SPECIFICATIONS AND BILL OF QUANTITY

PROJECT: G+2 OFFICE BUILDING

OWNER: SRS MINES, PETROLEUM, ENERGY, FOREST AND


ENVIRONMETAL PROTECTION BEREAU

LOCATION: JIGJIGA, ETHIOPIA

Date:February 2019
OWNER:-SRS MINES,PETROLEUM, ENERGY, FOREST
G+2 OFFICE BUILDING AND ENVIRONMETAL PROTECTION BEREAU

SRS MINES, PETROLEUM, ENERGY, FOREST AND ENVIRONMETAL PROTECTION BEREAU G+2 OFFICE BUILDING
PRICED BILL OF QUANTITY
SUMMARY

A. SUB-STRUCTURE

1 Excavation & Earth work Eth. Birr :-

2 Concrete Work Eth. Birr :-

3 Masonry Work Eth. Birr :-

Total (A) Eth. Birr :-

B. SUPER-STRUCTURE

1 Concrete Work Eth. Birr :-

2 Block Works Eth. Birr :-

3 Roofing & Water Proofing Eth. Birr :-

4 Carpentry & Joinery Eth. Birr :-

6 Aluminum Works Eth. Birr :-

7 Finishing Works Eth. Birr :-

8 Glazing Eth. Birr :-

9 Painting Eth. Birr :-

10 Sanitary Work Eth. Birr :-


11 Electrical Installation Eth. Birr :-

Total (B) Eth. Birr :-

Total (A + B) Eth. Birr :-

15% VAT Eth. Birr :-

GRAND TOTAL Eth. Birr :-

1
OWNER:-SRS MINES,PETROLEUM, ENERGY, FOREST
G+2 OFFICE BUILDING AND ENVIRONMETAL PROTECTION BEREAU

ECTION BEREAU G+2 OFFICE BUILDING

1,023,895.89

1,688,329.86

145,554.00

2,857,779.75

6,079,235.24

696,287.10

629,517.00

96,966.00

2,077,890.00

3,116,219.85

261,920.00

754,901.80

593,265.00
3,031,824.00

17,338,025.99

20,195,805.74

3,029,370.86

23,225,176.60

2
OWNER:-SRS MINES,PETROLEUM, ENERGY, FOREST
G+2 OFFICE BUILDING AND ENVIRONMETAL PROTECTION BEREAU
Item Description Unit Qty Rate Amount

A-SUB STRUCTURE

1. EXCAVATION & EARTH WORK

1.1 200mm thick top soil removing and site clearing M2 902.01 20.00 18,040.20

1.2 Bulk excavation in ordinary soil for to a depth not exceeding


300 mm from reduced level. M3 1,030.43 110.00 113,347.30

1.3 Dito as item 1.2 but not exceeding 320mm M3 - 110.00 -

1.4 Excavation for isolating footing to a depth not exceeding 150mm from
bulk excavation level. M3 400.72 120.00 48,086.40

1.5 Dito as item 1.4 but not exceeding 300mm M3 - 120.00 -

1.6 Excavation in stone masonary foundation of depth not exceeding 150cm M3 64.22 110.00 7,064.20

1.7 Fill around footing and foundation columns with imported selected materials
from out side well rolled and compacted in layers not exceeding
200 mm thick. M3 280.24 268.00 75,104.32

1.8 Fill under hard core with imported selected materials from out side well rolled and
compacted in layers not exceeding 200 mm thick. M3 789.99 268.00 211,717.32

1.9 Cart away surplus excavated material to a distance not exceeding 5kms. M3 2,094.72 180.00 377,049.60

1.10 250mm thick basaltic or equivalent stone hard core well rolled,
consolidated and blinded with crushed stone. M2 588.09 295.00 173,486.55

Total carried to summary 1,023,895.89

2. CONCRETE WORK

2.1 50 mm thick plain blinding lean concrete quality C-7


with minimum cement content of 150 kg /m3, of concrete:
a) Under footing footing M2 215.32 200.00 43,064.00
b) Under grade Beam M2 85.78 200.00 17,156.00
c) Under masonry wall M2 91.09 200.00 18,218.00
d) Under ground floor slab M2 588.09 200.00 117,618.00

2.2 Reinforced concrete quality C-25 with minimum cement


content of 360 kg /m3 filled into form work and vibrated
around rod reinforcement (Formwork and reinforcement
measured separately)
a) In footing pad M3 98.55 2,600.00 256,230.00
b) In foundation columns M3 13.58 2,600.00 35,308.00
c) In grade beam M3 34.31 2,600.00 89,206.00
d) In 10cm thick ground floor slab M2 588.09 300.00 176,427.00

2.3 Provide, cut and fix in position sawn ZIGBA form work, or steel
formwork, whichever is appropriate, strictly you should use molded
oil paint, form work should not removed before 24 hours.
a) In footing pad M2 156.36 275.00 42,999.00
b) In foundation columns M2 137.42 275.00 37,790.50
c) In grade beam M2 274.72 275.00 75,548.00

2.4 Chip wood or equivalent expansion joint filler as per the structural
drawing and engineer recommendation.

2
OWNER:-SRS MINES,PETROLEUM, ENERGY, FOREST
G+2 OFFICE BUILDING AND ENVIRONMETAL PROTECTION BEREAU
Item Description Unit Qty Rate Amount
a) Between slab & beam on ground floor level Ml 511.75 50.00 25,587.50

2.5 Mild steel re-bar according to structural drawings. Price shall include
cutting, bending, placing in position and tying with ø1.5mm wire,
a) ø8 mm deformed bar Kg 3,260.25 62.00 202,135.50
b) ø12 mm deformed bar Kg 1,081.17 62.00 67,032.54
c) ø14 mm deformed bar Kg 3,959.76 62.00 245,505.12
d) ø16 mm deformed bar Kg 3,846.85 62.00 238,504.70

Total carried to summary 1,688,329.86

3. MASONRY

3.1 Hard basaltic or equivalent 500mm thick stone masonry wall foundation
below basament beam level bedded in cement sand mortar ratio of (1:3). M3 85.62 1,700.00 145,554.00

Total carried to summary 145,554.00

B. SUPER STRUCTURE
1. CONCRETE WORKS
1.1 Reinforced concrete, filled in to formwork and vibrated
around rod reinforcement ( formwork and reinforcement are measured
separately) Use OPC cement type for all structural elements.
1.11 C-25 concrete class to:
a) In elevation columns. M3 40.55 2,600.00 105,430.00
b) In floor beam. M3 13.87 2,600.00 36,062.00
c) In 20cm thick suspended floor slab M3 401.28 2,600.00 1,043,328.00
d) In staircase and landing M3 20.79 2,600.00 54,054.00

1.2 Provide, cut and fix in position sawn ZIGBA form work, or steel .
formwork, whichever is appropriate, you may use molded
oil paint over form work, and shall not removed before 24 hours.
a) In elevation columns. M2 432.98 280.00 121,234.40
b) In floor beam. M2 124.08 280.00 34,742.40
c) In 20cm thick suspended floor slab M2 2,117.23 280.00 592,824.40
d) In staircase and landing M2 284.82 280.00 79,749.60

1.3 Mild steel re-bar according to structural drawings. Price shall include
cutting, bending, placing in position and tying with ø1.5mm wire,
a) ø8mm deformed bar Kg 1,896.12 62.00 117,559.44
b) ø10mm deformed bar Kg 27,252.63 62.00 1,689,663.06
c) ø12mm deformed bar Kg 3,417.99 62.00 211,915.38
d) ø14mm deformed bar Kg 9,927.17 62.00 615,484.54
e) ø16mm deformed bar Kg 22,212.71 62.00 1,377,188.02

Total carried to summary 6,079,235.24

2. BLOCK WORK

Walls shall be constructed from class 'B' hollow concrete blocks. The blocks shall be
selected for their consistency in dimensions, shapes, angles and strength. Blocks should
be free from cracks or any other defects and the surface characteristic of the blocks
shall be in such a way that good key for plaster is obtained.

2.1 20cm thick HCB wall, embedded in cement-sand mortar


of 1:3 mix ratio. Both sides shall be left for plastering. M2 1,248.33 330.00 411,948.90

2.2 Ditto item 2.1 but 150mm thick HCB walls. M2 917.22 310.00 284,338.20

2.3 Ditto item 2.1 but 100mm thick HCB walls. M2 24.60 290.00 7,134.00

3
OWNER:-SRS MINES,PETROLEUM, ENERGY, FOREST
G+2 OFFICE BUILDING AND ENVIRONMETAL PROTECTION BEREAU
Item Description Unit Qty Rate Amount
Total carried to summary 696,287.10

3- ROOFING & WATER PROOFING.

3.1 Brush and blow out dirt, dust, scrapings & all other loose material
until the reinforced concrete slab is fully cleared. Cast a light weight
concrete with 240 Kg /m3 cement content on all the roof and
concrete
gutter by providing the given slope with a minimum depth of 50mm.
The light weight concrete should be allowed to cure completely to
avoid cracks that could appear due to shrinkage or settlement. M2 750.00 120.00 90,000.00

3.2 Supply and lay cement-sand screed over the cured light-weight
concrete area of item 4.1 above with cement sand mix 1:3 and 1:1
with an average thickness of 30mm. M2 750.00 75.00 56,250.00

3.3 Supply and lay a single ply Hertalan or equivalent water-proofing


system, manufactured from a special EPDM rubber compound,
shall be used on the terrace roof & concrete gutter surface.
The water-proofing EPDM-system shall include contact and
bonding adhesives, sealant roof drains connection and all other
necessary accessories needed to complete the work. The entire
work shall be executed based on details provided by the
manufacturer and approval of engineer. M2 981.90 450.00 441,855.00

3.4 Supply & fix dia.100mm PVC down pipe, fixing shall be done by
means of metal rings. Work & cost includes metal strainer and two
coats
of oil paint. Ml 68.20 85.00 5,797.00

3.5 Galvanized Metal sheet flashing (Dev.L=35cm) Ml 209.50 170.00 35,615.00

Total carried to summary 629,517.00

4. CARPENTRY AND JOINERY

4.1 CARPENTRY

4.1.1 Supply and fix 7x10cm high quality wooden purlin at every 60cm c/c spacings. Ml 280.80 125.00 35,100.00

4.1.2 Supply and fix pvc suspended ceiling nailed to 4x5cm wooden purlin. Price includes
angular corner list . M2 152.80 575.00 87,860.00

4.2 JOINERY

FLUSH DOORS

Supply & fix 3ELLE brand, ALOE Porto SSF or equivalent model 44mm thick interior
single leaf flush doors with leaf resins-bonded honey comb core in hard board raised
plans on upper and lower part of the door in MDF. The frame shall be solid wood strips
trims in plywood with L-shape to allow adjustment of frames to wall thickness by at
4.2.1 least 5mm fitted with noise reduction gasket. The door finished with veneer and coated
in Italian walnut finish. ASSA or ICSA or equivalent type lock, key and strike plate in
brass-coated steel, three brass coated pin hinges with at least 14mm diameter handle in
solid brass accessories should be incorporated. The model of the accessories shall all
be approved by the engineer.

a) D1 (size: 70x210)cm No 20.00 2,016.00 40,320.00


b) D2 (size: 90x210)cm No 22.00 2,268.00 49,896.00
c) D3 (size: 180x250)cm No 1.00 6,750.00 6,750.00

Total carried to summary 96,966.00

6. ALUMINUM WORKS

4
OWNER:-SRS MINES,PETROLEUM, ENERGY, FOREST
G+2 OFFICE BUILDING AND ENVIRONMETAL PROTECTION BEREAU
Item Description Unit Qty Rate Amount
Every Door and window frame is manufactured from Aluminum tubular frame,
EURO profile or equivalent, 2mm thick, with an average weight that shall be approved
by the engineer. All works shall be done according to the window, door schedule.
Complete work includes all the necessary Iron monger and approved type of
6.1
cylindrical lock handles. Joints shall be water tight. Fixed and opening panels exposed
to weather shall be provided with weather strips, insuring that the strips are fixed
continuous enough to be water tight. All aluminum windows & doors type shall be
approved by the engineer.

