You are on page 1of 2

No Discriptions Units Qty Rate

A Site clearing-Earth work


1 Demolitioning and remove the rubish from site m3 47.04 $25.00
2 Concrete floor slap 5cm thick with iron barres 8mm m3 9.2 $150.00
3 Construction of masonry stone wall with ratio 1'3 m3 58 $70.00
Total A
B Silltrap
1 Excavation of the silltrap holl m3 18 $25.00
2 Concrete floor slap m3 1 $150.00
the construction masonry stone wall m3
3 40cm thick in the cement mortar max1:3 l 11.52 $70.00
4 the construction masonry stone wall
40cm thick for the chanal
m3 4.09 $70.00
5 Plastering m2 35 $3.00

TOTAL (B) for 4 silltrap 4


Amount

$ 1,176.00
$ 1,380.00
$ 4,060.00
$ 6,616.00

$ 450.00
$ 150.00

$ 806.40

$ 286.30
$ 105.00
$ 1,797.70
$ 7,190.80