SECTION 3:

EXTERNAL WORK
BERGVILLE MAGISTRATE OFFICE
REPAIR AND RENOVATIONS

Item Quantity Rate Amount


No
SECTION NUMBER 3

BILL NUMBER 1

SITE WORKS AND PAVING (PROVISIONAL)

GENERAL EARTH WORKS (PROVISIONAL)

JBCC􀆟Work􀆟Group􀆟No􀆟104.

SUPPLEMENTARY PREAMBLES

For􀆟Preambles􀆟see􀆟"PW371􀆟-􀆟Specification􀆟of􀆟Materials􀆟
and􀆟Methods􀆟to􀆟be􀆟used"

---------------------

SITE CLEARANCE, REMOVAL OF TREES, ETC.

Site Clearance :

1 Clear􀆟area􀆟of􀆟site􀆟of􀆟all􀆟rubbish,􀆟debris,􀆟vegetation,􀆟
hedges,􀆟shrubs􀆟and􀆟trees􀆟not􀆟exceeding􀆟200􀆟mm􀆟girth,􀆟
bush,􀆟etc.,􀆟including􀆟reclearing􀆟of􀆟any􀆟subsequent􀆟
vegetation􀆟growth􀆟during􀆟the􀆟contract􀆟period􀆟as􀆟
considered􀆟necessary􀆟by􀆟the􀆟Representative􀆟and􀆟
removing􀆟all􀆟material􀆟from􀆟site,􀆟As􀆟item􀆟1􀆟page􀆟124 m2 2􀆟135

Taking out and removing, grubbing up roots and


filling in holes

2 Indigenous􀆟tree􀆟exceeding􀆟200mm􀆟and􀆟not􀆟exceeding􀆟
500mm􀆟girth No 3

3 Indigenous􀆟tree􀆟exceeding􀆟500mm􀆟and􀆟not􀆟exceeding􀆟
1000mm􀆟girth No 2

4 Indigenous􀆟tree􀆟exceeding􀆟1000mm􀆟and􀆟not􀆟exceeding􀆟
1500mm􀆟girth No 3

Carried to Collection R

Section􀆟No.􀆟􀆟3
Bill􀆟No.􀆟􀆟1
Site􀆟works􀆟and􀆟Paving􀆟(Provisional)
RUBIQUANT
QUANTITY SURVEYORS

-150-
BERGVILLE MAGISTRATE OFFICE
REPAIR AND RENOVATIONS

ROADS, PAVINGS, ETC.,

EXCAVATION, FILLING, ETC

Excavation under paving not exceeding 300mm


deep

5 Under􀆟floors􀆟 m3 1􀆟344

Earth filling supplied by the contractor compacted


to 95% Mod AASHTO density

6 150mm􀆟layers􀆟of􀆟G5􀆟Material􀆟and􀆟compacted􀆟to􀆟95%􀆟
Mod,􀆟The􀆟G5􀆟should􀆟be􀆟the􀆟form􀆟of􀆟a􀆟sugar􀆟dolerite,􀆟
decomposed􀆟granite􀆟or􀆟decomposed􀆟sandstone􀆟 m3 810

7 150mm􀆟layers􀆟of􀆟G7􀆟Material􀆟and􀆟compacted􀆟to􀆟95%􀆟
Mod,􀆟The􀆟G7􀆟should􀆟be􀆟the􀆟form􀆟of􀆟a􀆟sugar􀆟dolerite,􀆟
decomposed􀆟granite􀆟or􀆟decomposed􀆟sandstone􀆟 m3 771

Base course constructed of filling supplied by the


Contractor:

8 Stabilisation􀆟of􀆟sub-base􀆟or􀆟in-situ􀆟material􀆟with􀆟equal􀆟
parts􀆟of􀆟Ordinary􀆟Portland􀆟Cement􀆟and􀆟road􀆟lime,􀆟evenly
worked􀆟into􀆟filling􀆟material,􀆟including􀆟wetting􀆟and􀆟curing􀆟
to􀆟the􀆟satisfaction􀆟of􀆟the􀆟Engineer. m3 427

Compaction of surfaces:

9 Compaction􀆟of􀆟ground􀆟surface􀆟under􀆟pavings,􀆟roads,􀆟
etc.􀆟including􀆟scarifying􀆟for􀆟a􀆟depth􀆟of􀆟150mm,􀆟breaking􀆟
down􀆟oversize􀆟material,􀆟adding􀆟suitable􀆟material􀆟where􀆟
necessary􀆟and􀆟compacting􀆟to􀆟93%􀆟Mod􀆟AASHTO􀆟
density􀆟and􀆟100%􀆟Mod􀆟AASHTO􀆟for􀆟sand. m2 2􀆟135

Carried to Collection R

Section􀆟No.􀆟􀆟3
Bill􀆟No.􀆟􀆟1
Site􀆟works􀆟and􀆟Paving􀆟(Provisional)
RUBIQUANT
QUANTITY SURVEYORS

-151-
BERGVILLE MAGISTRATE OFFICE
REPAIR AND RENOVATIONS

Coarse river sand filling supplied by the Contractor

10 Under􀆟paving m3 362

WEED KILLER

Approved weed killer in strict accordance with


manufacturers instructions

11 Under􀆟paving,􀆟etc m2 2􀆟548

PAVING

Paving􀆟to􀆟be􀆟laid􀆟in􀆟accordance􀆟with􀆟SABS􀆟1200􀆟MJ,􀆟
SABS􀆟1058􀆟and􀆟the􀆟Concrete􀆟Masonry􀆟Association's􀆟
specifications

Paving of 50 mm clay paving bricks of approved


colour with butt joints on 20 mm thick river sand
bed (elsewhere measured)

12 Paving􀆟in􀆟herringbone􀆟bond􀆟pattern􀆟to􀆟falls m2 413

13 Extra􀆟over􀆟for􀆟straight􀆟edge􀆟blocks m 351

Paving of 80 mm concrete paving bricks of


approved colour with butt joints on 20 mm thick
river sand bed (elsewhere measured)

14 Paving􀆟in􀆟stretcher􀆟bond􀆟to􀆟falls m2 2􀆟135

PRECAST KERBS

Precase concrete finished smooth on exposed


surfaces including bedding, cutting and pointing:

15 Kerb􀆟(SABS927􀆟fig􀆟6)􀆟with􀆟45􀆟x􀆟125mm􀆟unreinforced􀆟
concrete􀆟footing,􀆟250􀆟x􀆟250mm􀆟triangular􀆟concrete􀆟
haunching􀆟at􀆟back􀆟of􀆟each􀆟joint􀆟and􀆟300􀆟x􀆟150mm􀆟
concrete􀆟infill􀆟in􀆟front􀆟with􀆟cement􀆟grouted􀆟joints,􀆟
including􀆟excavation,􀆟backfilling,􀆟etc. m 670

16 Ditto,􀆟Kerb􀆟(SABS􀆟927􀆟fig􀆟6)􀆟but􀆟circular􀆟on􀆟plan􀆟not􀆟
exceeding􀆟4m􀆟radius􀆟formed􀆟with􀆟short􀆟lengths􀆟of􀆟
straight􀆟kerb. m 62

Carried to Collection R

Section􀆟No.􀆟􀆟3
Bill􀆟No.􀆟􀆟1
Site􀆟works􀆟and􀆟Paving􀆟(Provisional)
RUBIQUANT
QUANTITY SURVEYORS

-152-
BERGVILLE MAGISTRATE OFFICE
REPAIR AND RENOVATIONS

RETRO-REFLECTIVE ROAD SIGNS, ETC.

Road􀆟signs􀆟and􀆟road􀆟markings􀆟shall􀆟conform􀆟to􀆟the􀆟
requirements􀆟given􀆟in􀆟the􀆟South􀆟African􀆟Road􀆟Traffic􀆟
Manual􀆟and􀆟relevant􀆟SABS􀆟specifications.

The􀆟rate􀆟tendered􀆟for􀆟road􀆟signs􀆟shall􀆟cover􀆟the􀆟cost􀆟of􀆟
suplying􀆟and􀆟erecting􀆟the􀆟completed􀆟signboard􀆟supports,
face,􀆟frame􀆟and􀆟fixing􀆟brackets􀆟and􀆟shall􀆟include􀆟the􀆟
cost􀆟for􀆟providing􀆟retro-reflective􀆟backgrounds,􀆟symbols,􀆟
characters,􀆟legends􀆟and􀆟borders􀆟of􀆟the􀆟type􀆟specified􀆟in􀆟
the􀆟South􀆟African􀆟Road􀆟Traffic􀆟Manual.􀆟􀆟The􀆟tendered􀆟
rate􀆟shall􀆟include􀆟for􀆟excavations,􀆟backfilling􀆟and􀆟
concreting􀆟of􀆟sign􀆟supports.􀆟􀆟

17 900mm􀆟Diameter􀆟regulation􀆟"DISABLED􀆟PARKING􀆟
SYMBOL"􀆟sign􀆟(R323)􀆟in􀆟accordance􀆟with􀆟S.A.B.S.􀆟
standard􀆟fitted􀆟and􀆟fixed􀆟on􀆟creosoted􀆟pole,􀆟2􀆟700mm􀆟
high􀆟bedded􀆟in􀆟450􀆟x􀆟450􀆟x􀆟600mm􀆟deep􀆟concrete􀆟
footing,􀆟included􀆟all􀆟necessary􀆟excavation,􀆟etc. No 3

