You are on page 1of 51

Residence Building Project

Specification and Bill of Quantities Structural Work


For Ato Molla Beri

B+G+2 Residential Building St.

SUMMARY OF PRICES

1.A SUB STRUCTURE

1.A.1 Excavation and Earth work Birr 85,395.62


1.A.2 Concrete Work Birr 78,233.75
1.A.3 Sundry Work Birr 3,450.00
1.A.4 Masonry Works Birr 18,321.20
Sub Total Birr 185,400.56

1.B SUPER STRUCTURE

1.B.1 Concrete Work Birr 259,440.65


1.B.2 Block Works Birr
1.B.3 Roofing and Cladding Birr
1.B.4 Steel Structure Birr
1.B.5 Metal Work Birr
1.B.6 Joinery Birr
1.B.7 Finishing Birr
1.B.8 Glazing Birr
1.B.9 Painting Birr
1.B.10 Electrical Work Birr
1.B.11 Sanitary and Mechanical Work Birr
1.B.12 Miscellaneous Work Birr
Sub Total Birr 259,440.65
Total Sub & Super One Unit Birr 444,841.21

Belete Tamiru Consulting Architects and Engineers 1 of 51


Residence Building Project
Specification and Bill of Quantities Structural Work
For Ato Molla Beri

ITEM DESCRIPTION OF WORK UNIT QUANT UNIT TOTAL


PRICE PRICE

1.A . SUB – STRUCTURE

1.A.1. Excavation and Earth Work

1.A.1.1 Clear site of all rubbish, bushes, shrubs, undergrowth hedges small
trees, stubs, roots, etc. m2 - 235.00 -

1.A.1.2 Trees more than 80mm in diameter shall be Cut or up rooted, racked
and disposed off or deposited as directed by the engineer. Price
shall include filling holes with suitable material and disposal. No - 235.00 -

1.A.1.3 Site clearing to remove top soil to an average depth of 20cm starting
from N.G.L. m2 132.00 25.00 3,300.00

1.A.1.4 Bulk excavation over the site to reduce ground level up to an


average depth of 0.00-150cm from stripped ground level in ordinary
soil excavation. m3 - 110.00 -
-
1.A.1.5 Ditto but from 150cm -300cm from striped ground level. m3 - 120.00 -

1.A.1.6 Ditto but from 300cm -450cm from striped ground level. m3 - 140.00 -

1.A.1.7 Excavate for trench masonry foundation for entrance stair, retaing
wall, perpherial wall to a depth not exceeding 150cms starting from
stripped ground level in ordinary soil. m3 62.59 145.00 9,075.84

1.A.1.8 Excavate for isolated foundation footing to a depth not exceeding


150cms starting from stripped ground level in in ordinary soil. m3 104.53 145.00 15,156.85

1.A.1.9 Ditto but from 150cm -300cm from striped ground level. m3 35.71 150.00 5,356.13

1.A.1.13 Fill over excavated up to the bottom level of the lean concrete under
ground hard core with satisfactory soil (Selected Material)
conforming to ASTM D 2487 soil classification groups GW, GP, GM,
SW, SP, and SM, or a combination of these group symbols; free of
rock or gravel larger than 3 inches (75 mm) in any dimension, debris,
waste, frozen materials, vegetation, and other deleterious matter and
a swell potential of less than 3%. m3 176.36 60.00 10,581.66

1.A.1.15 Ditto as above item , but around isolated foundation


footings. m3 121.40 65.00 7,891.23

1.A.1.17 Redig from spoil heap and cart away surplus excavated materials to
a distance not exceeding 5km.from site. m3 298.00 95.00 28,309.84

Belete Tamiru Consulting Architects and Engineers 2 of 51


Residence Building Project
Specification and Bill of Quantities Structural Work
For Ato Molla Beri

1.A.1.18 Ditto as the above item but to surpluses excavated


material of item No.1.A.1.01 m3 95.00 -

1.A.1.19 Hard basaltic or equivalent stone hardcore well rolled consolidated


and blinded with crushed stone to a finished thickness of 25cm for
ground floor m2 104.07 55.00 5,724.07

1.A.1.21 Allow lump sum amount of dewatering from excavation pit. ls - 3,700.00 -

Total carried to summary 85,395.62

1.A.2. Concrete Work

1.A.2.1 5cms.thick lean concrete quality in class C-5 with minimum cement
content of 150kg /m3.

A) Under footing pad m2 34.34 45.00 1,545.30

C) Under grade beam m2 25.12 45.00 1,130.49

D) Under masonry foundation wall m2 52.16 45.00 2,347.20

G) under floor slab on grade m2 117.32 45.00 5,279.49

1.A.2.5 R. Concrete quality in class C-25 in 100mm thick slab on grade. m2 117.32 80.00 9,385.76

1.A.2.5 Reinforced concrete in class C-25, with minimum cement content of


360kg/m3 filled in into formwork and vibrated around steel
reinforcement, steel and formwork measured separately:-

A. In concrete pad

A.1 Isolated footing pad m3 15.36 560.00 8,598.80

B. In Foundation Column

B.1. From footing pad - ground floor m3 2.64 560.00 1,478.40

C. In Beam

C..2 Ground floor beam m3 6.70 520.00 3,483.58

1.A.2.7 Provide cut & fix in position sawn zigba wood or equivalent
formwork. Form work shall achieve fai face concrete finish on all
visible parts.