6.1.1 Window Doors


6.1.1.1) WD1 Size 460x300cm No 1.00 30,360.00 30,360.00
6.1.1.2) WD2 Size 1055x300cm No 3.00 69,630.00 208,890.00
6.1.1.3) WD3 Size 460x300cm No 14.00 30,360.00 425,040.00
6.1.1.4) WD4 Size 265x300cm No 1.00 17,490.00 17,490.00
6.1.1.5) WD5 Size 705x300cm No 1.00 46,530.00 46,530.00
6.1.1.6) WD6 Size 150x300cm No 7.00 9,900.00 69,300.00
6.1.1.7) WD7 Size 180x300cm No 2.00 11,880.00 23,760.00
6.1.1.8) WD8 Size 355x300cm No 1.00 23,430.00 23,430.00
6.1.1.9) WD9 Size 770x300cm No 1.00 50,820.00 50,820.00
6.1.1.10) WD10 Size 395x300cm No 1.00 26,070.00 26,070.00
6.1.1.11) WD11 Size 545x300cm No 1.00 35,970.00 35,970.00
6.1.1.12) WD12 Size 810x300cm No 1.00 53,460.00 53,460.00
6.1.1.13) WD13 Size 470x300cm No 1.00 31,020.00 31,020.00
6.1.1.14) WD13 Size 285x300cm No 1.00 18,810.00 18,810.00
Windows
6.1.1.15) W1 Size 460x200cm No 5.00 20,240.00 101,200.00
6.1.1.16) W2 Size 100x100cm No 11.00 2,200.00 24,200.00
6.1.1.17) W3 Size 300x160cm No 3.00 10,560.00 31,680.00
6.1.1.18) W4 Size 1280x100cm No 2.00 28,160.00 56,320.00
6.1.1.19) W5 Size 355x100cm No 2.00 7,810.00 15,620.00
6.1.1.20) W6 Size 570x100cm No 2.00 12,540.00 25,080.00
6.1.1.21) W7 Size 445x300cm No 1.00 29,370.00 29,370.00
6.1.1.22) W8 Size 890x100cm No 1.00 19,580.00 19,580.00
6.1.1.23) W8 Size 990x100cm No 2.00 21,780.00 43,560.00
6.1.1.24) W8 Size 100x300cm No 1.00 6,600.00 6,600.00
6.1.1.25) W8 Size 300x100cm No 4.00 6,600.00 26,400.00
6.1.2 Supply & fix structural curtain wall, framed with anodized aluminum
profile frames, with tinted 6 mm thick single glass & sealant all as per
the engineers approval & detail drawings. Unit price shall include glass,
anchorage, sealant, 12mm thick melamine coated chip wood panel
cladded internally below the level of window cill & all other necessary
works needed to complete the work.
a) CW1(size:970x950) cm No 1.00 322,525.00 322,525.00
b) CW2(size:230x940) cm No 1.00 75,670.00 75,670.00
c) CW3(size:460x625) cm No 1.00 100,625.00 100,625.00
d) CW4(size:140x950) cm No 1.00 46,550.00 46,550.00

6.2 Supply and fix 90cm high rail to the stair case made from Ø40mm
stainless steel pipe baluster, Ø40mm aluminum handrail & 4 rows of
Ø20mm stainless steel guard rails. Price shall include metal
plates and all other necessary works and materials needed for
anchorage. Price shall also include one coat of anti rust & synthetic
enamel spray paint to metal parts & all other necessary accessories
needed to complete the work. Ml 41.80 2,200.00 91,960.00

Total carried to summary 2,077,890.00

7. PLASTERING, FLOOR, WALL


AND OTHER FINISHING WORKS

PLASTERING

7.1
Supply and apply two coats of plaster in cement-sand mortar to every internal wall
surface, columns and beams. Mix ratio shall be 1:3.Price shall include preparing the
background for plastering by hacking, nicking out joints chiseling smooth surfaces to
roughen them, etc. M2 3,689.03 135.00 498,019.05

5
OWNER:-SRS MINES,PETROLEUM, ENERGY, FOREST
G+2 OFFICE BUILDING AND ENVIRONMETAL PROTECTION BEREAU
Item Description Unit Qty Rate Amount
7.2 Ditto item 7.1 but to the external HCB wall surface . M2 1,248.33 135.00 168,524.55

7.3 Ditto item 7.1 but to the Concrete slab Ceiling. M2 2,117.23 135.00 285,826.05

7.4 Ditto item 7.1 but to the stair soffit. M2 284.82 135.00 38,450.70

Supply & apply approved gypsum plaster with a minimum thickness of 3mm over
7.5 the 2 nd coat plastered surface of internal wall . Work & cost includes:-preparing the
surfaces, preparing every working materials etc. Application shall be done after well
cured the plastered surface and as per the instruction of the engineer M2 3,363.03 50.00 168,151.50

7.6 Ditto item 7.5 but to the Concrete slab Ceiling M2 2,117.23 50.00 105,861.50

7.7 Ditto item 7.5 but to the stair soffit. M2 284.82 50.00 14,241.00

FLOOR & WALL FINISHES

7.21 Supply and lay polished, chamfered & calibrated Sylvia epoxy treated
or equivalent type Marble/Granite tile.The price shall include Mapei, Cercol,
Keracol or equivalent type fillers and adhesive.
a) For thread (champhered & grooved at the bottom of front
edge & three rows of groove at the top of front edge for non
slippery) . size ( 35 x 3)cm. Ml 179.20 850.00 152,320.00
b) For riser.
size ( 14 x 2)cm. Ml 179.20 500.00 89,600.00
c) For floor tile.
size ( 40x40x3)cm. M2 13.65 1,600.00 21,840.00
d) For skirting .
size (10×2)cm Ml 58.80 350.00 20,580.00

7.22 Throated, weathered, champhered & grooved Marble/Granite window and door sill
embedded on Max Fix or equivalent cement mortar.
Size 3 x 28 cm window sill. Ml 305.95 750.00 229,462.50
Size 2 x 20 cm door sill. Ml 37.70 650.00 24,505.00

7.23 Supply and fix 300x400mm R.A.K. or equivalent ceramic wall tiles.
Color, Pattern, thickness adhesive & grouting shall be approved by
the engineer. M2 303.00 540.00 163,620.00

7.24 Supply and fix 300x300x0.8mm non slippery R.A.K. or equivalent


ceramic floor tile lay over the pre finished screed surface. Color,
Pattern, thickness & cement adhesive shall be approved by the engineer. M2 63.50 800.00 50,800.00

7.25 Supply and fix 600x600x0.8mm non slippery RAK Dubai or equivalent
porcelain floor tile lay over the pre finished screed surface. Color,
Pattern, thickness & cement adhesive shall be approved by the engineer. M2 1,528.90 580.00 886,762.00

7.26 Ditto item no.7.24 but 10cm height non slippery ceramic skirting. Ml 106.00 310.00 32,860.00

7.28 Ditto item no.7.25 but 10cm height non slippery porcelain skirting. Ml 531.60 310.00 164,796.00

Total carried to summary 3,116,219.85

8. GLAZING

8.1 Supply and fix 5mm thick Belgian Glaver Bel or equivalent tinted glass
with rubber beads to doors, windows and window doors as shown on the
drawings. Price shall include all the necessary works needed to
complete the work. M2 654.80 400.00 261,920.00

Total carried to summary 261,920.00

9. PAINTING

9.1 Apply three coats emulsion paint to internal plastered wall surface including
beam & column surfaces. Paint type and color shall approved by the architect. M2 3,363.03 40.00 134,521.20

6
OWNER:-SRS MINES,PETROLEUM, ENERGY, FOREST
G+2 OFFICE BUILDING AND ENVIRONMETAL PROTECTION BEREAU
Item Description Unit Qty Rate Amount

9.2 Ditto item 9.1 but on concrete ceiling surface. M2 2,402.05 40.00 96,082.00

9.3 Apply granite paint to external wall surface M2 1,248.33 420.00 524,298.60

Total carried to summary 754,901.80

10-SANITERY INSTALLATION

10.1 SANITARY INSTALLATION


1.1 SANITARY EQUIPMENT (FIXTURES)
All Fixtures Shall Be First Class European Standard/Manufactured & Should Subject
To The Engineer's, Consultant's or Client's Approval Based on Samples, Catalogues
&/or Brochures Presented By The Contractor. Unit Price Shall Include All The
Necessary Fixing Hooks or Brackets, Fittings, Accessories, & All Other Relevant
Activities As Civil Works (Chieseling of Walls, Beams &/or Floors) & etc... For The
Proper Installation & Operation of The Fixtures, Pipes & All Other Sanitary Materials
Based On Relevant Clauses of Local & International Standards.

P- Smell trap with connection pipe and all other necessary connecting and
fixing fittings and accessories for the proper installation and operation of the
basin. The basin shall also conform with the relevant clauses of Local &
International Standards.
1.1.2

Size: 560*420*840mm (l*w*d) (Approximate Size).


Color: White
Tap: Remer or Equivalent Long Lever Cold & Hot Water Mixer Tap.
Accessories: Remer or Equivalent. Nº 14 3,500.00 49,000.00

China with plastic seat and cover including 6 to 9 liters capacity low flush
cistern with push button, silent filling system & chromium plated water
connection underneath the cistern complete with all necessary connecting and
fixing fittings and accessories for the proper installation and operation of the
1.1.3
closet. The closet shall conform with Local and International Standards.

Trap: "S" Smell Trap.


Size: 706*360*795mm (l*w*d) (Approximate Size)
Color: White
Accessories: Remer or Equivalent. Nº 12.00 4,000.00 48,000.00

necessary connecting and fixing fittings and accessories for the proper
installation and functioning of the valve. The fixture shall conform with Local
and International Standards.
1.1.4

No 12.00 560.00 6,720.00


connecting accessories for the proper installation and operation of the rail. The
rail shall conform with Local & International Standards. /For actual location or
place of fixing, refer Architectural schedule or consult the Architect./
1.1.5

Model: Orient Accessories Built-in Rail.


Length: 600mm. Nº 14.00 850.00 11,900.00
and operation of the holder. The fixture shall conform with Local &
International Standards. /For actual location or place of fixing, refer
Architectural schedule or consult the Architect./
1.1.6

Model: Orient Accessories Built-in Rail.


Size: 185*95mm.
Color: White. Nº 14.00 550.00 7,700.00

7
OWNER:-SRS MINES,PETROLEUM, ENERGY, FOREST
G+2 OFFICE BUILDING
Supply and fix Toilet Paper Holder made of white vitreous China mounted to AND ENVIRONMETAL PROTECTION BEREAU
Item wall complete with all the necessary fixing and connecting accessories for the Unit
Description Qty Rate Amount
proper installation and operation of the fixture. The fixture shall conform with
Local & International Standards. /For actual location or place of fixing, refer
Architectural schedule or consult the Architect./

1.1.9

Model: Orient Accessories Built-in Rail.