STORMWATER CHANNELS

Stormwater channels, V drains

18 20􀆟MPa􀆟Concrete􀆟open􀆟surface􀆟stormwater􀆟channel􀆟1􀆟
000mm􀆟wide􀆟and􀆟85mm􀆟thick􀆟with􀆟V-shape􀆟channel􀆟1􀆟
000mm􀆟wide􀆟and􀆟75mm􀆟deep􀆟extreme􀆟formed􀆟in􀆟same,􀆟
finished􀆟smooth􀆟on􀆟exposed􀆟faces􀆟with􀆟angles􀆟slightly􀆟
rounded,􀆟laid􀆟to􀆟falls􀆟in􀆟lengths􀆟not􀆟exceeding􀆟2m,􀆟
jointed􀆟in􀆟3:1􀆟cement􀆟mortar􀆟including􀆟excavations,􀆟
necessary􀆟formwork􀆟including􀆟150mm􀆟deep􀆟selected􀆟
filling􀆟underneath􀆟and􀆟compacting􀆟to􀆟a􀆟density􀆟of􀆟93%􀆟of􀆟
the􀆟Mod.􀆟AASHTO􀆟Maximum􀆟density m 278

19 Type􀆟193􀆟fabric􀆟reinforcement􀆟in􀆟concrete􀆟surface􀆟beds,􀆟
slabs,􀆟etc. m2 333

20 Extra􀆟over􀆟1􀆟000mm􀆟wide􀆟channel􀆟for􀆟angles,􀆟
intersections,􀆟ends,􀆟dressing􀆟into􀆟sides􀆟of􀆟catchpits,􀆟etc. No 18

21 Triangular􀆟shaped􀆟stormwater􀆟channel􀆟outlet􀆟1m􀆟wide􀆟at􀆟
head,􀆟1.5m􀆟wide􀆟at􀆟base􀆟and􀆟1m􀆟long􀆟at􀆟sides􀆟formed􀆟of􀆟
85mm􀆟thick􀆟concrete􀆟V-shaped􀆟base􀆟including􀆟all􀆟
excavations,􀆟formwork􀆟and􀆟six􀆟150􀆟x􀆟150mm􀆟broken􀆟
bricks􀆟or􀆟stones􀆟protruding􀆟150mm􀆟high􀆟at􀆟base􀆟of􀆟the􀆟
spill􀆟basin No 3

Carried to Collection R

Section􀆟No.􀆟􀆟3
Bill􀆟No.􀆟􀆟1
Site􀆟works􀆟and􀆟Paving􀆟(Provisional)
RUBIQUANT
QUANTITY SURVEYORS

-153-
BERGVILLE MAGISTRATE OFFICE
REPAIR AND RENOVATIONS

GULLIES

22 110􀆟mm􀆟uPVC􀆟gulley􀆟complete􀆟with􀆟and􀆟including􀆟380􀆟x􀆟
380􀆟x􀆟170mm􀆟precast􀆟concrete􀆟gulley􀆟surround􀆟on􀆟
75mm􀆟Class􀆟C􀆟concrete􀆟base􀆟abd􀆟fitted􀆟with􀆟187mm􀆟
diameter􀆟uPVC􀆟grating. No 1

INSPECTION CHAMBERS, MANHOLES, ETC.

Sumps, catchpits, inspection chambers, etc


(gratings and covers elsewhere):

Gratings, covers, etc:

23 600􀆟x􀆟600􀆟x􀆟60kg􀆟Dished􀆟cast􀆟iron􀆟grating􀆟set􀆟in􀆟mortar No 1

The following in soakaways, french drains, etc:

24 Excavate􀆟not􀆟exceeding􀆟2m􀆟deep. m3 7

25 Unreinforced􀆟concrete􀆟15Mpa􀆟in􀆟base. m3 3

26 150mm􀆟Thick􀆟concrete􀆟block􀆟wall. m2 4

27 Selected􀆟rubble􀆟filling. m3 3

28 250􀆟Micron􀆟plastic􀆟waterproof􀆟membrane􀆟laid􀆟over􀆟
soakaway. m2 10

29 Risk􀆟of􀆟collapse􀆟to􀆟sides􀆟of􀆟soakaway􀆟excavations􀆟not􀆟
exceeding􀆟1,5m􀆟deep. m2 12

30 Extra􀆟over􀆟soakaway􀆟excavations􀆟for􀆟carting􀆟away􀆟
surplus􀆟material􀆟from􀆟excavations􀆟to􀆟a􀆟dumping􀆟site􀆟to􀆟
be􀆟located􀆟by􀆟the􀆟contractor. m3 2

31 Earthfilling􀆟obtained􀆟from􀆟excavations􀆟or􀆟stock􀆟piles􀆟on􀆟
site􀆟compacted􀆟to􀆟93%􀆟backfilled􀆟to􀆟soakways. m3 2

Carried to Collection R

Section􀆟No.􀆟􀆟3
Bill􀆟No.􀆟􀆟1
Site􀆟works􀆟and􀆟Paving􀆟(Provisional)
RUBIQUANT
QUANTITY SURVEYORS

-154-
BERGVILLE MAGISTRATE OFFICE
REPAIR AND RENOVATIONS

CONCRETE APRONS

The following in aprons

32 Level􀆟and􀆟compact􀆟earth􀆟under􀆟apron􀆟slab. m2 109

33 Unreinforced􀆟concrete􀆟(20MPa)􀆟in􀆟apron􀆟slab m3 16

34 Type􀆟193􀆟fabric􀆟reinforcement􀆟in􀆟concrete􀆟surface􀆟beds,􀆟
slabs,􀆟etc. m2 109

35 Wood􀆟float􀆟finish􀆟to􀆟top􀆟of􀆟concrete􀆟surface􀆟bed. m2 109

36 Half􀆟rounded􀆟angle􀆟on􀆟edge􀆟of􀆟concrete􀆟aprons. m 91

37 Rough􀆟formwork􀆟to􀆟edge􀆟of􀆟concrete􀆟not􀆟exceeding􀆟
300mm􀆟high. m 182

38 10mm􀆟Expansion􀆟joints􀆟of􀆟10mm􀆟Jointex􀆟filler􀆟board􀆟
between􀆟vertical􀆟concrete􀆟surfaces􀆟not􀆟exceeding􀆟
300mm􀆟high. m 9

39 Ditto,􀆟between􀆟vertical􀆟concrete􀆟surfaces􀆟and􀆟brickwork􀆟
surfaces􀆟not􀆟exceeding􀆟300mm􀆟high􀆟 m 91

40 Rake􀆟out􀆟softboard􀆟25mm􀆟deep􀆟and􀆟seal􀆟expansion􀆟
joints􀆟"􀆟Thioflex􀆟600"􀆟polysulphide􀆟sealing􀆟compound􀆟
including􀆟backing􀆟cord,􀆟bond􀆟breaker,􀆟primer,􀆟etc,􀆟in􀆟
aprons. m 100

Carried to Collection R

Section􀆟No.􀆟􀆟3
Bill􀆟No.􀆟􀆟1
Site􀆟works􀆟and􀆟Paving􀆟(Provisional)
RUBIQUANT
QUANTITY SURVEYORS

-155-
BERGVILLE MAGISTRATE OFFICE
REPAIR AND RENOVATIONS

ALUMINIUM FLAGPOLE

The􀆟following􀆟in􀆟a􀆟8,85m􀆟high􀆟Standard􀆟Government􀆟
type􀆟Aluminium􀆟Flagpole􀆟as􀆟"Aluweld"􀆟or􀆟other􀆟approved􀆟
and􀆟erected􀆟on􀆟600􀆟x􀆟600􀆟x􀆟800mm􀆟deep􀆟Class􀆟C􀆟
concrete􀆟base,􀆟incl􀆟excavations,􀆟carting􀆟away,􀆟etc.

41 8,85mm􀆟High􀆟flagpole􀆟comprising􀆟130mm􀆟and􀆟60mm􀆟
outside􀆟diameter􀆟aluminium􀆟tubing􀆟tapered􀆟by􀆟way􀆟of􀆟an􀆟
aluminium􀆟cone􀆟casting,􀆟welded􀆟and􀆟complete􀆟with􀆟
spherical􀆟top􀆟cap,􀆟two􀆟pulleys,􀆟two􀆟cleats,􀆟two􀆟halyards􀆟
(ropes),􀆟four􀆟flagrope􀆟clamps,􀆟􀆟swivel􀆟type􀆟base􀆟with􀆟four􀆟
M20􀆟x􀆟550mm􀆟long􀆟anchorbolts􀆟for􀆟fixing􀆟flagpole􀆟
baseplate􀆟including􀆟concrete􀆟base􀆟(Base􀆟size􀆟1500􀆟x􀆟
1500􀆟x􀆟550mm􀆟deep) No 2

LANDSCAPING

Ground preparation

42 Cultivation􀆟and􀆟preparation􀆟of􀆟areas􀆟to􀆟be􀆟planted m2 4􀆟380

Topsoil, compost, lime and fertilizer

43 Topsoil􀆟supplied􀆟by􀆟the􀆟contractor􀆟in􀆟plant􀆟beds,􀆟grassed􀆟
areas􀆟and􀆟holes􀆟for􀆟trees,􀆟shrubs,􀆟etc m3 657

44 "Kikuyu"􀆟sods􀆟approximately􀆟80mm􀆟thick m2 4􀆟380

SOFT LANDSCAPING

SOFT LANDSCAPING

45 Allow􀆟the􀆟PC􀆟amount􀆟of􀆟Two􀆟Hundred􀆟Thousand􀆟Rand􀆟
(R􀆟200􀆟000.00)􀆟for􀆟Soft􀆟Landscaping􀆟complete Item 200􀆟000.00

46 Allow􀆟for􀆟profit􀆟and􀆟attendance Item

Carried to Collection R

Section􀆟No.􀆟􀆟3
Bill􀆟No.􀆟􀆟1
Site􀆟works􀆟and􀆟Paving􀆟(Provisional)
RUBIQUANT
QUANTITY SURVEYORS