Belete Tamiru Consulting Architects and Engineers 3 of 51


Residence Building Project
Specification and Bill of Quantities Structural Work
For Ato Molla Beri

A. For concrete pad

A.1 Isolated footing pad m2 79.76 180.00 14,356.80

B. For Foundation Column

B.1. From footing pad - ground floor m2 34.32 180.00 6,177.60

C. For Beam

C..2 Ground floor beam m2 66.99 180.00 12,058.56

1.A.2.8 Supply& fix in position Steel reinforcement according to structural


drawing; Price includes cutting bending, placing in position and tying
wires.

A )f 8MM kg 874.63 3.50 3,061.19

B) f 10MM kg 172.16 3.50 602.56

C) f 12MM kg 666.12 3.50 2,331.44

D) f 14MM kg 1,169.03 3.50 4,091.59

E) f 16MM kg 658.57 3.50 2,304.99

Belete Tamiru Consulting Architects and Engineers 4 of 51


Residence Building Project
Specification and Bill of Quantities Structural Work
For Ato Molla Beri

Total carried to summary 78,233.75

1.A.3. Sundry Work

1.A.3.1 Construction joints shall be filled with 10mm thick & 100mm wide
chip wood both sides painted with bitumen between basement beam
and basement slab. ml 150.00 23.00 3,450.00

Total carried to summary 3,450.00

Belete Tamiru Consulting Architects and Engineers 5 of 51


Residence Building Project
Specification and Bill of Quantities Structural Work
For Ato Molla Beri

1.A.4. Masonry Work

1.A.4.1 Construct an average 60cm thick hard trachytic or equivalent stone


masonry retaining wall bedded in cement sand mortar ratio 1:3

A. Below Natural Ground Floor Level (BNGL) m3 1,500.00 -

1.A.4.1 Construct 50cm thick hard trachytic or equivalent stone masonry


foundation wall for perhepherial bedded in cement sand mortar ratio
1:3

A. Below Natural Ground Floor Level (BNGL) m3 29.34 340.00 9,975.60

1.A.4.2 Ditto but for above natural ground level m3 26.08 320.00 8,345.60

Total carried to summary 18,321.20

1.B . SUPER – STRUCTURE

1.B.1. Concrete Work

Belete Tamiru Consulting Architects and Engineers 6 of 51


Residence Building Project
Specification and Bill of Quantities Structural Work
For Ato Molla Beri

1.B.1.1 Reinforced concrete in class C-25, with minimum cement content of


360kg/m3 filled in into formwork and vibrated around steel
reinforcement steel and formwork measured.

A. In Elevation Column

A. 1 From ground -1st floor m3 3.60 520.00 1,872.00

A.2 From 1st -2nd floor m3 3.24 540.00 1,749.60

A. 3. From 2nd- 3rd floor m3 3.24 540.00 1,749.60

A. 3. From 3rd- roof floor m3 2.70 560.00 1,512.00

A. 3. From roof- upper roof floor m3 0.58 580.00 334.08

B. In floor beam

B.1 1st floor beam m3 5.62 540.00 3,034.15

B.2 2nd floor beam m3 5.62 540.00 3,034.15

B.3 3rd floor beam m3 5.62 560.00 3,146.53

B.4. roof floor beam m3 5.31 580.00 3,081.42

B.5. Water tanker beam m3 1.34 620.00 828.32

B.6. Pergolla m3 2.44 620.00 1,512.80

C. In 150mm thick solid floor slab

C.1 1st floor slab m2 103.97 98.00 10,189.06

C.2 2nd floor slab m2 103.97 105.00 10,916.85

C.3 3rd floor slab m2 103.97 105.00 10,916.85

C.4 Roof tanker floor slab m2 31.00 115.00 3,565.00

D. In stair case

D. 1 From ground -1st floor m3 3.75 520.00 1,950.21

D. 2 From 1st -3rd floor m3 7.25 540.00 3,916.77

E. In 100mm thick gutter

Belete Tamiru Consulting Architects and Engineers 7 of 51


Residence Building Project
Specification and Bill of Quantities Structural Work
For Ato Molla Beri

E.1 at 2nd & roof floor level m2 928.00 -

1.B.1.2 Provide cut & fix in position sawn zigba wood or equivalent
formwork.