Size: 170*185mm.
Color: White. Nº 12.00 550.00 6,600.00
and all the necessary connecting and fixing fittings & accessories for the proper
installation and operation of the mirror.
1.1.7

Size: 600*500mm. Nº 14.00 850.00 8,500.00

Supply, fix, test & commision approved quality Floor Drain made of polished
1.1.8 stainless steel complete with P-Smell trap (minimum depth of 75mm) and all
other necessary connecting fittings and accessories.
80mm diameter. Nº 12.00 950.00 11,400.00

Laboratory Sink / To be approved by submitting Catalogues/ with double


bowl as where shown on the drawing complete with long lever action cold and
hot water mixer tap, chrome plated chain, plug, chrome plated faucet, P-Smell
1.1.9 trap and all the necessary connecting and fixing accessories for the proper
installation and operation of the sink.

Material: Stainless Steel.


Color: Silver. Nº 8.00 9,000.00 72,000.00

Supply and install instant water heater made for European standard. The unit price
1.1.10
shall include all the necessary labour and material cost.
i - Capcity : 80liters Nº 2.00 4,000.00 68,000.00

Supply 12kg Dry Powder Fire Extinguisher for ABCE class of fire as where shown on
1.1.11 the drawing in basement parking. The material shall comply with TUV, BSI, NFPA or
equivalent institution certification and approval. Complete with approved standard
hanging and fixing material Nº 2.00 200.00 68,000.00

PLUMBING
10.2 Supply, WATER
install, SUPPLY
disinfect, test andSYSTEM
commission Potable Cold & Hot Water Supply
VESBO-PIPE SDR 6 or its equivalent PPR- Pipes (PN20), including pipe
fittings, supporting clamps, anchors, insulation (if necessary) and painting as
where required, cutting and making of chiesels on walls, floors &/or beams (if
necessary) and necessary accessories all as specified in the technical
specification of the material and shown on the drawings as per the
1.2.1
manufacturer's instructions & recommendation. Testing of lines shall be
executed at a minimum pressure of 10Kg/cm2 or twice the working pressure,
which ever is greater at the expense of the Contractor. NOTE: the diameters
which are listed are NOMINAL (internal) diameter of the pipe and the length
of each pipe must be at least 4m.
a) diameter 20mm Nominal diameter & wall thickness of 3.4mm ml 95.00 70.00 6,650.00
b) diameter 25mm Nomial diameter & wall thickness of 4.2mm ml 24.00 80.00 1,920.00
c) diameter 32mm Nominal diameter & wall thickness of 5.4mm ml 20.00 100.00 2,000.00

Service/Angle Valve on the water supply pipe before sanitary appliances


1.2.2 including all accessories, as specified in the technical specification and shown
on the drawings.
a) diameter 20mm Nº 40.00 270.00 10,800.00

Supply & install high quality (Manufactured) Bronze Gate Valve on the water supply
1.2.3 pipe riser branch lines and room controlling . NOTE: the bronze gate valves must be
same brand with the ppr pipes.
a) diameter 25mm Nº 8.00 295.00 2,360.00

8
OWNER:-SRS MINES,PETROLEUM, ENERGY, FOREST
G+2 OFFICE BUILDING AND ENVIRONMETAL PROTECTION BEREAU
Item Description Unit Qty Rate Amount
b) diameter 32mm Nº 10.00 330.00 3,300.00

10.3 WATER TANKERS PUMPS AND ACCESSORIES


1.3.1 WATER TANKS & ACCESSORIES @ ROOF LEVEL.

Supply and install 2000 liters capacity water tank made of fiber glass wall thickness
5mm or equivalent complete with required gate valves, float valve, inlet and outlet
pipe, over flow & drain, vent pipe and all the necessary accessories thereto. The tank
shall be placed on the concrete flat roof. Nº 3.00 5,000.00 15,000.00

Supply HDPE pipes for roof level and exposed water supply pipe sutem (PN 16) with
1.3.2 all the necessary connecting pieces such as bends, unions tees etc.the pipes and fittings
has to meet BS standard or equivalent institution and the pipe diameter listed are
external diameter.

a) diameter32mm ml 50.00 330.00 16,500.00

10.4 WASTE, VENT AND STORM WATER PIPES AND ACCESSORIES

All domestic waste, vent and storm water pipe lines shall be uPVC pipes and shall be
provided with a minimum slope of 1.5% towards the outlet unless specified. All uPVC
pipes and necessary fittings shall be standard quality and be free from damage during
storage, transportation, instullation etc. Unit price shall include all the necessary
assistance civil works, such as excavation cartaway, fixing or hanging to walls, beams
or slabs etc., necessary fittings such as bends, Ys, Ts, sockets, gaskets etc.
Supply, install, test & commission uPVC (Unplasticized Poly Venyl Chloride)
Series 3 (PN6) waste water drainage and vent pipes that comply with DIN
8062 according to where shown on the drawings, complete with all the
10.4.1 necessary connecting & fixing pieces, cleaning access, anchors, sockets &/or
adaptors, accessories & civil works thereto for the proper installation &
operation of the system.
a) Diameter 50 mm with wall thickness 3.2mm ml 50.00 85.00 4,250.00
c) Diameter 110 mm wall thickness 3.5mm ml 79.00 135.00 10,665.00
Supply and install approved quality storm water drainage uPVC (Unplasticized
Poly Venyl Chloride) Series 3 (PN6) Down Pipe for storm water drainage
system that comply with DIN 8062 according to where shown on the
drawings. Price shall include painting of UV-Radiation protection & all the
1.4.2
necessary connecting pieces, fixing & corrosion free clamping elements and all
other neecessary assistance civil works ther to for the proper installation &
operation of the system.
c) diameter 110 mm ml 50.00 155.00 7,750.00

Supply and install Vent Caps made of rigid uPVC to be connected to the roof
1.4.3 terminal of vent pipe as shown on the riser diagram, complete with all the
necessary sealings, gaskets to roof water proofing membrane including
stainless steel screws/as required and all other accessories.
a) diameter 50 mm Nº 8.00 450.00 3,600.00

10.5 SITE WASTE & STORM WATER DRAINAGE SYSTEM


1.5.1 Waste Water Drainage
Supply and lay uPVC (Unplasticized Poly Venyl Chloride) (PN6) Orange for
external waste & storm water drainage pipes that comply with BS 4660 & BS
5481 according to the drawing shown with a minimum slope of 1.5% or natural
ground slope which ever is greater on a firm bed of selected material. The
joints shall be made tight and installation shall make the best condition for
cleaning and maintenance. Unit price shall include excavation of the trench.
cartaway, back-fill & all other necessary civil works there to.
a) diameter 150 mm ml 45.00 450.00 20,250.00

9
OWNER:-SRS MINES,PETROLEUM, ENERGY, FOREST
G+2 OFFICE BUILDING AND ENVIRONMETAL PROTECTION BEREAU
Item Description Unit Qty Rate Amount

Supply and install circular sewer Man Hole made of precast concrete pipe with internal
dimension of 600*600*900mm(avg. depth), rested on mass concrete benching size
1000*1000*100mm concrete bottom slab reinforced with diameter 8mm reinforcement
1.5.2 bar c/c 200mm both ways. The bottom slab shall rest on 150mm thick well compacted
selected material. Man hole cover shall be RC concrete 80mm thick with 8mm
reinforcement bar @200mm c/c both ways as shown on the drawing. Unit price shall
include excavation, cart-away, compaction and back-fill as required and all assistance
civil works there to. Nº 16.00 2,650.00 42,400.00

suply and construct 30 mq. Capacity septic tank in masonry wall with both top and
1.5.3
bottomconcreteslab thicknes 200mmthick with manhole openings and with inlet and
outlet pipe conections LS 1.00 24,000.00 88,000.00

TOTAL CARRIED TO SUMMARY ................................................... 593,265.00

11.ELECTRICAL INSTALLATION
Supply and install :-
1 Power & Tele Intakes (Provisional Quantity)
Cost of EEPCo power Intake LS LS 750,000.00 750,000.00

1 Standby Diesel Generator Set


Fix Diesel generator set of 43kW (at site), 380/220V, 4-wire, 50Hz, 1500rpm, skid
mounted, complete with Automatic Load Transferee Switch, all necessary control and
1.1 alarm equipment; and as indicated on the drawing. No 1 627,000.00 627,000.00

2 Manhole
Manhole in bricks and with concrete base internally of 1500x1500x700mm including
2.1 concrete cover with lifting hole. No 2.00 2,500.00 5,000.00
-
Manhole in bricks and with concrete base internally of 500x500x500mm including
2.2 concrete cover with lifting hole. No 9.00 2,500.00 22,500.00

3 PVC pipes.
3.1 70 mm diameter for Power and Tele ml 122 70.00 8,540.00
3.2 60 mm diameter for Power and Tele ml 100 70.00 7,000.00
3.3 29 mm diameter for power lines from MDB to SDBs ml 588 30.00 17,640.00
3.4 16mm diameter for power lines from SDB to EACH SOURCE
4 Low Voltage System Earth
Low voltage system earthing (1x50)sq. mm bare copper conductor from CMDB earth
terminal ,to copper clad steel earthing rod of 16x2400mm in manhole measured
elsewhere(15m). [needs to have a mesh of 3 earthing rods to achieve the expected
4.1 earthing resistance] No 1.00 5,500.00 5,500.00

1x16 sq mm bare copper earth conductor from kWhmt board earth terminal to earth
4.2 rods in PVC pipe 50mm diameter. ml 7 450.00 3,150.00

5 Distribution Boards
Flush mounted distribution Board, MDB with lockable door and including bus bars of
100 Amp 3Phase, all necessary fixing and connecting accessories, complete and
5.1 consisting:-
5 pcs 10A, MCB, 1Phase
2 pcs 32A, MCB, 1Phase
2 pcs 20A, MCB, 1Phase
1 pcs 32A, MCB, 3Phase
1 pcs 40A, MCB, 3Phase
1 pcs 100A, MCB, 3Phase No 1 12,500.00 12,500.00
25% reserve pitches all complete
2 pcs digital KWHM 50-600A /3P, with Relay
3 pcs ammeter of (0-600A) with current transformer
1 pc volt meter (0-500 V), with selector switch
1 Surge arrestor of appropriate size
3 pcs pilot lamps.