-156-
BERGVILLE MAGISTRATE OFFICE
REPAIR AND RENOVATIONS

Section􀆟No.􀆟􀆟3

Bill􀆟No.􀆟􀆟1

Site􀆟works􀆟and􀆟Paving􀆟(Provisional)

COLLECTION

Page Amount
No
Total􀆟Brought􀆟Forward􀆟from􀆟Page􀆟No. 150

151

152

153

154

155

156

Carried Forward to Summary of Section No. 3 R

Section􀆟No.􀆟􀆟3
Bill􀆟No.􀆟􀆟1
Site􀆟works􀆟and􀆟Paving􀆟(Provisional)
RUBIQUANT
QUANTITY SURVEYORS

-157-
BERGVILLE MAGISTRATE OFFICE
REPAIR AND RENOVATIONS

Item Quantity Rate Amount


No
SECTION NUMBER 3

BILL NUMBER 2

WATER SUPPLY AND FIRE SERVICES


(PROVISIONAL)

JBCC􀆟Work􀆟Group􀆟No.􀆟148

WATER SUPPLIES

Note:

Rates􀆟for􀆟piping,􀆟etc.,􀆟have􀆟to􀆟include􀆟all􀆟adaptors,􀆟
flanges,􀆟etc.

General

Where􀆟ever􀆟possible,􀆟abridged􀆟descriptions􀆟have􀆟been􀆟
used􀆟for􀆟those􀆟items􀆟in􀆟this􀆟Bill􀆟which􀆟appear􀆟under􀆟the􀆟
main􀆟trade􀆟headings􀆟in􀆟previous/subsequent􀆟Bills.􀆟􀆟The􀆟
full􀆟descriptions􀆟of􀆟these􀆟items􀆟in􀆟the􀆟Preambles,􀆟as􀆟
referred􀆟to􀆟above,􀆟to􀆟the􀆟various􀆟trade􀆟bills􀆟are􀆟to,􀆟and􀆟
do􀆟apply􀆟equally􀆟to􀆟this􀆟Section.

Reference

Special􀆟reference􀆟is􀆟made􀆟to􀆟SABS􀆟1200􀆟specifications􀆟
for􀆟civil􀆟works.􀆟

Special􀆟reference􀆟is􀆟made􀆟to􀆟Specifications􀆟and􀆟details􀆟
of􀆟Department􀆟of􀆟Public􀆟Works􀆟Drainage􀆟Detail􀆟
(December􀆟1998).

Carried to Collection R

Section􀆟No.􀆟􀆟3
Bill􀆟No.􀆟􀆟2
Water􀆟supplies􀆟(Provisional)
RUBIQUANT
QUANTITY SURVEYORS

-158-
BERGVILLE MAGISTRATE OFFICE
REPAIR AND RENOVATIONS

Protection of existing services

The􀆟contractor􀆟must􀆟make􀆟allowance􀆟against􀆟the􀆟
relevant􀆟items􀆟for􀆟the􀆟following:

(a) Necessary􀆟care􀆟to􀆟be􀆟taken􀆟when􀆟excavating􀆟
near􀆟 existing􀆟services􀆟in􀆟or􀆟across􀆟the􀆟path􀆟of􀆟
excavations.

(b) Protection􀆟and􀆟maintaining􀆟such􀆟service􀆟in􀆟
operation
􀆟􀆟􀆟􀆟􀆟􀆟􀆟􀆟􀆟􀆟􀆟􀆟 by􀆟means􀆟of􀆟temporary􀆟support􀆟or􀆟shoring􀆟as􀆟
􀆟􀆟􀆟􀆟􀆟􀆟􀆟􀆟􀆟􀆟􀆟􀆟 necessary.

(c) Delays􀆟and􀆟disruption􀆟of􀆟the􀆟progress􀆟of􀆟the􀆟
work􀆟due􀆟
􀆟􀆟􀆟􀆟􀆟􀆟􀆟􀆟􀆟􀆟􀆟􀆟 to􀆟the􀆟existence􀆟of􀆟the􀆟service.

(d) Repairs􀆟necessitated􀆟by􀆟damage􀆟caused􀆟by􀆟the􀆟
Contractor.

SABS specifications references

Where􀆟reference􀆟is􀆟made􀆟to􀆟SABS􀆟1200􀆟specifications􀆟
(all􀆟sections)􀆟it􀆟will􀆟be􀆟deemed􀆟to􀆟exclude􀆟clause􀆟8􀆟
"Measurements􀆟and􀆟Payment".

Nature of ground

The􀆟tenderer􀆟must􀆟acquaint􀆟himself􀆟with􀆟the􀆟material􀆟to􀆟
be􀆟excavated􀆟in􀆟and􀆟are􀆟requested􀆟to􀆟study􀆟the􀆟
Geotechnical􀆟Survey􀆟Report􀆟attached􀆟to􀆟Part􀆟C4:􀆟Site􀆟
Information􀆟of􀆟the􀆟procurement􀆟document

Carting away of excavated material

Descriptions􀆟of􀆟carting􀆟away􀆟of􀆟excavated􀆟material􀆟shall􀆟
be􀆟deemed􀆟to􀆟include􀆟loading􀆟excavated􀆟material􀆟onto􀆟
trucks􀆟directly􀆟form􀆟the􀆟excavations􀆟or􀆟alternatively,􀆟from􀆟
stock􀆟piles􀆟situated􀆟on􀆟the􀆟building􀆟site.

Prescribed tests

All􀆟prescribed􀆟tests􀆟are􀆟to􀆟be􀆟executed􀆟by􀆟an􀆟approved,􀆟
accredited􀆟laboratory

Carried to Collection R

Section􀆟No.􀆟􀆟3
Bill􀆟No.􀆟􀆟2
Water􀆟supplies􀆟(Provisional)
RUBIQUANT
QUANTITY SURVEYORS

-159-
BERGVILLE MAGISTRATE OFFICE
REPAIR AND RENOVATIONS

Concrete pipes

Pipes􀆟shall􀆟be􀆟jointed􀆟with􀆟ogee􀆟joints􀆟with􀆟rubber􀆟collars􀆟
or􀆟socket􀆟and􀆟spigot􀆟joints􀆟with􀆟rubber􀆟rings

Polypropylene pipes

Polypropylene􀆟pipes􀆟42􀆟mm􀆟diameter􀆟and􀆟under􀆟shall􀆟
be􀆟seamless􀆟copper􀆟coloured􀆟class􀆟16􀆟pipes􀆟jointed􀆟with􀆟
brass􀆟compression􀆟fittings􀆟as􀆟designed􀆟for􀆟use􀆟with􀆟
copper􀆟pipes􀆟as􀆟stated.

Pipes􀆟shall􀆟be􀆟firmly􀆟fixed􀆟to􀆟walls􀆟etc.􀆟with􀆟coloured􀆟
nylon􀆟snap􀆟in􀆟pipe􀆟clips􀆟with􀆟provision􀆟for􀆟
accommodating􀆟thermal􀆟movement􀆟and􀆟jointed􀆟and􀆟
fixed􀆟strictly􀆟in􀆟accordance􀆟with􀆟the􀆟manufacturer's􀆟
instructions.

All􀆟pipe􀆟diameters􀆟are􀆟to􀆟match􀆟sizes􀆟as􀆟utilised􀆟for􀆟
copper􀆟pipes.

Polyethylene pipes

Polyethylene􀆟pipes􀆟75􀆟mm􀆟diameter􀆟and􀆟under􀆟up􀆟to􀆟42􀆟
mm􀆟shall􀆟be􀆟seamless􀆟copper􀆟coloured􀆟class􀆟16􀆟Type􀆟
IV􀆟HDPE􀆟pipes􀆟jointed􀆟with􀆟polymer􀆟compression􀆟
fittings.

Pipes􀆟shall􀆟be􀆟firmly􀆟fixed􀆟to􀆟walls􀆟etc.􀆟with􀆟coloured􀆟
nylon􀆟snap-in􀆟pipe􀆟clips􀆟with􀆟provision􀆟for􀆟
accommodating􀆟thermal􀆟movement􀆟and􀆟jointed􀆟and􀆟
fixed􀆟strictly􀆟in􀆟accordance􀆟with􀆟the􀆟manufacturer's􀆟
instructions.

All􀆟pipe􀆟diameters􀆟are􀆟to􀆟match􀆟sizes􀆟as􀆟utilised􀆟for􀆟
copper􀆟pipes.

C.O.D. Fibre Cement Pressure Pipes

Pipes􀆟shall􀆟be􀆟jointed􀆟with􀆟"Triplex"􀆟couplings.􀆟A􀆟
lubricant􀆟(soft􀆟soap)􀆟is􀆟to􀆟be􀆟used􀆟in􀆟connecting􀆟the􀆟
couplings􀆟to􀆟the􀆟pipe􀆟or􀆟fittings.􀆟􀆟The􀆟couplings􀆟are􀆟to􀆟be􀆟
unsupported􀆟on􀆟the􀆟bedding􀆟when􀆟pipes􀆟are􀆟layed.