A. For Elevation Column

A. 1 From ground -1st floor m2 46.80 180.00 8,424.00

A.2 From 1st -2nd floor m2 42.12 180.00 7,581.60

A.3. From 2nd - 3rd floor m2 42.12 180.00 7,581.60

A.3. From 3rd - roof floor m2 35.10 200.00 7,020.00

A.4. From roof - upper roof floor m2 7.84 200.00 1,568.00

B. For beam

B.1 1st floor beam m2 57.99 160.00 9,278.36

B.2 2nd floor beam m2 57.99 160.00 9,278.36

B. 3 3rd floor beam m2 57.99 180.00 10,438.16

B.4 Roof floor beam m2 66.41 200.00 13,282.00

B. 4 Water tanker beam m2 15.03 200.00 3,006.00

B. 5 pergolla beam m2 27.45 200.00 5,490.00

C. For solid floor slab

C.1 1st floor slab m2 103.97 160.00 16,635.20

C.2 2nd floor slab m2 103.97 160.00 16,635.20

C.3 3rd floor slab m2 103.97 180.00 18,714.60

C.3 Roof tanker floor slab m2 31.00 200.00 6,200.00

D. For stair case

DI. 1 From ground -1st floor m2 20.08 160.00 3,212.80

D. 2 From 1st -3rd floor m2 39.28 180.00 7,069.68

Belete Tamiru Consulting Architects and Engineers 8 of 51


Residence Building Project
Specification and Bill of Quantities Structural Work
For Ato Molla Beri

E. In 100mm thick gutter

E.1 at 2nd & roof floor level m2 580.00 -

1.B.1.4 Supply and fix in position Steel reinforcement according to ST.


drawing; Price includes cutting bending, placing in position and tying
wires.

A )f 8MM kg 4,338.29 3.50 15,184.02

B) f 10MM kg 1,014.68 3.50 3,551.38

C) f 12MM kg 1,406.15 3.50 4,921.51

D) f 14MM kg 3,679.61 3.50 12,878.65

E) f 16MM kg 1,611.60 3.50 5,640.58

F) f 20MM kg 725.59 3.50 2,539.55

Total carried to summary 259,440.65

Belete Tamiru Consulting Architects and Engineers 9 of 51


G+3-RESIDENTIAL BUILDING
SUB- STRUCTURE
ITEM TYPE SIZE No
Exavation & Earthwork

1.01 site clear

11.00 12.00 1.00 1.00

Total

1.02 Top soil removal avg. depth 20cm

11.00 12.00 1.00 1.00

Total

1.04.Trench Excavation for masonry wall

along axis X diretion


11.20 0.80 1.20 1.00
5.00 0.80 1.20 1.00
8.40 0.80 1.20 2.00
along axis Ydiretion
9.10 0.80 1.20 2.00
2.00 0.80 1.20 2.00
10.00 0.80 1.20 1.00
Entrance
Total

1.05.Footing excavation

up to 1.5m F1 2.10 2.10 2.00 2.00


avg depth =2.5m SF1 2.10 2.10 2.00 1.00
1.85 1.90 2.00 1.00
3.00 0.65 2.00 1.00
SF2 2.10 2.10 2.00 1.00
1.75 1.70 2.00 1.00
2.75 0.65 2.00 1.00

10 of 51
G+3-RESIDENTIAL BUILDING
SUB- STRUCTURE
ITEM TYPE SIZE No
SF3 1.70 1.70 2.00 1.00
1.90 1.65 2.00 1.00
1.25 0.65 2.00 1.00
SFB4
axis A 1.70 1.75 2.00 1.00
1.50 1.50 2.00 1.00
1.50 0.50 2.00 1.00
axis B 2.10 2.10 2.00 1.00
1.80 2.00 2.00 1.00
0.90 0.65 2.00 1.00
strap beam X3 2.60 0.65 2.00 1.00
X4 2.60 0.50 2.00 1.00

Total

1.06.Footing excavation

From 1.5m - 3.00m F1 2.10 2.10 0.70 2.00


avg depth =2.5m SF1 2.10 2.10 0.70 1.00
1.85 1.90 0.70 1.00
3.00 0.65 0.70 1.00
SF2 2.10 2.10 0.70 1.00
1.75 1.70 0.70 1.00
2.75 0.65 0.70 1.00
SF3 1.70 1.70 0.70 1.00
1.90 1.65 0.70 1.00
1.25 0.65 0.70 1.00
SFB4
axis A 1.70 1.75 0.65 1.00
1.50 1.50 0.65 1.00
1.50 0.50 0.65 1.00
axis B 2.10 2.10 0.65 1.00
1.80 2.00 0.65 1.00
0.90 0.65 0.65 1.00
strap beam X3 2.60 0.65 0.65 1.00
X4 2.60 0.50 0.65 1.00

11 of 51
G+3-RESIDENTIAL BUILDING
SUB- STRUCTURE
ITEM TYPE SIZE No
Total

1.07.Back fill under ground floor slab


avg depth 30cm
4.76 5.78 1.50 1.00
2.70 5.10 1.50 1.00
3.60 4.80 1.50 1.00
3.06 4.75 1.50 1.00
2.70 5.00 1.50 1.00
6.20 5.00 1.50 1.00