10
OWNER:-SRS MINES,PETROLEUM, ENERGY, FOREST
G+2 OFFICE BUILDING AND ENVIRONMETAL PROTECTION BEREAU
Item Description Unit Qty Rate Amount
5.1 Ditto as above but for SDB-GF/A, and consisting:40A-
15 pcs 10A, MCB, 1Phase
6 pcs 16A, MCB, 1Phase No 1 9,400.00 9,400.00
1 pc main 40A, MCB, 3Phase
25% reserve pitches all complete

5.2 Ditto as above but for SDB-GF/B, and consisting 32A:-


5 pcs 10A, MCB, 1Phase
2 pcs 16A, MCB, 1Phase
25% reserve pitches all complete No 1.00 2,000.00 2,000.00

5.3 Ditto as above but for SDB-1F/A, and consisting 32A:-


11 pcs 10A, MCB, 1Phase
6 pcs 16A, MCB, 1Phase
1 pc main 32A, MCB, 3Phase
25% reserve pitches all complete No 1.00 2,500.00 2,500.00

5.4 Ditto as above but for SDB-1F/B-CONSISTING


4 pcs 10A, MCB, 1Phase
1 pcs 16A, MCB,1 Phase
1 pcs 32 A, MCB, 1Phase
25% reserve pitches all complete No 1.00 2,000.00 2,000.00

5.5 Ditto as above but for SDB-2F consisting :-


12 pcs 10A, MCB, 1Phase
7 pcs 16A, MCB, 1Phase
1 pc main 32A, MCB, 3Phase
25% reserve pitches all complete No 1.00 3,000.00 3,000.00

5.6 Ditto as above but for SDB-UF


2 pcs 10A, MCB, 1Phase
2 pcs 16A, MCB, 1Phase
1 pcs 20A, MCB, 1Phase
25% reserve pitches all complete No 1.00 2,000.00 2,000.00

6 Cables
6.1 (3x2.5) Sq mm ml 310 65.00 20,150.00
6.2 3x4 mm sq. m 58 60 3,480.00
6.3 5x6 mm sq. m 80 150 12,000.00
6.4 (5x10) Sq mm ml 28 388.00 10,864.00
6.5 3x35/16 mm sq. m 100 3000 300,000.00

7 Extra Over Light Points for Flush Mounted Switches


7.1 Flush mounting single switch No 10.00 200.00 2,000.00
7.2 Flush mounting two way switch No 23.00 200.00 4,600.00
7.3 Flush mounting double switch No 80.00 250.00 20,000.00
7.4 Flush mounting intermediate switch No 3.00 250.00 750.00

6 Light Points

Flush mounted light points fed through PVC insulated conductors of 2x2.5mm 2 inside
PVC conduits of 16mm diameter, including junction boxes with covers and insulating
screw cap connectors, complete No 540 380.00 205,200.00

8 Flush Mounted Socket Outlet Points


10-16A/1P socket outlet points fed through PVC insulated conductors of 3x2.5mm 2
inside PVC conduit of 16mm diameter including junction boxes with covers and
8.1 insulating screw cap connectors. No 123.00 550.00 67,650.00
10 Flush mounted Socket Outlets with earth contact
10.1 Flush mounting single socket outlet of 10A/16A 1ph No 123 200 24,600.00

Telephon System
-The system shall be installed as per ETC standard

RJ 45 4 pair Tele socket out let points to for


flush mounting in thermoplastic conduit of 21mm

11
OWNER:-SRS MINES,PETROLEUM, ENERGY, FOREST
G+2 OFFICE BUILDING AND ENVIRONMETAL PROTECTION BEREAU
Item Description Unit Qty Rate Amount
with appropriate type junction box fed by standard
(CAT 6A UTP data cable) No 80 280.00 22,400.00

RJ 45 4 pair Tele socket outlets Nº 80 200.00 16,000.00

Note :- Use PVC conduit for risers and drops


I. Supply of Lighting fitting by the Client,

II. An average Unit price is considered for


cost estimation,
III. The price of fittings under this item to be
EXCLUDED in the contract agreement.
N.B.
Recommended types of fittings indicated
on the attached lighting fitting Schedule.

(a) Lighting fittings and lamps complete No 540 1,560.00 842,400.00


TYPE 1 No 11 450.00
TYPE 2 ` 15 450.00
TYPE 3 No 8 700.00
TYPE 4 No 115 1,250.00
TYPE 5 No 8 1,250.00
TYPE 6 No 188 1,250.00
TYPE 7 No 9.00 1,250.00
TYPE E No 25 150.00
379

TOTAL CARRIED TO SUMMARY ................................................... 3,031,824.00

12
TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

MAIN BLOCK & LABORATORY


B.SUPER STRUCTURE
1.0 CONCRETE WORK
ELEVATION COLUMN
a) In elevation columns.
40x40
53 / 3 l= 3
0.4 w= 0.4
0.4 d= 0.4
25.44 m3
25x30
8/ 3 l= 3
0.25 w= 0.25
0.3 d= 0.3
30x30
36 / 3 l= 3
0.3 w= 0.3
0.3 d= 0.3
9.72 m3
dia.40
13 / 3 l= 3
3.14 w= 3.14
0.044 r2= 0.044
5.39 m3
40.55 m3 GRAND TOTAL
b) In floor beam.

B11
4/ 1.55 l= 1.55
0.25 w= 0.25
0.4 d= 0.4
0.62 m3
B13
2/ 2.6 l= 2.6
0.25 w= 0.25
0.4 d= 0.4
0.52 m3
B14
2/ 5.6 l= 5.6
0.25 w= 0.25

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

0.4 d= 0.4
1.12 m3
B14-1
1/ 11.73 l= 11.73
0.25 w= 0.25
0.4 d= 0.4
1.17 m3
B14-2
1/ 15.65 l= 15.65
0.25 w= 0.25
0.4 d= 0.4
1.57 m3
B14-3
1/ 7.97 l= 7.97
0.25 w= 0.25
0.4 d= 0.4
0.80 m3
B14-4
1/ 11.3 l= 11.3
0.25 w= 0.25
0.4 d= 0.4
1.13 m3
PB
1/ 12.1 l= 12.1
0.2 w= 0.2
0.3 d= 0.3
0.73 m3
PB
7/ 1.35 l= 1.35
0.2 w= 0.2
0.3 d= 0.3
0.57 m3
RB7
2/ 15.4 l= 15.4
0.25 w= 0.25
0.4 d= 0.4
3.08 m3
RB8
2/ 6.4 l= 6.4
0.25 w= 0.25

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

0.4 d= 0.4
1.28 m3
RB9
2/ 6.4 l= 6.4
0.25 w= 0.25
0.4 d= 0.4
1.28 m3

13.87 m3 GRAND TOTAL


d) In staircase and landing
2/ 0.081 STAIR-1 A= 0.081
1.2 w= 1.2
18 d= 18
3.50 m3
landing
2/ 1.2 l= 1.2
1 w= 1
0.25 d= 0.25
0.60 m3
3/ 0.073 STAIR-2 A= 0.073
1.4 w= 1.4
20 d= 20
6.13 m3
landing
3/ 1.2 l= 1.2
3 w= 3
0.2 d= 0.2
2.16 m3
beam
3/ 4.6 l= 4.6
0.25 w= 0.25
0.4 d= 0.4
1.38 m3
2/ 0.135 STAIR-3 A= 0.135
1.3 w= 1.3
20 d= 20
7.02 m3
20.79 m3 GRAND TOTAL
c) In 20cm thick suspended floor slab

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

1st floor
1/ 537.57 main block A= 537.57
1 w= 1
0.2 d= 0.2
107.51 m3
1/ 176.14 laboratory block A= 176.14
1 w= 1
0.2 d= 0.2
35.23 m3
ddt void
-1 / 4.15 l= 4.15
4.7 w= 4.7
0.2 d= 0.2
- 3.90 m3
ddt stair-1
-1 / 5.76 l= 5.76
1.2 w= 1.2
0.2 d= 0.2
- 1.38 m3
ddt stair-2
-1 / 3 l= 3
3.8 w= 3.8
0.2 d= 0.2
- 2.28 m3
2nd floor
1/ 523.83 main block A= 523.83
1 w= 1
0.2 d= 0.2
104.77 m3
1/ 180.32 laboratory block A= 180.32
1 w= 1
0.2 d= 0.2
36.06 m3
ddt stair-1
-1 / 5.76 l= 5.76
1.2 w= 1.2
0.2 d= 0.2
- 1.38 m3
ddt stair-2

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

-1 / 3 l= 3
3.8 w= 3.8
0.2 d= 0.2
- 2.28 m3
lower roof floor
1/ 546.1 main block A= 546.1
1 w= 1
0.2 d= 0.2
109.22 m3
roof floor
1/ 6.4 main block l= 6.4
15.4 w= 15.4
0.2 d= 0.2
19.71 m3
401.28 m3 GRAND TOTAL
FORMWORK
a) In elevation columns.
total column
40x40
53 / 3 l= 3
1.6 w= 1.6
1 d= 1
254.40 m2
25x30
8/ 3 l= 3
1.1 w= 1.1
1 d= 1
30x30
36 / 3 l= 3
1.2 w= 1.2
1 d= 1
129.60 m2
dia.40
13 / 3 l= 3
3.14 w= 3.14
0.4 d= 0.4
48.98 m2
432.98 m2 GRAND TOTAL
b) In floor beam.

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

B11
4/ 1.55 l= 1.55
0.85 w= 0.85
1 d= 1
5.27 m2
B13
2/ 2.6 l= 2.6
0.85 w= 0.85
1 d= 1
4.42 m2
B14
2/ 5.6 l= 5.6
0.85 w= 0.85
1 d= 1
9.52 m2
B14-1
1/ 11.73 l= 11.73
0.9 w= 0.9
1 d= 1
10.56 m2
B14-2
1/ 15.65 l= 15.65
0.9 w= 0.9
1 d= 1
14.09 m2
B14-3
1/ 7.97 l= 7.97
0.9 w= 0.9
1 d= 1
7.17 m2
B14-4
1/ 11.3 l= 11.3
0.9 w= 0.9
1 d= 1
10.17 m2
PB
1/ 12.1 l= 12.1
0.8 w= 0.8
1 d= 1

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

9.68 m2
PB
7/ 1.35 l= 1.35
0.8 w= 0.8
1 d= 1
7.56 m2
RB7
2/ 15.4 l= 15.4
0.9 w= 0.9
1 d= 1
27.72 m2
RB8
2/ 6.4 l= 6.4
0.9 w= 0.9
1 d= 1
11.52 m2
RB9
2/ 6.4 l= 6.4
0.5 w= 0.5
1 d= 1
6.40 m2

124.08 m2 GRAND TOTAL


c) In 20cm thick suspended floor slab
1st floor
1/ 537.57 main block bottom A= 537.57
1 w= 1
1 d= 1
537.57 m2
1/ 116.72 main block sides l= 116.72
0.2 w= 0.2
1 d= 1
23.34 m2
1/ 176.14 laboratory block bottom A= 176.14
1 w= 1
1 d= 1
176.14 m2
1/ 50.24 laboratory block sides 1= 50.24
0.2 w= 0.2

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

1 d= 1
10.05 m2
ddt void bottom
-1 / 4.15 l= 4.15
4.7 w= 4.7
1 d= 1
void sides
1/ 17.7 l= 17.7
0.2 w= 0.2
1 d= 1
- 19.51 m2
ddt stair-1 bottom
-1 / 5.76 l= 5.76
1.2 w= 1.2
1 d= 1
- 6.91 m2
stair-1 sides
1/ 13.92 l= 13.92
0.2 w= 0.2
1 d= 1
2.78 m2
ddt stair-2 bottom
-1 / 3 l= 3
3.8 w= 3.8
1 d= 1
- 11.40 m2
stair-2 sides
1/ 13.6 l= 13.6
0.2 w= 0.2
1 d= 1
2.72 m2
2nd floor
1/ 523.83 main block bottom A= 523.83
1 w= 1
1 d= 1
523.83 m2
1/ 120.15 main block sides A= 120.15
0.2 w= 0.2
1 d= 1

