PRICE SUMMARY
Administration
A. SUBSTRUCTURE
1 Excavation and earth work Birr -
2 Masonry Work Birr -
3 Concrete work Birr -
GRAND TOTAL
td s dimen A. sub structure
l 15.2 1. Excavation and Earth Work
w 6.45
1 17.2
8.45
145.3 m2 site clearance
2 15.2
0.75
1 22.8 m3
5 5.65 internal mason
0.75
1 21.188 m3
43.99 m3 Trench excavation
2 15.2
0.3
1 9.12
5 5.65
0.3
1 8.475
17.60 m3 back fil around foundation wall
4 3.80
6.20
0.3 28.27 m3 back fil under hard core
27.189 m3 curt away
4 3.80
6.20 94.24
94.24 m2 hard core
2. Masonry Work
2 15.2
0.4
0.95 11.552
5 5.65
0.4
0.95 10.735
22.29 m3 stone masonry foundation below NGL
2 15.2
0.4
0.4 4.864
5 5.65
0.4
0.4 4.52
9.38 m3 stone masonry foundation Above NGL
3. Concrete Work
2 15.2
0.5 15.2
5 6.20
0.5 15.5
30.70 m2 Lean concrete C-5
4 3.80
6.20 94.24
94.24 m2 a) in 10cm thick RC floor slab, C-25
2 15.2
0.2
0.4 2.432
5 6.20
0.2
0.4 2.48
4.91 m3 b) in RC grade beam, C-25
2 15.2
2 0.2 12.16
5 6.20
2 0.2 12.4
24.56 m2 Timber form work or equivalent
2 15.2 steel bars
0.20 staff c/c 20cm
0.39 factor= (0.222*D*D)/36, D=8
1.10 staff length
65.99 Kg
5 6.20
0.20 staff c/c 20cm
0.39 factor= (0.222*D*D)/36, D=8
1.10 staff length
67.29 Kg
### Kg a) Ǿ 8mm plain bar for GBM staff
4 3.80
7.00
0.30 mesh c/c 25cm
0.60 factor= (0.222*D*D)/36, D=8
451.52 Kg b) ф 8mm deformed bar for slab
2 15.2
4 no of bars
1.21 factor= (0.222*D*D)/36, D=14
147 Kg
5 6.20
4 no of bars
1.21 factor= (0.222*D*D)/36, D=14
149.87 Kg
c) Ǿ 12mm Deformed bars for
### Kg longitudinal GBM
B. super structure
2 2.8 4. Concrete Work
5.6 ml
2 2
4 ml
5 1.9
9.5 ml
2 1.6
3.2 ml
2 1.1
2.2 ml
24.5 ml concrete windoe sill
17 3.60
0.20
0.20 2.45 m3 a) In R.C. elevation columns
3 15.2
0.3
0.2 2.736
5 6.20
0.3
0.2 1.86
4.60 m3 b) In R.C. TTB
3 15.2
0.2
0.2 1.824
5 6.20
0.2
0.2 1.24
3.06 m3 b) In R.C. intermediate beam
Form work
17 3.60
4 0.20 48.96 m2 a) Sides of elevation columns
3 15.2
3 0.2 27.36
5 6.20
3 0.2 18.6
45.96 m2 b) intermediate beam
2 15.2
3 0.2 18.24
5 6.20
3 0.2 18.6
36.84 m2 b) Sides of top tie beam
2 2.8
+6)mm 0.12 0.672 m2
2 2
0.12 0.48 m2
5 1.9
0.12 1.14 m2
2 1.6
0.12 0.384 m2
2 1.1
0.12 0.264 m2
2.94 m2 concrete windoe sill
2 15.2 beam
2 0.20 staff c/c 20cm
0.39 factor= (0.222*D*D)/36, D=8
1.10 staff length
131.98 Kg
5 6.20 beam
2 0.20 staff c/c 20cm
0.39 factor= (0.222*D*D)/36, D=8
1.10 staff length
134.58 Kg
17 3.60 column
0.20 staff c/c 20cm
0.39 factor= (0.222*D*D)/36, D=8
0.70 staff length
84.54 Kg
### Kg a) Ǿ 8mm plain bars
2 15.2
4 no of bars
2
1.21 factor= (0.222*D*D)/36, D=14
293.95 Kg
5 6.20
4 no of bars
2 1.21 factor= (0.222*D*D)/36, D=14
299.75 Kg
17 3.60
4 no of bars
1.21 factor= (0.222*D*D)/36, D=14
295.88 Kg
### Kg c) Ǿ 14mm Deformed bars
deduction(window)
2 2.000
1.500 -6 m2
2 1.900
1.500 -5.7 m2
1 1.600
1.500 -2.4 m2
2 1.900
0.600 -2.28 m2
2 1.100
0.600 -1.32 m2
1 1.600
0.600 -0.96 m2
-27.06 m2
deduction(doors)