Total

1.8.Back fill around footing pad

F1 2.10 2.10 2.70 2.00


SF1 2.10 2.10 2.70 1.00
1.85 1.90 2.70 1.00
3.00 0.65 2.70 1.00
SF2 2.10 2.10 2.70 1.00
1.75 1.70 2.70 1.00
2.75 0.65 2.70 1.00
SF3 1.70 1.70 2.70 1.00
1.90 1.65 2.70 1.00
1.25 0.65 2.70 1.00
SFB4 - -
1.70 1.75 2.70 1.00
1.50 1.50 2.70 1.00
1.50 0.50 2.70 1.00
2.10 2.10 2.70 1.00
1.80 2.00 2.70 1.00
0.90 0.65 2.70 1.00
2.60 0.65 2.70 1.00
2.60 0.50 2.70 1.00

ddt lean concrete


F1 1.70 1.70 0.05 2.00

12 of 51
G+3-RESIDENTIAL BUILDING
SUB- STRUCTURE
ITEM TYPE SIZE No
SF1 1.70 1.70 0.05 1.00
1.70 1.50 0.05 1.00
3.00 0.35 0.05 1.00
SF2 1.70 1.70 0.05 1.00
1.60 1.30 0.05 1.00
2.75 0.35 0.05 1.00
SF3 1.30 1.30 0.05 1.00
1.50 1.50 0.05 1.00
1.25 0.35 0.05 1.00
SFB4
1.30 1.60 0.05 1.00
1.30 1.30 0.05 1.00
1.50 0.35 0.05 1.00
1.70 1.70 0.05 1.00
1.70 1.60 0.05 1.00
0.90 0.35 0.05 1.00
- 2.20 0.35 0.05 1.00
2.20 0.35 0.05 1.00
ddt concret pad
F1 1.60 1.60 0.50 2.00
SF1 1.60 1.60 0.50 1.00
1.60 1.40 0.50 1.00
3.00 0.25 0.70 1.00
SF2 1.60 1.60 0.50 1.00
1.50 1.20 0.50 1.00
2.75 0.25 0.70 1.00
SF3 1.20 1.20 0.50 1.00
1.40 1.40 0.50 1.00
1.25 0.25 0.70 1.00
SFB4 -
1.20 1.50 0.50 1.00
- 1.20 1.20 0.50 1.00
- 1.50 0.25 0.70 1.00
1.60 1.60 0.50 1.00
1.60 1.50 0.50 1.00
0.90 0.25 0.70 1.00
2.20 0.25 0.70 1.00

13 of 51
G+3-RESIDENTIAL BUILDING
SUB- STRUCTURE
ITEM TYPE SIZE No
2.20 0.25 0.70 1.00

ddt foundation column


C1 2.20 0.25 0.40 1.00
C1' 2.20 0.25 0.40 1.00
C2 2.20 0.25 0.40 3.00
C2' 2.20 0.25 0.40 1.00
C2'' 2.20 0.25 0.40 1.00
C3 2.20 0.25 0.40 2.00
C4 2.20 0.25 0.40 1.00
C4' 2.20 0.25 0.40 1.00
C4'' 2.20 0.25 0.40 1.00

1.9. Cart away

Item 1.02
Item 1.04
Item 1.05
Item 1.06

Total

1.10. Ditto but for item 1.01


Item 1.01 132.00 1.00 0.20 1.00

Total

1.11. Hard Core under ground slab

4.76 5.78 1.00 1.00


2.70 5.10 1.00 1.00
3.60 4.80 1.00 1.00
3.06 4.75 1.00 1.00
6.20 5.00 1.00 1.00

14 of 51
G+3-RESIDENTIAL BUILDING
SUB- STRUCTURE
ITEM TYPE SIZE No
Total

15 of 51
G+3-RESIDENTIAL BUILDING
SUB- STRUCTURE
ITEM TYPE SIZE No
1.12. Dewatering

3. Sundry Item

3.01 Construction Joint


1*10 cm depth 4.76 1.00 1.00 2.00
2.70 1.00 1.00 2.00
3.60 1.00 1.00 2.00
3.06 1.00 1.00 2.00
6.20 1.00 1.00 2.00
5.78 1.00 1.00 2.00
5.10 1.00 1.00 2.00
4.80 1.00 1.00 2.00
4.75 1.00 1.00 2.00
5.00 1.00 1.00 2.00

Total

4.01 Below Natural ground level


along axis X diretion
11.20 0.50 0.90 1.00
5.00 0.50 0.90 1.00
8.40 0.50 0.90 2.00
along axis Ydiretion
9.10 0.50 0.90 2.00
2.00 0.50 0.90 2.00
10.00 0.50 0.90 1.00

4.02.above Natural ground level


along axis X diretion
11.20 0.50 0.80 1.00
5.00 0.50 0.80 1.00
8.40 0.50 0.80 2.00
along axis Ydiretion
9.10 0.50 0.80 2.00
2.00 0.50 0.80 2.00