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

24.03 m2
1/ 180.32 laboratory block bottom A= 180.32
1 w= 1
1 d= 1
180.32 m2
1/ 52.82 laboratory block sides A= 52.82
0.2 w= 0.2
1 d= 1
10.56 m2
ddt stair-1 bottom
-1 / 5.76 l= 5.76
1.2 w= 1.2
1 d= 1
- 6.91 m2
stair-1 sidea
1/ 13.92 l= 13.92
0.2 w= 0.2
1 d= 1
2.78 m2
ddt stair-2 bottom
-1 / 3 l= 3
3.8 w= 3.8
1 d= 1
- 11.40 m2
stair-2 sides
1/ 13.6 l= 13.6
0.2 w= 0.2
1 d= 1
2.72 m2
lower roof floor
1/ 546.1 main block bottom A= 546.1
1 w= 1
1 d= 1
546.10 m2
1/ 115.72 main block sides 1= 115.72
0.2 w= 0.2
1 d= 1
23.14 m2
roof floor

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

1/ 6.4 main block bottom l= 6.4


15.4 w= 15.4
1 d= 1
98.56 m2
1/ 43.6 main block sides l= 43.6
1 w= 1
0.2 d= 0.2
8.72 m2

2,117.23 m2 GRAND TOTAL


d) In staircase and landing
2/ 0.417 STAIR-1 A= 0.417
1 w= 1
18 d= 18
15.01 m2
landing
2/ 1.2 l= 1.2
1 w= 1
1 d= 1
2.40 m2
2/ 4.4 l= 4.4
0.2 w= 0.2
1 d= 1
1.76 m2
3/ 0.538 STAIR-2 A= 0.538
1 w= 1
20 d= 20
32.28 m2
landing
3/ 1.2 l= 1.2
3 w= 3
1 d= 1
10.80 m2
3/ 8.4 l= 8.4
1 w= 1
0.2 d= 0.2
5.04 m2
beam

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

3/ 4.6 l= 4.6
0.85 w= 0.85
1 d= 1
11.73 m2
2/ 5.145 STAIR-3 A= 5.145
1 w= 1
20 d= 20
205.80 m2
284.82 m2 GRAND TOTAL

2.00 BLOCK WORK


20 cm thick
all floor
1/ 396.84 A= 396.84
1 w= 1
396.84 m2
1/ 429.94 A= 429.94
1 w= 1
429.94 m2
1/ 305.188 A= 305.188
1 w= 1
305.19 m2
1/ 116.36 A= 116.36
1 w= 1
116.36 m2
1,248.33 m2 GRAND TOTAL
15 cm thick
all floor
1/ 296.7 A= 296.7
1 w= 1
296.70 m2
1/ 157.32 A= 157.32
1 w= 1
157.32 m2
1/ 463.2 A= 463.2
1 w= 1

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

463.20 m2
917.22 m2 GRAND TOTAL
10 cm thick
all floor
1/ 4.1 1= 4.1
3 w= 3
12.30 m2
1/ 4.1 l= 4.1
3 w= 3
12.30 m2
24.60 m2 GRAND TOTAL
14
groind
32
30
140
10
25
9.6
9
9
12
17.7
33
17.2
9.6
23
22
25
mez
64.5
f floor
72
36
33.2
58.032
23
18
10

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

33.4
30
23
16
29
6
16
20
52.8
typ;ical.
104
44
38
38
34
46
52.8
22
10
34
38
26
24
40
66
66
29.76
34
12
22
16.8

1790.592
wall tiles
4/ 5.33 l= 5.33
1.8 w= 1.8
38.38 m2
2/ 7.1 l= 7.1
1.8 w= 1.8

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

25.56 m2
4/ 3.1 l= 3.1
1.8 w= 1.8
22.32 m2
4/ 7.1 l= 7.1
1.8 w= 1.8
51.12 m2
4/ 24.3 l= 24.3
1.8 w= 1.8
174.96 m2
2/ 24.3 l= 24.3
1.8 w= 1.8
87.48 m2
16 / 4.88 l= 4.88
1.8 w= 1.8
140.54 m2
8/ 5.9 l= 5.9
2.7 w= 2.7
127.44 m2
667.80

STEEL STRUCTURAL WORK


/ rhs 80x80x4 mm
bootom 20.77
vertical 2.2
diagonal 20
internal vertical 100
internal diagonal
total length of single truss 142.97
for 3 truss= 1143.76
1/ 1143.76 total length 1143.76
10.048 unit weight 10.048
11,492.50 kg
11,492.50 kg GRAND TOTAL
rhs 40x40x3 mm

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

diagonal 54
/ internal vertical 37.8
internal diagonal 46.8
total length of single truss 138.6
for 3 truss= 1108.8
1/ 1108.8 total length 1108.8
3.768 unit weight 3.768
4,177.96 kg
4,177.96 kg GRAND TOTAL
plate size 80x80x6mm(6 mm thick quality fillet weld)
Detail A &B 32
for 3 truss= 96
plate size 40x20x6mm (6 mm thick quality fillet weld)
Detail C 32
for 3 truss= 96
plate size 35x20x6mm (6 mm thick quality fillet weld)
Detail D 32
for 3 truss= 96
1/ plate size 35x12x6mm (6 mm thick quality fillet weld)
Detail F 64
for 3 truss= 192
triangular plate size 35x20x6mm (6 mm thick quality fillet weld)
Detail G 64
for 3 truss= 192
trapezoidal plate size 35x20x6mm (6 mm thick quality fillet weld)
Detail A &B 32
for 3 truss= 96
J-bolt
1/ Detail A &B 32
for 3 truss= 96
lattice purline
size 40x40x3 mm
l= 104.18
length of purline for 1 row 0
number of purline 14
1/ tottal length of single purline 1458.52
1/ 1458.52 total length 1458.52
3.768 unit weight 3.768
5,495.70 kg

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

size 40x40x3 mm
l= 8
length of purline for 1 row 56
number of purline 24
1/ tottal length of single purline 1344
1/ 1344 total length 1344
2.512 unit weight 2.512
3,376.13 kg
8,871.83 kg GRAND TOTAL
1/ angle iron
at connection of purline 12
number of truss 8
total number of plate 96
for 3 truss= 288
ф12 l=100 mmbolt
at connection of purline 12
1/ number of truss 8
total number of plate 96
2 bolt/plate 192
for 3 truss= 576

1/

1/

1/

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


steel reinforcement
project
client

drg dia length of mo. Of


location shape
no. (mm) bar dimension c/c bar mem
MAIN BUILDING
ELEVATION COLUMN COLUMN
ground floor
C-1=12 pcs 16 3.84 10
C-2=4pcs 16 3.84 10
C-3=7pcs 16 3.84 10
C-4=1pcs 16 3.84 10
` C-5=4pcs 14 3.84 6
` C-6=2pcs 14 3.84 8
` C-7=2pcs 14 3.84 8
` C-8=3pcs 14 3.84 8
` C-9=2pcs 14 3.84 8
` C-10=1pcs 14 3.84 8
` C-11=1pcs 14 3.84 6
` 16 1.2 2
STIRRUP SEC 1-1 8 1.5 3 0.18 18
STIRRUP SEC 4-4 8 1 3 0.18 18
STIRRUP SEC 6-6 8 1.26 3 0.18 18

first floor
C-1=12 pcs 16 3.84 10
C-2=4pcs 16 3.84 10
C-3=7pcs 16 3.84 8
C-4=1pcs 16 3.84 8
` C-5=4pcs 14 3.533 6
` C-6=2pcs 14 3.533 6
` C-7=2pcs 14 3.533 6
` C-8=3pcs 14 3.533 6
` C-9=2pcs 14 3.533 8
` C-10=1pcs 14 3.533 8
` C-11=1pcs 14 3.533 6
STIRRUP SEC 1-1 8 1.5 3 0.18 18
STIRRUP SEC 3-3 8 1.1 3 0.18 18
STIRRUP SEC 4-4 8 1 3 0.18 18
STIRRUP SEC 6-6 8 1.26 3 0.18 18

second floor
C-1=12 pcs 16 3.533 10
C-2=4pcs 16 3.533 8
C-3=7pcs 16 3.84 8
C-4=1pcs 16 3.84 8
STIRRUP SEC 2-2 8 1.1 3 0.18 18
STIRRUP SEC 3-3 8 1.1 3 0.18 18
STIRRUP SEC 6-6 8 1.26 3 0.18 18

Roof floor
C-3=7pcs 16 3.533 8
C-4=1pcs 16 3.533 8
STIRRUP SEC 2-2 8 1.1 2.4 0.18 14

FLOOR BEAMS
B1 top 16 20.17 4
16 9.02 6
16 1.85 5
bot 14 17.674 9
st 10 1.7 16.7 0.2 85
st 10 1 16.7 0.2 85
B2 top 16 20.32 4
16 6.8 6
16 4.25 5
bot 14 17.7 9
st 10 1.7 16.65 0.2 84
st 10 1 16.65 0.2 84
B3 top 16 41.09 4
16 22.62 6
16 2.22 5
bot 14 40.85 9
st 10 2.5 38.2 0.2 192
10 1.4 38.2 0.2 192
B4 top 16 31.02 4
16 28.816 6
16 1.85 5
16 2.22 7
bot 14 12 9
14 21.82 7
14 5.568 8
st 10 2.5 36.7 0.2 185
st 10 1.4 36.7 0.2 185
B5 top 16 9.72 4
16 2.35 5
16 3.723 6
16 4 7
bot 16 6.673 10
bot 14 6.57 8
st 10 2.5 12.35 0.2 63
st 10 1.4 12.35 0.2 63
B6 top 16 13.443 6
16 6.35 7
bot 16 13.243 10
st 10 2.5 12.35 0.2 63
st 10 1.4 12.35 0.2 63
B7 top 16 13.443 6
16 6.35 7
bot 16 13.243 10
st 10 1.7 12.35 0.2 63
st 10 1 12.35 0.2 63
B8 top 16 13.443 4
16 6.35 6
bot 14 13.243 8
st 10 1.7 12.35 0.2 63
st 10 1 12.35 0.2 63
B9 top 16 13.443 8
16 6.35 10
bot 16 13.243 12
st 10 2.5 12.35 0.2 63
st 10 1.4 12.35 0.2 63
B10 top 16 23.32 4
16 12.63 6
bot 14 22.57 8
st 10 1.7 21.77 0.2 110
st 10 1 21.77 0.2 110
B11 top 16 2.6 5
bottom 16 1.9 4
st 8 1.2 1.9 0.15 14
B13 top 16 4.05 4
bottom 16 3.35 4
st 8 1.2 3.35 0.18 20
B14-1 top 14 6.85 3
bottom 14 6.35 3
st 8 1 6.35 0.18 36
B14-2 top 14 12.26 3
bottom 14 11.76 3
st 8 1 11.76 0.18 66
B14-3 top 14 17.12 3
bottom 14 15.82 3
st 8 1 15.82 0.18 89
PB-1 top 14 2.225 3
bottom 12 1.725 3
st 8 0.9 1.725 0.8 3
PB-2 top 14 13.6 3
bottom 12 13.1 3
st 8 0.9 1.725 0.8 3

roof beam
RB1 top 14 31.04 4
bot 14 17.674 6
st 10 1.5 16.7 0.2 85
st 10 1 16.7 0.2 85
RB2 top 14 31.37 4
bot 14 17.7 6
st 10 1.5 16.65 0.2 84
st 10 1 16.65 0.2 84
RB3 top 16 45.53 4
16 13.6 6
16 6.8 5
bot 14 40.85 8
st 10 1.7 38.2 0.2 192
10 1 38.2 0.2 192
RB4 top 14 56.06 4
14 8.416 6
bot 14 28.478 6
14 10.91 7
st 10 1.7 36.7 0.2 185
st 10 1 36.7 0.2 185
RB5 top 16 15.793 4
16 4 6
bot 14 13.243 7
st 10 1.7 12.35 0.2 63
st 10 1 12.35 0.2 63
RB6 top 16 13.443 6
16 6.35 7
bot 14 13.243 12
st 10 1.7 12.35 0.2 63
st 10 1 12.35 0.2 63
RB7 top 14 16.84 2
14 6.8 1
bot 12 16.156 2
st 10 1.8 15.35 0.2 78
st 10 1.2 15.35 0.2 78
RB8 top 14 7.04 3
bot 14 6.34 3
st 10 1.8 6.35 0.2 33
st 10 1.2 6.35 0.2 33
RB9 top 14 7.04 3
bot 14 6.35 4
st 10 1.8 6.35 0.2 33
st 10 1.2 6.35 0.2 33

