You are on page 1of 96

SUMMERY OF STANDARD BILL OF QUANTITY

Consultant :- Agape Consulting & Trading Plc.


Project :-
Location :-Addis Ababa
A. sub structure

1 Excavation work & Earth work Birr

2 Concrete work Birr

Total of A…..................... Birr

B. super structure

1 Concrete work Birr

2 Block work Birr

3 Plastering And Pointing Birr

4 Finishing Birr

5 Painting Birr

6 Sanitary Installation Birr

7 Electrical Installation Birr

8 Roofing Birr

9 Steel Structure Birr

Total B…..................... Birr

Total of A & B…..................... Birr

15 % VAT…..................... Birr

Total After VAT…..................... Birr


QUANTITY
ding Plc.

1,983,856.45

2,578,754.20

4,562,610.65

13,421,711.73

1,616,564.93

701,058.20

2,938,665.33

195,021.81

20,613.23

18,893,635.23

23456245.8790638

3518436.88185956

26974682.7609233
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-
Location:- Addis Ababa

ITEM STANDARD
DESCRIPTION UNIT
NO QTY

A- Sub Structure
3 Excavation and Earth work.(manual )
Clear and remove top soil to an average
3.1
depth of 200mm.
m2 616.00

Bulk Excavation in ordinary soil to a depth


3.2
not exceeding 1500mm from reduced level.
m3 924.00

Pit Excavation in soft rock to a depth not


3.4
exceeding 1600mm from reduced level.
m3 166.80

3.6 Trench Excavation not exceeding 1.5m 412.47

Back Fill around foundation with selected


material from excavated material and
3.7
compact in layers not exceednig 200mm
m3 1,278.27

thick
Back fill under hardcore Compacted
thickness should not be more than 20cm
3.7 and the fild density shoud attain 95% of the m3 55.79
Maximum dry density according to
AASHTO-180
250mm Thick Basaltick or equvalent stone
3.7.6 hard core well rolled consolidated and m2 69.74
blinding with crushed stone.
TOTAL CARRIED TO SUMMARY
B Sub structure
2. CONCRETE WORK
50 mm lean concrete quality C-5, with minimum
2.01
cement content of 150 kg /m3, of concrete; m3

a) Under footing m3 102.97

Reinforced concrete quality C-30 with minimum


cement content of 400 kg of cement/m3(OPC
2.02 cement) filled in to form work and vibrated m3
around rod reinforcement (Formwork and
reinforcement measured separately)

a) In Footing Pad m3 52.37

b) In foundation Column m3 6.12

Reinforced concrete quality C-25 with minimum


cement content of 360 kg of cement/m3(PPC
2.03 cement) filled in to form work and vibrated
around rod reinforcement (Formwork and
reinforcement measured separately)

a) In Ground floor beam 19.59

b) In 20cm thick ground floor slab m3 28.22

c) In Stair case m3 26.69

Provide, cut and fix in position structural wood or


2.03
steel formwork which ever is appropriate.

a) In Footing Pad m3 126.74

b) In Ground floor beam m3 254.66

Mild steel reinforcement according to structural


2.04
drawings. m3
a) Dia 6 mm plain bar m3
b) Dia 8 mm deformed bar m3 7,502.63

c) Dia 10 mm deformed bar m3


d) Dia 12 mm deformed bar m3
e) Dia 14 mm deformed bar m3 3,669.62

f) Dia 16 mm deformed bar m3 871.70

g) Dia 20mm deformed bar m3


h) Dia 24mm deformed bar
TOTAL CARRIED TO SUMMARY
3.MASONARY WORK
500mm thick hard trachytic rodly dressed
3.01 stone masonary foundation wall below ground m 3 166.51
level beded in cement mortar 1:3

TOTAL CARRIED TO SUMMARY


B-SUPER STRUCTURE
1. CONCRETE WORK

Reinforced concrete quality C-30,400kg/m3


filled in to formwork and vibrate aound rod
1.01
reinforcement.(Formwork and reinforcement
measured separately)

a) In elevation columns,
Ground Floor m 3 14.27

1st Floor m 3 11.16

2nd Floor m 3 11.16

Reinforced concrete quality C-25,360kg/m3


filled in to formwork and vibrate aound rod
1.02
reinforcement.(Formwork and
reinforcement measured separately)

a) In First Floor beam (FFB) m 3 18.13

b) in seconed floor beam(SFB) m 3 13.38

c) In Roof floor Beam (RFB) m 3 4.75


In 200mm thick slab m 3

a) In Ground floor slab m 3 42.81

b) In stair case and landing m 3 10.26

c) In First Floor Slab 61.57

Provide, cut and fix in position structural


wood or steel formwork appropriately. m 4

1.03 a) In elevation columns, m 2

Ground Floor m 2 166.46

1st Floor m 2 130.20

2nd Floor m 2 130.20

Ground Floor beam (GFB) m 2 26.99

First Floor beam (FFB) m 2 163.14

Second Floor beam (SFB) m 2 120.43

Roof beam (RB) m 2 86.89

SLAB
a) In 200mm thick 1st floor slab m 2 354.57

b) In 200mm thick Second floor slab m 2 354.57

c) In 160mm thick Roof floor slab m 2 152.64

Stair case m 2 51.05

Mild steel reinforcement according to


structural drawings. Price includes cutting,
bending, placing in position and tying wire m 2

and concrete spacers.


1.04 a) Dia 6 mm plain bar
b) Dia 8 mm deformed bar kg 42,220.00

c) Dia 10 mm deformed bar kg 4,137.44

d) Dia 12 mm deformed bar kg 23.54

e) Dia 14 mm deformed bar kg 5,152.81

f) Dia 16 mm deformed bar kg 1,726.22

g) Dia 20mm deformed bar kg


h) Dia 24mm deformed bar kg
TOTAL CARRIED TO SUMMARY
2. BLOCK WORK

Class B HCB wall which can satisfy the


2.01 designed strength bedded in cement mortar m2
(1:3).price shall include mortar bedding

2.02 Ditto as Item 2.01 but 15cm thick HCB wall m2 905.31

2.03 Ditto as Item 2.01 but 10 cm thick HCB wall m2 731.97

TOTAL CARRIED TO SUMMARY


3. WATER PROOFING WORK

Supply and fix torch applied water proofing


membrene of 4mm thick which passes (ASTM
3.01
D6222) and granural finishing for roof water
proofing system(minimum slope 1/20).

m2 168.02
TOTAL CARRIED TO SUMMARY
4. CARPENTRY AND JOINERY
Supply and fix 40mm thick patterned MDF
panels on both sides with locks, hings &that
comply EN/ASTEM standared & shall be
approved by the designer prior to fixing .the
door frame shall be out of solid Austrraalia
pin. The toilet door frame shall be painted
with water resistance oil paint to a height of
4.01
30cm from base.price also includes providing
door stopper. the given price is subjected to
approval of ministry of urban (Note:- The
specification & unit price is subjected to
approval of ministry of urban development
&constructon .shall there be changes ,further
comminication will made accordingly)

DOOR
a) Type D1=size 900x2100mm No
b) Type D2=size 1500x2100mm (MAIN
GATE) No
Hand Rail & (Guard
A.staircase supplyRail
& fix best quality
4.02 approved type of wooden handrail for stair m2
case)

CLOSET & KITCHEN CABINETS


A. Closet ( supply & fix best quality approved
4.03
type of wooden closet) m2
B.Kitchen cabinet ( supply & fix best quality
4.04
approved type of wooden Kitchen Cabinet) m2

TOTAL CARRIED TO SUMMARY


5.PLASTERING AND POINTING
Apply two coats of plastering in cement
6.01
mortar (1.3).
a) To internal wall surfaces, m2 731.97

b) To external wall surfaces, m2 918.50


b)Plastered soffit m2

TOTAL CARRIED TO SUMMARY


6.FINISHING

Marble flooring to stair case bedded on and


7.01
includeing cement sand mortar mix 1:3

a) Stair case m2 57.77

Ditto but 30x3cm bull nosed marble window


sill & door sill bedded on cement mortar (1:3)
7.01
ratio. Price shall include cement screed, mirror ml 26.70

polishing and all necessary works.

Supply and fix 8mm thick porcilen tiles. Price


shall include cement sand mortar(1:3)
backing, grouting with matching color and
7.02
42mm thick cement screed and also other m2 191.54

incidental works. The colour, pattern and


texture should be approved by the Architect.

7.04 Supply and fix 10cm high porcilien skirting ml 383.81

Supply and fix 10mm thick perquet floor


tiles. Price shall include cement sand
mortar(1:3) backing, grouting with matching
7.05
color and 42mm thick cement screed and also m2 588.00

other incidental works. The colour, pattern and


texture should be approved by the Architect.

TOTAL CARRIED TO SUMMARY


8.PAINTING
Apply kadisco or equivalent type Quartz paint
to external plaster wall surface according to
9.01
complete manufacturing instruction m2
applicaton.
Apply three coats of approved type plastic
9.01
emulsion paint to
a)all internal wall surfaces, m2 676.01

b)All externale wall surface m2 905.31

TOTAL CARRIED TO SUMMARY


SANITARY INSTALLATION
WATER SUPPLY
Hot,Cold,Drianage
Diameter 15 mm 58.34

Diameter 20 mm 412.48

Diameter 32 mm
Diameter 50 mm 50.13

Diameter 75 mm 10.36

Diameter 110 mm 83.57

TOTAL CARRIED TO SUMMARY


Y

UNIT PRICE overhead


TOTAL AMOUNT
(Birr) and profite

0.15

57.39 35,349.16

199.54 184,371.73

225.66 37,640.31

1,986.82 819,510.06

645.87 825,604.20

645.87 36,035.66

650.19 45,345.34

1,983,856.45
383.84 39,522.77

- -

11,834.34 619,784.48

12,252.00 74,982.22

- -

11,206.12 219,515.52

11,206.12 316,245.52

11,322.19 302,223.14

- -

790.80 100,222.51

803.67 204,658.13

- -

- -

190.73 1,430,958.41

- -
- -

185.61 681,118.98

185.61 161,796.17

- -

- -

2,578,754.20

5,179.93 862,488.19

862,488.19

12,273.47 175,117.83

12,273.47 136,971.89

12,273.47 136,971.89

- -

11,206.12 203,133.29

11,206.12 149,955.78

11,206.12 53,206.65
- -

11,206.12 479,714.56

11,206.12 114,960.11
11,206.12 690,012.92

- -

- -

803.67 133,778.24

803.67 104,637.31

803.67 104,637.31

803.67 21,687.73

803.67 131,112.48

803.67 96,789.03

803.67 69,831.66

- -

803.67 284,953.79

803.67 284,953.79

803.67 122,668.20

803.67 41,027.15

- -

- -
185.61 7,836,453.66

185.61 767,949.50

185.61 4,369.48

185.61 956,413.02

185.61 320,404.44

- -
- -

13,421,711.73

1,079.17 976,983.35

873.78 639,581.58

1,616,564.93
- -

- -

- -

-
424.76 310,914.38

424.76 390,143.82
-

701,058.20

1,902.10 109,880.51

2,452.89 65,485.36

4,098.78 785,064.69

425.98 163,496.54

- -

3,086.29 1,814,738.23

2,938,665.33
121.22 81,947.39

124.90 113,074.41

195,021.81

125.52 6,292.95

145.52 1,507.31

153.33 12,812.98

20,613.23
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-
Location:- Addis Ababa
TIM DIMN TOTAL DISCRIPTION