16 of 51
G+3-RESIDENTIAL BUILDING
SUB- STRUCTURE
ITEM TYPE SIZE No
10.00 0.50 0.80 1.00

Total

17 of 51
M3

132.00

132.00

132.00

132.00

10.75
4.80
16.13

17.47
3.84
9.60

62.59

17.64
8.82
7.03
3.90
8.82
5.95
3.58

18 of 51
M3
5.78
6.27
1.63

5.95
4.50
1.50
8.82
7.20
1.17
3.38 0.4
2.60

104.53

2.15
6.17
3.09
2.46
1.37
3.09
2.08
1.25
2.02
2.19
0.57

1.93
1.46
0.49
2.87
2.34
0.38
1.10
0.85

19 of 51
M3
35.71
111.33

41.23
20.66
25.92
21.80
20.25
46.50

176.36

23.81
11.91
9.49
5.27
11.91
8.03
4.83
7.80
8.46
2.19
-
8.03
6.08
2.03
11.91
9.72
1.58
4.56
3.51

(0.29)

20 of 51
M3
(0.14)
(0.13)
(0.05)
(0.14)
(0.10)
(0.05)
(0.08)
(0.11)
(0.02)

(0.10)
(0.08)
(0.03)
(0.14)
(0.14)
(0.02)
(0.04)
(0.04)

(2.56)
(1.28)
(1.12)
(0.53)
(1.28)
(0.90)
(0.48)
(0.72)
(0.98)
(0.22)
-
(0.90)
(0.72)
(0.26)
(1.28)
(1.20)
(0.16)
(0.39)

21 of 51
M3
(0.39)

(0.22)
(0.22)
(0.66)
(0.22)
(0.22)
(0.44)
(0.22)
(0.22)
(0.22)

121.40

26.40
62.59
104.53
35.71

298.00

26.40

26.40

27.49
13.77
17.28
14.54
31.00

22 of 51
M3
104.07

23 of 51
M3

9.52
5.40
7.20
6.12
12.40
11.55
10.20
9.60
9.50
10.00

91.49

-
5.04
2.25
7.56
-
8.19
1.80
4.50

29.34

-
4.48
2.00
6.72
-
7.28
1.60

24 of 51
M3
4.00

26.08

25 of 51
1. CONCRETE WORK
G+2-RESIDENTIAL BUILDING
CONCRETE Total Size
Type Size No
2.1. Lean Concrete

A. Under Footing pad

F1 1.70 1.70 1.00 2.00 5.78


SF1 1.70 1.70 1.00 1.00 2.89
- 1.70 1.50 1.00 1.00 2.55
- 3.00 0.35 1.00 1.00 1.05
SF2 1.70 1.70 1.00 1.00 2.89
- 1.60 1.30 1.00 1.00 2.08
- 2.75 0.35 1.00 1.00 0.96
SF3 1.30 1.30 1.00 1.00 1.69
- 1.50 1.50 1.00 1.00 2.25
- 1.25 0.35 1.00 1.00 0.44
SFB4 - - 1.00 - -
- 1.30 1.60 1.00 1.00 2.08
- 1.30 1.30 1.00 1.00 1.69
- 1.50 0.35 1.00 1.00 0.53
- 1.70 1.70 1.00 1.00 2.89
- 1.70 1.60 1.00 1.00 2.72
- 0.90 0.35 1.00 1.00 0.32
- 2.20 0.35 1.00 1.00 0.77
- 2.20 0.35 1.00 1.00 0.77

Total 34.34 m2

B Under grade floor beam

26 of 51
1. CONCRETE WORK
G+2-RESIDENTIAL BUILDING
GB1 6.60 0.30 1.00 1.00 1.98
GB2 11.20 0.30 1.00 1.00 3.36
GB3 11.36 0.30 1.00 1.00 3.41
GB4 9.04 0.30 1.00 2.00 5.42
GB5 11.00 0.30 1.00 1.00 3.30
GB6 10.50 0.30 1.00 1.00 3.15
GB7 10.00 0.30 1.00 1.00 3.00
GB8 5.00 0.30 1.00 1.00 1.50

Total 25.12 m2

C. Unde rmasonry wall

along axis X diretion


11.20 0.80 1.00 1.00 8.96
5.00 0.80 1.00 1.00 4.00
8.40 0.80 1.00 2.00 13.44

along axis Ydiretion 9.10 0.80 1.00 2.00 14.56


2.00 0.80 1.00 2.00 3.20
10.00 0.80 1.00 1.00 8.00

Total 52.16
D. Under ground floor slab

4.76 5.78 1.00 1.00 27.49


2.70 5.10 1.00 1.00 13.77
3.60 4.80 1.00 1.00 17.28
3.06 4.75 1.00 1.00 14.54
27 of 51
1. CONCRETE WORK
G+2-RESIDENTIAL BUILDING
6.20 5.00 1.00 1.00 31.00
2.00 2.00 1.00 1.00 4.00
5.78 1.60 1.00 1.00 9.25

Total 117.32 m2
2.2 .100mm thick solid slab

A. Ground floor
4.76 5.78 1.00 1.00 27.49
2.70 5.10 1.00 1.00 13.77
3.60 4.80 1.00 1.00 17.28
3.06 4.75 1.00 1.00 14.54
6.20 5.00 1.00 1.00 31.00
2.00 2.00 1.00 1.00 4.00
5.78 1.60 1.00 1.00 9.25