FLOOR SLAB
1st floor slab
1 10 35.483 5 0.2 26
2 10 7.54 3.7 0.2 20
3 10 6.255 2.9 0.2 15
4 10 12 1.3 0.2 8
5 10 9.45 2.1 0.2 12
6 10 5.3 1.2 0.2 7
7 10 42.2 5 0.2 26
8 10 2.87 0.9 0.2 6
9 10 10.29 0.9 0.2 6
10 10 16.966 1 0.2 6
11 10 16.04 1.7 0.2 10
12 10 8.84 4.875 0.2 25
13 10 8 2.98 0.2 16
14 10 4.23 1.879 0.2 10
15 10 17.68 4.95 0.2 26
16 10 8.825 1.75 0.2 10
17 10 16.825 3.85 0.2 20
18 10 15.6 7.6 0.2 39
19 10 8.825 1.25 0.2 7
20 10 3.785 3.025 0.2 16
21 10 2.75 7.2 0.2 37
22 10 16.505 7.725 0.2 40
23 10 15.565 4 0.2 21
24 10 10.06 1.3 0.2 8
25 10 3.672 15.342 0.2 78
26 10 17.65 4.9 0.2 26
27 10 7.78 4.864 0.2 25
28 10 8.825 4.9 0.2 26
29 10 5.03 1.55 0.2 9
30 12 3.625 14.15 0.2 72
31 12 2.89 7.15 0.2 37
32 12 3.525 5.25 0.2 27
33 10 4 27.45 0.2 138
34 12 3.225 10.25 0.2 52
35 12 3.24 16.8 0.2 85
36 10 4 4.9 0.2 26
37 12 3.4 5.375 0.2 28
38 12 3.4 1.25 0.2 7
39 10 3.4 1.25 0.2 7
40 10 3.4 5 0.2 26
41 12 3.495 7.15 0.2 37
42 10 1.84 5 0.2 26
43 10 1.84 1.2 0.2 7
44 10 1.597 1.7 0.2 10
45 10 3.307 1.7 0.2 10
46 10 2.85 1.7 0.2 10
47 10 4 4.95 0.2 26
48 12 3.67 3.54 0.2 19
49 12 0.81 1.55 0.2 9
2nd floor slab
1 10 35.483 5 0.2 26
2 10 7.54 3.7 0.2 20
3 10 6.255 2.9 0.2 15
4 10 12 1.3 0.2 8
5 10 3.45 1.3 0.2 8
6 10 5.3 1.2 0.2 7
7 10 42.2 5 0.2 26
8 10 2.87 0.9 0.2 6
9 10 10.29 0.9 0.2 6
10 10 16.966 1 0.2 6
11 10 10.61 1.7 0.2 10
12 10 8.84 4.875 0.2 25
13 10 10.94 2.825 0.2 15
14 10 8.07 4.875 0.2 25
15 10 8.84 4.95 0.2 26
16 10 8.825 1.75 0.2 10
17 10 16.825 3.85 0.2 20
18 10 15.6 7.6 0.2 39
19 10 8.825 1.25 0.2 7
20 10 3.785 3.025 0.2 16
21 10 2.75 7.2 0.2 37
22 10 16.505 7.725 0.2 40
23 10 15.565 4 0.2 21
24 10 10.06 1.3 0.2 8
25 10 3.672 10.16 0.2 52
26 10 8.825 4.9 0.2 26
27 10 7.78 4.864 0.2 25
28 10 10.908 4.9 0.2 26
29 12 3.625 14.15 0.2 72
30 12 3.525 5.25 0.2 27
31 10 4 27.45 0.2 138
32 12 3.225 10.25 0.2 52
33 12 3.24 16.8 0.2 85
34 10 4 4.9 0.2 26
35 12 3.4 5.375 0.2 28
36 12 3.4 1.25 0.2 7
37 10 3.4 1.25 0.2 7
38 10 3.4 5 0.2 26
39 12 3.495 7.15 0.2 37
40 10 1.84 5 0.2 26
41 10 1.84 1.2 0.2 7
42 10 1.597 1.7 0.2 10
43 10 3.307 1.7 0.2 10
44 10 2.85 1.7 0.2 10
45 10 4 4.95 0.2 26
Lower & Upper roof slab
1 10 46.058 5 0.2 26
2 10 12 1.3 0.2 8
3 10 3.45 1.3 0.2 8
4 10 5.3 1.2 0.2 7
5 10 41.551 5.15 0.2 27
6 10 2.87 0.9 0.2 6
7 10 10.29 0.9 0.2 6
8 10 16.966 1 0.2 6
9 10 19.39 5.83 0.2 30
10 10 16.425 1.6 0.2 9
11 10 16.825 4.1 0.2 21
12 10 15.6 4.3 0.2 22
13 10 8.825 4.5 0.2 24
14 10 8.825 1.5 0.2 9
15 10 16.505 4.1 0.2 21
16 10 16.505 4.3 0.2 22
17 10 15.565 4.15 0.2 22
18 10 9.8 1.5 0.2 9
19 12 3.4 5.15 0.2 27
20 10 3.4 5.15 0.2 27
21 12 1.84 5.15 0.2 27
22 12 3.495 5.15 0.2 27
23 10 3.4 5.83 0.2 30
24 12 3.625 15.35 0.2 78
25 12 3.525 5.4 0.2 28
26 10 4 29.75 0.2 150
27 12 3.225 10.35 0.2 53
28 12 3.24 16.85 0.2 85

stair case
stair case-1 16 5.51 1.2 0.15 9
16 5.18 1.2 0.15 9
16 1.88 1.2 0.15 9
16 2.3 1.2 0.15 9
8 0.9 1.2 0.2 7
8 7.96 1.2 0.2 7
8 1.2 23
STB1 top 16 2.5 4
bot 14 1.8 3
8 1.2 1.8 0.18 11
stair case-2
14 5.392 1.4 0.15 10
14 2.328 1.4 0.15 10
14 2 1.4 0.15 10
14 1.371 1.4 0.15 10
8 0.56 1.4 0.2 8
8 1.4 4.042 0.2 21
8 1.4 15
STB2 top 16 6.1 3
bot 14 5.4 3
8 1.2 5.4 0.2 28
stair case-3
16 9.043 1.3 0.13 11
16 3.103 1.3 0.13 11
16 2.8 1.3 0.13 11
16 3.74 1.3 0.13 11
16 3.32 1.3 0.13 11
8 0.88 1.3 0.2 8
10 1.3 7.174 0.2 37
10 1.3 20
STB3 top 16 2.75 4
bot 16 1.95 5
8 1.3 1.95 0.18 12
TOTAL LENGTH
UNIT WEIGHT
TOTAL WEIGHT
TOTAL WEIGHT WITH 5%
no.memb total no. total length in meters for each dia.
er Bars 6 8 10 12 14 16 20

12 120 460.8
4 40 153.6
7 70 268.8
1 10 38.4
4 24 92.16
2 16 61.44
2 16 61.44
3 24 92.16
2 16 61.44
1 8 30.72
1 6 23.04
1 2 2.4
30 540 810
4 72 72
5 90 113.4

12 120 460.8
4 40 153.6
7 56 215.04
1 8 30.72
4 24 84.792
2 12 42.396
2 12 42.396
3 18 63.594
2 16 56.528
1 8 28.264
1 6 21.198
24 432 648
6 108 118.8
4 72 72
5 90 113.4

12 120 423.96
4 32 113.056
7 56 215.04
1 8 30.72
19 342 376.2
4 72 79.2
1 18 22.68
7 56 197.848
1 8 28.264
8 112 123.2
0
0
2 8 161.36
2 12 108.24
2 10 18.5
2 18 318.132
2 170 289
2 170 170
2 8 162.56
2 12 81.6
2 10 42.5
2 18 318.6
2 168 285.6
2 168 168
2 8 328.72
2 12 271.44
2 10 22.2
2 18 735.3
2 384 960
2 384 537.6
2 8 248.16
2 12 345.792
2 10 18.5
2 14 31.08
2 18 216
2 14 305.48
2 16 89.088
2 370 925
2 370 518
4 16 155.52
4 20 47
4 24 89.352
4 28 112
4 40 266.92
4 32 210.24
4 252 630
4 252 352.8
10 60 806.58
10 70 444.5
10 100 1324.3
10 630 1575
10 630 882
4 24 322.632
4 28 177.8
4 40 529.72
4 252 428.4
4 252 252
2 8 107.544
2 12 76.2
2 16 211.888
2 126 214.2
2 126 126
4 32 430.176
4 40 254
4 48 635.664
4 252 630
4 252 352.8
2 8 186.56
2 12 151.56
2 16 361.12
2 220 374
2 220 220
4 20 52
4 16 30.4
4 56 67.2
4 16 64.8
4 16 53.6
4 80 96
2 6 41.1
2 6 38.1
2 72 72
2 6 73.56
2 6 70.56
2 132 132
2 6 102.72
2 6 94.92
2 178 178
7 21 46.725
7 21
7 21 18.9
1 3 40.8
1 3
1 3 2.7

1 4 124.16
1 6 106.044
1 85 127.5
1 85 85
1 4 125.48
1 6 106.2
1 84 126
1 84 84
1 4 182.12
1 6 81.6
1 5 34
1 8 326.8
1 192 326.4
1 192 192
1 4 224.24
1 6 50.496
1 6 170.868
1 7 76.37
1 185 314.5
1 185 185
2 8 126.344
2 12 48
2 14 185.402
2 126 214.2
2 126 126
6 36 483.948
6 42 266.7
6 72 953.496
6 378 642.6
6 378 378
2 4 67.36
2 2 13.6
2 4 64.624
2 156 280.8
2 156 187.2
2 6 42.24
2 6 38.04
2 66 118.8
2 66 79.2
2 6 42.24
2 8 50.8
2 66 118.8
2 66 79.2