Carried to Collection R

Section􀆟No.􀆟􀆟3
Bill􀆟No.􀆟􀆟2
Water􀆟supplies􀆟(Provisional)
RUBIQUANT
QUANTITY SURVEYORS

-160-
BERGVILLE MAGISTRATE OFFICE
REPAIR AND RENOVATIONS

uPVC pipes and fittings

Sewer􀆟and􀆟drainage􀆟pipes􀆟and􀆟fittings􀆟shall􀆟be􀆟jointed􀆟
and􀆟sealed􀆟with􀆟butyl􀆟rubber􀆟rings.

Soil,􀆟waste􀆟and􀆟vent􀆟pipes􀆟and􀆟fittings􀆟shall􀆟be􀆟solvent􀆟
weld􀆟jointed.

Copper pipes

Pipes􀆟shall􀆟be􀆟hard􀆟drawn􀆟and􀆟half-hard􀆟􀆟pipes􀆟of􀆟the􀆟
class􀆟stated.􀆟􀆟Class􀆟0􀆟(thin􀆟walled􀆟hard􀆟drawn)􀆟pipes􀆟
shall􀆟not􀆟be􀆟bent.􀆟􀆟Class􀆟1􀆟(thin􀆟walled􀆟half-hard),􀆟Class􀆟
2􀆟(half-hard)􀆟and􀆟Class􀆟3􀆟(heavy􀆟walled􀆟half-hard)􀆟pipes􀆟
shall􀆟only􀆟be􀆟bent􀆟with􀆟benders􀆟with􀆟inner􀆟and􀆟outer􀆟
formers.􀆟􀆟Fittings􀆟to􀆟copper􀆟waste,􀆟vent􀆟and􀆟anti-syphon􀆟
pipes,􀆟capillary􀆟solder􀆟fittings􀆟and􀆟compression􀆟fittings􀆟
shall􀆟be􀆟"Cobra􀆟Watertech"􀆟type.􀆟􀆟Capillary􀆟solder􀆟fittings
shall􀆟comply􀆟with􀆟ISO􀆟2016.􀆟􀆟Only􀆟compression􀆟fittings􀆟
shall􀆟be􀆟used􀆟in􀆟walls􀆟or􀆟in􀆟ground.

Reducing fittings

Where􀆟fittings􀆟have􀆟reducing􀆟ends􀆟or􀆟branches􀆟they􀆟are􀆟
described􀆟as􀆟"reducing".􀆟􀆟In􀆟case􀆟of􀆟pipes􀆟with􀆟
diameters􀆟not􀆟exceeding􀆟60􀆟mm􀆟only􀆟the􀆟largest􀆟end􀆟or􀆟
branch􀆟size􀆟is􀆟given.􀆟Should􀆟the􀆟contractor􀆟wish􀆟to􀆟use􀆟
other􀆟fittings􀆟and􀆟bushes􀆟or􀆟reducers􀆟he􀆟may􀆟do􀆟so􀆟on􀆟
the􀆟understanding􀆟that􀆟no􀆟claim􀆟in􀆟this􀆟regard􀆟will􀆟be􀆟
entertained.􀆟In􀆟case􀆟of􀆟pipes􀆟with􀆟diameters􀆟exceeding􀆟
60􀆟mm􀆟all􀆟sizes􀆟are􀆟given􀆟and􀆟no􀆟claim􀆟for􀆟extra􀆟
bushes,􀆟reducers,􀆟etc.,􀆟will􀆟be􀆟entertained.

Exposed concrete surfaces

Exposed􀆟surfaces􀆟of􀆟concrete􀆟stormwater􀆟channels,􀆟
cover􀆟slabs,􀆟inspection􀆟eye􀆟marker􀆟slabs,􀆟gulley􀆟tops,􀆟
cleaning􀆟eye􀆟tops,􀆟catchpits,􀆟inspection􀆟chambers,􀆟etc.􀆟
shall􀆟be􀆟finished􀆟smooth􀆟with􀆟plaster.

Excavations

No􀆟claim􀆟for􀆟rock􀆟excavation􀆟will􀆟be􀆟entertained􀆟unless􀆟
the􀆟contractor􀆟has􀆟timeously􀆟notified􀆟the􀆟Quantity􀆟
Surveyor/Engineer􀆟thereof􀆟prior􀆟to􀆟backfilling.

"Soft􀆟rock"􀆟and􀆟"hard􀆟rock"􀆟shall􀆟be􀆟as􀆟defined􀆟in􀆟
"Earthworks".

Carried to Collection R

Section􀆟No.􀆟􀆟3
Bill􀆟No.􀆟􀆟2
Water􀆟supplies􀆟(Provisional)
RUBIQUANT
QUANTITY SURVEYORS

-161-
BERGVILLE MAGISTRATE OFFICE
REPAIR AND RENOVATIONS

Saddles

Saddles􀆟to􀆟be􀆟the􀆟Magnum􀆟uPVC􀆟type􀆟with􀆟stainless􀆟
steel􀆟bolts􀆟and􀆟screw􀆟pieces􀆟complete􀆟with􀆟Talbot􀆟
lockable􀆟clamp􀆟and􀆟compression􀆟external􀆟screw-thread􀆟
adaptor.

uPVC pressure pipes and fittings

Pipes􀆟for􀆟water􀆟supply􀆟shall􀆟be􀆟of􀆟the􀆟class􀆟stated.

Pipes􀆟of􀆟40􀆟mm􀆟diameter􀆟and􀆟smaller􀆟shall􀆟be􀆟plain􀆟
ended􀆟with􀆟solvent􀆟welded􀆟uPVC􀆟loose􀆟sockets􀆟and􀆟
fittings

Pipes􀆟of􀆟50􀆟mm􀆟diameter􀆟and􀆟greater􀆟shall􀆟have􀆟sockets􀆟
and􀆟spigots􀆟with􀆟push-in􀆟type􀆟integral􀆟rubber􀆟ring􀆟joints.􀆟􀆟
Bends􀆟shall􀆟be􀆟uPVC􀆟and􀆟all􀆟outer􀆟fittings􀆟shall􀆟be􀆟cast􀆟
iron,􀆟all􀆟with􀆟similar􀆟push-in􀆟type􀆟joints

Exposed concrete surfaces

Exposed􀆟surfaces􀆟of􀆟concrete􀆟stormwater􀆟channels,􀆟
cover􀆟slabs,􀆟inspection􀆟eye􀆟marker􀆟slabs,􀆟gulley􀆟tops,􀆟
cleaning􀆟eye􀆟tops,􀆟catchpits,􀆟inspection􀆟chambers,􀆟etc.􀆟
shall􀆟be􀆟finished􀆟smooth􀆟with􀆟plaster

Excavations

No􀆟claim􀆟for􀆟rock􀆟excavation􀆟will􀆟be􀆟entertained􀆟unless􀆟
the􀆟contractor􀆟has􀆟timeously􀆟notified􀆟the􀆟quantity􀆟
surveyor􀆟thereof􀆟prior􀆟to􀆟backfilling

"Soft􀆟rock"􀆟and􀆟"hard􀆟rock"􀆟shall􀆟be􀆟as􀆟defined􀆟in􀆟
"Earthworks"

Carried to Collection R

Section􀆟No.􀆟􀆟3
Bill􀆟No.􀆟􀆟2
Water􀆟supplies􀆟(Provisional)
RUBIQUANT
QUANTITY SURVEYORS

-162-
BERGVILLE MAGISTRATE OFFICE
REPAIR AND RENOVATIONS

Laying, backfilling, bedding, etc. of pipes

Pipes􀆟shall􀆟be􀆟laid􀆟and􀆟bedded􀆟and􀆟trenches􀆟shall􀆟be􀆟
carefully􀆟backfilled􀆟in􀆟accordance􀆟with􀆟manufacturer's􀆟
instructions.

Where􀆟no􀆟manufacturer's􀆟instructions􀆟exist􀆟pipes􀆟shall􀆟
be􀆟laid􀆟in􀆟accordance􀆟with􀆟clauses􀆟5.1􀆟and􀆟5.2􀆟each􀆟of􀆟
the􀆟following:

SABS􀆟1200􀆟L: Medium-pressure􀆟pipelines
LD: Sewers
LE: Stormwater􀆟drainage

Pipe􀆟trenches􀆟etc.􀆟shall􀆟be􀆟backfilled􀆟in􀆟accordance􀆟with􀆟
clauses􀆟3,􀆟5.5,􀆟5.6,􀆟5.7􀆟and􀆟7􀆟of􀆟SABS􀆟1200

DB: Earthworks􀆟(Pipe􀆟trenches)

Pipes􀆟hall􀆟be􀆟bedded􀆟in􀆟accordance􀆟with􀆟clauses􀆟3.1􀆟to􀆟
3.4.1.,􀆟5.1􀆟to􀆟5.3􀆟and􀆟7􀆟of􀆟SABS􀆟1200

LB: Bedding􀆟(Pipes)

Unless􀆟otherwise􀆟described􀆟bedding􀆟of􀆟rigid􀆟pipes􀆟shall􀆟
be􀆟class􀆟B􀆟bedding

Steel pipes, fittings and specials

Pipes of Nominal Bore up to 150 mm:


Substitute􀆟"screwed"􀆟in􀆟L3.4.2􀆟with􀆟"flanged".

Pipes of Nominal Bore over 150 mm:


Add􀆟the􀆟following:

"All􀆟mild􀆟steel􀆟pipes􀆟must􀆟be􀆟manufactured􀆟from􀆟Grade􀆟
B􀆟steel􀆟with􀆟minimum􀆟plate􀆟thickness􀆟of􀆟6,0􀆟mm􀆟except􀆟
where􀆟specified􀆟otherwise."