A- Sub Structure

3.1 site clearance


1 22 L*W+working space 1m
28
616.00 m2
616.00 Total of site clearance
3.2 Bulk excavation
1 22
28
1.5
924.00 m3
924.00 Total of Bulk Excavtion
3.4 Pit excavation
12 3 F1
3
0.5
54.00 m3
4 3.5 - F2
3.5 -
0.5 -
24.50 m3
4 3.2 - F3
2.6 -
0.5 -
16.64 m3
2 5.706 - STF 1
2.42 -
1 -
27.62 m3
3 5.69 - STF 2
2.58 -
1 -
44.04 m3
166.80 Total of Pit Excavation
3.6 Trench Excavation
4 19.33 along axis A-B on 1-7
1.25
1.7
164.30 m3
4 16.2 - along axis 7-3 on A-D
1.25 -
1.7 -
137.70 m3
2 20 - along axis 1-2 on A-D
1.25 -
1.7 -
85.00 m3
3 3.995 - on side of axis A-D & on axis c'
1.25 -
1.7 -
25.47 m3
412.47 Total of Trench excavation
3.7 Back Fill
166.80 Dettoo as Pit excavation
924.00 Detto as Bulk excavation
412.47 Dettoo as Trench excavation
1,503.27 Total
Deduction
52.37 Total concrete volume of Footing pad
6.12 Total Concretevolume of Foundation columun
166.51 Total concrete volume of Masonary wall
225.00 Total
1,278.27 TOTAL VOLUMN OF BACK FILL
3.7.6 Hard core
1 5.1 on axis A-B & 3-4
3.9
0.25
4.97 m3
1 5.1 - on axis A-B & 1-2
3.495 -
0.25 -
4.46 m3
1 5.1 - on axis A-B & 4-5
3.015 -
0.25 -
3.84 m3
1 4.335 - on axis A-B & 5-6
5.1 -
0.25 -
5.53 m3
1 5.1 - on axis A-B & 6-7
2.23 -
0.25 -
2.84 m3
1 4.4 on axis B-C & 3-4
3.9
0.25
4.29 m3
1 4.4 - on axis B-C & 1-2
3.495 -
0.25 -
3.84 m3
1 4.4 - on axis B-C & 4-5
3.015 -
0.25 -
3.32 m3
1 4.335 - on axis B-C & 5-6
4.4 -
0.25 -
4.77 m3
1 4.4 - on axis B-C & 6-7
2.23 -
0.25 -
2.45 m3
1 5.8 on axis C-D & 3-4
3.9
0.25
5.65 m3
1 5.8 - on axis C-D & 4-5
3.015 -
0.25 -
4.37 m3
1 4.335 - on axis C-D & 5-6
5.8 -
0.25 -
6.29 m3
1 5.8 - on axis C-D & 6-7
2.23 -
0.25 -
3.23 m3
1 1.98 - on axis C-C' & 1-2
3.495 -
0.25 -
1.73 m3
1 3.514 - on axis C'-D & 1-2
3.495 -
0.25 -
3.07 m3
1 3.514 - on axis C'-D & 1-2
3.495 -
0.25 -
3.07 m3
2 1.15 - on the side of axis A-D
3.495 -
0.25 -
2.01 m3
69.74 Total of Hard core
Back fill under hard core
1 5.1 on axis A-B & 3-4
3.9
0.2
3.98 m3
1 5.1 - on axis A-B & 1-2
3.495 -
0.2 -
3.56 m3
1 5.1 - on axis A-B & 4-5
3.015 -
0.2 -
3.08 m3
1 4.335 - on axis A-B & 5-6
5.1 -
0.2 -
4.42 m3
1 5.1 - on axis A-B & 6-7
2.23 -
0.2 -
2.27 m3
1 4.4 on axis B-C & 3-4
3.9
0.2
3.43 m3
1 4.4 - on axis B-C & 1-2
3.495 -
0.2 -
3.08 m3
1 4.4 - on axis B-C & 4-5
3.015 -
0.2 -
2.65 m3
1 4.335 - on axis B-C & 5-6
4.4 -
0.2 -
3.81 m3
1 4.4 - on axis B-C & 6-7
2.23 -
0.2 -
1.96 m3
1 5.8 on axis C-D & 3-4
3.9
0.2
4.52 m3
1 5.8 - on axis C-D & 4-5
3.015 -
0.2 -
3.50 m3
1 4.335 - on axis C-D & 5-6
5.8 -
0.2 -
5.03 m3
1 5.8 - on axis C-D & 6-7
2.23 -
0.2 -
2.59 m3
1 1.98 - on axis C-C' & 1-2
3.495 -
0.2 -
1.38 m3
1 3.514 - on axis C'-D & 1-2
3.495 -
0.2 -
2.46 m3
1 3.514 - on axis C'-D & 1-2
3.495 -
0.2 -
2.46 m3
2 1.15 - on the side of axis A-D
3.495 -
0.2 -
1.61 m3
55.79 Total of backfill Hard core
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-
Location:- Addis Ababa
TIM DIMN TOTAL DISCRIPTION
SKIRTING
1 46.314 on axis A-D & b/n axis 1-2
46.314 m
Deduction
-2 1 window 1
(2.00) m2
-2 2 - window 2
(4.00)
-4 0.7 - door
(2.80) m2
1 70.045 - on axis A-D & b/n axis 3-7
70.05 m2
- Deduction
-17 1 - window 1
(17.00) m2
-1 3 - window 2
(3.00) m2
-1 2 - window 3
(2.00) m2
-6 0.7 - door
(4.20)
- m2
81.359 Total of external Ground Floor SKIRTING
First floor Plan
1 51.127 on axis A-D & b/n axis 1-2
51.13 m2
-2 1 - window 1
(2.00) m2
-3 2 - window 2
(6.00) m2
-4 0.7 - door
(2.80) m2
1 61.914 - on axis A-D & b/n axis 3-7
61.91 m2
- Deduction
- Windows
-4 1.5 -
(6.00) m2
- window 2
-1 3.998 -
(4.00) m2
-3 2 -
(6.00) m2
-1 4.08 -
(4.08) m2
-1 2.915 -
(2.92) m2
-1 0.7 -
(0.70) m2
78.55 Total of external First floor SKIRTING
Second Floor Plan
1 65.934 on axis A-D & b/n axis 3-7
65.93 m2
- Deduction
-3 1.5 - window 1
(4.50) m2
-1 2 - window 2
(2.00) m2
-1 2.2 -
(2.20) m2
-1 3 -
(3.00) m2
-1 2 -
(2.00) m2
-1 3 -
(3.00) m2
-1 2 -
(2.00) m2
47.23 Total of Second Floor Plastering work
INTERNAL SKIRTING
Ground floor plan
6 3.895 on axis A-D & b/n axis 1-2
23.37 m2
- Deduction
-2 0.7 -
(1.40)
1 45.239 - on axis A-D & b/n axis 3-7
45.24
- Deduction
-5 0.7 -
(3.50)
63.71 Total of Internal Ground Floor SKIRTING
First floor Plan
1 15.8 on axis A-D & b/n axis 1-2
15.80 m2
- Deduction
-2 0.7 -
(1.40)
1 73.175 - on axis A-D & b/n axis 3-7
73.18
-7 0.7 - Deduction
(4.90)
82.68 Total of First Floor Internal SKIRTING
Second Floor Plan
1 33.785 on axis A-D & b/n axis 3-7
33.79
-5 0.7 - Door
(3.50)
30.285 Total of Internal Second Floor SKIRTING
Stair case
5 2.9 landing
1.54
22.33 m2
52 0.17 - riser
1.45 -
12.82 m2
52 0.3 - tread
1.45 -
22.62 m2
57.77 Total of stair case tiles
Ground floor plan
porciline tiles
1 5 5
1 6 6
1 14 14
1 8.3 8.3
1 14 14
1 13 13 m2
1 3 3
1 18 18
1 1.536 1.536
1 1.5 1.5
1 7.2 7.2
91.536 Total fo porciline
perquet tiles
1 42 42
1 26 26
m2
1 50 50
1 40 40
158 total of perquet tiles
First floor Plan
1 6 6 porciline tiles
1 12 12
1 12 12
1 13 13
1 6 6
1 6 6 m2
1 8 8
1 6 6
1 7 7
1 7 7
83 Total fo porciline
perquet tiles
1 24 24
1 11 11
1 37 37
1 22 22
m2
1 24 24
1 30 30
1 18 18
1 33 33
199 total of perquet tiles
Second Floor Plan
1 6 6 porciline tiles
1 6 6
m2
1 5 5
17 Total fo porciline
perquet tiles
1 112 112
1 22 22
1 29 29 m2
1 29 29
1 17 17
231 total of perquet tiles
silling
Door
40 0.7
0.2
5.6 m2
1 2.8
0.3
0.84 m2
1 1.524 -
0.3 -
0.46 m2
6.90 Total of Door Silling
window
28 1
0.3
8.40
8 2 -
0.3 -
4.80
6 3 -
0.3 -
5.40
1 4 -
0.3 -
1.20
19.80 Total of window Silling
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-
Location:- Addis Ababa
TIM DIMN TOTAL DISCRIPTION