1 26 922.558
1 20 150.8
1 15 93.825
1 8 96
1 12 113.4
1 7 37.1
1 26 1097.2
1 6 17.22
1 6 61.74
1 6 101.796
1 10 160.4
1 25 221
1 16 128
1 10 42.3
1 26 459.68
1 10 88.25
1 20 336.5
1 39 608.4
1 7 61.775
1 16 60.56
1 37 101.75
1 40 660.2
1 21 326.865
1 8 80.48
1 78 286.416
1 26 458.9
1 25 194.5
1 26 229.45
1 9 45.27
1 72 261
1 37 106.93
1 27 95.175
1 138 552
1 52 167.7
1 85 275.4
3 78 312
1 28 95.2
1 7 23.8
1 7 23.8
10 260 884
1 37 129.315
1 26 47.84
1 7 12.88
1 10 15.97
1 10 33.07
1 10 28.5
2 52 208
1 19 69.73
1 9 7.29

1 26 922.558
1 20 150.8
1 15 93.825
1 8 96
1 8 27.6
1 7 37.1
1 26 1097.2
1 6 17.22
1 6 61.74
1 6 101.796
1 10 106.1
1 25 221
1 15 164.1
1 25 201.75
2 52 459.68
1 10 88.25
1 20 336.5
1 39 608.4
1 7 61.775
1 16 60.56
1 37 101.75
1 40 660.2
1 21 326.865
1 8 80.48
1 52 190.944
2 52 458.9
1 25 194.5
1 26 283.608
1 72 261
1 27 95.175
1 138 552
1 52 167.7
1 85 275.4
3 78 312
1 28 95.2
1 7 23.8
1 7 23.8
10 260 884
1 37 129.315
1 26 47.84
1 7 12.88
1 10 15.97
1 10 33.07
1 10 28.5
2 52 208

1 26 1197.508
1 8 96
1 8 27.6
1 7 37.1
1 27 1121.877
1 6 17.22
1 6 61.74
1 6 101.796
1 30 581.7
1 9 147.825
1 21 353.325
2 44 686.4
1 24 211.8
1 9 79.425
1 21 346.605
1 22 363.11
1 22 342.43
1 9 88.2
2 54 183.6
12 324 1101.6
1 27 49.68
1 27 94.365
2 60 204
1 78 282.75
1 28 98.7
1 150 600
1 53 170.925
1 85 275.4

2 18 99.18
2 18 93.24
2 18 33.84
2 18 41.4
36 252 226.8
2 14 111.44
2 46 55.2
2 8 20
2 6 10.8
2 22 26.4

6 60 323.52
6 60 139.68
6 60 120
6 60 82.26
60 480 268.8
6 126 176.4
6 90 126
3 9 54.9
3 9 48.6
3 84 100.8

1 11 99.473
1 11 34.133
1 11 30.8
1 11 41.14
1 11 36.52
20 160 140.8
1 37 48.1
1 20
1 4 11
1 5 9.75
1 12 15.6
TOTAL LENGTH 0 4363.92 40060.617 3499.174 7464.6 12780.616 0
UNIT WEIGHT 0.222 0.395 0.617 0.888 1.209 1.58 2.467
TOTAL WEIGHT 0 1723.7484 24717.40069 3107.266512 9024.7 20193.3733 0
TOTAL WEIGHT WITH 5% 0 1896.1232 27189.14076 3417.993163 9927.17 22212.7106 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
#REF!
24
0
3.55392
0
0
TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

A.SUB STRUCTURE
1.0 EARTH WORK
MAIN HOUSE
1.1 site clearing
1/ 506.67 MAIN BLOCK 1 506.55
1 w= 1
506.67 m2
1/ 180.4 LABORATORY BLOCK 1 180.4
1 w= 1
180.40 m2
1/ 214.94 SITE l= 214.98
1 w= 1
214.94 m2
902.01 m2 GRAND TOTAL
1.2 bulk excavation to depth 150 cm
1/ 686.95 l= 686.95
1 w= 1
1.5 d= 1.5
1,030.43 m3
1,030.43 m3 GRAND TOTAL
1.3 bulk excavation to depth 320 cm
1/ 686.95 l= 686.95
1 w= 1
0 d= 0
- m3
- m3 GRAND TOTAL
1.4 pit excavation not exceeding 150 cm
F1=300x300x65=7 pcs
7/ 3.5 l= 3.5
3.5 w= 3.5
1.35 d= 1.35
115.76 m3
F2=260x260x50=2 pcs
2/ 3.1 l= 3.1
3.1 w= 3.1
1.35 d= 1.35
25.95 m3
F3=240x240x40=17 pcs
17 / 2.9 l= 2.9
2.9 w= 2.9
1.35 d= 1.35
193.01 m3
F4=200x200x40=5 pcs
5/ 2.5 l= 2.5
2.5 w= 2.5
1.35 d= 1.35
42.19 m3
F5=100x100x30=2 pcs
2/ 1.5 l= 1.5

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

1.5 w= 1.5
1.35 d= 1.35
F6=160x160x30=4 pcs
4/ 2.1 l= 2.1
2.1 w= 2.1
1.35 d= 1.35
23.81 m3
400.72 m3 GRAND TOTAL
1.5 dito but not exceeding 300 cm
F1=300x300x65=7 pcs
7/ 3.5 l= 3.5
3.5 w= 3.5
0 d= 0
- m3
F2=260x260x50=2 pcs
2/ 3.1 l= 3.1
3.1 w= 3.1
0 d= 0
- m3
F3=240x240x40=17 pcs
17 / 2.9 l= 2.9
2.9 w= 2.9
0 d= 0
- m3
F4=200x200x40=5 pcs
5/ 2.5 l= 2.5
2.5 w= 2.5
0 d= 0
- m3
F5=100x100x30=2 pcs
2/ 1.5 l= 1.5
1.5 w= 1.5
0 d= 0
F6=160x160x30=4 pcs
4/ 2.1 l= 2.1
2.1 w= 2.1
0 d= 0
- m3
- m3 GRAND TOTAL
1.6 Trench excavation
MAIN BLOCK
1/ 113.04 l= 113.04
0.25 w= 0.25
1.5 d= 1.5
42.39 m3
LABORATORY BLOCK
1/ 58.2 l= 58.2
0.25 w= 0.25
1.5 d= 1.5
21.83 m3
64.22 m3 GRAND TOTAL
1.7 Back fill under foundation
volume of pit and trench
64.22 m3
400.72 m3

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

464.94 m3
ddt volume of footing
F1=300x300x65=7 pcs
-7 / 3 l= 3
3 w= 3
0.65 d= 0.65
- 40.95 m3
F2=260x260x50=2 pcs
-2 / 2.6 l= 2.6
2.6 w= 2.6
0.5 d= 0.5
- 6.76 m3
F3=240x240x40=17 pcs
-17 / 2.4 l= 2.4
2.4 w= 2.4
0.4 d= 0.4
- 39.17 m3
F4=200x200x40=5 pcs
-5 / 2 l= 2
2 w= 2
0.4 d= 0.4
- 8.00 m3
F5=100x100x30=2 pcs
-2 / 1 l= 1
1 w= 1
0.3 d= 0.3
- 0.60 m3
F6=160x160x30=4 pcs
-4 / 1.6 l= 1.6
1.6 w= 1.6
0.3 d= 0.3
- 3.07 m3
ddt foundation column
section=40x40
33 / -0.65 l= -0.65
0.4 w= 0.4
0.4 d= 0.4
- 3.43 m3
ddt foundation column
section=30x25
2/ -1 l= -1
0.3 w= 0.3
0.25 d= 0.25
- 0.15 m3
ddt volume of stone masonary main block
1/ 109.76 l= 109.76
0.5 w= 0.5
-1 d= -1
- 54.88 m3
ddt volume of stone masonary laboratory
1/ 55.38 l= 55.38
0.5 w= 0.5
-1 d= -1
- 27.69 m3
280.24 m3 GRAND TOTAL

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

1.8 ditto but for under hard core


1/ 180.4 volume of bulk 1= 180.4
1 LAB. BLOCK w= 1
1.15 d= 1.15
207.46 m3
1/ 506.55 MAIN BLOCK 1= 506.55
1 w= 1
1.15 d= 1.15
582.53 m3
789.99 m3 GRAND TOTAL
1.10 25 cm thick hard core
1/ 437.05 MAIN BLOCK 1= 437.05
1 w= 1
437.05 m2
1/ 151.04 l= 151.04
1 LAB. BLOCK w= 1
151.04 m2
588.09 m2 GRAND TOTAL
2.0 COCNCRETE WORK
a) lean concrete under footing
F1=300x300x65=7 pcs
7/ 3.05 l= 3.05
3.05 w= 3.05
1 d= 1
65.12 m2
F2=260x260x50=2 pcs
2/ 2.65 l= 2.65
2.65 w= 2.65
1 d= 1
14.05 m2
F3=240x240x40=17 pcs
17 / 2.45 l= 2.45
2.45 w= 2.45
1 d= 1
102.04 m2
F4=200x200x40=5 pcs
5/ 2.05 l= 2.05
2.05 w= 2.05
1 d= 1
21.01 m2
F5=100x100x30=2 pcs
2/ 1.05 l= 1.05
1.05 w= 1.05
1 d= 1
2.21 m2
F6=160x160x30=4 pcs
4/ 1.65 l= 1.65
1.65 w= 1.65
1 d= 1
10.89 m2
215.32 m2 GRAND TOTAL
b) grade beam
GB1
2/ 34.9 l= 34.9

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

0.25 w= 0.25
1 d= 1
17.45 m2
GB1'
1/ 33.95 l= 33.95
0.25 w= 0.25
1 d= 1
8.49 m2
GB2
8/ 11.2 l= 11.2
0.25 w= 0.25
1 d= 1
22.40 m2
GB3
1/ 74.02 l= 74.02
0.25 w= 0.25
1 d= 1
18.51 m2
GB4
2/ 11.2 l= 11.2
0.25 w= 0.25
1 d= 1
5.60 m2
GB5
1/ 14.53 l= 14.53
0.25 w= 0.25
1 d= 1
3.63 m2
GB6
1/ 5.6 l= 5.6
0.25 w= 0.25
1 d= 1
1.40 m2
GB7
2/ 13.8 l= 13.8
0.25 w= 0.25
1 d= 1
6.90 m2
GB8
1/ 5.6 l= 5.6
0.25 w= 0.25
1 d= 1
1.40 m2
85.78 m2 GRAND TOTAL
c) Under masonry wall
main block
1/ 109.76 l= 109.76
0.5 w= 0.5
1 d= 1
54.88 m2
laboratory block
1/ 72.42 l= 72.42
0.5 w= 0.5
1 d= 1
36.21 m2

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

91.09 m2 GRAND TOTAL


d) Under ground floor slab
main block
1/ 437.05 A= 437.05
1 d= 1
437.05 m2
laboratory block
1/ 151.04 A= 151.04
1 d= 1
151.04 m2
588.09 m2 GRAND TOTAL
2.02 C-25 concrete for
footing
F1=300x300x65=7 pcs
7/ 3 l= 3
3 w= 3
0.65 d= 0.65
40.95 m3
F2=260x260x50=2 pcs
2/ 2.6 l= 2.6
2.6 w= 2.6
0.5 d= 0.5
6.76 m3
F3=240x240x40=17 pcs
17 / 2.4 l= 2.4
2.4 w= 2.4
0.4 d= 0.4
39.17 m3
F4=200x200x40=5 pcs
5/ 2 l= 2
2 w= 2
0.4 d= 0.4
8.00 m3
F5=100x100x30=2 pcs
2/ 1 l= 1
1 w= 1
0.3 d= 0.3
0.60 m3
F6=160x160x30=4 pcs
4/ 1.6 l= 1.6
1.6 w= 1.6
0.3 d= 0.3
3.07 m3
98.55 m3 GRAND TOTAL
b) foundation column

foundation column on F1=40x40x215=7 pcs


7/ 0.4 l= 0.4
0.4 w= 0.4
2.15 d= 2.15
2.41 m3
foundation column on F2=40x40x230=2 pcs
2/ 0.4 l= 0.4

