Employer : - SRS MINES,ENERGY AND PETROLEUM BEREAUE

Contractor :- NEJIB ADEN BUILDING CONTRACTOR


Consultant : - VILLA ENGINEERING AND ENVIRONMENT CONSULTANCY
PIT EXCAVATION DEBTH
FROM top of FFL to from top of FFL to Bulk from bulk Excavation to REMARK
FOTTING NAMPOSITION pad depth NGL Excavation bottom of pad (pit dabth) average debth

F1 Axis 2 on B 2.5 0.8 0.3 1.4


Axis 3 on B 2.5 0.77 0.3 1.43
Axis 4 on B 2.5 0.73 0.3 1.47
Axis 5 on B 2.5 0.71 0.3 1.49
Axis 6 on B 2.5 0.65 0.3 1.55
Axis 7 on B 2.5 0.63 0.3 1.57
Axis 10 on D 2.5 0.56 0.3 1.64
10.55 1.50714285714

F2 Axis 1 on B 2.5 0.83 0.3 1.37


Axis 8 on B 2.5 0.65 0.3 1.55
2.92 1.46

F3 Axis 1 on A 2.5 0.8 0.3 1.4


Axis 1 on C 2.5 0.85 0.3 1.35
Axis 2 on A 2.5 0.75 0.3 1.45
Axis 2 on C 2.5 0.88 0.3 1.32
Axis 3 on A 2.5 0.73 0.3 1.47
Axis 3 on C 2.5 0.87 0.3 1.33
Axis 4 on A 2.5 0.64 0.3 1.56
Axis 4 on C 2.5 0.8 0.3 1.4
Axis 5 on A 2.5 0.63 0.3 1.57
Axis 5 on C 2.5 0.81 0.3 1.39
Axis 6 on A 2.5 0.58 0.3 1.62
Axis 6 on C 2.5 0.75 0.3 1.45
Axis 7 on A 2.5 0.58 0.3 1.62
Axis 7 on AC 2.5 0.77 0.3 1.43
Axis 8 on A 2.5 0.57 0.3 1.63
Axis 8 on C 2.5 0.75 0.3 1.45
Axis 12 on D 2.5 0.52 0.3 1.68
25.12 1.47764705882

F4 Axis 9 on C 2.5 0.56 0.3 1.64


Axis 9 on D 2.5 0.67 0.3 1.53
Axis 10 on B' 2.5 0.32 0.3 1.88
Axis 10 on C 2.5 0.38 0.3 1.82
Axis 10 on E 2.5 0.65 0.3 1.55
8.42 1.684

F5 Axis 8' on B 2.5 0.5 0.3 1.7


Axis 8' on B' 2.5 0.5 0.3 1.7
3.4 1.7

F6 Axis 9 on B' 2.5 0.55 0.3 1.65


Axis 9 on E 2.5 0.76 0.3 1.44
Axis 11 on c' 2.5 0.32 0.3 1.88
Axis 12 on E 2.5 0.63 0.3 1.57
6.54 1.635