Carried to Collection R

Section􀆟No.􀆟􀆟3
Bill􀆟No.􀆟􀆟2
Water􀆟supplies􀆟(Provisional)
RUBIQUANT
QUANTITY SURVEYORS

-163-
BERGVILLE MAGISTRATE OFFICE
REPAIR AND RENOVATIONS

Corrosion protection

Cast Iron Pipes and Fittings:


Substitute􀆟L3.9.1􀆟with􀆟the􀆟following:

"All􀆟internal􀆟surfaces􀆟shall􀆟be􀆟grit􀆟blasted􀆟to􀆟SA􀆟2½􀆟
standard􀆟and􀆟then􀆟coated􀆟with􀆟Copon􀆟EP􀆟2300􀆟epoxy􀆟
paint􀆟to􀆟a􀆟minimum􀆟thickness􀆟of􀆟350􀆟micron."

Joints, Bolts, Nuts and Washers:


Substitute􀆟L3.9.5􀆟with􀆟the􀆟following:

"All􀆟joints,􀆟bolts,􀆟nuts􀆟and􀆟washers􀆟shall􀆟be􀆟cadmium-
plated􀆟or􀆟stainless􀆟steel."

Rates

Rates􀆟for􀆟pipe􀆟items􀆟are􀆟to􀆟be􀆟all􀆟inclusive􀆟prices􀆟and􀆟
rates􀆟(except􀆟where􀆟allowed􀆟for􀆟elsewhere)􀆟are􀆟for􀆟the􀆟
completed􀆟work􀆟as􀆟described􀆟in􀆟the􀆟respective􀆟items􀆟
and􀆟shall􀆟include􀆟all􀆟labour,􀆟pipes, bedding and filling
complete in layers not exceeding 300 mm (unless
otherwise specified) and compacted􀆟all􀆟sundry􀆟work,􀆟
equipment􀆟cost,􀆟guards,􀆟lighting,􀆟profit􀆟and􀆟
maintenance.

Under􀆟paved􀆟areas􀆟and􀆟buildings􀆟the􀆟sand􀆟bedding􀆟and􀆟
filling􀆟must􀆟be􀆟stabilised􀆟with􀆟4􀆟%􀆟cement.

Rates􀆟for􀆟inspection􀆟chambers,􀆟etc.,􀆟are􀆟to􀆟be􀆟all􀆟
inclusive􀆟prices􀆟and􀆟rates􀆟(except􀆟where􀆟allowed􀆟for􀆟
elsewhere)􀆟for􀆟the􀆟completed􀆟work􀆟as􀆟described􀆟in􀆟the􀆟
respective􀆟items􀆟and􀆟shall􀆟include􀆟all􀆟labour,􀆟pipes,􀆟
concrete-floors􀆟and􀆟slabs,􀆟brickwork,􀆟plastering,􀆟
compacting,􀆟all􀆟sundry􀆟work,􀆟equipment􀆟cost,􀆟guards,􀆟
lighting,􀆟profit􀆟and􀆟maintenance.

The􀆟Contractor􀆟is􀆟referred􀆟to􀆟Drawing􀆟no's􀆟
208640VSO/15􀆟to􀆟17􀆟annexed􀆟to􀆟these􀆟Bill􀆟of􀆟
Quantities.

Pipework, fittings, etc.

All􀆟underground􀆟steel􀆟pipes􀆟and􀆟fittings,􀆟after􀆟
installation,􀆟shall􀆟be􀆟protected􀆟against􀆟corrosion􀆟
according􀆟to􀆟PSL􀆟1.2

Carried to Collection R

Section􀆟No.􀆟􀆟3
Bill􀆟No.􀆟􀆟2
Water􀆟supplies􀆟(Provisional)
RUBIQUANT
QUANTITY SURVEYORS

-164-
BERGVILLE MAGISTRATE OFFICE
REPAIR AND RENOVATIONS

Maintenance period

The􀆟maintenance􀆟period􀆟for􀆟the􀆟following􀆟work􀆟shall􀆟be􀆟
12􀆟calendar􀆟months.

High density polyethylene class 16 piping


complying with SABS 533 Part III

1 25􀆟mm􀆟Pipes􀆟laid􀆟in􀆟and􀆟including􀆟trenches􀆟not􀆟
exceeding􀆟1000􀆟mm􀆟deep m 15

2 32􀆟mm􀆟Pipes􀆟laid􀆟in􀆟and􀆟including􀆟trenches􀆟not􀆟
exceeding􀆟1000􀆟mm􀆟deep m 5

3 40􀆟mm􀆟Pipes􀆟laid􀆟in􀆟and􀆟including􀆟trenches􀆟not􀆟
exceeding􀆟1000􀆟mm􀆟deep m 5

4 50􀆟mm􀆟Pipes􀆟laid􀆟in􀆟and􀆟including􀆟trenches􀆟not􀆟
exceeding􀆟1000􀆟mm􀆟deep m 40

5 63􀆟mm􀆟Pipes􀆟laid􀆟in􀆟and􀆟including􀆟trenches􀆟not􀆟
exceeding􀆟1000􀆟mm􀆟deep m 78

The following in HDPe compression (16 Bar) fittings

6 25􀆟x􀆟20􀆟Reducer No 6

7 25􀆟x􀆟90°􀆟Elbow No 4

8 32􀆟x􀆟20􀆟Reducer No 3

9 32􀆟x􀆟90°􀆟Elbow No 3

10 32􀆟x􀆟32􀆟Equal􀆟Tee No 1

11 40􀆟x􀆟90°􀆟Elbow No 2

12 40􀆟x􀆟32􀆟Reducer No 1

13 40􀆟x􀆟22􀆟Reducer No 2

14 50􀆟x􀆟50􀆟Euqual􀆟Tee No 2

15 50􀆟x􀆟90°􀆟Elbow No 6

16 50􀆟x􀆟32􀆟Reducer No 3

Carried to Collection R

Section􀆟No.􀆟􀆟3
Bill􀆟No.􀆟􀆟2
Water􀆟supplies􀆟(Provisional)
RUBIQUANT
QUANTITY SURVEYORS

-165-
BERGVILLE MAGISTRATE OFFICE
REPAIR AND RENOVATIONS

17 63􀆟x􀆟63􀆟Euqual􀆟Tee No 8

18 63􀆟x􀆟90°􀆟Elbow No 15

19 63􀆟x􀆟50􀆟Reducer No 1

The following in valves, etc

20 32mm􀆟Stainless􀆟steel􀆟sluice/gate􀆟valve􀆟with􀆟teflon􀆟seat No 1

21 35mm􀆟Isolating􀆟valve No 2

22 35mm􀆟In-line􀆟strainer No 1

23 35mm􀆟Non-return􀆟valve No 1

24 35mm􀆟adjustable􀆟pressure􀆟reducing􀆟valve􀆟set􀆟to􀆟4.0BAR No 1

25 50mm􀆟Stainless􀆟steel􀆟sluice/gate􀆟valve􀆟with􀆟teflon􀆟seat No 3

26 54mm􀆟Non-return􀆟valve No 2

27 54mm􀆟In-line􀆟strainer No 2

28 54mm􀆟Isolating􀆟valve No 6

29 54mm􀆟adjustable􀆟pressure􀆟reducing􀆟valve􀆟set􀆟to􀆟4.0BAR No 1

30 63mm􀆟Isolating􀆟valve No 5

The following in Valve Chamber

31 Standard􀆟valve􀆟chamber􀆟size􀆟337􀆟x􀆟337􀆟x􀆟390mm􀆟high􀆟
comprising􀆟of􀆟Class􀆟25/19􀆟concrete􀆟footing􀆟and􀆟collar,􀆟
with􀆟200mm􀆟diameter􀆟Class􀆟B􀆟COD􀆟fibre􀆟cement􀆟pipe􀆟
vertically􀆟into􀆟ground􀆟and􀆟covered􀆟with􀆟Besaans-du􀆟
Plessis􀆟size􀆟115mm􀆟diameter􀆟x􀆟102􀆟Type􀆟7􀆟stopcock􀆟
box􀆟cast􀆟into􀆟concrete􀆟collar􀆟 No 5

Sundries

32 Cut􀆟into􀆟existing􀆟HDPE􀆟pipe􀆟in􀆟ground􀆟and􀆟connect􀆟new􀆟
50mm􀆟HDPE􀆟water􀆟pipe No 1.00

Carried to Collection R

Section􀆟No.􀆟􀆟3
Bill􀆟No.􀆟􀆟2
Water􀆟supplies􀆟(Provisional)
RUBIQUANT
QUANTITY SURVEYORS

-166-
BERGVILLE MAGISTRATE OFFICE
REPAIR AND RENOVATIONS

BOREHOLE

Borehole

33 Allow􀆟the􀆟PC􀆟amount􀆟of􀆟Two􀆟Hundred􀆟and􀆟Sixty􀆟
Thousand􀆟Rand􀆟(R􀆟260􀆟000.00)􀆟for􀆟Borehole􀆟complete Item 260􀆟000.00

34 Allow􀆟for􀆟profit􀆟and􀆟attendance Item

TESTING :

35 Allow􀆟for􀆟testing􀆟the􀆟whole􀆟of􀆟the􀆟water􀆟reticulation􀆟
system􀆟and􀆟for􀆟any􀆟re-testing􀆟necessary􀆟after􀆟taking􀆟out􀆟
and􀆟replacing􀆟any􀆟defective􀆟work􀆟to􀆟the􀆟satisfaction􀆟of􀆟
the􀆟Representative. Item

