SUMMARY OF PRICES
1.A.1.1 Clear site of all rubbish, bushes, shrubs, undergrowth hedges small
trees, stubs, roots, etc. m2 - 235.00 -
1.A.1.2 Trees more than 80mm in diameter shall be Cut or up rooted, racked
and disposed off or deposited as directed by the engineer. Price
shall include filling holes with suitable material and disposal. No - 235.00 -
1.A.1.3 Site clearing to remove top soil to an average depth of 20cm starting
from N.G.L. m2 132.00 25.00 3,300.00
1.A.1.6 Ditto but from 300cm -450cm from striped ground level. m3 - 140.00 -
1.A.1.7 Excavate for trench masonry foundation for entrance stair, retaing
wall, perpherial wall to a depth not exceeding 150cms starting from
stripped ground level in ordinary soil. m3 62.59 145.00 9,075.84
1.A.1.9 Ditto but from 150cm -300cm from striped ground level. m3 35.71 150.00 5,356.13
1.A.1.13 Fill over excavated up to the bottom level of the lean concrete under
ground hard core with satisfactory soil (Selected Material)
conforming to ASTM D 2487 soil classification groups GW, GP, GM,
SW, SP, and SM, or a combination of these group symbols; free of
rock or gravel larger than 3 inches (75 mm) in any dimension, debris,
waste, frozen materials, vegetation, and other deleterious matter and
a swell potential of less than 3%. m3 176.36 60.00 10,581.66
1.A.1.17 Redig from spoil heap and cart away surplus excavated materials to
a distance not exceeding 5km.from site. m3 298.00 95.00 28,309.84
1.A.1.21 Allow lump sum amount of dewatering from excavation pit. ls - 3,700.00 -
1.A.2.1 5cms.thick lean concrete quality in class C-5 with minimum cement
content of 150kg /m3.
1.A.2.5 R. Concrete quality in class C-25 in 100mm thick slab on grade. m2 117.32 80.00 9,385.76
A. In concrete pad
B. In Foundation Column
C. In Beam
1.A.2.7 Provide cut & fix in position sawn zigba wood or equivalent
formwork. Form work shall achieve fai face concrete finish on all
visible parts.
C. For Beam
1.A.3.1 Construction joints shall be filled with 10mm thick & 100mm wide
chip wood both sides painted with bitumen between basement beam
and basement slab. ml 150.00 23.00 3,450.00
1.A.4.2 Ditto but for above natural ground level m3 26.08 320.00 8,345.60
A. In Elevation Column
B. In floor beam
D. In stair case
1.B.1.2 Provide cut & fix in position sawn zigba wood or equivalent
formwork.
B. For beam
Total
Total
1.05.Footing excavation
10 of 51
G+3-RESIDENTIAL BUILDING
SUB- STRUCTURE
ITEM TYPE SIZE No
SF3 1.70 1.70 2.00 1.00
1.90 1.65 2.00 1.00
1.25 0.65 2.00 1.00
SFB4
axis A 1.70 1.75 2.00 1.00
1.50 1.50 2.00 1.00
1.50 0.50 2.00 1.00
axis B 2.10 2.10 2.00 1.00
1.80 2.00 2.00 1.00
0.90 0.65 2.00 1.00
strap beam X3 2.60 0.65 2.00 1.00
X4 2.60 0.50 2.00 1.00
Total
1.06.Footing excavation
11 of 51
G+3-RESIDENTIAL BUILDING
SUB- STRUCTURE
ITEM TYPE SIZE No
Total
Total
12 of 51
G+3-RESIDENTIAL BUILDING
SUB- STRUCTURE
ITEM TYPE SIZE No
SF1 1.70 1.70 0.05 1.00
1.70 1.50 0.05 1.00