A.sub Structure

4. Concrete work
Lean concrete quality c-5
12 2 F1
2
48.00 m2
4 2.5 - F2
2.5 -
25.00 m2
4 2.2 - F3
1.6 -
14.08 m2
2 1.2 STF1
1.4
3.36
2 1.5 -
0.87 -
2.61
3 1.2 - STF2
1.58 -
5.69
3 1.5 -
0.94 -
4.23
102.97 Total of Lean Concrete
Footing Pad
12 2 F1
2
0.5
24.00 m3
4 2.5 - F2
2.5 -
0.5 -
12.50 m3
4 2.2 - F3
1.6 -
0.5 -
7.04 m3
-
2 1.2 - STF 1
1.4 -
0.35 -
1.18 m3
2 1.5 -
0.87 -
0.35 -
0.91 m3
2 3.7 -
0.5 -
0.3 -
1.11 m3
3 1.2 - STF 2
1.58 -
0.4 -
2.28 m3
3 1.5 -
0.94 -
0.4 -
1.69 m3
3 3.7 -
0.5 -
0.3 -
1.67 m3
52.37 Total of Footing Pad
Foundation Columun
16 0.4 c1
0.3
1.7
3.26 m3
13 0.4 - c2
0.3 -
1.7 -
2.65 m3
1 0.4 - c3
0.3 -
1.7 -
0.20 m3
6.12 Total of Footing Columun
Ground Floor Beam
2 18.484 GFB 1 along axis 1&2 on axis A-D
0.25
0.4
3.70 m3
2 3.595 - GFB 2 side axis of A&D
0.25 -
0.4 -
0.72 m3
5 3.595 - GFB 3 on axis of A-D
0.25 -
0.4 -
1.80 m3
5 15.3 - GFB 4 on axis 3-7
0.25 -
0.4 -
7.65 m3
4 14.314 - GFB 5 on axis A-D
0.25 -
0.4 -
5.73 m3
19.59 Total of GFB
FORM WORK
Footing Pad
12 8 F1
0.5
48.00 m2
4 10 - F2
0.5 -
20.00 m2
4 7.6 - F3
0.5 -
15.20 m2
2 5.2 - STF 1
0.35 -
3.64 m2
2 4.74 -
0.35 -
3.32 m2
2 3.7 -
1.3 -
9.62 m2
3 5.56 - STF 2
0.4 -
6.67 m2
3 4.88 -
0.4 -
5.86 m2
3 3.7 -
1.3 -
14.43 m2
126.74 Total of the footing Pad Form work
Foundation Columun
16 1.4 c1
1.7
38.08 m2
13 1.4 - c2
1.7 -
30.94 m2
1 1.4 - c3
1.7 -
2.38 m2
71.40 Total of Footing Columun Form Work
Ground Floor Beam
2 18.484 GFB 1 along axis 1&2 on axis A-D
1.3
48.06 m2
2 3.595 - GFB 2 side axis of A&D
1.3 -
9.35 m2
5 3.595 - GFB 3 on axis of A-D
1.3 -
23.37 m2
5 15.3 - GFB 4 on axis 3-7
1.3 -
99.45 m2
4 14.314 - GFB 5 on axis A-D
1.3 -
74.43 m2
254.66 Total of GFB Form Work
Ground Floor slab
1 17.825 b/n axis A-B & on axis 1-7
5.1
0.1
9.09 m3
1 17.825 - b/n axis B-C & on axis 1-7
4.4 -
0.1 -
7.84 m3
1 14.33 - b/n axis B-C & on axis 1-7
5.8 -
0.1 -
8.31 m3
1 8.514 - b/n axis 1-2 & on axis C,C',D
3.495 -
0.1 -
2.98 m3
28.22 Total of Ground floor slab
Summary of sanitary pipes
Location Ø 15 Ø 20 Ø 25 Ø 32 Ø 50 Ø 75 Ø 110
Ground Floor 14 44 11 10
First Floor 31 60 26 27
Second Floor 13 182 12
Roof Floor 63
Elevation 63 57
58 412 - - 50 10 84
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-
Location:- Addis Ababa
TIM DIMN TOTAL DISCRIPTION

B.SUPER STRUCTURE

1. CONCRETE WORK
1.01 REINFORCED CONCRETE C- 30
a. In elevation Column
Ground Floor column
Ground floor columun
16 4.1 c1
0.4
0.3
7.87 m3
12 4.1 - c2
0.4 -
0.3 -
5.90 m3
1 4.1 - c3
0.3 -
0.4 -
0.49 m3
14.27 Total of Ground floor columun
First Floor Beam
2 14.994 FFB 1
0.25
0.4
3.00 m3
5 3.49 - FFB 2
0.25 -
0.4 -
1.75 m3
1 15.296 - FFB 3
0.25 -
0.4 -
1.53 m3
2 15.3 - FFB 4
0.25 -
0.4 -
3.06 m3
2 15.3 - FFB 5
0.25 -
0.4 -
3.06 m3
1 14.334 - FFB 6
0.25 -
0.4 -
1.43 m3
2 14.334 - FFB 7
0.25 -
0.4 -
2.87 m3
1 14.334 - FFB 8
0.25 -
0.4 -
1.43 m3
18.13 Total of First Floor Beam
First Floor Columun
16 0.4 c1
0.3
3.1
5.95 m3
13 0.4 - c2
0.3 -
3.1 -
4.84 m3
1 0.4 - c3
0.3 -
3.1 -
0.37 m3
11.16 Total of Footing Columun
Roof beam
2 15 RB 1
0.25
0.4
3.00 m3
5 3.496 - RB 2
0.25 -
0.4 -
1.75 m3
4.748 Total Roof Beam
Second Floor Beam
3 15.296 SFB 1
0.25
0.4
4.59 m3
2 15.296 - SFB 2
0.25 -
0.4 -
3.06 m3
3 14.334 - SFB 3
0.25 -
0.4 -
4.30 m3
1 14.334 - SFB 4
0.25 -
0.4 -
1.43 m3
13.38 Total Second Floor Beam
Second Floor columun
16 0.4 c1
0.3
3.1
5.95 m3
13 0.4 - c2
0.3 -
3.1 -
4.84 m3
1 0.4 - c3
0.3 -
3.1 -
0.37 m3
11.16 Total of Second Floor Columun
Roof Treeace Beam
1 15.3 RTB 1
0.25
0.4
1.53 m3
1 15.3 - RTB 2
0.25 -
0.4 -
1.53 m3
1 15.3 - RTB 3
0.25 -
0.4 -
1.53 m3
1 7.2 - RTB 4
0.25 -
0.4 -
0.72 m3
2 12.104 - RTB 5
0.25 -
0.4 -
2.42
- m3
2 6.919 - RTB 6
0.25 -
0.4 -
1.38 m3
1 5.4 - RTB 7
0.25 -
0.4 -
0.54 m3
9.65 Total of roof terrace
Third Floor columun
13 0.4 - c2
0.3 -
3.1 -
4.84 m3
1 0.4 - c3
0.3 -
3.1 -
0.37 m3
5.21 Total of Footing Columun
Ground Floor slab
1 15.595 Ground floor cad area
18.3
0.15
42.81 m3
42.81 Total Ground floor cad area
First Floor slab
1 17.825 b/n axis A-B & on axis 1-7
5.1
0.19
17.27 m3
1 17.825 - b/n axis B-C & on axis 1-7
4.4 -
0.19 -
14.90 m3
1 14.33 - b/n axis B-C & on axis 1-7
5.8 -
0.19 -
15.79 m3
1 8.514 - b/n axis 1-2 & on axis C,C',D
3.495 -
0.19 -
5.65 m3
1 3.995 - extended slab
1.75 -
0.19 -
1.33 m3
1 18.25 - extended slab
1.2 -
0.19 -
4.16 m3
1 7.21 - extended slab
1.8 -
0.19 -
2.47 m3
61.57 First Floor slab
Second Floor slab
1 17.825 b/n axis A-B & on axis 1-7
5.1
0.19
17.27 m3
1 17.825 - b/n axis B-C & on axis 1-7
4.4 -
0.19 -
14.90 m3
1 14.33 - b/n axis B-C & on axis 1-7
5.8 -
0.19 -
15.79 m3
1 8.514 - b/n axis 1-2 & on axis C,C',D
3.495 -
0.19 -
5.65 m3
1 3.995 - extended slab
1.75 -
0.19 -
1.33 m3
1 18.25 - extended slab
1.2 -
0.19 -
4.16 m3
1 7.21 - extended slab
1.8 -
0.19 -
2.47 m3
61.57 Second Floor slab
Roof Treeace slab
1 15.3 on axis A-D & 3-5
6.915
0.19
20.10 m3
1 7.36 - on axis A-B' & 5-6
5.18 -
0.19 -
7.24 m3
27.35 Total Roof Treeace Slab
FORM WORK
Ground floor columun
16 4.1 c1
1.4
91.84 m3
12 4.1 - c2
1.4 -
68.88 m3
1 4.1 - c3
1.4 -
5.74 m3
166.46 Total of Ground floor columun Form Work
Ground Floor Beam
1 16.748 GFB 1
0.5
8.37 m2
1 4.095 - GFB 2
0.5 -
2.05 m2
1 3.495 - GFB 3
0.5 -
1.75 m2
1 15.3 - GFB 4
0.5 -
7.65 m2
1 14.334 - GFB 5
0.5 -
7.17 m2
26.99 Total Ground floor Beam form work
First Floor Beam
2 14.994 FFB 1
0.9
26.99 m3
5 3.49 - FFB 2
0.9 -
15.71 m3
1 15.296 - FFB 3
0.9 -
13.77 m3
2 15.3 - FFB 4
0.9 -
27.54 m3
2 15.3 - FFB 5
0.9 -
27.54 m3
1 14.334 - FFB 6
0.9 -
12.90 m3
2 14.334 - FFB 7
0.9 -
25.80 m3
1 14.334 - FFB 8
0.9 -
12.90 m3
163.14 Total of First Floor Beam Form Work
First Floor Columun
16 1.4 c1
3.1
69.44 m3
13 1.4 - c2
3.1 -
56.42 m3
1 1.4 - c3
3.1 -
4.34 m3
130.20 Total of Footing Columun Form Work
Roof beam
2 15 RB 1
0.9
27.00 m3
5 3.496 - RB 2
0.9 -
15.73 m3
42.73 Total Roof Beam Form Work
Second Floor Beam
3 15.296 SFB 1
0.9
41.30 m3
2 15.296 - SFB 2
0.9 -
27.53 m3
3 14.334 - SFB 3
0.9 -
38.70 m3
1 14.334 - SFB 4
0.9 -
12.90 m3
120.43 Second Floor Beam Form Work
Second Floor columun
16 1.4 c1
3.1
69.44 m3
13 1.4 - c2
3.1 -
56.42 m3
1 1.4 - c3
3.1 -
4.34 m3
130.20 Total of Second Floor Columun Form Work
Roof Treeace Beam
1 15.3 RTB 1
0.9
13.77 m3
1 15.3 - RTB 2
0.9 -
13.77 m3
1 15.3 - RTB 3
0.9 -
13.77 m3
1 7.2 - RTB 4
0.9 -
6.48 m3
2 12.104 - RTB 5
0.9 -
21.79
- m3
2 6.919 - RTB 6
0.9 -
12.45 m3
1 5.4 - RTB 7
0.9 -
4.86 m3
86.89 Total of roof terrace Beam Form Work
Third Floor columun
13 1.4 c2
3.1
56.42 m3
1 1.4 - c3
3.1 -
4.34 m3
60.76 Total of Footing Columun Form Work
First Floor slab
1 17.825 b/n axis A-B & on axis 1-7
5.1 90.91
4.35575
95.26 m3
1 17.825 - b/n axis B-C & on axis 1-7
4.4 78.43
4.35575 -
82.79 m3
1 14.33 - b/n axis B-C & on axis 1-7
5.8 83.11
4.35575 -
87.47 m3
1 8.514 - b/n axis 1-2 & on axis C,C',D
3.495 29.76
4.35575 -
34.11 m3
1 3.995 - extended slab
1.75 6.99
4.35575 -
11.35 m3
1 18.25 - extended slab
1.2 21.90
4.35575 -
26.26 m3
1 7.21 - extended slab
1.8 12.98
4.35575 -
17.33 m3
354.57 Total First Floor slab Form Work
Second Floor slab
1 17.825 b/n axis A-B & on axis 1-7
5.1 90.91
4.35575
95.26 m3
1 17.825 - b/n axis B-C & on axis 1-7
4.4 78.43
4.35575 -
82.79 m3
1 14.33 - b/n axis B-C & on axis 1-7
5.8 83.11
4.35575 -
87.47 m3
1 8.514 - b/n axis 1-2 & on axis C,C',D
3.495 29.76
4.35575 -
34.11 m3
1 3.995 - extended slab
1.75 6.99
4.35575 -
11.35 m3
1 18.25 - extended slab
1.2 21.90
4.35575 -
26.26 m3
1 7.21 - extended slab
1.8 12.98
4.35575 -
17.33 m3
354.57 Total of second Floor slab Form Work
Roof Treeace slab
1 15.3 on axis A-D & 3-5
6.915 105.7995
4.35575
110.16 m3
1 7.36 - on axis A-B' & 5-6
5.18 38.12
4.35575 -
42.48 m3
152.64 ground floor stair case
stair case
ground floor stair case
26 1.45 steps
0.0255
0.96 m3
4 1.51 landing
1.45
0.16
1.40 m3
2 4.284 sofit
1.45
0.17
2.11 m3
4.47 Total of Ground Floor Stair Case
First floor and above stair case
26 1.45 steps
0.0255
0.96 m3
4 1.51 landing
1.45
0.16
1.40128 m3
4 3.47 sofit
1.45
0.17
3.42 m3
5.78 Total of first floor stair case
10.26 Total of stair case
ground floor stair case form work
2 4.2
1.45
0.3
13.88
52 0.17
1.45
12.82
26.69 Total of stair case form work
First floor and above stair case form work
2 3.47
1.45
0.3
11.54
52 0.17
1.45
12.82
24.36 Total of stair case form work
51.05 Total stair case form work
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-
Location:- Addis Ababa
TIM DIMN TOTAL DISCRIPTION

