BILL NO. 1 : FOUNDATIONS (PROVSIONAL)
SITE CLEARANCE
EXCAVATION
Pumping
Disposal
J Redig from spoil heap, return, fill and well compact selected
excavated material around foundations. m3 38
K Redig from spoil heap and cart away to a tip to be found by the
contractor. m3 63
Formation
Carried to Collection $
Section No. 4
BUILDER'S WORK
Bill No. 1
FOUNDATIONS
Proposed Administration Block in Guruve
4-1-
For ILO Zimbabwe - Women in Mining
Sundries
TERMITES
S Footings. m3 18
Sundries
V Strike off and cure top of concrete and finish with a power float
m2 9
including any additonal cement.
REINFORCEMENT
Carried to Collection $
Section No. 4
BUILDER'S WORK
Bill No. 1
4-2-
FOUNDATIONS
Proposed Administration Block in Guruve
For ILO Zimbabwe - Women in Mining
EXPANSION JOINTS
BRICKWORK
Brickwork in approved bricks in cement mortar as
described
REINFORCEMENT
Brickforce lapped at joints and junctions and building in as
the work proceeds (measured nett)
AE Extra over one brick wall or skin for fair finishing and pointing
m2 9
in stretcher bond.
Carried to Collection $
Section No. 4
4-3-
BUILDER'S WORK
Bill No. 1
FOUNDATIONS
Proposed Administration Block in Guruve
For ILO Zimbabwe - Women in Mining
Section No. 4
BUILDER'S WORK
Bill No. 1
FOUNDATIONS
COLLECTION
Page Amount
No
Total Brought Forward from Page No. 1
4-4-
Carried Forward to Summary of Section No. 4 $
Section No. 4
BUILDER'S WORK
Bill No. 1
FOUNDATIONS
Proposed Administration Block in Guruve
For ILO Zimbabwe - Women in Mining
CONCRETE
A Beams. m3 1
B Lintol beams. m3 3
FORMWORK
C Sides of beams. m2 6
REINFORCEMENT (PROVISIONAL)
PRECAST CONCRETE
G
Rainwater dripstone 450 mm wide x 150 mm thick x 760 mm
long with segmental channel formed in top with one stopped
finished smooth on all exposed faces and place in position. No 10
4-5-
Carried Forward to Summary of Section No. 4 $
Section No. 4
BUILDER'S WORK
Bill No. 2
CONCRETE, FORMWORK AND REINFORCEMENT
Proposed Administration Block in Guruve
For ILO Zimbabwe - Women in Mining
Sundries
H On walls. m2 20
VENTILATION (PROVISIONAL)
REINFOCEMENT
4-6-
Carried to Collection $
Section No. 4
BUILDER'S WORK
Bill No. 3
BRICKWORK
Proposed Administration Block in Guruve
For ILO Zimbabwe - Women in Mining
M Extra over one brick wall or skin for fair finishing and pointing
in stretcher bond. m2 137
BUILDING IN
R
Hoist to required level, set in position, wedge to allow free
swing and build into brick wall strong room door and frame
under the direction of and to the entire satisfaction of the
Manufacturer's representative and in strict accordance with their
conditions for installation, cover and protect. No 1
S
Hoist to required level, set in position, wedge to allow free
swing and build into brick wall emergency door and frame under
the direction of and to the entire satisfaction of the
Manufacturer's representative and in strict accordance with their
conditions for installation, cover and protect. No 1
CILLS
U
75 x 230 x 50 mm Brick on-edge external cill cropped at back,
set sloping and pointing on top, front edge and projecting soffit. m 9
4-7-
Carried to Collection $
Section No. 4
BUILDER'S WORK
Bill No. 3
BRICKWORK
Proposed Administration Block in Guruve
For ILO Zimbabwe - Women in Mining
Section No. 4
BUILDER'S WORK
Bill No. 3
BRICKWORK
COLLECTION
Page Amount
No
Total Brought Forward from Page No. 6