3.00 0.35 0.05 1.00
SF2 1.70 1.70 0.05 1.00
1.60 1.30 0.05 1.00
2.75 0.35 0.05 1.00
SF3 1.30 1.30 0.05 1.00
1.50 1.50 0.05 1.00
1.25 0.35 0.05 1.00
SFB4
1.30 1.60 0.05 1.00
1.30 1.30 0.05 1.00
1.50 0.35 0.05 1.00
1.70 1.70 0.05 1.00
1.70 1.60 0.05 1.00
0.90 0.35 0.05 1.00
- 2.20 0.35 0.05 1.00
2.20 0.35 0.05 1.00
ddt concret pad
F1 1.60 1.60 0.50 2.00
SF1 1.60 1.60 0.50 1.00
1.60 1.40 0.50 1.00
3.00 0.25 0.70 1.00
SF2 1.60 1.60 0.50 1.00
1.50 1.20 0.50 1.00
2.75 0.25 0.70 1.00
SF3 1.20 1.20 0.50 1.00
1.40 1.40 0.50 1.00
1.25 0.25 0.70 1.00
SFB4 -
1.20 1.50 0.50 1.00
- 1.20 1.20 0.50 1.00
- 1.50 0.25 0.70 1.00
1.60 1.60 0.50 1.00
1.60 1.50 0.50 1.00
0.90 0.25 0.70 1.00
2.20 0.25 0.70 1.00
13 of 51
G+3-RESIDENTIAL BUILDING
SUB- STRUCTURE
ITEM TYPE SIZE No
2.20 0.25 0.70 1.00
Item 1.02
Item 1.04
Item 1.05
Item 1.06
Total
Total
14 of 51
G+3-RESIDENTIAL BUILDING
SUB- STRUCTURE
ITEM TYPE SIZE No
Total
15 of 51
G+3-RESIDENTIAL BUILDING
SUB- STRUCTURE
ITEM TYPE SIZE No
1.12. Dewatering
3. Sundry Item
Total
16 of 51
G+3-RESIDENTIAL BUILDING
SUB- STRUCTURE
ITEM TYPE SIZE No
10.00 0.50 0.80 1.00
Total
17 of 51
M3
132.00
132.00
132.00
132.00
10.75
4.80
16.13
17.47
3.84
9.60
62.59
17.64
8.82
7.03
3.90
8.82
5.95
3.58
18 of 51
M3
5.78
6.27
1.63
5.95
4.50
1.50
8.82
7.20
1.17
3.38 0.4
2.60
104.53
2.15
6.17
3.09
2.46
1.37
3.09
2.08
1.25
2.02
2.19
0.57
1.93
1.46
0.49
2.87
2.34
0.38
1.10
0.85
19 of 51
M3
35.71
111.33
41.23
20.66
25.92
21.80
20.25
46.50
176.36
23.81
11.91
9.49
5.27
11.91
8.03
4.83
7.80
8.46
2.19
-
8.03
6.08
2.03
11.91
9.72
1.58
4.56
3.51
(0.29)
20 of 51
M3
(0.14)
(0.13)
(0.05)
(0.14)
(0.10)
(0.05)
(0.08)
(0.11)
(0.02)
(0.10)
(0.08)
(0.03)
(0.14)
(0.14)
(0.02)
(0.04)
(0.04)
(2.56)
(1.28)
(1.12)
(0.53)
(1.28)
(0.90)
(0.48)
(0.72)
(0.98)
(0.22)
-
(0.90)
(0.72)
(0.26)
(1.28)
(1.20)
(0.16)
(0.39)
21 of 51
M3
(0.39)
(0.22)
(0.22)
(0.66)
(0.22)
(0.22)
(0.44)
(0.22)
(0.22)
(0.22)
121.40
26.40
62.59
104.53
35.71
298.00
26.40
26.40
27.49
13.77
17.28
14.54
31.00
22 of 51
M3
104.07
23 of 51
M3
9.52
5.40
7.20
6.12
12.40
11.55
10.20
9.60
9.50
10.00
91.49
-
5.04
2.25
7.56
-
8.19
1.80
4.50
29.34
-
4.48
2.00
6.72
-
7.28
1.60
24 of 51
M3
4.00
26.08
25 of 51
1. CONCRETE WORK
G+2-RESIDENTIAL BUILDING
CONCRETE Total Size
Type Size No
2.1. Lean Concrete
Total 34.34 m2
26 of 51
1. CONCRETE WORK
G+2-RESIDENTIAL BUILDING
GB1 6.60 0.30 1.00 1.00 1.98
GB2 11.20 0.30 1.00 1.00 3.36
GB3 11.36 0.30 1.00 1.00 3.41
GB4 9.04 0.30 1.00 2.00 5.42
GB5 11.00 0.30 1.00 1.00 3.30
GB6 10.50 0.30 1.00 1.00 3.15
GB7 10.00 0.30 1.00 1.00 3.00
GB8 5.00 0.30 1.00 1.00 1.50
Total 25.12 m2
Total 52.16
D. Under ground floor slab
Total 117.32 m2
2.2 .100mm thick solid slab
A. Ground floor
4.76 5.78 1.00 1.00 27.49
2.70 5.10 1.00 1.00 13.77
3.60 4.80 1.00 1.00 17.28
3.06 4.75 1.00 1.00 14.54
6.20 5.00 1.00 1.00 31.00
2.00 2.00 1.00 1.00 4.00
5.78 1.60 1.00 1.00 9.25
Total 117.32 m2
A.Foundation pad
Total 15.36 m3
A.Foundation column
