Professional Documents
Culture Documents
Item
Description Unit Qty Rate Amount
No.
A. SUB-STRUCTURE
Sub-Total (1)
2. CONCRETE WORK
Lean Concrete (C-5) 50mm thick, under strip footing
2
2.1 pads and/or masonry walls. m 378.00
7
Specifications and Bill of Quantities
Dire Dawa University Construction Project Office
Item
Description Unit Qty Rate Amount
No.
Sub-Total (2)
3. MASONRY WORK
Sub-Total (3)
B. SUPER-STRUCTURE
4. CONCRETE WORK
Reinforced Concrete Class in C-25, minimum of 360
kg cement per meter cube of concrete. Filled into
4.1 formwork and vibrated around reinforcement
(formwork and reinforcement bar are measured
separately) In:
a) Columns m3 9.65
3
b) Copping m 9.60
a) Columns m2 192.96
b) Copping m2 96.00
Sub-Total (4)
8
Specifications and Bill of Quantities
Dire Dawa University Construction Project Office
Item
Description Unit Qty Rate Amount
No.
5. BLOCK WORK
Sub-Total (5)
Sub-Total (6)
2. CONCRETE WORK
3. MASONRY WORK
Sub-Total (A)
B. SUPER-STRUCTURE
4. CONCRETE WORK
5. BLOCK WORK
Sub-Total (B)
9
Specifications and Bill of Quantities