4-8-
Carried Forward to Summary of Section No. 4 $
Section No. 4
BUILDER'S WORK
Bill No. 3
BRICKWORK
Proposed Administration Block in Guruve
For ILO Zimbabwe - Women in Mining
A
Roof covering in single length sheets to mild steel purlins at
maximum 1 400 mm centres with minimum 300 mm end laps
with and including sealing to side and end laps using pliastic or
other equal and approved sealant and seam bolting at 1 000 mm
centres. m2 167
INSULATION
D
4 mm alucushion bubble fold single sided aluminium foil faced
insulation material in 1 250 mm widths with white polyethylene
coating on other side lapped 100 mm at all joints stretched tight
over straining wires (elsewhere measured) on top of timber
purlins, all in strict accordance with the manufacturer's
instructions (Alucushion (Pty) Ltd, P O Box 912-717 Silverton
0127 South Africa). m2 167
4-9-
Carried Forward to Summary of Section No. 4 $
Section No. 4
BUILDER'S WORK
Bill No. 4
ROOF COVERINGS
Proposed Administration Block in Guruve
For ILO Zimbabwe - Women in Mining
ROOF TRUSSES
ROOF TIMBERS
Sawn softwood
4-10-
Carried Forward to Summary of Section No. 4 $
Section No. 4
BUILDER'S WORK
Bill No. 5
CARPENTRY
Proposed Administration Block in Guruve
For ILO Zimbabwe - Women in Mining
B Extra for trimming for and forming trap door size 600 x 600 mm
in clear with 50 x 76 mm wrot rebated softwood frame and 19
mm wrot softwood quadrant all round. No 1
DOORS
IRONMONGERY
To wood
4-11-
G Union 3 lever lockset. No 10
Carried to Collection $
Section No. 4
BUILDER'S WORK
Bill No. 6
JOINERY AND IRONMONGERY
Proposed Administration Block in Guruve
For ILO Zimbabwe - Women in Mining
M
Shower curtain supplied and fixed complete with and including
all fixtures and accessories. Size 960 x 2 100 mm high. No 2
Sundries
4-12-
Carried to Collection $
Section No. 4
BUILDER'S WORK
Bill No. 6
JOINERY AND IRONMONGERY
Proposed Administration Block in Guruve
For ILO Zimbabwe - Women in Mining
Section No. 4
BUILDER'S WORK
Bill No. 6
COLLECTION
Page Amount
No
Total Brought Forward from Page No. 11
12
4-13-
Carried Forward to Summary of Section No. 4 $
Section No. 4
BUILDER'S WORK
Bill No. 6
JOINERY AND IRONMONGERY
Proposed Administration Block in Guruve
For ILO Zimbabwe - Women in Mining
4-14-
F Window type NC5F. Size 533 x 951 mm high. No 1 0.00
Carried to Collection $
Section No. 4
BUILDER'S WORK
Bill No. 7
METALWORK
Proposed Administration Block in Guruve
For ILO Zimbabwe - Women in Mining
4-15-
Carried to Collection $
Section No. 4
BUILDER'S WORK
Bill No. 7
METALWORK
Proposed Administration Block in Guruve
For ILO Zimbabwe - Women in Mining
Section No. 4
BUILDER'S WORK
Bill No. 7
METALWORK
COLLECTION
Page Amount
No
Total Brought Forward from Page No. 14
15
4-16-
Carried Forward to Summary of Section No. 4 $
Section No. 4
BUILDER'S WORK
Bill No. 7
METALWORK
Proposed Administration Block in Guruve
For ILO Zimbabwe - Women in Mining
PLASTERING
INTERNALLY
A Walls. m2 254
C Walls. m2 105
E Rhinoboard ceilings. m2 92
4-17-
WALL TILING
F Walls. m2 48
SUNDRIES
Carried to Collection $
Section No. 4
BUILDER'S WORK
Bill No. 8
PLASTERING AND WALL LININGS
Proposed Administration Block in Guruve
For ILO Zimbabwe - Women in Mining
4-18-
Carried to Collection $
Section No. 4
BUILDER'S WORK
Bill No. 8
PLASTERING AND WALL LININGS
Proposed Administration Block in Guruve
