Item Unit Quantity Rate Amount

No.
BILL NO.1: FOUNDATIONS (PROVISIONAL)

SITE CLEARANCE

A Clear site of all rubbish, bushes, scrub, undergrowth hedges,


small trees, stump roots etc. m2 30

EXCAVATION

Pumping

B Allow for keeping the excavations free from storm, surface water
and mud by pumbing and baling. Item 1.00

Excavation in pickable material commencing at ground level for

C Excavate over site to remove vegetable soil average 150 mm


deep and cart to a spoil on site. m3 2

D Reducing levels under floors not exceeding 300 mm deep. m3 3

E Surface trenches not exceeding 2 metres deep. m3 12

F Extra over excavation in pickable material for excavation in hard


pickable material m3 1

G Ditto for excavation in rock. m3 1

Planking and strutting

H Allow for maintaining and supporting sides of all excavations


and making good all slips. m2 32

Disposal

J Redig from spoil heap, return, fill and well compact selected
excavated material around foundations. m3 6

K Redig from spoil heap and cart away to a tip to be found by the
contractor. m3 8

Formation

L Scarify ground to a depth of 150 mm and compact to 90%


H.C.E density. m2 9

Carried to Collection $
Section No. 5
BUILDER'S WORK
Bill No. 1
FOUNDATIONS

5-1-
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining

M Imported material fill in maximum 150 mm thick layers in


making up levels under floors and compact to 96% H.C.E.
density. m3 1

N Imported material fill in maximum 150 mm thick layers in


making up levels under floors and compact to 96% H.C.E.
density. m3 1
Imported material fill in maximum 150 mm thick layers in
P making up levels under floors and compact to 98% H.C.E.
density. m3 1

Sundries

Q 250 Micron black polythene sheeting well lapped at joints and


junctions including all cutting and waste (measured nett) and
over filling to receive concrete. m2 9

TERMITES

R Termite treatment as decscribed to top of filling and walls. m2 12

CONCRETE, FORMWORK AND REINFORCEMENT

Unreiforced concrete (Grade 30-20 mm stone) in

S Footings. m3 3

Vibrated reinforced concrete (Grade 30-20 mm stone) in

T Mesh reinforced concrete slabs. m3 1

Sundries

U Strike off and cure top of concrete and finish with a power float
including any additional cement. m2 9

REINFORCEMENT

Welded fabric reinforcement of approved manufacturer


including all cutting, tying, placing in position with necessary
temporary supports and minimum 300 mm laps both ways
(measured nett)

V Ref. S245 (mass of 2,45 kg/square metre ) in top reinforcement


to concrete slabs. m2 9

Carried to Collection $
Section No. 5
BUILDER'S WORK

5-2-
Bill No. 1
FOUNDATIONS
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining

EXPANSION JOINTS

W 10 mm expansion joints formed of "Kaylite " 150 mm deep or


approved expansion joint sheeting and maintain in position set
horizontally in between concrete. m 18

X Rake out 10 mm expansion joint sheeting, 10 mm deep, prime


and seal with Plastic sealer". m 18

BRICKWORK

Brickwork in approved bricks in cement mortar as described


in cement mortar (1:4) in English bond as described.

Y Half brick wall. m2 3

Z One brick wall. m2 7

AA One brickwall finished fair one side m2 3

Brickforce lapped at joints and junctions and building in as


the work proceeds (measured nett)

AB Ref. C1 in half brick walls. m 15

AC Ref. C2 in one brick walls. m 71

FAIR FINISHED BRICKWORK

Fair finishing to brickwork

AD Extra over one brickwall or skin for fair finishing and pointing in
stretcher bond. m2 3

Carried to Collection $

5-3-
Section No. 5
BUILDER'S WORK
Bill No. 1
FOUNDATIONS
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining

Section No. 5

BUILDER'S WORK

Bill No. 1

FOUNDATIONS

COLLECTION
Page Amount
No
Total Brought Forward from Page No. 1

5-4-
Carried Forward to Summary of Section No. 5 $
Section No. 5
BUILDER'S WORK
Bill No. 1
FOUNDATIONS
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining

Item Unit Quantity Rate Amount


No.
BILL NO.2: CONCRETE, FORMWORK AND
REINFORCEMENT

CONCRETE

Vibrated reinforced concrete (Grade 30-20 mm stone) in

A Ring beam. m3 1

B Lintol beams. m3 0.5

FORMWORK

Sawn formwork as described to

C Sides of beams in narrow widths m2 12

D Soffits of beams in narrow widths. m2 5

REINFORCEMENT

Steel bar reinforcement including all bending, hookeds,


binding wire and temporary supports.