Total 117.32 m2

2.3. C -25 CONCRETE

A.Foundation pad

F1 1.60 1.60 0.50 2.00 2.56 6.40


SF1 1.60 1.60 0.50 1.00 1.28 6.40
- 1.60 1.40 0.50 1.00 1.12 6.00
- 3.00 0.25 0.70 1.00 0.53 11.40
SF2 1.60 1.60 0.50 1.00 1.28 6.40
- 1.50 1.20 0.50 1.00 0.90 5.40
- 2.75 0.25 0.70 1.00 0.48 10.60
28 of 51
1. CONCRETE WORK
G+2-RESIDENTIAL BUILDING
SF3 1.20 1.20 0.50 1.00 0.72 4.80
- 1.40 1.40 0.50 1.00 0.98 5.60
- 1.25 0.25 0.70 1.00 0.22 7.00
SFB4 - - - - - -
- 1.20 1.50 0.50 1.00 0.90 5.40
- 1.20 1.20 0.50 1.00 0.72 4.80
- 1.50 0.25 0.70 1.00 0.26 7.20
- 1.60 1.60 0.50 1.00 1.28 6.40
- 1.60 1.50 0.50 1.00 1.20 6.20
- 0.90 0.25 0.70 1.00 0.16 7.00
- 2.20 0.25 0.70 1.00 0.39 10.60
- 2.20 0.25 0.70 1.00 0.39 10.00

Total 15.36 m3

2.3 C -30 CONCRETE

A.Foundation column

From -2.5 - +0.00


C1 2.20 0.25 0.40 1.00 0.22 1.30
C1' 2.20 0.25 0.40 1.00 0.22 1.30
C2 2.20 0.25 0.40 3.00 0.66 1.30
C2' 2.20 0.25 0.40 1.00 0.22 1.30
C2'' 2.20 0.25 0.40 1.00 0.22 1.30
C3 2.20 0.25 0.40 2.00 0.44 1.30
C4 2.20 0.25 0.40 1.00 0.22 1.30
C4' 2.20 0.25 0.40 1.00 0.22 1.30
C4'' 2.20 0.25 0.40 1.00 0.22 1.30

29 of 51
1. CONCRETE WORK
G+2-RESIDENTIAL BUILDING

2.64 m3

2.3 C -25 CONCRETE

A. Beam

A.2. Ground floor beam


GB1 6.60 0.40 0.20 1.00 0.53 0.80
GB2 11.20 0.40 0.20 1.00 0.90 0.80
GB3 11.36 0.40 0.20 1.00 0.91 0.80
GB4 9.04 0.40 0.20 2.00 1.45 0.80
GB5 11.00 0.40 0.20 1.00 0.88 0.80
GB6 10.50 0.40 0.20 1.00 0.84 0.80
GB7 10.00 0.40 0.20 1.00 0.80 0.80
GB8 5.00 0.40 0.20 1.00 0.40 0.80

Total 6.70 m3

30 of 51
Total

31 of 51
32 of 51
6.40
3.20
3.00
7.98
3.20
2.70
7.42
33 of 51
2.40
2.80
4.90
-
2.70
2.40
5.04
3.20
3.10
4.90
7.42
7.00

79.76 m2

2.86
2.86
8.58
2.86
2.86
5.72
2.86
2.86
2.86

34 of 51
34.32 m2

5.28
8.96
9.09
14.46
8.80
8.40
8.00
4.00

66.99 m2

35 of 51
1. CONCRETE WORK
G+3-RESIDENTIAL BUILDING
CONCRETE FORM WORK
1.1. C-30 Concrete

A. Elevation Column

From +0.0 - + 3.4


C1 3.00 0.25 0.40 1.00 0.30 1.30 3.90
C1' 3.00 0.25 0.40 1.00 0.30 1.30 3.90
C2 3.00 0.25 0.40 3.00 0.90 1.30 11.70
C2' 3.00 0.25 0.40 1.00 0.30 1.30 3.90
C2'' 3.00 0.25 0.40 1.00 0.30 1.30 3.90
C3 3.00 0.25 0.40 2.00 0.60 1.30 7.80
C4 3.00 0.25 0.40 1.00 0.30 1.30 3.90
C4' 3.00 0.25 0.40 1.00 0.30 1.30 3.90
C4'' 3.00 0.25 0.40 1.00 0.30 1.30 3.90

3.60 m3 46.80

From + 3.4 - +6.46


C1 2.70 0.25 0.40 1.00 0.27 1.30 3.51
C1' 2.70 0.25 0.40 1.00 0.27 1.30 3.51
C2 2.70 0.25 0.40 3.00 0.81 1.30 10.53
C2' 2.70 0.25 0.40 1.00 0.27 1.30 3.51
C2'' 2.70 0.25 0.40 1.00 0.27 1.30 3.51
C3 2.70 0.25 0.40 2.00 0.54 1.30 7.02
C4 2.70 0.25 0.40 1.00 0.27 1.30 3.51
C4' 2.70 0.25 0.40 1.00 0.27 1.30 3.51
C4'' 2.70 0.25 0.40 1.00 0.27 1.30 3.51