4 Masonary work

500mm thick stone masonary


2 18.484 GFB 1 along axis 1&2 on axis A-D
0.5
1.7
31.42 m3
2 3.595 - GFB 2 side axis of A&D
0.5 -
1.7 -
6.11 m3
5 3.595 - GFB 3 on axis of A-D
0.5 -
1.7 -
15.28 m3
5 15.3 - GFB 4 on axis 3-7
0.5 -
1.7 -
65.02 m3
4 14.314 - GFB 5 on axis A-D
0.5 -
1.7 -
48.67 m3
166.51 Total of GFB Masonary work
Total no.of
Location Ø Length No. of bar No. of member
bars Ø-8

Footing Foundation Pad


F1 14 2.70 14 12 162 -
14 2.70 14 12 162 -
F2 14 3.20 24 4 95 -
14 3.20 24 4 95 -
F3 14 3.00 16 4 63 -
14 3.00 12 4 47 -
Total Length (ML) -
Page 1 Unit Weight (Kg/m) 0.395
Total Weight (Kg) 0.00
Strap footing pad - -
STF 1 - -
16 1.60 10 2 20 -
16 1.60 10 2 20 -
14 1.80 10 2 21 -
14 1.80 10 2 21 -
16 3.78 3 2 6 -
16 3.78 4 2 8 -
14 1.27 7 2 14 -
14 1.90 11 2 22 -
STF 2 - -
16 1.60 9 3 27 -
16 1.60 9 3 27 -
16 1.98 12 3 35 -
16 1.98 12 3 35 -
16 3.80 3 3 9 -
16 3.80 4 3 12 -
14 1.34 8 3 23 -
14 1.34 8 3 23 -
14 1.90 12 3 35 -
14 1.90 12 3 35 -
Total Length (ML) -
Page 1 Unit Weight (Kg/m) 0.395
Total Weight (Kg) 0.00
foundational columun - -
c1 14 3.50 8 16 128 -
c2 14 3.50 8 16 128 -
c3 16 3.50 8 16 128 -
Total Length (ML) -
Page 1 Unit Weight (Kg/m) 0.395
Total Weight (Kg) 0.00
Stirr up foundation
cloumn
c1 8 1.10 15 16 243 266.93
c2 8 1.10 15 14 212 233.57
c3 8 1.10 15 1 15 16.68
Total Length (ML) 517.18
Page 1 Unit Weight (Kg/m) 0.395
Total Weight (Kg) 204.29
Ground Floor Beam - -
GFB 1 14 10.38 3 2 6 -
14 11.08 3 2 6 -
14 8.00 3 2 6 -
14 7.70 3 2 6 -
14 6.44 3 2 6 -
GFB 2 14 4.75 3 2 6 -
14 4.75 3 2 6 -
GFB 3 14 4.75 3 5 15 -
14 4.75 3 5 15 -
GFB 4 14 8.63 3 5 15 -
14 9.33 3 5 15 -
14 6.98 3 5 15 -
14 5.50 3 5 15 -
14 6.28 3 5 15 -
GFB 5 14 6.15 3 4 12 -
14 11.13 3 4 12 -
14 3.41 3 4 12 -
14 9.60 3 4 12 -
14 5.08 3 4 12 -
Total Length (ML) -
Page 1 Unit Weight (Kg/m) 0.395
Total Weight (Kg) 0.00
Ground Floor Beam
Stirr up
GFB 1 8 1.20 19 2 37 44.40
8 1.20 18 2 36 43.20
8 1.20 12 2 25 29.60
8 1.20 18 2 36 43.20
8 1.20 16 2 31 37.44
8 1.20 11 2 21 25.76
8 1.20 16 2 31 37.44
8 1.20 12 2 24 28.80
8 1.20 36 2 72 86.74
8 1.20 10 2 21 25.07
GFB 2 8 1.20 37 2 74 88.68
GFB 3 8 1.20 36 5 180 215.70
GFB 4 8 1.20 18 5 90 108.00
8 1.20 12 5 62 74.00
8 1.20 18 5 90 108.00
8 1.20 16 5 78 93.60
8 1.20 11 5 54 64.40
8 1.20 16 5 78 93.60
8 1.20 20 5 101 121.80
8 1.20 14 5 69 83.20
8 1.20 20 5 101 121.80
GFB 5 8 1.20 23 4 93 111.84
8 1.20 12 4 50 59.84
8 1.20 18 4 73 87.36
8 1.20 18 4 73 87.36
8 1.20 31 4 125 149.52
8 1.20 40 4 160 192.19
Total Length (ML) 2,262.53
Page 1 Unit Weight (Kg/m) 0.395
Total Weight (Kg) 893.70
Ground floor columun - -
c1 14 5.30 8 16 128 -
c2 14 5.30 8 14 112 -
c3 16 5.30 8 1 8 -
Total Length (ML) -
Page 1 Unit Weight (Kg/m) 0.395
Total Weight (Kg) 0.00
Ground floor Columun
stirr up
c1 8 1.30 16 16 251 325.87
8 1.30 13 16 204 264.85
8 1.30 16 16 251 325.87
c2 8 1.30 16 14 219 285.13
8 1.30 13 14 178 231.75
8 1.30 16 14 219 285.13
c3 8 1.30 16 1 16 20.37
8 1.30 16 1 16 20.37
8 1.30 13 1 13 16.55
Total Length (ML) 1,775.89
Page 1 Unit Weight (Kg/m) 0.395
Total Weight (Kg) 701.48
First floor Beam - -
FFB 1 16 8.96 3 2 6 -
14 9.33 3 2 6 -
14 6.28 3 2 6 -
14 5.50 3 2 6 -
14 6.98 3 2 6 -
FFB 2 14 4.75 3 5 15 -
16 4.75 3 5 15 -
FFB 3 16 8.63 3 1 3 -
14 6.28 3 1 3 -
14 5.50 3 1 3 -
16 4.07 1 1 1 -
16 9.33 3 1 3 -
16 6.98 3 1 3 -
FFB 4 16 8.63 3 2 6 -
14 6.28 3 2 6 -
16 4.07 2 2 4 -
14 5.50 3 2 6 -
16 9.33 4 2 8 -
16 6.98 5 2 10 -
FFB 5 16 8.63 4 2 8 -
16 6.28 3 2 6 -
14 4.06 2 2 4 -
16 5.50 3 2 6 -
16 6.93 4 2 8 -
FFB 6 16 6.15 4 1 4 -
14 3.41 3 1 3 -
16 9.60 4 1 4 -
16 11.13 4 1 4 -
14 5.08 3 1 3 -
FFB 7 16 6.15 4 2 8 -
14 3.41 3 2 6 -
14 2.67 1 2 2 -
14 2.93 1 2 2 -
16 11.13 4 2 8 -
16 9.60 4 2 8 -
16 5.08 3 2 6 -
FFB 8 16 6.15 3 2 6 -
14 3.41 3 2 6 -
14 9.60 3 2 6 -
16 11.13 3 2 6 -
14 5.08 3 2 6 -
Total Length (ML) -
Page 1 Unit Weight (Kg/m) 0.395
Total Weight (Kg) 0.00