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

0.4 w= 0.4
2.3 d= 2.3
0.74 m3
foundation column on F3=40x40x240=17 pcs
17 / 0.4 l= 0.4
0.4 w= 0.4
2.4 d= 2.4
6.53 m3
foundation column on F4=40x40x240=5 pcs
5/ 0.4 l= 0.4
0.4 w= 0.4
2.4 d= 2.4
1.92 m3
foundation column on F5=30x25x250=2 pcs
2/ 0.3 l= 0.3
0.25 w= 0.25
2.5 d= 2.5
0.38 m3
foundation column on F6=40x40x250=4 pcs
4/ 0.4 l= 0.4
0.4 w= 0.4
2.5 d= 2.5
1.60 m3
13.58 m3 GRAND TOTAL
c) In grade beam
GB1
2/ 34.9 l= 34.9
0.25 w= 0.25
0.4 d= 0.4
6.98 m3
GB1'
1/ 33.95 l= 33.95
0.25 w= 0.25
0.4 d= 0.4
3.40 m3
GB2
8/ 11.2 l= 11.2
0.25 w= 0.25
0.4 d= 0.4
8.96 m3
GB3
1/ 74.02 l= 74.02
0.25 w= 0.25
0.4 d= 0.4
7.40 m3
GB4
2/ 11.2 l= 11.2

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

0.25 w= 0.25
0.4 d= 0.4
2.24 m3
GB5
1/ 14.53 l= 14.53
0.25 w= 0.25
0.4 d= 0.4
1.45 m3
GB6
1/ 5.6 l= 5.6
0.25 w= 0.25
0.4 d= 0.4
0.56 m3
GB7
2/ 13.8 l= 13.8
0.25 w= 0.25
0.4 d= 0.4
2.76 m3
GB8
1/ 5.6 l= 5.6
0.25 w= 0.25
0.4 d= 0.4
0.56 m3

34.31 m3 GRAND TOTAL


d) In 10cm thick ground floor slab
main block
1/ 437.05 A= 437.05
1 d= 1
437.05 m2
laboratory block
1/ 151.04 A= 151.04
1 d= 1
151.04 m2
588.09 m2 GRAND TOTAL

FORMWORK
a) In footing pad
F1=300x300x65=7 pcs
7/ 3 l= 3
4 w= 4
0.65 d= 0.65
54.60 m2
F2=260x260x50=2 pcs

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

2/ 2.6 l= 2.6
4 w= 4
0.5 d= 0.5
10.40 m2
F3=240x240x40=17 pcs
17 / 2.4 l= 2.4
4 w= 4
0.4 d= 0.4
65.28 m2
F4=200x200x40=5 pcs
5/ 2 l= 2
4 w= 4
0.4 d= 0.4
16.00 m2
F5=100x100x30=2 pcs
2/ 1 l= 1
4 w= 4
0.3 d= 0.3
2.40 m2
F6=160x160x30=4 pcs
4/ 1.6 l= 1.6
4 w= 4
0.3 d= 0.3
7.68 m2
156.36 m2 GRAND TOTAL
b) foundation column

foundation column on F1=40x40x215=7 pcs


7/ 0.4 l= 0.4
4 w= 4
2.15 d= 2.15
24.08 m2
foundation column on F2=40x40x230=2 pcs
2/ 0.4 l= 0.4
4 w= 4
2.3 d= 2.3
7.36 m2
foundation column on F3=40x40x240=17 pcs
17 / 0.4 l= 0.4
4 w= 4
2.4 d= 2.4
65.28 m2
foundation column on F4=40x40x240=5 pcs
5/ 0.4 l= 0.4
4 w= 4
2.4 d= 2.4
19.20 m2
foundation column on F5=30x25x250=2 pcs
2/ 0.55 l= 0.55
2 w= 2
2.5 d= 2.5
5.50 m2
foundation column on F6=40x40x250=4 pcs
4/ 0.4 l= 0.4
4 w= 4

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

2.5 d= 2.5
16.00 m2
137.42 m2 GRAND TOTAL
c) In grade beam
GB1
2/ 35.05 l= 35.05
1 w= 1
0.8 d= 0.8
56.08 m2
GB1'
1/ 33.95 l= 33.95
1 w= 1
0.8 d= 0.8
27.16 m2
GB2
8/ 11.2 l= 11.2
1 w= 1
0.8 d= 0.8
71.68 m2
GB3
1/ 74.02 l= 74.02
1 w= 1
0.8 d= 0.8
59.22 m2
GB4
2/ 11.2 l= 11.2
1 w= 1
0.8 d= 0.8
17.92 m2
GB5
1/ 14.53 l= 14.53
1 w= 1
0.8 d= 0.8
11.62 m2
GB6
1/ 5.6 l= 5.6
1 w= 1
0.8 d= 0.8
4.48 m2
GB7
2/ 13.8 l= 13.8
1 w= 1

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

0.8 d= 0.8
22.08 m2
GB8
1/ 5.6 l= 5.6
1 w= 1
0.8 d= 0.8
4.48 m2

274.72 m2 GRAND TOTAL

3.0 masonary wall


1/ 113.04 l= 113.04
0.5 w= 0.5
1 d= 1
56.52 m3
1/ 58.2 l= 58.2
0.5 w= 0.5
1 d= 1
29.10 m3
85.62 m3 GRAND TOTAL

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


TAKE OFF SHEET
PROJECT G+2 OFFICE BUILDING
CLIENT SRS MPEFAEPB
LOCATION JIGJIGA, ETHIOPIA

contractor supervisor consultant


steel reinforcement
project
client

drg dia length of no. Of bar


location shape
no. (mm) bar dimension c/c mem
MAIN BUILDING
FOOTING
F1=300x300x65=7 pcs 16 4 2.9 0.15 40
F2=260x260x50=2 pcs 16 3.3 2.5 0.16 34
F3=240x240x40=17 pcs 14 2.9 2.3 0.14 34
F4=200x200x40=5 pcs 14 2.5 1.9 0.18 24
F5=100x100x30=2 pcs 12 1.3 0.9 0.2 12
F6=160x160x30=4 pcs 12 1.9 1.5 0.15 22

FOUNDATION COLUMN
C-1=12 pcs 16 3.922 12
C-2=4pcs 16 3.922 10
C-3=7pcs 16 3.922 12
C-4=1pcs 16 3.922 10
` C-5=2pcs 14 3.922 6
` C-6=2pcs 14 3.922 8
` C-7=2pcs 14 3.922 8
` C-8=3pcs 14 3.922 8
` C-9=2pcs 14 3.922 8
` C-10=1pcs 14 3.922 10
` C-11=1pcs 14 3.922 8
STIRRUP SEC 1-1 8 1.5 2.4 0.18 14
STIRRUP SEC 4-4 8 1 2.4 0.18 14
STIRRUP SEC 6-6 8 1.26 2.4 0.18 14

grade beams
GB1 top 14 41.29 2
14 25.02 1
bot 12 40.85 2
8 1.2 38.2 0.18 213
GB1' top 14 39.79 2
14 22.62 1
bot 12 39.39 2
8 1.2 37.1 0.18 207
GB2 top 14 13.84 2
14 6.35 2
bot 12 13.24 2
8 1.2 12.35 0.18 70
GB3 top 12 75.25 3
bot 12 75.25 2
8 1.2 74.02 0.18 412
GB4 top 14 13.84 2
14 6.35 2
bot 12 13.24 2
8 1.2 12.35 0.18 70
GB5 top 14 15.9 2
14 6.35 2
bot 12 15.2 2
8 1.2 14.5 0.18 82
GB6 top 14 7.04 2
bot 12 6.34 2
8 1 6.34 0.18 36
GB7 top 14 20.08 2
14 9.35 1
bot 12 19.92 2
8 1.2 18.35 0.18 103
GB8 top 14 6.92 2
14 6.35 1
bot 12 6.57 2
8 1.2 6.35 0.18 36
10cm thick ground floor slab
1 8 5.83 4.75 0.25 20
1 8 4.75 5.83 0.25 24
1 8 1 16.38 0.25 67
1 8 16.38 1 0.25 5
1 8 5.83 1.38 0.25 7
1 8 1.38 5.83 0.25 24
1 8 0.95 4.75 0.25 20
1 8 4.75 0.95 0.25 5
1 8 1.78 4.75 0.25 20
1 8 4.75 1.78 0.25 8
1 8 5.83 1.55 0.25 7
1 8 1.55 5.83 0.25 24
1 8 5.83 1.15 0.25 6
1 8 1.15 5.83 0.25 24
1 8 5.83 5.78 0.25 24
1 8 5.78 5.83 0.25 24
1 8 4.99 5.83 0.25 24
1 8 4.99 5.83 0.25 24
1 8 2.83 5.78 0.25 24
1 8 5.78 2.83 0.25 12
1 8 1.25 6.11 0.25 25
1 8 6.11 1.25 0.25 6

TOTAL LENGTH
UNIT WEIGHT
TOTAL WEIGHT
TOTAL WEIGHT WITH 5%
no.memb total no. total length in meters for each dia.
er Bars 6 8 10 12 14 16 20

0
7 280 1120
2 68 224.4
17 578 1676.2
5 120 300
2 24 31.2
4 88 167.2

0
12 144 564.768
4 40 156.88
7 84 329.448
1 10 39.22
2 12 47.064
2 16 62.752
2 16 62.752
3 24 94.128
2 16 62.752
1 10 39.22
1 8 31.376
30 420 630
2 28 28
5 70 88.2

2 4 165.16
2 2 50.04
2 4 163.4
2 426 511.2
1 2 79.58
1 1 22.62
1 2 78.78
1 207 248.4
8 16 221.44
8 16 101.6
8 16 211.84
8 560 672
1 3 225.75
1 2 150.5
1 412 494.4
2 4 55.36
2 4 25.4
2 4 52.96
2 140 168
1 2 31.8
1 2 12.7
1 2 30.4
1 82 98.4
1 2 14.08
1 2 12.68
1 36 36
2 4 80.32
2 2 18.7
2 4 79.68
2 206 247.2
1 2 13.84
1 1 6.35
1 2 13.14
1 36 43.2

14 280 1632.4
14 336 1596
1 67 67
1 5 81.9
1 7 40.81
1 24 33.12
1 20 19
1 5 23.75
1 20 35.6
1 8 38
1 7 40.81
1 24 37.2
1 6 34.98
1 24 27.6
3 72 419.76
3 72 416.16
1 24 119.76
1 24 119.76
1 24 67.92
1 12 69.36
1 25 31.25
1 6 36.66

TOTAL LENGTH 8253.8 0 1217.53 3275.23 2434.716 0


UNIT WEIGHT 0.395 0.617 0.888 1.209 1.58 2.467
TOTAL WEIGHT 3260.251 0 1081.16664 3959.76 3846.85128 0
TOTAL WEIGHT WITH 5% 3260.251 0 1081.16664 3959.76 3846.85128 0
0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
1 0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
#REF!