3.24 m3 42.12

36 of 51
1. CONCRETE WORK
G+3-RESIDENTIAL BUILDING
CONCRETE FORM WORK

From +6.46 - +9.52


C1 2.70 0.25 0.40 1.00 0.27 1.30 3.51
C1' 2.70 0.25 0.40 1.00 0.27 1.30 3.51
C2 2.70 0.25 0.40 3.00 0.81 1.30 10.53
C2' 2.70 0.25 0.40 1.00 0.27 1.30 3.51
C2'' 2.70 0.25 0.40 1.00 0.27 1.30 3.51
C3 2.70 0.25 0.40 2.00 0.54 1.30 7.02
C4 2.70 0.25 0.40 1.00 0.27 1.30 3.51
C4' 2.70 0.25 0.40 1.00 0.27 1.30 3.51
C4'' 2.70 0.25 0.40 1.00 0.27 1.30 3.51

3.24 m3 42.12

From +9.52 - +12.58


C1 2.70 0.25 0.40 1.00 0.27 1.30 3.51
C1' 2.70 0.25 0.40 1.00 0.27 1.30 3.51
C2 2.70 0.25 0.40 3.00 0.81 1.30 10.53
C2' 2.70 0.25 0.40 1.00 0.27 1.30 3.51
C3 2.70 0.25 0.40 2.00 0.54 1.30 7.02
C4 2.70 0.25 0.40 1.00 0.27 1.30 3.51
C4' 2.70 0.25 0.40 1.00 0.27 1.30 3.51

2.70 m3 35.10

From +12.58 - 14.58


C1' 1.60 0.25 0.40 1.00 0.16 1.30 2.08
C2' 1.60 0.25 0.40 1.00 0.16 1.30 2.08
C4' 1.60 0.25 0.40 1.00 0.16 1.30 2.08
37 of 51
1. CONCRETE WORK
G+3-RESIDENTIAL BUILDING
CONCRETE FORM WORK
C5 1.60 0.20 0.30 1.00 0.10 1.00 1.60

0.58 m3 7.84

1.2. C-25 Concrete

A . BEAM

1st floor

FFB1 6.60 0.40 0.20 1.00 0.53 0.85 5.61


FFB2 11.20 0.40 0.20 1.00 0.90 0.85 9.52
FFB3 3.00 0.40 0.20 1.00 0.24 0.85 2.55
FFB4 4.00 0.40 0.20 1.00 0.32 0.85 3.40
FFB5 5.00 0.40 0.20 1.00 0.40 0.85 4.25
FFB6 9.04 0.40 0.20 1.00 0.72 0.85 7.68
FFB7 11.00 0.40 0.20 1.00 0.88 0.70 7.70
FFB8 5.40 0.40 0.20 1.00 0.43 0.70 3.78
FFB9 10.00 0.40 0.20 1.00 0.80 0.85 8.50
FFB10 5.00 0.40 0.20 1.00 0.40 1.00 5.00

5.62 m3 57.99

2nd floor

FFB1 6.60 0.40 0.20 1.00 0.53 0.85 5.61


FFB2 11.20 0.40 0.20 1.00 0.90 0.85 9.52
FFB3 3.00 0.40 0.20 1.00 0.24 0.85 2.55

38 of 51
1. CONCRETE WORK
G+3-RESIDENTIAL BUILDING
CONCRETE FORM WORK
FFB4 4.00 0.40 0.20 1.00 0.32 0.85 3.40
FFB5 5.00 0.40 0.20 1.00 0.40 0.85 4.25
FFB6 9.04 0.40 0.20 1.00 0.72 0.85 7.68
FFB7 11.00 0.40 0.20 1.00 0.88 0.70 7.70
FFB8 5.40 0.40 0.20 1.00 0.43 0.70 3.78
FFB9 10.00 0.40 0.20 1.00 0.80 0.85 8.50
FFB10 5.00 0.40 0.20 1.00 0.40 1.00 5.00

5.62 m3 57.99
3rd floor

FFB1 6.60 0.40 0.20 1.00 0.53 0.85 5.61


FFB2 11.20 0.40 0.20 1.00 0.90 0.85 9.52
FFB3 3.00 0.40 0.20 1.00 0.24 0.85 2.55
FFB4 4.00 0.40 0.20 1.00 0.32 0.85 3.40
FFB5 5.00 0.40 0.20 1.00 0.40 0.85 4.25
FFB6 9.04 0.40 0.20 1.00 0.72 0.85 7.68
FFB7 11.00 0.40 0.20 1.00 0.88 0.70 7.70
FFB8 5.40 0.40 0.20 1.00 0.43 0.70 3.78
FFB9 10.00 0.40 0.20 1.00 0.80 0.85 8.50
FFB10 5.00 0.40 0.20 1.00 0.40 1.00 5.00