First floor Beam Stirr up


FFB 1 8 1.20 18 2 36 43.20
8 1.20 12 2 25 29.60
8 1.20 18 2 36 43.20
8 1.20 15 2 30 36.00
8 1.20 10 2 21 24.80
8 1.20 15 2 30 36.00
8 1.20 21 2 42 50.06
8 1.20 13 2 25 30.42
8 1.20 19 2 37 44.42
FFB 2 8 1.20 36 5 180 215.70
FFB 3 8 1.20 18 1 18 21.60
8 1.20 12 1 12 14.80
8 1.20 18 1 18 21.60
8 1.20 15 1 15 18.00
8 1.20 10 1 10 12.40
8 1.20 15 1 15 18.00
8 1.20 20 1 20 24.00
8 1.20 14 1 14 16.40
8 1.20 20 1 20 24.00
FFB 4 8 1.20 18 2 36 43.20
8 1.20 12 2 25 29.60
8 1.20 18 2 36 43.20
8 1.20 15 2 30 36.00
8 1.20 10 2 21 24.80
8 1.20 15 2 30 36.00
8 1.20 20 2 40 48.00
8 1.20 14 2 27 32.80
8 1.20 20 2 40 48.00
FFB 5 8 1.20 18 2 36 43.20
8 1.20 12 2 25 29.60
8 1.20 18 2 36 43.20
8 1.20 15 2 30 36.00
8 1.20 10 2 21 24.80
8 1.20 15 2 30 36.00
8 1.20 20 2 40 48.00
8 1.20 14 2 27 32.80
8 1.20 20 2 40 48.00
FFB 6 8 1.20 23 1 23 27.96
8 1.20 18 1 18 21.60
8 1.20 12 1 12 14.80
8 1.20 18 1 18 21.60
8 1.20 31 1 31 37.38
8 1.20 40 1 40 48.05
FFB 7 8 1.20 23 2 47 55.92
8 1.20 18 2 36 43.20
8 1.20 12 2 25 29.60
8 1.20 18 2 36 43.20
8 1.20 31 2 62 74.76
8 1.20 40 2 80 96.10
FFB 8 8 1.20 23 1 23 27.96
8 1.20 18 1 18 21.60
8 1.20 12 1 12 14.80
8 1.20 18 1 18 21.60
8 1.20 31 1 31 37.38
8 1.20 40 1 40 48.05
Total Length (ML) 2,092.96
Page 1 Unit Weight (Kg/m) 0.395
Total Weight (Kg) 826.72
First Floor Columun -
c1 14 4.30 8 16 128 -
c2 14 4.30 8 14 112 -
c3 16 4.30 8 1 8 -
Total Length (ML) -
Page 1 Unit Weight (Kg/m) 0.395
Total Weight (Kg) 0.00
First Floor Columun
Stirr up
c1 8 1.30 13 16 211 273.87
8 1.30 11 16 172 223.25
8 1.30 13 16 211 273.87
c2 8 1.30 13 14 184 239.63
8 1.30 11 14 150 195.35
8 1.30 13 14 184 239.63
c3 8 1.30 13 1 13 17.12
8 1.30 13 1 13 17.12
8 1.30 11 1 11 13.95
Total Length (ML) 1,493.79
Page 1 Unit Weight (Kg/m) 0.395
Total Weight (Kg) 590.05

Second Floor Beam -


RB 1 14 8.63 3 2 6 -
14 6.28 3 2 6 -
14 5.50 3 2 6 -
14 9.33 3 2 6 -
14 6.98 3 2 6 -
RB 2 14 4.75 3 2 6 -
16 4.75 3 2 6 -
SFB 1 14 8.63 3 2 6 -
14 6.28 3 2 6 -
14 5.50 3 2 6 -
14 6.98 3 2 6 -
16 9.33 3 2 6 -
SFB 2 14 8.63 3 2 6 -
14 6.28 3 2 6 -
14 4.07 1 2 2 -
14 5.50 3 2 6 -
14 6.98 3 2 6 -
14 9.33 3 2 6 -
SFB 3 16 6.15 3 2 6 -
14 3.41 3 3 9 -
14 9.60 3 3 9 -
16 11.13 3 3 9 -
14 5.08 3 3 9 -
SFB 4 14 6.15 3 1 3 -
14 3.41 3 1 3 -
14 9.60 3 1 3 -
14 11.13 3 1 3 -
14 5.08 3 1 3 -
Total Length (ML) -
Page 1 Unit Weight (Kg/m) 0.395
Total Weight (Kg) 0.00
Second floor Beam stirr
up
RB 1 8 1.20 18 1 18 21.60
8 1.20 12 1 12 14.80
8 1.20 18 1 18 21.60
8 1.20 15 1 15 18.00
8 1.20 10 1 10 12.40
8 1.20 15 1 15 18.00
8 1.20 20 1 20 24.00
8 1.20 14 1 14 16.40
8 1.20 20 1 20 24.00
RB 2 8 1.20 18 1 18 21.60
8 1.20 12 1 12 14.80
8 1.20 18 1 18 21.60
8 1.20 15 1 15 18.00
8 1.20 10 1 10 12.40
8 1.20 15 1 15 18.00
8 1.20 20 1 20 24.00
8 1.20 14 1 14 16.40
8 1.20 20 1 20 24.00
RB 3 8 1.20 36 5 180 215.70
SFB 1 8 1.20 18 3 54 64.80
8 1.20 12 3 37 44.40
8 1.20 18 3 54 64.80
8 1.20 15 3 45 54.00
8 1.20 10 3 31 37.20
8 1.20 15 3 45 54.00
8 1.20 20 3 60 72.00
8 1.20 14 3 41 49.20
8 1.20 20 3 60 72.00
SFB 2 8 1.20 18 2 36 43.20
8 1.20 12 2 25 29.60
8 1.20 18 2 36 43.20
8 1.20 15 2 30 36.00
8 1.20 10 2 21 24.80
8 1.20 15 2 30 36.00
8 1.20 20 2 40 48.00
8 1.20 14 2 27 32.80
8 1.20 20 2 40 48.00
SFB 3 8 1.20 23 3 70 83.88
8 1.20 18 3 54 64.80
8 1.20 12 3 37 44.40
8 1.20 18 3 54 64.80
8 1.20 31 3 93 112.14
8 1.20 40 3 120 144.14
SFB 4 8 1.20 23 1 23 27.96
8 1.20 18 1 18 21.60
8 1.20 12 1 12 14.80
8 1.20 18 1 18 21.60
8 1.20 31 1 31 37.38
8 1.20 40 1 40 48.05
Total Length (ML) 2,096.85
Page 1 Unit Weight (Kg/m) 0.395
Total Weight (Kg) 828.26
Second Floor Columun - -
c2 14 4.20 8 14 112 -
c3 16 4.20 8 1 8 -
Total Length (ML) -
Page 1 Unit Weight (Kg/m) 0.395
Total Weight (Kg) 0.00
Second Floor Columun
-
Stirr up
c2 8 1.30 13 14 177 230.53
8 1.30 10 14 145 188.07
8 1.30 13 14 177 230.53
c3 8 1.30 13 1 13 16.47
8 1.30 10 1 10 13.43
8 1.30 13 1 13 16.47
-
Total Length (ML) 695.50
Page 1 Unit Weight (Kg/m) 0.395
Total Weight (Kg) 274.72
Roof Treeace Beam
RTB 1 14 8.63 3 1 3 -
14 6.28 3 1 3 -
14 5.50 3 1 3 -
14 9.33 3 1 3 -
14 6.98 3 1 3 -
RTB 2 14 8.63 3 1 3 -
16 6.28 3 1 3 -
16 5.50 3 1 3 -
16 6.98 3 1 3 -
16 9.33 3 1 3 -
RTB 3 16 8.63 3 1 3 -
16 6.28 3 1 3 -
14 3.37 3 1 3 -
14 5.50 3 1 3 -
14 9.33 3 1 3 -
14 6.98 3 1 3 -
RTB 4 16 8.46 3 1 3 -
16 8.46 3 1 3 -
RTB 5 16 3.62 3 2 6 -
14 3.37 1 2 2 -
16 11.13 3 2 6 -
16 9.68 3 2 6 -
14 5.08 3 2 6 -
RTB 6 14 8.47 3 2 6 -
14 8.47 3 2 6 -
RTB 7 14 6.35 3 2 6 -
14 6.35 3 2 6 -
Total Length (ML) -
Page 1 Unit Weight (Kg/m) 0.395
Total Weight (Kg) 0.00
Roof Terrace Beam Stirr
UP
RTB 1 8 1.20 18 1 18 21.60
8 1.20 12 1 12 14.80
8 1.20 18 1 18 21.60
8 1.20 15 1 15 18.00
8 1.20 10 1 10 12.40
8 1.20 15 1 15 18.00
8 1.20 20 1 20 24.00
8 1.20 14 1 14 16.40
8 1.20 20 1 20 24.00
RTB 2 8 1.20 18 1 18 21.60
8 1.20 12 1 12 14.80
8 1.20 18 1 18 21.60
8 1.20 15 1 15 18.00
8 1.20 10 1 10 12.40
8 1.20 15 1 15 18.00
8 1.20 20 1 20 24.00
8 1.20 14 1 14 16.40
8 1.20 20 1 20 24.00
RTB 3 8 1.20 18 1 18 21.60
8 1.20 12 1 12 14.80
8 1.20 18 1 18 21.60
8 1.20 15 1 15 18.00
8 1.20 10 1 10 12.40
8 1.20 15 1 15 18.00
8 1.20 20 1 20 24.00
8 1.20 14 1 14 16.40
8 1.20 20 1 20 24.00
RTB 4 8 1.20 18 1 18 21.60
8 1.20 12 1 12 14.80
8 1.20 18 1 18 21.60
8 1.20 22 1 22 26.52
RTB 5 8 1.20 18 2 36 43.20
8 1.20 12 2 25 29.60
8 1.20 18 2 36 43.20
8 1.20 31 2 62 74.76
8 1.20 40 2 80 96.10
RTB 6 8 1.20 31 2 62 74.76
8 1.20 40 2 80 96.10
RTB 7 8 1.20 19 1 19 22.80
8 1.20 13 1 13 15.60
8 1.20 19 1 19 22.80
Total Length (ML) 1,115.83
Page 1 Unit Weight (Kg/m) 0.395
Total Weight (Kg) 440.75
Ground floor mesh
on axis A & 1-2 8 1.55 9 1 9 13.56
8 3.50 18 1 18 64.57
8 1.55 9 1 9 13.56
8 3.50 18 1 18 64.57
B/n axis A-B on 1-7 8 3.50 18 1 18 64.57
8 5.10 26 1 26 135.15
8 3.90 21 1 21 79.95
8 5.10 26 1 26 135.15
8 3.02 16 1 16 48.47
8 5.10 26 1 26 135.15
8 5.19 27 1 27 139.61
8 5.10 26 1 26 135.15
8 2.23 12 1 12 27.09
8 5.10 26 1 26 135.15
B/n axis B-C on 1-7 8 3.50 18 1 18 64.57
8 4.40 23 1 23 101.20
8 3.90 21 1 21 79.95
8 4.40 23 1 23 101.20
8 3.02 16 1 16 48.47
8 4.40 23 1 23 101.20
8 5.19 27 1 27 139.61
8 4.40 23 1 23 101.20
8 2.23 12 1 12 27.09
8 4.40 23 1 23 101.20
B/n axis C-D on 1-7 8 3.50 18 1 18 64.57
8 5.80 30 1 30 174.00
8 3.90 21 1 21 79.95
8 5.80 30 1 30 174.00
8 3.02 16 1 16 48.47
8 5.80 30 1 30 174.00
8 5.19 27 1 27 139.61
8 5.80 30 1 30 174.00
8 2.23 12 1 12 27.09
8 5.80 30 1 30 174.00
Total Length (ML) 3,287.08
Page 1 Unit Weight (Kg/m) 0.395
Total Weight (Kg) 1298.39
First floor slab - -
on axis A-D b/n 1-2 8 6.98 58 1 58 405.42
8 7.54 34 1 34 258.25
8 6.98 32 1 32 226.35
8 6.71 30 1 30 197.95
8 6.98 50 1 50 346.01
8 7.44 29 1 29 214.70
10 3.84 30 1 30
10 3.37 30 1 30
10 4.59 30 1 30
on axis A-D b/n 2-7 8 6.02 52 1 52 313.04
8 7.62 32 1 32 243.08
8 6.06 30 1 30 183.82
8 4.90 27 1 27 132.30
8 6.02 46 1 46 274.60
8 8.55 14 1 14 119.70
8 3.51 30 1 30 106.47
8 4.90 21 1 21 103.39
8 3.51 40 1 40 139.23
8 8.55 21 1 21 180.41
8 11.70 26 1 26 310.05
8 7.62 44 1 44 336.55
8 7.54 27 1 27 204.21
8 9.65 23 1 23 221.95
8 4.90 44 1 44 216.62
8 9.65 49 1 49 476.07
8 8.55 44 1 44 371.93
8 7.54 26 1 26 197.55
8 4.90 26 1 26 128.38
8 8.55 39 1 39 331.74
10 3.37 27 1 27 -
10 3.60 27 1 27 -
10 2.50 30 1 30 -
10 2.50 40 1 40 -
10 3.60 27 1 27 -
10 3.60 27 1 27 -
10 3.60 27 1 27 -
10 2.93 30 1 30 -
10 2.93 30 1 30 -
10 2.67 35 1 35 -
10 2.67 30 1 30 -
10 2.67 40 1 40 -
10 3.84 16 1 16 -
10 3.37 16 1 16 -
10 3.60 16 1 16 -
10 2.38 30 1 30 -
10 2.38 35 1 35 -
10 2.38 40 1 40 -
Total Length (ML) 6,239.75
Page 1 Unit Weight (Kg/m) 0.395
Total Weight (Kg) 2464.70
Roof terrace slab