For ILO Zimbabwe - Women in Mining
Section No. 4
BUILDER'S WORK
Bill No. 8
COLLECTION
Page Amount
No
Total Brought Forward from Page No. 17
18
4-19-
Carried Forward to Summary of Section No. 4 $
Section No. 4
BUILDER'S WORK
Bill No. 8
PLASTERING AND WALL LININGS
Proposed Administration Block in Guruve
For ILO Zimbabwe - Women in Mining
GRANOLITHIC
B Paving to floors. m2 86
4-20-
C 100 mm High skirting with cove at junction with floor and
square top edge, including mitres, etc,. m 84
SUNDRIES
B Extra for outlet nozzle for and joint to 100 x 100 mm rainwater
pipe. No 10
4-21-
F Ditto shoe. No 10
SANITARY FITTINGS
Carried to Collection $
Section No. 4
BUILDER'S WORK
Bill No. 10
RAINWATER DISPOSAL AND PLUMBING
Proposed Administration Block in Guruve
For ILO Zimbabwe - Women in Mining
SANITARY PLUMBING
4-22-
Q 50 mm Bend. No 10
R 50 mm Inspection bend. No 5
S 50 mm Junction. No 3
T 50 mm Inspection junction. No 3
U 50 mm V.S.P. No 2
V 50 mm End cap. No 1
W 110 mm Bend. No 4
Y 110 mm Junction. No 1
Carried to Collection $
Section No. 4
BUILDER'S WORK
Bill No. 10
RAINWATER DISPOSAL AND PLUMBING
Proposed Administration Block in Guruve
For ILO Zimbabwe - Women in Mining
AE
40 - 40 Flexi trap and joint to outlet of fitting and P.V.C pipe. No 3
AF "Cobra" code 323 SQ/CP shower floor trap with and including 1
½ BSP make outlet connection, 100 mm x 100 mm square
shower grating and 37 mm shank, and setting in floor slab and
joints to P.V.C pipe. No 2
WATER INSTALLATION
4-23-
AJ 15 mm Ditto laid in screed. No 7
AS 22 mm Elbow. No 17
AT 22 mm Tee. No 12
AU 22 - 15 mm Reducer. No 11
AW 28 mm Socket union. No 2
AX 54 mm Elbow. No 4
AY 54 mm Tee. No 2
Carried to Collection $
Section No. 4
BUILDER'S WORK
Bill No. 10
RAINWATER DISPOSAL AND PLUMBING
Proposed Administration Block in Guruve
For ILO Zimbabwe - Women in Mining
AZ 54 - 32 mm Reducing tee. No 2
BA 54 mm Socket union. No 2
Brasswork
4-24-
BC
Shower set comprising of pair of 15 mm "Cobra" Ledimo code
LO-288-15 underwall stop tap with and including ½" female
inlets and adjustable wall flange with hot and cold water indices,
bridging piece, 900 mm copper riser, "Cobra" code 023TU-400
tubular shower arm 400 mm long with and including ½" BSP
male inlet and ½" BSP male outlet, and "Cobra" code 075-
15/160 round single function 160 mm diameter shower head
with and including ½" BSP female inlet, including chasing into
wall and joints to copper pipe. No 2
FIRE APPLIANCES
BM
Swivel type fire horse reel with 30 metres of 20 mm diameter
rubber hose, chromium plated nozzle holder and 25 mm
chromium plated arm ball-o-valve, bolt back plate of reel and
nozzle holder to wall, connect up and joint 28 mm diameter
copper pipe. No 2
Carried to Collection $
Section No. 4
BUILDER'S WORK
Bill No. 10
RAINWATER DISPOSAL AND PLUMBING
Proposed Administration Block in Guruve
For ILO Zimbabwe - Women in Mining
BUILDER'S WORK
4-25-
BQ Hole half brick wall for small pipe. No 10
TESTING
Carried to Collection $
Section No. 4
BUILDER'S WORK
Bill No. 10
RAINWATER DISPOSAL AND PLUMBING
Proposed Administration Block in Guruve
For ILO Zimbabwe - Women in Mining
Section No. 4
BUILDER'S WORK
4-26-
Bill No. 10
COLLECTION
Page Amount
No
Total Brought Forward from Page No. 21
22
23
24
25
4-27-
BILL NO. 11: GLAZING
A 3 - 4 mm Clear glass. m2 7
B 4 mm Obscure glass. m2 2