29 of 51
1. CONCRETE WORK
G+2-RESIDENTIAL BUILDING
2.64 m3
A. Beam
Total 6.70 m3
30 of 51
Total
31 of 51
32 of 51
6.40
3.20
3.00
7.98
3.20
2.70
7.42
33 of 51
2.40
2.80
4.90
-
2.70
2.40
5.04
3.20
3.10
4.90
7.42
7.00
79.76 m2
2.86
2.86
8.58
2.86
2.86
5.72
2.86
2.86
2.86
34 of 51
34.32 m2
5.28
8.96
9.09
14.46
8.80
8.40
8.00
4.00
66.99 m2
35 of 51
1. CONCRETE WORK
G+3-RESIDENTIAL BUILDING
CONCRETE FORM WORK
1.1. C-30 Concrete
A. Elevation Column
3.60 m3 46.80
3.24 m3 42.12
36 of 51
1. CONCRETE WORK
G+3-RESIDENTIAL BUILDING
CONCRETE FORM WORK
3.24 m3 42.12
2.70 m3 35.10
0.58 m3 7.84
A . BEAM
1st floor
5.62 m3 57.99
2nd floor
38 of 51
1. CONCRETE WORK
G+3-RESIDENTIAL BUILDING
CONCRETE FORM WORK
FFB4 4.00 0.40 0.20 1.00 0.32 0.85 3.40
FFB5 5.00 0.40 0.20 1.00 0.40 0.85 4.25
FFB6 9.04 0.40 0.20 1.00 0.72 0.85 7.68
FFB7 11.00 0.40 0.20 1.00 0.88 0.70 7.70
FFB8 5.40 0.40 0.20 1.00 0.43 0.70 3.78
FFB9 10.00 0.40 0.20 1.00 0.80 0.85 8.50
FFB10 5.00 0.40 0.20 1.00 0.40 1.00 5.00
5.62 m3 57.99
3rd floor
5.62 m3 57.99
roof floor beam
RFB1 5.00 0.40 0.20 1.00 0.40 1.00 5.00
RFB2 12.75 0.40 0.20 1.00 1.02 1.00 12.75
RFB3 4.00 0.40 0.20 1.00 0.32 1.00 4.00
RFB4 5.00 0.40 0.20 1.00 0.40 1.00 5.00
39 of 51
1. CONCRETE WORK
G+3-RESIDENTIAL BUILDING
CONCRETE FORM WORK
RFB5 3.00 0.40 0.20 1.00 0.24 1.00 3.00
RFB6 6.18 0.40 0.20 1.00 0.49 1.00 6.18
RFB7 9.04 0.40 0.20 1.00 0.72 1.00 9.04
RFB8 11.00 0.40 0.20 1.00 0.88 1.00 11.00
RFB9 5.40 0.40 0.20 1.00 0.43 1.00 5.40
RFB10 5.05 0.40 0.20 1.00 0.40 1.00 5.05
5.31 m3 66.41
Water tanker beam
WTFB1 4.95 0.40 0.20 2.00 0.79 0.90 8.91
WTFB2 3.40 0.40 0.20 2.00 0.54 0.90 6.12
1.34 m3 15.03
Pergolla
PB1 1.70 0.40 0.20 7.00 0.95 0.90 10.71
PB2 6.20 0.40 0.20 3.00 1.49 0.90 16.74
2.44 m3 27.45
B. Slab
1st floor
6.20 5.00 1.00 1.00 31.00 31.00 31.00
2.00 2.00 1.00 1.00 4.00 4.00 4.00
4.80 3.60 1.00 1.00 17.28 17.28 17.28
2.70 3.30 1.00 1.00 8.91 8.91 8.91
40 of 51
1. CONCRETE WORK
G+3-RESIDENTIAL BUILDING
CONCRETE FORM WORK
4.75 5.80 1.00 1.00 27.55 27.55 27.55
1.60 5.80 1.00 1.00 9.28 9.28 9.28
3.50 1.70 1.00 1.00 5.95 5.95 5.95
-
103.97 m2 - 103.97
-
2nd floor -
-
6.20 5.00 1.00 1.00 31.00 31.00 31.00
2.00 2.00 1.00 1.00 4.00 4.00 4.00
4.80 3.60 1.00 1.00 17.28 17.28 17.28
2.70 3.30 1.00 1.00 8.91 8.91 8.91
4.75 5.80 1.00 1.00 27.55 27.55 27.55
1.60 5.80 1.00 1.00 9.28 9.28 9.28
3.50 1.70 1.00 1.00 5.95 5.95 5.95
103.97 m2 103.97
3rd floor
6.20 5.00 1.00 1.00 31.00 31.00 31.00
2.00 2.00 1.00 1.00 4.00 4.00 4.00
4.80 3.60 1.00 1.00 17.28 17.28 17.28
2.70 3.30 1.00 1.00 8.91 8.91 8.91
4.75 5.80 1.00 1.00 27.55 27.55 27.55
1.60 5.80 1.00 1.00 9.28 9.28 9.28
3.50 1.70 1.00 1.00 5.95 5.95 5.95
103.97 m2 103.97
41 of 51
1. CONCRETE WORK
G+3-RESIDENTIAL BUILDING
CONCRETE FORM WORK
31.00 m2 31.00
C . STAIR
Gutter
Total - -
43 of 51
m2
6.46
m2
44 of 51
9.52
m2
m2
45 of 51
m2
m2
46 of 51
m2
m2
47 of 51
m2
m2
m2
48 of 51
m2
m2
m2
49 of 51
m2
1.4
m2
50 of 51
m2
51 of 51