clauses 802, 804, 805, 806, 1202 & 1204
PCC Grade M 20
Nominial mix (1:2:4) Qnty. As Per
Statement : 3E 90.30 Cum 6369.00 575120.70

Providing weepholes in brick masonry/stone


masonry, plain/reinforced concrete abutment,
wing wall, return wall with 100 mm dia AC
5 12.9
pipe extending through the full width of the
structures with slope of 1(V):20(H) towards
drawing face complete as per drawing
Qnty. As Per
Statement : 3E 20 Nos 182.00 3640.00

Providing and laying reinforced cement


concrete in superstructure as per drawing
13.1 / A /
6 and technical specifications Clauses 800,
III (a)
1205.4 and 1205.5. R.C.C grade M 20
For design mix RCC M 20 Qnty. As Per
Statement : 3E 45.20 Cum 7025.00 317530.00
Rate (Rs.)
Total

B (m)

D (m)
L (m)
Sl

No.
SOR No. Item Description Qnty. Unit As per SOR Amount
No.
2016-17 (Rs.)

1 2 3 4 5 6 7 8 9 10 11

Providing PCC M-20 architectural coping on


the top of wing wall, return wall etc. complete
7 12.13
as per drawing and technical specification
Clauses 615, 710 and 1204.3.11 Qnty. As Per
Statement : 3E 8.00 Rm 413.00 3304.00

Supplying, fitting and placingTMT bar


reinforcement in foundation complete as per
8 11.8
drawings and technical specifications
Clauses 1000 and 1202 Qnty. As Per
Statement : 3E 3.900 MT 65489.00 255407.10

Supplying, fitting and placing TMT bar


reinforcement (Fe 415) in substructure
9 12.7 complete as per drawings and technical
specification Clauses 1002, 1005, 1010 &
1202 Qnty. As Per
Statement : 3E 10.924 MT 65583.00 716428.69

Supplying, fitting, and placing TMT bar


reinforcement in superstructure complete as
10 13.3
per drawing and technical specifications
Clauses 1002, 1010 and 1202 Qnty. As Per
Statement : 3E 0.022 MT 66360.00 1459.92

Providing and laying filter media with


granular crushed aggregates as per
specification to a thickness of not less than
11 12.11 600 mm with smaller size towards the soil
and bigger size towards the wall and
providing over the entire surface behind
abutment, wing Qnty. As Per
Statement : 3E 5.97 Cum 1452.00 8668.44

Providing concrete for plain/reinforced


concrete in open foundations complete as
12 11.4 / IV per drawing and technical specification
Clause 802, 803, & 1203
IV) R.C.C.grade M 20 Qnty. As Per
Statement : 3E 123.28 Cum 6297.00 776294.16

Construction of toe walls for protection of


slopes as per drawing and technical
13 14.11 / I specifications Clause 1302.5
Random rubble masonry in case of stone
Qnty. As Per
pitching laid with cement mortar (1:5)
Statement : 3E 19.62 Cum 2876.00 56427.12

Providing and laying of dry rubble flooring


14 14.8 complete as per drawings and technical
Qnty. As Per
specifications Clause 1303.3
Statement : 3E 13.61 Cum 1378.00 18754.58

Filling in foundation trenches as per drawing


15 11.2(I) and technical specification Clause 305.3.9
Sand filling Qnty. As Per
Statement : 3E 114.24 Cum 968.00 110584.32

Construction of R.C.C. railing of M 25 grade


in cast-in-situ with 20 mm nominal size
aggregate, true to line and grade, tolerance
of vertical railing post not to exceed 1 in 500,
16 13.6
centre-to-centre spacing between vertical
posts not to exceed 2000 mm as per
drawing and technical specifications Clauses
800, 900 and 1208.3
Qnty. As Per
Statement : 3E 41.60 Rm 2584.00 107494.40
Rate (Rs.)
Total

B (m)

D (m)
L (m)
Sl

No.
SOR No. Item Description Qnty. Unit As per SOR Amount
No.
2016-17 (Rs.)

1 2 3 4 5 6 7 8 9 10 11

Analysis Prime Coat, Tack Coat, Premix Carpeting


17 Qnty. As Per
Rate and Seal Coat (as a Wearing Coat)
Statement : 2E 110.88 sqm #REF! #REF!
Total=Rs. #REF!
Total Say ~ Rs. #REF!
Total Cost for 0 Nos. Triple Cell Box culverts 5m x 5m Rs. #REF!
DETAILS OF MEASUREMENT

Item : Box culvert 5m x 5m (Triple Cell) (As per IRC SP-20) , 16.80 mtr. span,
Statement : 3E