8 9.33 52 1 52 485.16
8 7.62 40 1 40 304.80
8 6.02 30 1 30 182.61
8 4.90 27 1 27 132.30
8 8.50 46 1 46 387.73
8 6.02 2 1 2 9.07
8 7.62 31 1 31 237.36
8 4.83 30 1 30 146.51
8 4.90 21 1 21 103.39
8 4.83 40 1 40 191.59
10 3.37 27 1 27 -
10 2.50 30 1 30 -
10 3.60 25 1 25 -
10 2.50 40 1 40 -
10 3.37 21 1 21 -
10 3.60 21 1 21 -
10 3.84 24 1 24 -
10 4.04 36 1 36 -
8 8.56 21 1 21 180.51
8 9.99 44 1 44 441.22
8 9.83 30 1 30 290.80
8 7.74 77 1 77 595.34
Total Length (ML) 3,688.40
Page 1 Unit Weight (Kg/m) 0.395
Total Weight (Kg) 1456.92
Seconde Floor Slab 8 7.64 52 1 52 397.28
8 7.62 40 1 40 304.80
8 4.90 40 1 40 196.00
8 6.02 45 1 45 270.90
8 8.55 40 1 40 342.00
8 6.02 59 1 59 355.18
8 4.90 31 1 31 152.64
8 3.51 45 1 45 157.95
8 3.51 59 1 59 207.09
8 8.55 31 1 31 266.33
8 7.62 53 1 53 402.34
8 7.50 57 1 57 427.50
8 4.90 52 1 52 254.80
8 8.50 52 1 52 442.00
8 9.65 52 1 52 501.80
8 9.65 45 1 45 434.25
8 9.65 59 1 59 569.35
8 8.55 23 1 23 196.65
8 4.90 23 1 23 114.17
8 7.54 23 1 23 175.68
10 3.37 97 1 97 -
10 3.60 97 1 97 -
10 2.50 69 1 69 -
10 2.93 69 1 69 -
10 3.84 50 1 50 -
10 2.67 103 1 103 -
Total Length (ML) 5,270.63
Page 1 Unit Weight (Kg/m) 0.395
Total Weight (Kg) 2081.90
spiral stair case
stair case
step 8 0.90 5 9 43 39.07
14 1.75 7 1 7 -
14 1.86 7 1 7 -
14 4.54 7 1 7 -
12 1.29 9 1 9 -
8 0.90 5 9 43 39.07
14 1.75 7 1 7 -
14 1.86 7 1 7 -
14 4.54 7 1 7 -
12 1.29 9 1 9 -
landind beam 16 3.32 3 2 6 -
16 3.32 3 2 6 -
stirr up 8 1.20 20 2 40 47.88
Total Length (ML) 13,647.65
Page 1 Unit Weight (Kg/m) 0.395
Total Weight (Kg) 5390.82
Ground floor stair case - -
8 0.80 7 13 88
14 3.13 11 1 11 -
14 1.92 11 1 11 -
14 1.94 11 1 11 -
14 6.56 11 1 11 -
14 1.23 11 1 11 -
8 0.80 7 13 88 70.72
14 3.13 11 1 11 -
14 1.92 11 1 11 -
14 1.94 11 1 11 -
14 6.56 11 1 11 -
14 1.23 11 1 11 -
landing beam 16 4.20 3 2 6 -
14 4.27 3 2 6 -
stirr up 8 1.20 31 2 62 74.76
Total Length (ML) 145.48
Page 1 Unit Weight (Kg/m) 0.395
Total Weight (Kg) 57.46
First floor & above Stair
- -
case
8 0.80 7 10 68 54.40
14 2.87 11 1 11 -
14 1.92 11 1 11 -
14 2.31 11 1 11 -
14 2.47 11 1 11 -
14 6.56 11 1 11 -
8 0.80 7 10 68 54.40
14 2.87 11 1 11 -
14 1.92 11 1 11 -
14 2.31 11 1 11 -
14 2.47 11 1 11 -
14 6.56 11 1 11 -
landing beam 14 4.27 3 2 6 -
14 4.27 3 2 6 -
stirr up 8 1.20 31 2 62 74.76
Total Length (ML) 183.56
Page 1 Unit Weight (Kg/m) 0.395
Total Weight (Kg) 72.51
Total length
Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24

- - 437.40 - - -
- - 437.40 - - -
- - 303.71 - - -
- - 303.71 - - -
- - 188.00 - - -
- - 140.00 - - -
- - 1,810.22 - - -
0.62 0.89 1.209 1.579 2.468 3.552
0.00 0.00 2188.55 0.00 0.00 0.00
- - - - - -
- - - - - -
- - - 32.74 - -
- - - 32.74 - -
- - 37.20 - - -
- - 37.20 - - -
- - - 22.68 - -
- - - 30.24 - -
- - 17.27 - - -
- - 41.80 - - -
- - - - - -
- - - 43.20 - -
- - - 43.20 - -
- - - 69.58 - -
- - - 69.58 - -
- - - 34.17 - -
- - - 45.56 - -
- - 31.01 - - -
- - 31.01 - - -
- - 66.77 - - -
- - 66.77 - - -
- - 329.04 423.70 - -
0.62 0.89 1.209 1.579 2.468 3.552
0.00 0.00 397.81 669.02 0.00 0.00
-
- - 448.00 - - -
- - 448.00 - - -
- - - 448.00 - -
- - 896.00 448.00 - -
0.62 0.89 1.209 1.579 2.468 3.552
0.00 0.00 1083.26 707.39 0.00 0.00
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.62 0.89 1.209 1.579 2.468 3.552
0.00 0.00 0.00 0.00 0.00 0.00
- - - - - -
- - 62.25 - - -
- - 66.45 - - -
- - 48.00 - - -
- - 46.20 - - -
- - 38.63 - - -
- - 28.47 - - -
- - 28.47 - - -
- - 71.18 - - -
- - 71.25 - - -
- - 129.38 - - -
- - 139.88 - - -
- - 104.63 - - -
- - 82.50 - - -
- - 94.13 - - -
- - 73.80 - - -
- - 133.61 - - -
- - 40.87 - - -
- - 115.21 - - -
- - 60.95 - - -
- - 1,435.84 - - -
0.62 0.89 1.209 1.579 2.468 3.552
0.00 0.00 1735.93 0.00 0.00 0.00

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.62 0.89 1.209 1.579 2.468 3.552
0.00 0.00 0.00 0.00 0.00 0.00
- - - - - -
- - 678.40 - - -
- - 593.60 - - -
- - - 42.40 - -
- - 1,272.00 42.40 - -
0.62 0.89 1.209 1.579 2.468 3.552
0.00 0.00 1537.85 66.95 0.00 0.00

