H. PAINTING
TOTAL #VALUE!
FIRST FLOOR
Sr.No. Quantity Description Rate Unit Amount
A.BRICKWORK
Providing Autoclaved Aerated Concrete Block
masonary of Ecolite or equivalent make
conforming to IS:2185 (Part 3) – 1984 in extra
fine jointing mortar of fixoblock of UltraTech
oR equivalent in superstructure including
striking joints, raking out joints and
scaffolding etc. Complete. (The test hall be
carried out conforming to IS:6441 (Part I) -
1972)
E. PAINTING
INTRENAL
TOTAL 2147280
SECOND FLOOR
Sr.No. Quantity Description Rate Unit Amount
A.BRICKWORK
E. PAINTING
INTRENAL
TOTAL 2147280
THIRD FLOOR
Sr.No. Quantity Description Rate Unit Amount
A.BRICKWORK
Providing Autoclaved Aerated Concrete Block
masonary of Ecolite or equivalent make
conforming to IS:2185 (Part 3) – 1984 in extra
fine jointing mortar of fixoblock of UltraTech
oR equivalent in superstructure including
striking joints, raking out joints and
scaffolding etc. Complete. (The test hall be
carried out conforming to IS:6441 (Part I) -
1972)
E. PAINTING
INTRENAL
TOTAL 2527562
FORTH FLOOR
Sr.No. Quantity Description Rate Unit Amount
A.BRICKWORK
E. PAINTING
INTRENAL
TOTAL 2527562
TERRACE FLOOR
Sr.No. Quantity Description Rate Unit Amount
A.BRICKWORK
E. PAINTING
INTRENAL
TOTAL 512608.9
STAIRCASE FLOOR
Sr.No. Quantity Description Rate Unit Amount
B. RCC WORK M 20 GRADE
Providing and casting in situ C.C. of trap /
granite/ quartzite / gneiss metal of approved
quality for RCC works as per detailed
drawings and designs or as directed by
Engineer-in-charge including normal
dewatering, centering, form work,
ompaction, finishing the formed surfaces with
.M. 1:3 of sufficient minimum thickness to
give a smooth and even surface wherever
necessary or roughening if special finish is to
be provided and curing, etc. complete. (By
weigh batching and mix design for M-250 and
M-300 only. Use of L&T, A.C.C., Ambuja, Birla
Gold, Manikgad, Rajashree, etc. cement is
permitted.) (Excluding M.S. or Tor
reinforcement)
E. PAINTING
EXTERNAL
TOTAL 467657.5
LIFT FLOOR
Sr.No. Quantity Description Rate Unit Amount
B. RCC WORK M 20 GRADE
Providing and casting in situ C.C. of trap /
granite/ quartzite / gneiss metal of approved
quality for RCC works as per detailed
drawings and designs or as directed by
Engineer-in-charge including normal
dewatering, centering, form work,
ompaction, finishing the formed surfaces with
.M. 1:3 of sufficient minimum thickness to
give a smooth and even surface wherever
necessary or roughening if special finish is to
be provided and curing, etc. complete. (By
weigh batching and mix design for M-250 and
M-300 only. Use of L&T, A.C.C., Ambuja, Birla
Gold, Manikgad, Rajashree, etc. cement is
permitted.) (Excluding M.S. or Tor
reinforcement)
TOTAL 452676
WINDOWS
A FOUNDATION TO PLINTH
I. Excavation:
1 Excavation for footing 1.05 1.05 1.5 13 21.50 CU.M
IV. PAINTING
1 Internal 83.8 1 2.925 1 245.12 SQ.MT
2 Ceiling 12.65 6.85 1 1 86.65 SQ.MT
3 External 50.46 1 2.925 1 147.60 SQ.MT
V.FLOORING
1 FLOORING TILES 12.65 6.85 1 1 86.65 SQ.MT
2 SKIRTING 83.8 1 0.1 8.38 SQ.MT
PROPOSED APARTMENT AT SHIRALA, SANGLI
internal
10.47 9.852
10 10.31
9.845 10.97
9.845 10.52
9.807 9.75
9.671 9.8
8.911 9.8
9.722 9.66
10.726 80.662
10.691
99.688
external
Area 48.986
40.712
89.698 3 269.094
Deduction
4.65
5.95
3.05*16
59.4 2.8 166.32
total 102.774
2.54 2.925 1 7.43
2.88 2.925 1 8.42
4.57 2.925 1 13.37
8.08 2.925 1 23.63
3.3 2.925 1 9.65
3.74 2.925 1 10.94
2.75 2.925 1 8.04
2.75 2.925 1 8.04
3.03 2.925 1 8.86
3.03 2.925 1 8.86
2.66 2.925 1 7.78
2.75 2.925 1 8.04
2.75 2.925 1 8.04
2.66 2.925 1 7.78
2.9 2.925 1 8.48
4.12 2.925 1 12.05
2.35 2.925 1 6.87
2.47 2.925 1 7.22
1.4 2.925 1 4.10
1.2 2.925 1 3.51
2.35 2.925 1 6.87
2.35 2.925 1 6.87
2.35 2.925 1 6.87
4.8 2.925 1 14.04
2.2 2.925 1 6.44
3.82 2.925 1 11.17
4 2.925 1 11.70
83.8 245.12
AREA 30.4 2.55 77.52 CUM
DEDUCTION
DOOR 2.1 0.9 24 45.36
WIN 1.5 1.5 20 45
90.36
0.15
DEDUCTIO 13.554
TOTAL 63.966
INTERNAL
1 AREA 58.359 2.875 167.7821
DEDUCTION
D 2.1 0.9 6 11.34
1.5 1.5 5 11.25
22.59
TOTAL 145.1921
2 AREA 54.6 2.875 156.975
DEDUCTION
D 2.1 0.9 4 7.56
1.5 1.5 4 9
16.56
TOTAL 140.415
3 AREA 48.29 2.875 138.8338
DEDUCTION
D 2.1 0.9 3 5.67
1.5 1.5 3 6.75
12.42
TOTAL 126.4138
4 AREA 48.044 2.875 138.1265
DEDUCTION
D 2.1 0.9 3 5.67
1.5 1.5 3 6.75
12.42
TOTAL 125.7065
5 AREA 50.5 2.875 145.1875
DEDUCTION
D 2.1 0.9 5 9.45
1.5 1.5 5 11.25
20.7
TOTAL 124.4875
EXTERNAL