Professional Documents
Culture Documents
No Description
1 Warehouse Construction 9,144,730.35
2 Compund Works 16,838,817.80
TOTAL ETB 25,983,548.14
Vat 15% 3,897,532.22
GRAND TOTAL 29,881,080.36
SUMMARY
A. SUB STRUCTURE
1 EXCAVATION & EARTH WORK BIRR 1,110,134.93
B. SUPER STRUCTURE
1 CONCRETE WORK BIRR 1,693,451.09
2. CONCRETE WORK
2.1 5cm thick lean concrete C-7,150kg/cement/M 3 of
concrete.
3. MASONRY WORK
50cm thick sound stone foundation wall built in cement
3.1 m3 108.07 4,800.00 518,760.00
mortar mix. 1:4
B. SUPER STRUCTURE
1. CONCRETE WORK
Reinforced mechanical Mix concrete in class C-25, with
minimum cement of 360kg/m3 filled into formwork and
1.1 vibrated around steel reinforcement (reinforcement
measured separately)
2. BLOCK WORK
40cm thick hard trachytic stone masonry wall above
2.1 ground level bedded in cement mortar (1:3) all as per the M3 93.38 4,800.00 448,200.00
detailed drawing. Price shall include mortar bed.
20cm thick HCB wall both sides left for plastering
2.2 bedded in cement mortar (1:3). Price shall include M2 295.25 572.00 168,883.00
mortar bed.
3. ROOFING
3.1 Roof covering in EGA-500 sheet including roof ridge
cover fixed to 30x30x2.5mm RHS purlin at 90cm c/c by
means of J-bolt screw. Roof cover measured in M2 540.21 1,521.00 821,659.41
horizontal projection. Price shall include metal gutter of
development 60cm.
3.2 110mm PVC down pipe with full acessorices. Ml 152.00 678.00 103,056.00
4. STEEL STRUCTURE
Prepare & erect steel roof structure all as shown on the
detail drawings. Apply two coats of antirust paint. Price
includes all necessary preparation work such as
cleaning, wire brushing ,connecting plates, bolts, nuts, Pcs 14.0 81160.00 1,136,240.00
angle iron, reinf bars finally two coats of anti-rust
paint.& all the necessary accessories.
5. METAL WORK
Metal framed windows & doors price includes all locks,
door slidding hardware, handles should be ASSA,TESA
or equivalent comply with ASTM/ EN quality standard
complete work all according to drawing. All accessories
should be of the same quality standard as that of the
main frame. Use 0.8mm thick metal ribbed sheet for
doors covered part.
5.1 Window
W1 Size: 1500 x 4000mm № 2.00 17,500.00 35,000.00
5.2 Metal Slidding Door
D1 Size: 3000mm x 4000mm № 2.00 38,000.00 76,000.00
7. GLAZING
7.1 5mm thick clear glass M2 20.00 2,500.00 50,000.00
9. ELECTRICAL INSTALLATION
9.1 Internal & External Installation
Supply and install flush mounted stainless steel box
Main-distribution board (MDB-C2-C4) with lockable
door, earthing load connectors, bus bar of 20 Amp
9.1.1 consisting of:1pc, Main switch of 20 Amp 3-ph pcs 1.00 14,200.00 14,200.00
2Pcs, ACB of
16 Amp 1-ph
4pc, ACB of 10 Amp 1-ph
Supply and install flush mounted stainless steel box sub-
distribution board (SDB-C2-C4) with lockable door,
earthing load connectors, bus bar of 20 Amp consisting
9.1.2 of:1pc, Main switch of 20 Amp 3-ph pcs 2.00 9,600.00 19,200.00
2Pcs, ACB of 16 Amp 1-
ph
4pc, ACB of 10 Amp 1-ph
Light points fed through PVC conductor of 2x2.5 sq.
mm. in thermoplastic conduit of Ø13.5mm in/uner
9.1.3 surface, price shall including junction boxes, screw type pcs 30.00 470.00 14,100.00
insulating caps and cover as well as flush mounted
switches.
1.5 Fill
Fill around foundation with selected and non expansive granular material
brought from outside and well ram in layers not exceeding 20cm thick by
1.5.1 sprinkling water using hand compactor. m3
1.6 Disposal
Cart away all surplus excavated materials to a distance not less than 10km
1.6.1 m3
from site.
2. CONCRETE WORK
5cm thick lean concrete C-7,150kg/cement/M3 of concrete.
2.1
a) In Grade Beam M3
2.3 Provide, cut and fix in position sawn zigba wood or steel formwork :
a) In Grade Beam M2
Mild steel reinforcement bar according to structural drawings, price
includes cutting, bending, placing in position and tying wire. Bars should
2.4 be free from coatings such as oil and mortar before they are placed.
a. Φ8 deformed bars kg
b. Φ12 deformed bars kg
3. MASONRY WORK
50cm thick sound stone foundation wall built in cement mortar mix. 1:4
3.1 Below OGL m3
50cm thick sound stone foundation wall built in cement mortar mix. 1:5
3.2 above OGL m3
B. SUPER STRUCTURE
1. CONCRETE WORK
1.1 Reinforced mechanical Mix concrete in class C-25, with minimum
cement of 360kg/m3 filled into formwork and vibrated around steel
reinforcement (reinforcement measured separately)
a) In Column M3
1.2 Provide, cut and fix in position sawn zigba wood or steel formwork :
a) In Column M2
1.3 Mild steel reinforcement bar according to structural drawings, price
includes cutting, bending, placing in position and tying wire. Bars should
be free from coatings such as oil and mortar before they are placed
a. Φ8 deformed bars kg
b. Φ12 deformed bars kg
2. BLOCK WORK
2.1 20cm thick HCB wall both sides left for plastering bedded in cement
M2
mortar (1:3). Price shall include mortar bed.
3. FINISHING
Pointing in cement sand mortar of ratio 1:3 to HCB wall and Masonary
6.1 M2
above ground in both side
Plastering in cement sand mortar of ratio 1:3 to columes and beams edges
6.2 M2
-
-
-
-
-
773.26 220 170,116.32
2,654.76 220 584,048.26
-
-
35 1531.2 53,592.00
35 72,000 2,520,000.00
20 756 15,120.00
650 738 479,700.00
650 240 156,000.00
1 7200 7,200.00
1 4500 4,500.00
2 4200 8,400.00
1 5000 5,000.00
RY 16,838,817.80