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.62 0.89 1.209 1.579 2.468 3.552
0.00 0.00 0.00 0.00 0.00 0.00
- - - - - -
- - - 53.78 - -
- - 55.95 - - -
- - 37.65 - - -
- - 33.00 - - -
- - 41.85 - - -
- - 71.18 - - -
- - - 71.18 - -
- - - 25.88 - -
- - 18.83 - - -
- - 16.50 - - -
- - - 4.07 - -
- - - 27.97 - -
- - - 20.92 - -
- - - 51.75 - -
- - 37.65 - - -
- - - 16.26 - -
- - 33.00 - - -
- - - 74.60 - -
- - - 69.75 - -
- - - 69.00 - -
- - - 37.65 - -
- - 16.24 - - -
- - - 33.00 - -
- - - 55.40 - -
- - - 24.60 - -
- - 10.22 - - -
- - - 38.40 - -
- - - 44.54 - -
- - 15.24 - - -
- - - 49.20 - -
- - 20.44 - - -
- - 5.35 - - -
- - 5.87 - - -
- - - 89.07 - -
- - - 76.81 - -
- - - 30.47 - -
- - - 36.90 - -
- - 20.44 - - -
- - 57.61 - - -
- - - 66.80 - -
- - 30.47 - - -
- - 527.46 1,068.00 - -
0.62 0.89 1.209 1.579 2.468 3.552
0.00 0.00 637.70 1686.38 0.00 0.00

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.62 0.89 1.209 1.579 2.468 3.552
0.00 0.00 0.00 0.00 0.00 0.00
- - - - - -
- - 550.40 - - -
- - 481.60 - - -
- - - 34.40 - -
- - 1,032.00 34.40 - -
0.62 0.89 1.209 1.579 2.468 3.552
0.00 0.00 1247.69 54.32 0.00 0.00

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
0.62 0.89 1.209 1.579 2.468 3.552
0.00 0.00 0.00 0.00 0.00 0.00

- - - - - -
- - 51.75 - - -
- - 37.65 - - -
- - 33.00 - - -
- - 55.95 - - -
- - 41.85 - - -
- - 28.47 - - -
- - - 28.50 - -
- - 51.75 - - -
- - 37.65 - - -
- - 33.00 - - -
- - 41.85 - - -
- - - 55.95 - -
- - 51.75 - - -
- - 37.65 - - -
- - 8.13 - - -
- - 33.00 - - -
- - 41.85 - - -
- - 55.95 - - -
- - - 36.90 - -
- - 30.65 - - -
- - 86.41 - - -
- - - 100.21 - -
- - 45.71 - - -
- - 18.45 - - -
- - 10.22 - - -
- - 28.80 - - -
- - 33.40 - - -
- - 15.24 - - -
- - 910.14 221.56 - -
0.62 0.89 1.209 1.579 2.468 3.552
0.00 0.00 1100.36 349.84 0.00 0.00

-
- - - - - -
0.62 0.89 1.209 1.579 2.468 3.552
0.00 0.00 0.00 0.00 0.00 0.00
- - - - - -
- - 470.40 - - -
- - - 33.60 - -
- - 470.40 33.60 - -
0.62 0.89 1.209 1.579 2.468 3.552
0.00 0.00 568.71 53.05 0.00 0.00

- - 470.40 33.60 - -
0.62 0.89 1.209 1.579 2.468 3.552
0.00 0.00 568.71 53.05 0.00 0.00
- -
- - 25.88 - - -
- - 18.83 - - -
- - 16.50 - - -
- - 27.97 - - -
- - 20.92 - - -
- - 25.88 - - -
- - - 18.83 - -
- - - 16.50 - -
- - - 20.92 - -
- - - 27.97 - -
- - - 25.88 - -
- - - 18.83 - -
- - 10.10 - - -
- - 16.50 - - -
- - 27.97 - - -
- - 20.92 - - -
- - - 25.38 - -
- - - 25.38 - -
- - - 21.72 - -
- - 6.73 - - -
- - - 66.80 - -
- - - 58.06 - -
- - 30.47 - - -
- - 50.81 - - -
- - 50.81 - - -
- - 38.11 - - -
- - 38.11 - - -
- - 426.52 326.27 - -
0.62 0.89 1.209 1.579 2.468 3.552
0.00 0.00 515.66 515.17 0.00 0.00

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- - - - - -
0.62 0.89 1.209 1.579 2.468 3.552
0.00 0.00 0.00 0.00 0.00 0.00

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- - - - - -
0.62 0.89 1.209 1.579 2.468 3.552
0.00 0.00 0.00 0.00 0.00 0.00
-
-
-
-
-
-
-
113.42
99.54
135.57
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
90.99
97.20
75.83
99.17
97.20
97.20
97.20
88.88
88.88
93.45
80.99
105.91
60.93
53.47
57.12
72.19
83.30
94.41
1,882.83 - - - - -
0.62 0.89 1.209 1.579 2.468 3.552
1167.36 0.00 0.00 0.00 0.00 0.00

-
-
-
-
-
-
-
-
-
-
90.99
75.83
90.00
99.17
71.11
75.96
91.65
143.72
-
-
-
-
738.42 - - - - -
0.62 0.89 1.209 1.579 2.468 3.552
457.82 0.00 0.00 0.00 0.00 0.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
325.32
347.52
172.50
202.17
193.66
275.01
1,516.18 - - - - -
0.62 0.89 1.209 1.579 2.468 3.552
940.03 0.00 0.00 0.00 0.00 0.00

- - -
- - 12.63
- - 13.46
- - 32.87
- 11.33 -
- - -
- - 12.63
- - 13.46
- - 32.87
- 11.33 -
- -
- -
- -
3,973.02 23.54 119.13 1.58 2.47 3.55
0.62 0.89 1.209 1.579 2.468 3.552
2463.27 20.95 144.03 2.49 6.09 12.62
- - -
- - -
- - 33.39
- - 20.47
- - 20.73
- - 69.93
- - 13.15
- - -
- - 33.39
- - 20.47
- - 20.73
- - 69.93
- - 13.15
- - -
- - 25.59
- - -
- - 340.92 - - -
0.62 0.89 1.209 1.579 2.468 3.552
0.00 0.00 412.17 0.00 0.00 0.00

- - -
- - -
- - 30.58
- - 20.47
- - 24.66
- - 26.35
- - 69.93
- - -
- - 30.58
- - 20.47
- - 24.66
- - 26.35
- - 69.93
- - 25.59
- - 25.59
- - -
- - 395.16 - - -
0.62 0.89 1.209 1.579 2.468 3.552
0.00 0.00 477.75 0.00 0.00 0.00
PROJECT :-B+G+2 RESIDENCE
LOCATION:-ADDIS ABEBA
CLIENT:- ATO DEMIS AYENEW
CONSULTANT :-AGAPE CONSULTING & TRADING PLC.

SUBST

Page number Ø-8


Foundation pad
Foundation Column
Strap footing pad
Ground Floor Slab 3,287.08
Ground floor beam 1,435.84
Ground Floor beam stirr up 2,262.53
Foundation Column stirr up 517.18
Total length(m) 7,502.63
unit weight(kg) 0.395
Total weight (kg) 2,963.54

PROJECT :-B+G+2 RESIDENCE


LOCATION:-ADDIS ABEBA
CLIENT:- ATO DEMIS AYENEW
CONSULTANT :-AGAPE CONSULTING & TRADING PLC.

SUPER-S

Page number Ø-8


Ground column
1st floor column
2nd floor column
First Floor Beam
second Floor Beam
Roof Floor Beam
Ground column stirr up 2,262.53
1st floor column stirr up 1,493.79
2nd floor column stirr up 695.50
First Floor Beam stirr up 2,092.96
second Floor Beam stirr up 2,096.85
Roof Floor Beam stirr up 1,115.83
Stair case 13,976.69
Gound Floor mesh 3,287.08
First Floor slab 6,239.75
Second floor Slab 5,270.63
Roof Slab 3,688.40
Total length(m) 42,220.00
unit weight(kg) 0.395
Total weight (kg) 16,676.90
LC. Page of

SUBSTRUCTURE

Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24


1,810.22
896.00 448.00
329.04 423.70

- - 3,035.26 871.70 - -
0.62 0.89 1.209 1.579 2.468 3.552
- - 3,669.62 1,376.41 - -

Total weight (Kg) 8,009.58

LC. Page of

SUPER-STRUCTURE

Ø-10 Ø-12 Ø-14 Ø-16 Ø-20 Ø-24


1,272.00 42.40
1,032.00 34.40
470.40 33.60
527.46 1,068.00
910.14 221.56
426.52 326.27
23.54 514.29

1,882.83
1,516.18
738.42
4,137.44 23.54 5,152.81 1,726.22 - -
0.62 0.89 1.209 1.579 2.468 3.552
2,565.21 20.95 6,229.75 2,725.71 - -