1 Earthwork in excavation
Box Cell = 2 x 7.400 x 1.800 x 1.800 = 47.95 Cum
Cutoff Wall Long = 2 x 18.600 x 0.900 x 1.650 = 55.24 Cum
Cutoff Wall Short = 2 x 6.800 x 0.900 x 1.650 = 20.20 Cum
Return wall = 4 x 2.600 x 3.714 x 1.600 = 61.80 Cum
Toe Long Wall = 2 x 18.600 x 1.350 x 1.150 = 57.75 Cum
Toe Side Wall = 2 x 2.000 x 1.350 x 1.150 = 6.21 Cum
Toe Side Wall = 2 x 1.200 x 1.350 x 1.150 = 3.73 Cum
(T) 252.88 Cum

2 Providing concrete for plain/reinforced concrete in open foundations


a) Below Raft of Box Cell = 1 x 6.800 x 16.80 x 0.100 = 11.42 Cum
b) Return wall = 4 x 2.000 x 3.11 x 0.200 = 4.98 Cum

D/S Appron
Bottom of Cutoff Long Wall = 1 x 18.600 x 0.600 x 0.150 = 1.67 Cum
Bottom of Cutoff Short Wall = 2 x 6.800 x 0.600 x 0.150 = 1.22 Cum
Toe Long Wall = 1 x 18.600 x 0.750 x 0.150 = 2.09 Cum
Toe Side Wall = 2 x 2.000 x 0.750 x 0.150 = 0.45 Cum
PCC Base = 1 x 0.000 x 0.000 x 0.000 = 0.00 Cum

U/S Appron
Toe Long Wall = 1 x 18.600 x 0.750 x 0.150 = 2.09 Cum
Toe Side Wall = 2 x 1.200 x 0.750 x 0.150 = 0.27 Cum
PCC Base = 1 x 0.000 x 0.000 x 0.000 = 0.00 Cum
(T) 24.21 Cum

266
DETAILS OF MEASUREMENT

Item : Box culvert 5m x 5m (Triple Cell) (As per IRC SP-20) , 16.80 mtr. span,
3 Providing concrete for plain / reinforced concrete in foundations M 20

a) Box Wall Raft = 1 x 6.80 x 16.80 x 0.40 45.70 Cum


b) Return wall = 4 x 2.00 x 2.489 x 1.40 = 27.88 Cum
73.57 Cum

4 Providing concrete for plain / reinforced concrete in substructure M 20

a) Box Side Wall = 2 x 6.00 x 0.50 x 5.00 30.00 Cum


b) Box Mid Wall = 2 x 6.00 x 0.40 x 5.00 24.00 Cum
c) Return wall = 4 x( 0.40 + 2.11 )/2 x 2.00 x 3.61 = 36.30 Cum
(T) 90.30 Cum

5 Providing weepholes

b) Return wall = 4 x 5 = 20 Nos


(T) 20 Nos

6 Providing and laying reinforced cement concrete in superstructure RCC M 20

Deck slab = 1 x 6.00 x 16.80 x 0.40 = 40.32 Cum


Top Hunch = 6 x 6.00 x 0.20 x 0.20 x 1/2 = 0.72 Cum
End Piller = 4 x 0.40 x 0.40 x 0.60 = 0.38 Cum
RCC Kerb = 2 x 16.80 x 0.45 x 0.25 = 3.78 Cum
(T) 45.20 Cum

7 Providing PCC M-20 architectural coping on the top of wing wall, return wall etc.
For coping of return wall = 4 x 2.00 = 8.00 mtr

8 TMT bar reinforcement in foundation


Qty. As Per Annexure - R3E = (T) 3.900 MT

9 TMT bar reinforcement (Fe 415) in substructrue

Qty. As Per Annexure - R3E = (T) 10.924 MT

267
DETAILS OF MEASUREMENT

Item : Box culvert 5m x 5m (Triple Cell) (As per IRC SP-20) , 16.80 mtr. span,
10 TMT bar reinforcement in superstructure

Qty. As Per Annexure - R3E = (T) 0.022 MT

11 Providing and laying filter material underneath pitching


D/S Appron
Filter material = 1 x 17.70 x 1.55 x 0.15 = 4.12 Cum

U/S Appron
Filter material = 1 x 17.70 x 0.70 x 0.15 = 1.86 Cum
(T) 5.97 Cum

12 Providing concrete for plain/reinforced concrete in open foundations M 20

Cutoff Long Wall = 2 x 18.60 x 0.30 x 1.50 = 16.74 Cum


Cutoff Short Wall = 2 x 6.80 x 0.30 x 1.50 = 6.12 Cum
RCC Raft = 1 x 6.80 x 16.80 x 0.40 = 45.70 Cum
End Wall = 2 x 6.00 x 0.50 x 5.00 = 30.00 Cum
Mid Wall = 2 x 6.00 x 0.40 x 5.00 = 24.00 Cum
Bottom Hunch = 6 x 6.00 x 0.20 x 0.20 x 1/2 = 0.72 Cum
(T) 123.28 Cum