Mirrors
C
6 mm "City Mirror" clear float quality glass silvered and sealed
mirror with polished edges sprayed on back with clear lacquer
before fixing, four times drilled for and plugged and screwed to
walls with and including chromium plated capped mirror screws
and rubber washers. Size 500 x 600 mm. No 2
4-28-
Item Unit Quantity Rate Amount
No
BILL NO. 12 : PAINTING
ON PLASTER, ETC
ON METAL
ON WOOD, ETC
G
Carbolineum saturate sawn softwood wall plate before fixing. m2 13
Knot, prime, stop and apply one undercoat and two finishing
coats high gloss enamel paint on
Carried to Collection $
Section No. 4
BUILDER'S WORK
Bill No. 12
PAINTING
Proposed Administration Block in Guruve
4-29-
For ILO Zimbabwe - Women in Mining
LEAVE CLEAN
L
Allow for touching all working throughout, clean off all paint,
oil, cement or other stains or marks on walls, floors, ceiling,
glass, etc and leave all surfaces in full and proper working order. Item 1.00 0.00
Carried to Collection $
Section No. 4
BUILDER'S WORK
Bill No. 12
4-30-
PAINTING
Proposed Administration Block in Guruve
For ILO Zimbabwe - Women in Mining
Section No. 4
BUILDER'S WORK
Bill No. 12
PAINTING
COLLECTION
Page Amount
No
Total Brought Forward from Page No. 28
29
4-31-
BUILDER'S WORK
Bill No. 12
PAINTING
Proposed Administration Block in Guruve
For ILO Zimbabwe - Women in Mining
WATER RETICULATION
Generally
A Allow for keeping the excavations free from storm and surface
water by pumping and baling Item 1.00 0.00
Excavation
B
Excavation in pickable material commencing at natural ground
level for surface trenches not exceeding 2 metres deep m3 107 4.50 481.50
Disposal
F Re-dig from spoil heap, return, fill and well compact selected
excavated material in trenches. m3 102 5.21 531.42
G Re-dig from spoil heap and cart away surplus material to a tip to
be found by the contractor. m3 5 4.50 22.50
H
25 mm Diameter pipe laid in ground including excavating trench
not exceeding 1 metre deep, fill in ram and spread surplus
excavated material on site not exceeding 100 metres. m 71 0.00
4-32-
Carried to Collection $
Section No. 4
BUILDER'S WORK
Bill No. 13
EXTERNAL WORKS
Proposed Administration Block in Guruve
For ILO Zimbabwe - Women in Mining
J
63 mm Diameter pipe laid in ground including excavating trench
not exceeding 1 metre deep, fill in, ram and spread surplus
excavated material on site not exceeding 100 metres. m 107 0.00
K 25 mm Elbow. No 11 0.00
L 25 mm Tee. No 6 0.00
N 63 mm Elbow. No 9 0.00
P 63 mm Tee. No 5 0.00
Q 63 - 25 mm Reducer. No 2 0.00
SOIL DRAINAGE
Generally
S Allow for keeping the excavation free from storm, surface water
by pumping and baling. Item 1.00 0.00
Excavation
T
Excavation in pickable material commencing at natural ground
level for surface trenches not exceeding 2 metres deep. m3 42 4.50 189.00
Disposal
X Re-dig from spoil heap, return, fill and well compact selected
excavated material in trenches. m3 38 5.21 197.98
4-33-
Carried to Collection $
Section No. 4
BUILDER'S WORK
Bill No. 13
EXTERNAL WORKS
Proposed Administration Block in Guruve
For ILO Zimbabwe - Women in Mining
Y Re-dig from spoil heap and cart away surplus material to a tip to
be found by the Contractor. m3 4
AC 110 mm Bend. m 11
AD 110 mm Y-junction. m 6
Sundries
AG Cast iron A.B.C pattern cleaning eye cover and frame and joint