Total weight (Kg) 28,218.52


STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-
Location:- Addis Ababa
TIM DIMN TOTAL DISCRIPTION
BLOCK WORK
Ground floor plan
External block work
1 46.314 on axis A-D & b/n axis 1-2
4.3
199.1502 m2
Deduction
-2 1 window 1
1.5
(3.00) m2
-2 2 - window 2
1.5 - m2
(6.00)
-4 0.7 - door
2.1 -
(5.88) m2
1 70.045 on axis A-D & b/n axis 3-7
4.3
301.19 m2
- Deduction
-17 1 - window 1
3.3 -
(56.10) m2
-1 3 - window 2
3.3 -
(9.90) m2
-1 2 - window 3
3 -
(6.00) m2
-6 0.7 - door
2.1 -
(8.82)
- m2
404.6437 Total of external Ground Floor Block work
First floor Plan
1 51.127 on axis A-D & b/n axis 1-2
3.3
168.7191 m2
-2 1 window 1
1.5
m2
-3 2 window 2
3.3
m2
-4 0.7 door
2.1
m2
1 61.914 on axis A-D & b/n axis 3-7
3.3
204.3162 m2
Deduction
Windows
-4 1.5
1
(6.00) m2
- window 2
-1 3.998 -
2.5 -
(10.00) m2
-3 2 -
2.5 -
(15.00) m2
-1 4.08 -
2.5 -
(10.20) m2
-1 2.915 -
2.5 -
(7.29) m2
-1 0.7 -
2.1 -
(1.47) m2
323.08 Total of external First floor block work
Second Floor Plan
1 65.934 on axis A-D & b/n axis 3-7
3.3
217.58 m2
- Deduction
-3 1.5 - window 1
1 -
(4.50) m2
-1 2 - window 2
2.5 -
(5.00) m2
-1 2.2 -
2.5 -
(5.50) m2
-1 3 -
2.5 -
(7.50) m2
-1 2 -
2.5 -
(5.00) m2
-1 3 -
2.5 -
(7.50) m2
-1 2 -
2.5 -
(5.00) m2
177.58 Total of Second Floor Block Work
905.31 Total of external
INTERNAL BLOCK WORK
Ground floor plan
6 3.895 on axis A-D & b/n axis 1-2
3.3
77.12 m2
- Deduction
-2 0.7 -
2.1 -
(2.94)
1 45.239 - on axis A-D & b/n axis 3-7
3.3 -
149.29
- Deduction
-5 0.7 -
2.1 -
(7.35)
216.12 Total of Internal Ground Floor Block work
First floor Plan
1 15.8 on axis A-D & b/n axis 1-2
4.7
74.26 m2
- Deduction
-2 0.7 -
2.1 -
(2.94)
1 73.175 - on axis A-D & b/n axis 3-7
4.7 -
343.92
-7 0.7 - Deduction
2.1 -
(10.29)
404.95 Total of First Floor Internal Block work
Second Floor Plan
1 33.785 on axis A-D & b/n axis 3-7
3.5
118.2475
-5 0.7 0 Door
2.1 0
-7.35
110.8975 Total of Internal Second Floor Block Work
731.97 Total of Internal
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-
Location:- Addis Ababa
TIM DIMN TOTAL DISCRIPTION
PAINTING WORK
Ground floor plan
External PAINTING WORK
1 46.314 on axis A-D & b/n axis 1-2
4.3
199.1502 m2
Deduction
-2 1 window 1
1.5
(3.00) m2
-2 2 - window 2
1.5 - m2
(6.00)
-4 0.7 - door
2.1 -
(5.88) m2
1 70.045 on axis A-D & b/n axis 3-7
4.3
301.19 m2
- Deduction
-17 1 - window 1
3.3 -
(56.10) m2
-1 3 - window 2
3.3 -
(9.90) m2
-1 2 - window 3
3 -
(6.00) m2
-6 0.7 - door
2.1 -
(8.82)
- m2
404.6437 Total of external Ground Floor PAINTING WORK
First floor Plan
1 51.127 on axis A-D & b/n axis 1-2
3.3
168.7191 m2
-2 1 window 1
1.5
m2
-3 2 window 2
3.3
m2
-4 0.7 door
2.1
m2
1 61.914 on axis A-D & b/n axis 3-7
3.3
204.3162 m2
Deduction
Windows
-4 1.5
1
(6.00) m2
- window 2
-1 3.998 -
2.5 -
(10.00) m2
-3 2 -
2.5 -
(15.00) m2
-1 4.08 -
2.5 -
(10.20) m2
-1 2.915 -
2.5 -
(7.29) m2
-1 0.7 -
2.1 -
(1.47) m2
323.08 Total of external First floor PAINTING WORK
Second Floor Plan
1 65.934 on axis A-D & b/n axis 3-7
3.3
217.58 m2
- Deduction
-3 1.5 - window 1
1 -
(4.50) m2
-1 2 - window 2
2.5 -
(5.00) m2
-1 2.2 -
2.5 -
(5.50) m2
-1 3 -
2.5 -
(7.50) m2
-1 2 -
2.5 -
(5.00) m2
-1 3 -
2.5 -
(7.50) m2
-1 2 -
2.5 -
(5.00) m2
177.58 Total of Second Floor External PAINTING WORK
905.31 Total External Paint work
INTERNAL PAINTING WORK
Ground floor plan
6 3.895 on axis A-D & b/n axis 1-2
4.3
100.49 m2
- Deduction
-2 0.7 -
2.1 -
(2.94)
1 45.239 - on axis A-D & b/n axis 3-7
4.3 -
194.53
- Deduction
-5 0.7 -
2.1 -
(7.35)
284.73 Total of Internal Ground Floor PAINTING WORK
First floor Plan
1 15.8 on axis A-D & b/n axis 1-2
3.3
52.14 m2
- Deduction
-2 0.7 -
2.1 -
(2.94)
1 73.175 - on axis A-D & b/n axis 3-7
3.3 -
241.48
-7 0.7 - Deduction
2.1 -
(10.29)
280.39 Total of First Floor Internal PAINTING WORK
Second Floor Plan
1 33.785 on axis A-D & b/n axis 3-7
3.5
118.2475
-5 0.7 0 Door
2.1 0
-7.35
110.8975 Total of Internal Second Floor PAINTING WORK
676.01 Total of Internal painting
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-
Location:- Addis Ababa
TIM DIMN TOTAL DISCRIPTION
Plastering work
Ground floor plan
External plastering work
1 46.314 on axis A-D & b/n axis 1-2
4.3
199.1502 m2
Deduction
-2 1 window 1
1.5
(3.00) m2
-2 2 - window 2
1.5 - m2
(6.00)
-4 0.7 - door
2.1 -
(5.88) m2
1 70.045 on axis A-D & b/n axis 3-7
4.3
301.19 m2
- Deduction
-17 1 - window 1
3.3 -
(56.10) m2
-1 3 - window 2
3.3 -
(9.90) m2
-1 2 - window 3
3 -
(6.00) m2
-6 0.7 - door
2.1 -
(8.82)
- Total
m2 of external Ground Floor
404.6437 Plastering work
First floor Plan
1 51.127 on axis A-D & b/n axis 1-2
3.3
168.7191 m2
-2 1 window 1
1.5
m2
-3 2 window 2
3.3
m2
-4 0.7 door
2.1
m2
1 61.914 on axis A-D & b/n axis 3-7
3.3
204.3162 m2
Deduction
Windows
-4 1.5
1
(6.00) m2
- window 2
-1 3.998 -
2.5 -
(10.00) m2
-3 2 -
2.5 -
(15.00) m2
-1 4.08 -
2.5 -
(10.20) m2
-1 2.915 -
2.5 -
(7.29) m2
-1 0.7 -
2.1 -
(1.47) Total
m2 of external First floor
323.08 Plastering work
Second Floor Plan
1 65.934 on axis A-D & b/n axis 3-7
3.5
230.77 m2
- Deduction
-3 1.5 - window 1
1 -
(4.50) m2
-1 2 - window 2
2.5 -
(5.00) m2
-1 2.2 -
2.5 -
(5.50) m2
-1 3 -
2.5 -
(7.50) m2
-1 2 -
2.5 -
(5.00) m2
-1 3 -
2.5 -
(7.50) m2
-1 2 -
2.5 -
(5.00) Total
m2 of Second Floor Plastering
190.77 work
918.50 Total External plasterning
INTERNAL Plastering work
Ground floor plan
6 3.895 on axis A-D & b/n axis 1-2
4.3
100.49 m2
- Deduction
-2 0.7 -
2.1 -
(2.94)
1 45.239 - on axis A-D & b/n axis 3-7
4.3 -
194.53
- Deduction
-5 0.7 -
2.1 -
(7.35) Total of Internal Ground Floor
284.73 Plastering work
First floor Plan
1 15.8 on axis A-D & b/n axis 1-2
4.7
74.26 m2
- Deduction
-2 0.7 -
2.1 -
(2.94)
1 73.175 - on axis A-D & b/n axis 3-7
4.7 -
343.92
-7 0.7 - Deduction
2.1 -
(10.29) Total of First Floor Internal
404.95 Plastering work
Second Floor Plan
1 33.785 on axis A-D & b/n axis 3-7
3.5
118.2475
-5 0.7 0 Door
2.1 0
-7.35 Total of Internal Second Floor
110.8975 Plastering work
800.5787 Total of Internal Plastering
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-
Location:- Addis Ababa
TIM DIMN TOTAL DISCRIPTION
Roofing & Water proofing
1 1.7 for roof slab
3.084
5.24
1 5.485 -
7.658 -
42.00
1 14.398 -
3.315 -
47.73
1 4.4 -
16.6 -
73.04
168.02 Total area
STANDARD TAKE OFF SHEET
Consultant :- Agape Consulting & Trading Plc.
Project :-
Location :-Addis Ababa Page of

12.ALUMINUM

item Description unit Qty Area in m2

Door Pcs
size 0.7x2.1 Pcs 36.00 37.47
window Pcs
size 1x1.5 Pcs 20.00 21.15
size 2x2.3 Pcs 9.00 13.60
size 3x2.3 Pcs 1.00 7.90
size 1.45x2.5 Pcs 1.00 4.63
size 1.2x2.5 Pcs 1.00 4.00
size 2.85x3.32 Pcs 1.00 10.46
size 3.3x2.4 Pcs 1.00 8.92
size 4.7x3.8 Pcs 1.00 18.86
size 3.825x3.2 Pcs 1.00 13.32
STANDARD BILL OF QUANTITY
Consultant :- Agape Consulting & Trading Plc.
Project :-
Location:- Addis Ababa
pipe work
Location Times Ø Length Ø 15 Ø 20 Ø 25 Ø 32
Ground Floor - - - -
drinage 1 50 11 - - - -
1 75 10 - - - -
110 67 - - - -
cold 1 20 44 - 44 - -
hot 1 15 14 14 - - -
Total length 14 44 - -
First Floor - - - -
drinage 1 50 26 - - - -
1 110 27 - - - -
cold 1 20 60 - 60 - -
hot 1 15 31 31 - - -
Total length 31 60 - -
Second Floor - - - -
drinage 1 50 12 - - - -
cold 1 20 182 - 182 - -
hot 1 15 13 13 - - -
- - - -
Total length 13 182 - -
Roof plan - - - -
cold 1 20 63 - 63 - -
- - - -
- - - -
Total length - 63 - -
Elevation - - - -
drinage 6 110 10 - - - -
cold 7 20 9 - 63 - -
- - - -
Total length - 63 - -
Plc.

Ø 50 Ø 75 Ø 110
- - -
11 - -
- 10 -
- - -
- - -
- - -
11 10 -
- - -
26 - -
- - 27
- - -
- - -
26 - 27
- - -
12 - -
- - -
- - -
- - -
12 - -
- - -
- - -
- - -
- - -
- - -
- - -
- - 57
- - -
- - -
- - 57