EMERGENCY WATER TANK

36 Galvanised􀆟steel􀆟tank􀆟(4x3x1􀆟high􀆟module􀆟Panels)􀆟on􀆟
9m􀆟high􀆟galvanised􀆟steel􀆟stand􀆟(elsewhere􀆟measured)􀆟
complete􀆟in􀆟accordance􀆟with􀆟CKS􀆟114􀆟including􀆟100􀆟mm
diameter􀆟float􀆟valve􀆟series􀆟7354􀆟according􀆟to􀆟VOSA Item

37 Supply,􀆟deliver􀆟to􀆟site􀆟and􀆟erect􀆟9􀆟m􀆟high􀆟galvanised􀆟
steel􀆟tank􀆟stand􀆟for􀆟the􀆟abovementioned􀆟tank,􀆟complete􀆟
with􀆟side􀆟ladder,􀆟bearers,􀆟excavations,􀆟backfill,􀆟formwork􀆟
all􀆟in􀆟strict􀆟accordance􀆟with􀆟the􀆟necessary􀆟safety􀆟acts,􀆟
etc. Item

38 Galvanised􀆟steel􀆟tank􀆟(6x5x3􀆟high􀆟module􀆟Panels)􀆟on􀆟
ground􀆟level􀆟complete􀆟in􀆟accordance􀆟with􀆟CKS􀆟114􀆟
including􀆟100􀆟mm􀆟diameter􀆟float􀆟valve􀆟series􀆟7354􀆟
according􀆟to􀆟VOSA Item

39 Pretreatment􀆟Galvanised􀆟steel􀆟tank􀆟(4x4x4􀆟high􀆟module􀆟
Panels)􀆟on􀆟ground􀆟level􀆟complete􀆟in􀆟accordance􀆟with􀆟
CKS􀆟114􀆟including􀆟100􀆟mm􀆟diameter􀆟float􀆟valve􀆟series􀆟
7354􀆟according􀆟to􀆟VOSA Item

REINFORCED CONCRETE

40 Concrete􀆟base􀆟and􀆟stub􀆟columns􀆟for􀆟water􀆟tank m3 19

Carried to Collection R

Section􀆟No.􀆟􀆟3
Bill􀆟No.􀆟􀆟2
Water􀆟supplies􀆟(Provisional)
RUBIQUANT
QUANTITY SURVEYORS

-167-
BERGVILLE MAGISTRATE OFFICE
REPAIR AND RENOVATIONS

REINFORCEMENT (Provisional)

Mild steel reinforcement

41 8mm􀆟Diameter􀆟bars t 0.23

High tensile steel reinforcement

42 12mm􀆟Ditto t 0.91

43 16mm􀆟Ditto t 1.14

WATER SUPPLIES TO IRRIGATION SYSTEM

44 Provide􀆟an􀆟amount􀆟of􀆟R100􀆟000.00􀆟(One􀆟Hundred􀆟
Thousand􀆟Rand)􀆟for􀆟Irrigation􀆟system􀆟with􀆟JoJo􀆟tanks􀆟
Pump􀆟etc Item 100􀆟000.00

45 Profit􀆟and􀆟attendance􀆟on􀆟above-mentioned􀆟item Item

Carried to Collection R

Section􀆟No.􀆟􀆟3
Bill􀆟No.􀆟􀆟2
Water􀆟supplies􀆟(Provisional)
RUBIQUANT
QUANTITY SURVEYORS

-168-
BERGVILLE MAGISTRATE OFFICE
REPAIR AND RENOVATIONS

Section􀆟No.􀆟􀆟3

Bill􀆟No.􀆟􀆟2

Water􀆟supplies􀆟(Provisional)

COLLECTION

Page Amount
No
Total􀆟Brought􀆟Forward􀆟from􀆟Page􀆟No. 158

159

160

161

162

163

164

165

166

167

168

Carried Forward to Summary of Section No. 3 R

Section􀆟No.􀆟􀆟3
Bill􀆟No.􀆟􀆟2
Water􀆟supplies􀆟(Provisional)
RUBIQUANT
QUANTITY SURVEYORS

-169-
BERGVILLE MAGISTRATE OFFICE
REPAIR AND RENOVATIONS

Item Quantity Rate Amount


No
SECTION NUMBER 3

BILL NUMBER 3

SOIL DRAINAGE (PROVISIONAL)

SUPPLEMENTARY PREAMBLES

Items,􀆟materials􀆟or􀆟methods􀆟to􀆟be􀆟used􀆟specified􀆟by􀆟
trade􀆟names􀆟or􀆟catalogue􀆟numbers􀆟are􀆟only􀆟an􀆟
indication􀆟of􀆟the􀆟quality􀆟required.􀆟Items,􀆟materials􀆟or􀆟
other􀆟approved􀆟may􀆟be􀆟used􀆟with􀆟prior􀆟approval􀆟from􀆟
the􀆟architect􀆟

JBCC􀆟Work􀆟Group􀆟No.􀆟146

EXISTING MANHOLE

1 Break􀆟into􀆟existing􀆟manhole,􀆟build􀆟in􀆟pipe􀆟as􀆟necessary,􀆟
bench􀆟out􀆟in􀆟connection􀆟to􀆟the􀆟existing􀆟soil􀆟drainage􀆟
system􀆟with􀆟and􀆟including􀆟all􀆟excavations,􀆟material􀆟and􀆟
labour􀆟to􀆟the􀆟approval􀆟of􀆟the􀆟Representative. No 1.00

REPAIR OF SEWER INFRASTRUCTURE

Sewer pipe repairs, all pipe and fittings to be


checked with Engineer before installing

Free Flow uPVC drain pipes including bedding,


backfilling and compackting of pipe trenches

2 110mm􀆟Pipe􀆟and􀆟excavations􀆟not􀆟exceeding􀆟1m􀆟deep m 97

3 110mm􀆟Pipe􀆟and􀆟excavations􀆟exceeding􀆟1m􀆟and􀆟not􀆟
exceeding􀆟2m􀆟deep m 34

Carried to Collection R

Section􀆟No.􀆟􀆟3
Bill􀆟No.􀆟􀆟3
Soil􀆟Drainage􀆟(Provisional)
RUBIQUANT
QUANTITY SURVEYORS

-170-
BERGVILLE MAGISTRATE OFFICE
REPAIR AND RENOVATIONS

Extra over Free Flow uPVC pipe for fittings

4 110mm􀆟Bend No 12

5 110mm􀆟Access􀆟bend No 23

6 110mm􀆟Access􀆟junction No 7

7 110mm􀆟Rodding􀆟eye No 11

8 110mm􀆟Gulley􀆟P-trap􀆟 No 5

Sundries

9 15MPa/19mm􀆟Mass􀆟concrete􀆟encasing􀆟around􀆟110mm􀆟
horizontal􀆟drain􀆟pipe􀆟including􀆟all􀆟necessary􀆟formwork m 12

Work to existing

10 Excavate􀆟in􀆟earth􀆟not􀆟exceeding􀆟2m􀆟deep􀆟for􀆟and􀆟
remove􀆟existing􀆟110mm􀆟diameter􀆟drain􀆟pipe􀆟and􀆟fittings􀆟
including􀆟backfilling,􀆟compaction,􀆟etc m 131

Sundries

11 Extra􀆟over􀆟excavations􀆟to􀆟trenches,􀆟holes,􀆟etc.,􀆟for􀆟
excavations􀆟in􀆟soft􀆟rock m3 4

12 Ditto,􀆟but􀆟hard􀆟rock. m3 4

13 Imported􀆟sand􀆟in􀆟bedding􀆟and􀆟surround􀆟to􀆟pipework􀆟well􀆟
compacted􀆟in􀆟layers,􀆟including􀆟any􀆟additional􀆟
excavation,􀆟risk􀆟of􀆟collapse,􀆟etc m3 25

14 Keeping􀆟excavations􀆟free􀆟of􀆟water Item

Precast concrete circular manholes

15 Standard􀆟precast􀆟manhole,􀆟not􀆟exceeding􀆟750􀆟mm􀆟􀆟
deep􀆟internally􀆟complete􀆟with􀆟precast􀆟concrete􀆟rings,􀆟
cover􀆟slab,􀆟double􀆟seal􀆟cast􀆟iron􀆟manhole􀆟cover􀆟and􀆟
frame􀆟(SABS􀆟558􀆟Type􀆟2A􀆟heavy􀆟duty􀆟in􀆟roads􀆟and􀆟
Type􀆟8A􀆟medium􀆟duty􀆟elsewhere),􀆟unreinforced􀆟
concrete􀆟􀆟footing􀆟and􀆟benching􀆟in􀆟bottom,􀆟dished􀆟down􀆟
to􀆟channels􀆟and􀆟finished􀆟smooth􀆟with􀆟plaster. No 1

Carried to Collection R

Section􀆟No.􀆟􀆟3
Bill􀆟No.􀆟􀆟3
Soil􀆟Drainage􀆟(Provisional)
RUBIQUANT
QUANTITY SURVEYORS

-171-
BERGVILLE MAGISTRATE OFFICE
REPAIR AND RENOVATIONS

16 Standard􀆟precast􀆟manhole,􀆟1􀆟050􀆟mm􀆟internal􀆟diameter􀆟
exceeding􀆟750􀆟mm􀆟and􀆟not􀆟exceeding􀆟1􀆟000􀆟mm􀆟deep􀆟
internally􀆟complete􀆟with􀆟precast􀆟concrete􀆟rings,􀆟cover􀆟
slab,􀆟double􀆟seal􀆟cast􀆟iron􀆟manhole􀆟cover􀆟and􀆟frame􀆟
(SABS􀆟558􀆟Type􀆟2A􀆟heavy􀆟duty􀆟in􀆟roads􀆟and􀆟Type􀆟8A􀆟
medium􀆟duty􀆟elsewhere),􀆟unreinforced􀆟concrete􀆟􀆟footing􀆟
and􀆟benching􀆟in􀆟bottom,􀆟dished􀆟down􀆟to􀆟channels􀆟and􀆟
finished􀆟smooth􀆟with􀆟plaster. No 1