5.62 m3 57.99
roof floor beam
RFB1 5.00 0.40 0.20 1.00 0.40 1.00 5.00
RFB2 12.75 0.40 0.20 1.00 1.02 1.00 12.75
RFB3 4.00 0.40 0.20 1.00 0.32 1.00 4.00
RFB4 5.00 0.40 0.20 1.00 0.40 1.00 5.00

39 of 51
1. CONCRETE WORK
G+3-RESIDENTIAL BUILDING
CONCRETE FORM WORK
RFB5 3.00 0.40 0.20 1.00 0.24 1.00 3.00
RFB6 6.18 0.40 0.20 1.00 0.49 1.00 6.18
RFB7 9.04 0.40 0.20 1.00 0.72 1.00 9.04
RFB8 11.00 0.40 0.20 1.00 0.88 1.00 11.00
RFB9 5.40 0.40 0.20 1.00 0.43 1.00 5.40
RFB10 5.05 0.40 0.20 1.00 0.40 1.00 5.05

5.31 m3 66.41
Water tanker beam
WTFB1 4.95 0.40 0.20 2.00 0.79 0.90 8.91
WTFB2 3.40 0.40 0.20 2.00 0.54 0.90 6.12

1.34 m3 15.03
Pergolla
PB1 1.70 0.40 0.20 7.00 0.95 0.90 10.71
PB2 6.20 0.40 0.20 3.00 1.49 0.90 16.74

2.44 m3 27.45

B. Slab

B.1. 150mm thick Solid slab

1st floor
6.20 5.00 1.00 1.00 31.00 31.00 31.00
2.00 2.00 1.00 1.00 4.00 4.00 4.00
4.80 3.60 1.00 1.00 17.28 17.28 17.28
2.70 3.30 1.00 1.00 8.91 8.91 8.91

40 of 51
1. CONCRETE WORK
G+3-RESIDENTIAL BUILDING
CONCRETE FORM WORK
4.75 5.80 1.00 1.00 27.55 27.55 27.55
1.60 5.80 1.00 1.00 9.28 9.28 9.28
3.50 1.70 1.00 1.00 5.95 5.95 5.95
-
103.97 m2 - 103.97
-
2nd floor -
-
6.20 5.00 1.00 1.00 31.00 31.00 31.00
2.00 2.00 1.00 1.00 4.00 4.00 4.00
4.80 3.60 1.00 1.00 17.28 17.28 17.28
2.70 3.30 1.00 1.00 8.91 8.91 8.91
4.75 5.80 1.00 1.00 27.55 27.55 27.55
1.60 5.80 1.00 1.00 9.28 9.28 9.28
3.50 1.70 1.00 1.00 5.95 5.95 5.95

103.97 m2 103.97

3rd floor
6.20 5.00 1.00 1.00 31.00 31.00 31.00
2.00 2.00 1.00 1.00 4.00 4.00 4.00
4.80 3.60 1.00 1.00 17.28 17.28 17.28
2.70 3.30 1.00 1.00 8.91 8.91 8.91
4.75 5.80 1.00 1.00 27.55 27.55 27.55
1.60 5.80 1.00 1.00 9.28 9.28 9.28
3.50 1.70 1.00 1.00 5.95 5.95 5.95

103.97 m2 103.97

41 of 51
1. CONCRETE WORK
G+3-RESIDENTIAL BUILDING
CONCRETE FORM WORK

Water tanker slab


6.20 5.00 1.00 1.00 31.00 31.00 31.00

31.00 m2 31.00

C . STAIR

C.1.Fron ground - 1st floor

sec ST2-ST2 3.20 1.40 0.18 1.00 0.81 4.83 4.83


1.30 0.28 0.17 10.00 0.62 0.22 2.21
3.00 1.00 0.15 1.00 0.45 3.00 3.00
sec ST1-ST1
3.20 1.40 0.18 1.00 0.81 4.83 4.83
1.30 0.28 0.17 10.00 0.62 0.22 2.21
3.00 1.00 0.15 1.00 0.45 3.00 3.00

Total 3.75 m3 20.08

C.2.Fron 1st floor- 3rd floor

sec ST2-ST2 3.20 1.40 0.18 2.00 1.61 4.83 9.66


1.30 0.28 0.17 18.00 1.11 0.22 3.98
3.00 1.00 0.15 2.00 0.90 3.00 6.00
sec ST1-ST1
3.20 1.40 0.18 2.00 1.61 4.83 9.66
1.30 0.28 0.17 18.00 1.11 0.22 3.98
42 of 51
1. CONCRETE WORK
G+3-RESIDENTIAL BUILDING
CONCRETE FORM WORK
3.00 1.00 0.15 2.00 0.90 3.00 6.00

Total 7.25 m3 39.28

Gutter

Total - -

43 of 51
m2

6.46

m2

44 of 51
9.52

m2

m2

45 of 51
m2

m2

46 of 51
m2

m2

47 of 51
m2

m2

m2

48 of 51
m2

m2

m2

49 of 51
m2

1.4

m2

50 of 51
m2

51 of 51

You might also like