2 0.800
2.500 -4 m2
8 0.900
2.500 -18 m2
1 1.200
2.500 -3 m2
above intermediate beam
-25 m2
2 15.200
0.900 27.36 m2
7 6.450
0.900 40.635 m2
2.700
0.900 2.43 m2
4.000
0.900 3.6 m2
5.000
above int
0.900 4.5 m2
78.525 m2
2 3.500
1 1.300 4.55 m2 triangular part above TTB
249.14 m2 20cm thick H.C.B
6.Roofing Work
8.200 Truss spacing
16.400 134.48 m2 Roof cover in G28 CIS 1.3
2 16.400 32.8 ml G-28 roof gutter Truss spacing
5 4.500 22.5 ml front 0.9
5 4.500 22.5 ml rear
45 ml Ǿ110 pvc down pipe
7. CARPENTRY AND JOINERY
13 16.640 216.32 ml Top & bottom member Rafter
13 4.13 53.69 vertical member
13 7.160 93.08 Diagonal member
146.77 ml vertical member & diagonal
12 16.400 196.8 ml 5*7 zigba
2 4.220 8.44
2 16.400 32.8 Area
41.24 ml facia board Perimeter
1 15.200 15.2 Area
1 10.400 10.4 Perimeter
1 10.560 10.56 Area
1 28.380 28.38 Perimeter
1 8.640 8.64 Area
1 8.640 8.64 Perimeter
1 21.120 21.12 Area
1 12.800 12.8 Perimeter
1 2.880 2.88 Area
1 1.740 1.74 Perimeter
1 6.560 6.56 Area
1 0.798 0.7975 Perimeter
### m2 chip wood ceiling Area
8. METAL WORK Perimeter
8 2.5x0.9 8 No doors Area
2 2.5x0.8 2 No doors Perimeter
1 2.5x1.2 1 No doors Area
2 2.8x1.5 2 No windows Perimeter
2 2x1.5 2 No windows Area
2 1.9x1.5 2 No windows Perimeter
2 1.6x1.5 2 No windows Area
3 1.9x0.6 3 No windows Perimeter
2 1.1x0.6 2 No windows
1 1.6x0.6 1 No windows
9. Plastering & pointing
1 15.600
3.400 53.04 m2
1 13.200
3.400 44.88 m2
1 16.400
3.400 55.76 m2
1 21.800
3.400 74.12 m2
1 11.800
3.400 40.12 m2
1 11.800
3.400 40.12 m2
1 19.600
3.400 66.64 m2
1 14.400
3.400 48.96 m2
1 6.800
3.400 23.12 m2
1 5.300
3.400 18.02 m2
1 10.500
3.400 35.7 m2
1 2.900
3.400 9.86 m2
510.34 m2
-27.06 m2 deduction(window)
-25 m2 deduction(door)
458.28 m2 internal wall
2 15.2
0.2 6.08 m2
2 6.20
0.200 2.48 m2
8.56 m2 grade beams
18 3.60
0.20 12.96 m2 elevation columns
2 15.2
2 0.2 12.16 m2
2 15.20
2 0.200 12.16 m2
24.32 m2 intermediate beam & TTB
2.94 m2 window sill
2 15.200
4.000 121.6 m2
2 6.450
4.000 51.6 m2
### m2 deduction
149.19 m2 external pointing
10. PAVING & FLOORING
127.72 m2 3cm thick cement screed
2 17.200
1 34.4 m2
2 6.45
1 12.9 m2
47.3 m2 dressed stone pavement
2 17.200 34.40 ml
2 8.450 16.90 ml
51.30 ml Half concrete ditch
458.28 m2 internal wall painting
127.72 m2 chip wood ceiling
11. Electrical
1.00 11.1 MDB
1.00 pcs
1.00
1.00 pcs
1.00 11.2 Light point
21.00 pcs
1.00 11.3 Socket
12.00 pcs
1.00 11.4 Telephone Points
2.00 pcs
11.5 Fittings
a. Fluorescent Luminaries type
Philips TMS 200/2.36D with
2XTL'D36W
8.00 pcs
b. Fluorescent Luminaries type
Philips TMS 200/1.36C with
1.00 1XTL'D36W
8.00 pcs
c. Siemens 5NL-510/3 with 60W
1.00 incandescent lamp
12.00 pcs
d. Siemens 5NL-460/2 with 60w
1.00 incandescent lamp
2.00 pcs
Supply and lay plastice of ø 16mm
fro TELE intake from the MH into
1.00 TELE-terminal box
200.00 Ml
NO. Of truss
13
NO. Of truss X x1 h h1 h x
6 4.1 1.1 1 0.27 1 0.27 1