to 110 mm diameter P.V.C pipe including encasing all round in
concrete (Grade 10-20 mm stone) and finish smooth on all
exposed surfaces. No 3
AH
110 mm Diameter P.V.C gulley trap with hopper head and cast
iron grating and joint to 110 mm P.V.C pipe including encasing
in concrete (Grade 10 -20 mm stone) carried up as kerb 75 mm
high above ground level and dished to grating including
necessary framework and finish smooth on all exposed faces. No 3
4-34-
AK Extra over excavation for hard pickable material. m3 1
Carried to Collection $
Section No. 4
BUILDER'S WORK
Bill No. 13
EXTERNAL WORKS
Proposed Administration Block in Guruve
For ILO Zimbabwe - Women in Mining
AN Re-dig from temporary spoil heap, return fill and ram excavated
material around walls. m3 3
BD Render one coat cement plaster including all labours with a steel
trowel finish on walls m2 9
4-35-
BE 20 mm Untinted granolothic finish as described to top of cover
slab m2 3
Carried to Collection $
Section No. 4
BUILDER'S WORK
Bill No. 13
EXTERNAL WORKS
Proposed Administration Block in Guruve
For ILO Zimbabwe - Women in Mining
Soakaway
BJ
Excavate for soakaway 8 400 mm long x 1 520 mm wide x 1
830 mm deep, lay 100 mm diameter approved burnt clay or
porous concrete drain pipe laid with 15 mm open joints in 40
mm stone filling including packing stone around the pipes as the
construction goes on and lay asbestos sheeting on top after
finishing stone filling. No 1
TESTING
BK
Allow for testing and commissioning all water, fire, refuse and
soil drains included in this Bill, make good all defects and retest
until approved, no trenches are to be filled until approved. Item 1.00
4-36-
Carried to Collection $
Section No. 4
BUILDER'S WORK
Bill No. 13
EXTERNAL WORKS
Proposed Administration Block in Guruve
For ILO Zimbabwe - Women in Mining
Section No. 4
BUILDER'S WORK
Bill No. 13
EXTERNAL WORKS
COLLECTION
Page Amount
No
Total Brought Forward from Page No. 31
32
33
34
35
4-37-
Carried Forward to Summary of Section No. 4 $
Section No. 4
BUILDER'S WORK
Bill No. 13
EXTERNAL WORKS
Proposed Administration Block in Guruve
For ILO Zimbabwe - Women in Mining
PROVISIONAL SUMS
Test cubes
Electrical installation
4-38-
K Provide the sum of $5,000.00 (Five thousand dollars only) for
security installations (CCTV, access control and intruder alarm)
executed complete. Item 1.00
Carried to Collection $
Section No. 4
BUILDER'S WORK
Bill No. 14
PROVISIONAL SUMS
Proposed Administration Block in Guruve
For ILO Zimbabwe - Women in Mining
N
Provide the sum of $5,500.00 (Five thousand five hundred
dollars only) for built in kitchen cupboards executed complete. Item 1.00
Built in shelves
OTHER SUMS
Builder's work
4-39-
Carried to Collection $
Section No. 4
BUILDER'S WORK
Bill No. 14
PROVISIONAL SUMS
Proposed Administration Block in Guruve
For ILO Zimbabwe - Women in Mining
Section No. 4
BUILDER'S WORK
Bill No. 14
PROVISIONAL SUMS
COLLECTION
Page Amount
No
Total Brought Forward from Page No. 37
38
4-40-
Carried Forward to Summary of Section No. 4 $
Section No. 4
BUILDER'S WORK
Bill No. 14
PROVISIONAL SUMS
Proposed Administration Block in Guruve
For ILO Zimbabwe - Women in Mining
Section No. 4
BUILDER'S WORK
1 FOUNDATIONS 4
3 BRICKWORK 8
4 ROOF COVERINGS 9
5 CARPENTRY 10
7 METAL WORK 16
11 GLAZING 27
4-41-
12 PAINTING 30
13 EXTERNAL WORKS 36
14 PROVISIONAL SUMS 39
4-42-