13 Construction of toe walls for protection

D/S Appron
Toe Long Wall = 1 x 18.600 x 0.450 x 1.000 = 8.37 Cum
Toe Side Wall = 2 x 2.000 x 0.450 x 1.000 = 1.80 Cum

U/S Appron
Toe Long Wall = 1 x 18.600 x 0.450 x 1.000 = 8.37 Cum
Toe Side Wall = 2 x 1.200 x 0.450 x 1.000 = 1.08 Cum
(T) 19.62 Cum

268
DETAILS OF MEASUREMENT

Item : Box culvert 5m x 5m (Triple Cell) (As per IRC SP-20) , 16.80 mtr. span,

14 Providing and laying of dry rubble flooring


D/S Appron
Over Filter material = 1 x 17.700 x 1.550 x 0.225 = 6.17 Cum
U/S Appron
Over Filter material = 1 x 17.700 x 0.700 x 0.600 = 7.43 Cum
(T) 13.61 cum

15 Filling in foundation trenches


Below PCC leveling Course = 1 x 6.800 x 16.800 x 1.000 = 114.24 Cum

16 Construction of R.C.C. railing of M 25

R.C.C. railing = 2 x 20.80 = 41.60 Rm

17 Prime Coat, Tack Coat, Premix Carpeting and Seal Coat


= 1 x 16.800 x 6.600 = 110.88 Sqm

269
Annexure-R3E
REINFORCEMENT CALCULATION SHEET - Box culvert 5m x 5m (Triple Cell)
A - Foundation

Length of
Sl Dia. Spacing Total length Wt. Total Wt. Wt.
Particular No each Bar
No. (mm) (m) (m) (kg/m) (kg/m) (MT)
(m)
1 Cut off Wall
4-T 10 mm Bottom bar 10 1 4 37.30 149.20 0.62 91.91 0.092
T 8 mm @ 250mm C/C vertical B/W 8 2 7 0.250 37.26 497.85 0.39 196.27 0.196
T 8mm , @200 c/c Stirrups 8 1 187 0.200 37.26 6953.46 0.39 2741.33 2.741
2 Surface Reinforcement
T10 mm @ 125 mm C/C B/W Surface reinforcement
Long way 10 1 48 0.125 16.90 817.28 0.62 503.45 0.503

T10 mm @ 125 mm C/C B/W Surface reinforcement


Shot way 10 1 48 0.125 6.10 295.00 0.62 181.72 0.182
Total 3.715 Ton
Add 5% for wastage = 0.186 Ton
Total 3.900 Ton
B - Sub-Structure

Length of
Sl Dia. Spacing Total length Wt. Total Wt. Wt.
Bar Mark No each Bar
No. (mm) (m) (m) (kg/m) (kg/m) (MT)
(m)
2 Box Cell
a 16 2 38 0.160 8.84 671.84 1.58 1059.46 1.059
b 16 1 38 0.160 4.61 175.18 1.58 276.25 0.276
c 8 2 38 0.160 2.82 214.32 0.39 84.49 0.084
d 12 4 31 0.200 5.72 709.28 0.89 629.16 0.629
d1 10 2 57 0.300 5.92 674.88 0.62 415.73 0.416
d2 (Hoz. Way) 10 2 57 0.300 5.92 674.88 0.62 415.73 0.416
d2 (Vert. Way) 10 8 20 0.300 5.92 947.20 0.62 583.48 0.583
e 16 2 38 0.160 23.81 1809.41 1.58 2853.36 2.853
f 16 2 38 0.160 16.72 1270.72 1.58 2003.87 2.004
g 8 2 38 0.160 5.86 445.36 0.39 175.58 0.176
h 12 1 38 0.160 16.72 635.36 0.89 563.59 0.564
i 20 1 38 0.160 3.00 114.00 2.46 280.90 0.281
j 10 1 60 0.100 16.72 1003.20 0.62 617.97 0.618
k 20 1 38 0.160 3.00 114.00 2.46 280.90 0.281
m 8 8 40 0.150 0.96 305.60 0.39 120.48 0.120
n 8 4 40 0.150 0.68 109.28 0.39 43.08 0.043
Total 10.404 Ton
Add 5% for wastage = 0.520 Ton
Total 10.924 Ton

C - Super-Structure

3 End Pillar
T 12 mm - 4 Nos. 12 4 4 0.92 14.72 0.89 13.06 0.013
T 8 mm @ 200 mm C/C 8 4 4 0.200 1.42 20.51 0.39 8.08 0.008
Total 0.021 Ton
Add 5% for wastage = 0.001 Ton
Total 0.022 Ton