4.1 2.1 1 0.51 2 0.51 1
4.1 3.1 1 0.76 3 0.76 1.2
4.1 4.3 1 1.05 4 1.05
4.220
18
PRICE SUMMARY
Biology Laboratory
A. SUBSTRUCTURE
1 Excavation and earth work Birr
2 Masonry Work Birr
3 Concrete work Birr
12.2 Ditto as item 12.1 but to chip wood ceiling m2 186 80.43 14,959.98
Total Carried to summary 27,024.48
13. Electrical Installation
Supply and install Sub - Distribution Board
(SDB-C2-C6) with lockable door, earthing lead
13.1 connectors, bus bar of 20 Amp and all the
necessary accessories consisting of :
1 Pc, main switch of 32 Amp 3-Ph
4 Pcs, ACB of 20 Amp 1-Ph
2 Pc, ACB of 16 Amp 1- Ph
1 Pc, ACB of 10 Amp 1-ph Pcs 1 8,000.00 8,000.00
Light points fed through PVS conductor of
2x2.5 sq mm in thermoplastic conduit of ø
13.2 13.5 mm in / under surface, including caps and Pcs 12 360.00 4,320.00
cover as well as flush mounted switches
23
ф 50 mm Ml 15 150.00 2,250.00
Total Carried to summary 10,650.00
24
PRICE SUMMARY
Block 9 Multi Purpose Hall
A. SUBSTRUCTURE
1 Excavation and earth work Birr
2 Masonry Work Birr
3 Concrete work Birr
12.2 Ditto as item 12.1 but to chip wood ceiling m2 220 80.43
Total Carried to summary ###
13. Electrical Installation
Supply and install Sub - Distribution Board
(SDB-C2-C6) with lockable door, earthing lead
13.1 connectors, bus bar of 20 Amp and all the
necessary accessories consisting of :
1 Pc, main switch of 32 Amp 3-Ph
4 Pcs, ACB of 16 Amp 1-Ph
2 Pc, ACB of 10 Amp 1- Ph
1 Pc, ACB of 10 Amp 1-ph Pcs 1 10,000.00
o
u
31
n
t
No. Description of work Unit Quantity Rate
Light points fed through PVS conductor of
2x2.5 sq mm in thermoplastic conduit of ø
13.2 13.5 mm in / under surface, including caps and Pcs 43 360.00
cover as well as flush mounted switches
Flush mounted socket outlets of 16 Amp 1-ph
fed through PVC conduter of 3x2.5 sq mm in
13.3 thermoplastic conduit of ø 16 mm in/under Pcs 12 386.00
surface including junction boxes, screw type
insulating caps and cover
Loudspeaker point fed through audio cable of
2x1.0 sq mm in thermoplastic conduit of ø
13.4 13mm in/under surface including junction Pcs 2 350.00
boxes, screw type insulating caps and cover.
Supply and fix loudspeaker type Philips type
13.5 LBC-3053/00 with 36W and 100V line Amplifier Pcs 1 50,000.00
type Philips LBB-1143/00 with 100W
amplification.
13.6 Type of light fittings or equivalent
a. Fluorescent Luminaries type Philips TMS
200/2.36D with 2XTL'D36W Pcs 7 350.00
ф 50 mm Ml 16 150.00
ф 110 mm Ml 4 200.00
Supply and fix floor drain of ф 50mm, made of
14.2 enameled cast iron with smell trap complete
with all accessories
ф 50 mm No 2 150.00
Supply and install vent caps made of rigid
14.3 PVC, to be connected to the roof terminal of
vent pipe
o
u
32
n
t
No. Description of work Unit Quantity Rate
ф 50 mm No 2 250.00
Total Carried to summary ###
SPECIFICATION AND BILL OF QUANTITIES
FOR
CONSTRUCTION OF SCHOOLS
GRAND SUMMARY