17 Standard􀆟precast􀆟manhole,􀆟1􀆟050􀆟mm􀆟internal􀆟diameter􀆟
exceeding􀆟1000􀆟mm􀆟and􀆟not􀆟exceeding􀆟1􀆟250􀆟mm􀆟deep􀆟
internally􀆟complete􀆟with􀆟precast􀆟concrete􀆟rings,􀆟cover􀆟
slab,􀆟double􀆟seal􀆟cast􀆟iron􀆟manhole􀆟cover􀆟and􀆟frame􀆟
(SABS􀆟558􀆟Type􀆟2A􀆟heavy􀆟duty􀆟in􀆟roads􀆟and􀆟Type􀆟8A􀆟
medium􀆟duty􀆟elsewhere),􀆟unreinforced􀆟concrete􀆟􀆟footing􀆟
and􀆟benching􀆟in􀆟bottom,􀆟dished􀆟down􀆟to􀆟channels􀆟and􀆟
finished􀆟smooth􀆟with􀆟plaster. No 2

TESTING :

18 Allow􀆟for􀆟testing􀆟the􀆟whole􀆟of􀆟the􀆟soil􀆟drainage􀆟system􀆟
and􀆟for􀆟any􀆟re-testing􀆟necessary􀆟after􀆟taking􀆟out􀆟and􀆟
replacing􀆟any􀆟defective􀆟work􀆟to􀆟the􀆟satisfaction􀆟of􀆟the􀆟
Representative. Item

Carried to Collection R

Section􀆟No.􀆟􀆟3
Bill􀆟No.􀆟􀆟3
Soil􀆟Drainage􀆟(Provisional)
RUBIQUANT
QUANTITY SURVEYORS

-172-
BERGVILLE MAGISTRATE OFFICE
REPAIR AND RENOVATIONS

Section􀆟No.􀆟􀆟3

Bill􀆟No.􀆟􀆟3

Soil􀆟Drainage􀆟(Provisional)

COLLECTION

Page Amount
No
Total􀆟Brought􀆟Forward􀆟from􀆟Page􀆟No. 170

171

172

Carried Forward to Summary of Section No. 3 R

Section􀆟No.􀆟􀆟3
Bill􀆟No.􀆟􀆟3
Soil􀆟Drainage􀆟(Provisional)
RUBIQUANT
QUANTITY SURVEYORS

-173-
BERGVILLE MAGISTRATE OFFICE
REPAIR AND RENOVATIONS

Item Quantity Rate Amount


No
SECTION NUMBER 3

BILL NUMBER 4

FENCING AND GATES (PROVISIONAL)

Fencing􀆟prices􀆟are􀆟to􀆟include􀆟for􀆟site􀆟clearance􀆟and􀆟
grading􀆟to􀆟even􀆟lines􀆟1􀆟m􀆟each􀆟side􀆟of􀆟fence􀆟line􀆟unless􀆟
otherwise􀆟described,􀆟all􀆟necessary􀆟excavations􀆟in􀆟earth,􀆟
risk􀆟of􀆟collapse􀆟and􀆟disposal􀆟of􀆟surplus􀆟excavated􀆟
material

DEMOLITIONS

-WORK􀆟GROUP􀆟102-

Removal of existing fence

1 Take􀆟down􀆟and􀆟remove􀆟existing􀆟wire􀆟mesh􀆟fencing􀆟2􀆟
400mm􀆟high􀆟including􀆟300􀆟mm􀆟flat􀆟wrapped,􀆟with􀆟post􀆟
as􀆟indicated􀆟by􀆟the􀆟engineer m 525

2 Take􀆟down􀆟and􀆟remove􀆟existing􀆟steel􀆟palisade􀆟fencing􀆟2􀆟
100mm􀆟high􀆟including􀆟posts􀆟as􀆟indicated􀆟by􀆟the􀆟
engineer m 125

SITE CLEARANCE

-WORK􀆟GROUP􀆟104-

3 Allow􀆟for􀆟digging􀆟up􀆟and􀆟removal􀆟of􀆟all􀆟grass,􀆟shrubs,􀆟
rubbish􀆟and􀆟vegetable􀆟soil􀆟for􀆟a􀆟width􀆟of􀆟500mm􀆟on􀆟
either􀆟side􀆟of􀆟new􀆟fence􀆟line􀆟including􀆟forming􀆟50mm􀆟
high􀆟free􀆟space􀆟between􀆟underside􀆟of􀆟fence􀆟and􀆟ground􀆟
surface􀆟by􀆟reducing􀆟or􀆟making􀆟up􀆟levels􀆟as􀆟required m 525

Carried to Collection R

Section􀆟No.􀆟􀆟3
Bill􀆟No.􀆟􀆟4
Fencing,􀆟etc􀆟(Provisional)
RUBIQUANT
QUANTITY SURVEYORS

-174-
BERGVILLE MAGISTRATE OFFICE
REPAIR AND RENOVATIONS

METALWORK

-WORK􀆟GROUP􀆟136-

SECURITY FENCING

Powder coated steel security fencing as per


COCHRANE PRODUCTS 358 HIGH SECURITY
FENCING MESH. All details and specifications to
be verified with manufacturer

"ClearVu"􀆟or􀆟other􀆟approved

4 2900mm􀆟high􀆟"Cochrane􀆟ClearVu"􀆟fence􀆟with􀆟spikes􀆟on􀆟
top􀆟or􀆟similar􀆟approved,􀆟complete􀆟with􀆟bases􀆟
excavations􀆟etc.􀆟according􀆟to􀆟manufacturers􀆟detail,􀆟see􀆟
details􀆟at􀆟the􀆟back􀆟of􀆟the􀆟bills􀆟of􀆟quantities􀆟 m 430

5 2100mm􀆟high􀆟"Cochrane􀆟ClearVu"􀆟fence􀆟with􀆟spikes􀆟on􀆟
top􀆟or􀆟similar􀆟approved,􀆟complete􀆟with􀆟bases􀆟
excavations􀆟etc.􀆟according􀆟to􀆟manufacturers􀆟detail,􀆟see􀆟
details􀆟at􀆟the􀆟back􀆟of􀆟the􀆟bills􀆟of􀆟quantities􀆟 m 95

6 3500􀆟x􀆟2900mm􀆟High􀆟"Cochrane􀆟ClearVu"􀆟or􀆟similar􀆟
approved􀆟Double􀆟gate􀆟complete􀆟as􀆟per􀆟details􀆟at􀆟the􀆟
back􀆟of􀆟Bill􀆟of􀆟Quantities. No 1

7 4500􀆟x􀆟2100mm􀆟High􀆟"Cochrane􀆟ClearVu"􀆟or􀆟similar􀆟
approved􀆟Double􀆟gate􀆟complete􀆟as􀆟per􀆟details􀆟at􀆟the􀆟
back􀆟of􀆟Bill􀆟of􀆟Quantities. No 1

8 4500􀆟x􀆟2900mm􀆟High􀆟"Cochrane􀆟ClearVu"􀆟or􀆟similar􀆟
approved􀆟sliding􀆟gate􀆟complete􀆟on􀆟and􀆟including􀆟gate􀆟
rail,􀆟stoped􀆟end,􀆟guide􀆟rollers􀆟and􀆟gate􀆟motor. No 1

9 5500􀆟x􀆟2900mm􀆟High􀆟"Cochrane􀆟ClearVu"􀆟or􀆟similar􀆟
approved􀆟sliding􀆟gate􀆟complete􀆟on􀆟and􀆟including􀆟gate􀆟
rail,􀆟stoped􀆟end,􀆟guide􀆟rollers􀆟and􀆟gate􀆟motor. No 1

Carried to Collection R

Section􀆟No.􀆟􀆟3
Bill􀆟No.􀆟􀆟4
Fencing,􀆟etc􀆟(Provisional)
RUBIQUANT
QUANTITY SURVEYORS

-175-
BERGVILLE MAGISTRATE OFFICE
REPAIR AND RENOVATIONS

Section􀆟No.􀆟􀆟3

Bill􀆟No.􀆟􀆟4

Fencing,􀆟etc􀆟(Provisional)

COLLECTION

Page Amount
No
Total􀆟Brought􀆟Forward􀆟from􀆟Page􀆟No. 174

175

Carried Forward to Summary of Section No. 3 R

Section􀆟No.􀆟􀆟3
Bill􀆟No.􀆟􀆟4
Fencing,􀆟etc􀆟(Provisional)
RUBIQUANT
QUANTITY SURVEYORS

-176-
BERGVILLE MAGISTRATE OFFICE
REPAIR AND RENOVATIONS

SECTION SUMMARY - External Works (Provisional)


Bill Page Amount
No No
1 Site􀆟works􀆟and􀆟Paving􀆟(Provisional) 157

2 Water􀆟supplies􀆟(Provisional) 169

3 Soil􀆟Drainage􀆟(Provisional) 173

4 Fencing,􀆟etc􀆟(Provisional) 176

CARRIED TO FINAL SUMMARY R

Section􀆟No.􀆟􀆟3
RUBIQUANT
QUANTITY SURVEYORS

-177-
SECTION 4:

E03/2<0(17$1'75$,1,1*

2)/$%285
BERGVILLE MAGISTRATE OFFICE
REPAIR AND RENOVATIONS

Item Quantity Rate Amount


No
SECTION NO 4

BILL NUMBER 1

EMPLOYMENT AND TRAINING OF LABOUR ON


EPWP-NYS INFRASTRUCTURE PROJECTS

PREAMBLES

Tenders􀆟are􀆟advised􀆟to􀆟study􀆟Additional􀆟Specification􀆟
SL:􀆟􀆟Employment􀆟and􀆟Training􀆟of􀆟Labour􀆟on􀆟the􀆟
Expanded􀆟Public􀆟Works􀆟Programme􀆟(EPWP)􀆟
Infrastructure􀆟Projects:􀆟National􀆟Youth􀆟Service,􀆟as􀆟
bound􀆟elsewhere􀆟in􀆟the􀆟Bills􀆟of􀆟Quantities,􀆟and􀆟then􀆟
price􀆟this􀆟Bill􀆟accordingly

TRAINING OF YOUTH WORKERS


Target : 20 Youth Workers

Skills􀆟development,􀆟Life􀆟Skills􀆟and􀆟Technical􀆟training:

1 Orientation􀆟and􀆟Life􀆟skills􀆟development􀆟traing􀆟for􀆟youth􀆟
workers􀆟for􀆟an􀆟avarage􀆟of􀆟10􀆟days􀆟per􀆟youth􀆟worker􀆟(ref.􀆟
SL􀆟11.01.01) Item 150􀆟000.00

2 Technical􀆟skills􀆟training􀆟for􀆟youth􀆟workers􀆟for􀆟an􀆟avarage􀆟
of􀆟45􀆟days􀆟per􀆟youth􀆟worker􀆟(ref.􀆟SL􀆟11.01.01) Item 400􀆟000.00

3 Add􀆟profit􀆟on􀆟above􀆟if􀆟required Item

4 Allow􀆟for􀆟attendance􀆟on􀆟the􀆟above,􀆟if􀆟any Item

5 Penalty􀆟due􀆟to􀆟not􀆟meeting􀆟the􀆟target􀆟as􀆟in􀆟SL􀆟11.01.02􀆟􀆟
(R 2'000.00􀆟per􀆟Youth􀆟Worker)􀆟

Travelling and Accommodation during off-site


Training

Orientation􀆟,Life􀆟skills􀆟training􀆟for􀆟10􀆟days􀆟each(SL)

6 Traveling􀆟(based􀆟on􀆟R30􀆟per􀆟day􀆟return􀆟trip/trainer) Item 10􀆟000.00

7 Accomodation􀆟(based􀆟on􀆟10􀆟days􀆟per􀆟week􀆟and􀆟
R150p/n) Item 25􀆟000.00

Carried to Collection R

Section􀆟No.􀆟􀆟4
Bill􀆟No.􀆟􀆟1
Employment􀆟and􀆟Training􀆟of􀆟Labour
RUBIQUANT
QUANTITY SURVEYORS

-178-
BERGVILLE MAGISTRATE OFFICE
REPAIR AND RENOVATIONS

8 Add􀆟profit􀆟and􀆟attendance􀆟on􀆟above􀆟if􀆟required Item

Skill􀆟development􀆟and􀆟technical􀆟training􀆟(ref.SL)

9 Traveling􀆟(based􀆟on􀆟R30􀆟per􀆟day􀆟return􀆟trip/trainer) Item 10􀆟000.00

10 Accomodation􀆟(based􀆟on􀆟5􀆟nights􀆟per􀆟week􀆟and􀆟
R150/N) Item 30􀆟000.00

11 Add􀆟profit􀆟and􀆟attendance􀆟on􀆟above􀆟if􀆟required Item

ALTERNATIVE WORKERS FOR THE PERIOD OF


OFF-SITE TRAINING

12 Skills􀆟development􀆟and􀆟technical􀆟training􀆟for􀆟youth􀆟
workers􀆟for􀆟a􀆟period􀆟of􀆟45􀆟days􀆟per􀆟youth􀆟worker(ref:􀆟
SL11.03.01) W/D 1􀆟935

Employment of youth workers

13 Employment􀆟of􀆟youth􀆟workers

NOTE: The􀆟unit􀆟of􀆟measurement􀆟shall􀆟be􀆟the􀆟number􀆟of􀆟
youth􀆟workers􀆟at􀆟the􀆟labour􀆟rate􀆟of􀆟R1100􀆟per􀆟month􀆟as􀆟
the􀆟agreed􀆟by􀆟MINMEC􀆟multiplied􀆟by􀆟the􀆟period􀆟
employment􀆟in􀆟months􀆟and􀆟the􀆟rate􀆟tendered􀆟shall􀆟
include􀆟full􀆟compensation􀆟for􀆟all􀆟costs􀆟associated􀆟with􀆟
the􀆟employment􀆟of􀆟youth􀆟workers􀆟and􀆟for􀆟complying􀆟with􀆟
the􀆟conditions􀆟of􀆟contract.The􀆟cost􀆟for􀆟training􀆟shall􀆟be􀆟
excluded􀆟from􀆟this􀆟item.􀆟This􀆟item􀆟is􀆟based􀆟on􀆟6􀆟months􀆟
appointment􀆟for􀆟youth􀆟workers Item 112􀆟200.00

14 Add􀆟profit􀆟on􀆟above􀆟if􀆟required Item

15 Allow􀆟for􀆟attendance􀆟on􀆟the􀆟above,􀆟if􀆟any Item

Provision of EPWP designed overalls to youth


workers

16 Supply􀆟2x􀆟EPWP􀆟branded􀆟overalls,􀆟1􀆟x􀆟EPWP􀆟branded􀆟
hard􀆟hat􀆟and􀆟1􀆟x􀆟pair􀆟safety􀆟boots􀆟to􀆟youth􀆟workers Item 30􀆟600.00

17 Add􀆟profit􀆟on􀆟above􀆟if􀆟required Item

18 Allow􀆟for􀆟attendance􀆟on􀆟the􀆟above,􀆟if􀆟any Item

Carried to Collection R

Section􀆟No.􀆟􀆟4
Bill􀆟No.􀆟􀆟1
Employment􀆟and􀆟Training􀆟of􀆟Labour
RUBIQUANT
QUANTITY SURVEYORS

-179-
BERGVILLE MAGISTRATE OFFICE
REPAIR AND RENOVATIONS

Provision of Small Tools for youth workers

19 Supply􀆟of􀆟small􀆟tools􀆟to􀆟youth􀆟workers.􀆟􀆟Specification􀆟to􀆟
be􀆟supplied􀆟by􀆟the􀆟EPWP-NYS􀆟Service􀆟Provider􀆟for􀆟the􀆟
respective􀆟trades.􀆟These􀆟tools􀆟will􀆟become􀆟the􀆟property􀆟
of􀆟the􀆟youth􀆟workers􀆟after􀆟the􀆟completion􀆟of􀆟the􀆟
programme􀆟(Ref􀆟SL􀆟11.06.01) Item 13􀆟600.00

20 Add􀆟profit􀆟on􀆟above􀆟if􀆟required Item

21 Allow􀆟for􀆟attendance􀆟on􀆟the􀆟above,􀆟if􀆟any Item

Appointment of Youth team Leader

22 Appointment􀆟of􀆟youth􀆟team􀆟leader􀆟for􀆟the􀆟duration􀆟of􀆟the􀆟
contract􀆟(ref:SL􀆟11.07.01) Item 54􀆟000.00

Liaison with Service provider

23 Liaison􀆟with􀆟service􀆟provider􀆟(ref􀆟SL􀆟10.08) Hrs 100

CLO Allowance

24 Provide􀆟a􀆟budgetary􀆟allowance􀆟of􀆟Five􀆟Hundred􀆟
Thousand􀆟Rand􀆟(R􀆟500'000.00)􀆟for􀆟CLO􀆟complete Item 500􀆟000.00

Carried to Collection R

Section􀆟No.􀆟􀆟4
Bill􀆟No.􀆟􀆟1
Employment􀆟and􀆟Training􀆟of􀆟Labour
RUBIQUANT
QUANTITY SURVEYORS

-180-
BERGVILLE MAGISTRATE OFFICE
REPAIR AND RENOVATIONS

Section􀆟No.􀆟􀆟4

Bill􀆟No.􀆟􀆟1

Employment􀆟and􀆟Training􀆟of􀆟Labour

COLLECTION

Page Amount
No
Total􀆟Brought􀆟Forward􀆟from􀆟Page􀆟No. 178

179

180

CARRIED TO FINAL SUMMARY R

Section􀆟No.􀆟􀆟4
Bill􀆟No.􀆟􀆟1
Employment􀆟and􀆟Training􀆟of􀆟Labour
RUBIQUANT
QUANTITY SURVEYORS

-181-
FINAL SUMMARY
BERGVILLE MAGISTRATE OFFICE
REPAIR AND RENOVATIONS

FINAL SUMMARY
Section Page Amount
No No
1 Preliminaries 50

2 Repairs􀆟&􀆟Renovations 149

3 External􀆟Works􀆟(Provisional) 177

4 Employment􀆟and􀆟Training􀆟of􀆟Labour 181

SUBTOTAL R

Part􀆟B􀆟:􀆟Electrical􀆟Installation Item

Part􀆟C􀆟:􀆟Mechanical􀆟Installation Item

SUBTOTAL R

ADD:

VALUE ADDED TAX R

TOTAL R