E All sizes (Provisional) kg 192

PRECAST CONCRETE

Prestressed precast concrete (Grade 20-20 mm stone)


finished fair on all exposed surfaces.

F
Rainwater dripstone 450 mm wide x 150 mm thick x 760 mm
long with segmental channel formed in top with one stopped
finished smooth on all exposed faces and place in position. No 4

5-5-
Carried Forward to Summary of Section No. 5 $
Section No. 5
BUILDER'S WORK
Bill No. 2
CONCRETE, FORMWORK AND REINFORCEMENT
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining

Item Unit Quantity Rate Amount


No.
BILL NO.3 :BRICKWORK

BRICKWORK

Brickwork in common bricks in cement mortar as described

A Half brick walls. m2 11

B One brick gable walls ditto. m2 35

C One brick walls in two half brick skins. m2 1

Sundries

D Rough splay cutting and waste. m2 1

E Rough raking cutting and waste. m2 2

F Hoop iron ties as described 1000 mm long. No 6

DAMP PROOF COURSE

One layer of three ply bituminous felt sheeting as damp


proof course as described well lapped at joints and junctions
(measured nett)

G On walls. m2 3

H Stepped under cills. m2 1

VENTILATION (PROVISIONAL)

J 230 x 150 mm Cast plaster ventilator and building into


brickwork. No. 8

K 230 x 150 mm Precast concrete plain patterned vermin proof air


vent and built into brickwork. No. 8

REINFOCEMENT

5-6-
Brickforce lapped at joints and junctions and building in as
the work proceeds (measured nett)

L Ref. C1 in half brick walls. m 45

Carried to Collection $
Section No. 5
BUILDER'S WORK
Bill No. 3
BRICKWORK
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining

M Ref. C2 in one brick walls. m 307

FACINGS

Approved facing bricks in cement mortar and pointing in


cement mortar with square ruled horizontal joints and
perpends

N Extra over one brick wall or skin for facing and pointing in
stretcher bond. m2 46

BUILDING IN

P Set up in position, cross brace and build in pressed steel door


frame not 5 square metres. No. 2

Q Set up in position, and build in pressed steel window and frame


not 5 square metres. No. 3

CILLS

R
75 x 230 x 50 mm Brick on-edge external cill cropped at back,
set sloping and pointing on top, front edge and projecting soffit. m 5

5-7-
Carried to Collection $
Section No. 5
BUILDER'S WORK
Bill No. 3
BRICKWORK
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining

Section No. 5

BUILDER'S WORK

Bill No. 3

BRICKWORK

COLLECTION
Page Amount
No
Total Brought Forward from Page No. 6

5-8-
Carried Forward to Summary of Section No. 5 $
Section No. 5
BUILDER'S WORK
Bill No. 3
BRICKWORK
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining

Item Unit Quantity Rate Amount


No.
BILL NO.4: ROOF COVERINGS

SHEET ROOF COVERINGS FIXED IN STRICT


ACCORDANCE WITH THE MANUFACTURER'S
PRINTED INSTRUCTIONS INCLUDING ALL
FIXINGS AND SQUARE CUTTING (MEASURED
NETT)

0.58 mm IBR 890 role-formed chromadeck Z200 roof sheets


in Buffalo Brown colour

A
Roof covering in single length sheet to mild steel purlins at
maximum 1 400 mm centres with minimum 300 mm end laps
with and including sealing to side and end laps using pliastic or
other equal and approved sealant and seam bolting at 1 000 mm
centres. m2 20

B Serrated ridge closer and fixing in conjuction with roofing. m 4

INSULATION

C
4mm Alucushion bubble fold single sided aluminium foil faced
insulation material in 1 250 mm widths with white polyethene
coating on other side lapped 100 mm at all joints stretched tight
over straining wires (elsewhere measured) on top of timber
purlins all in strict accordance with the manufacturer's
instructions (Alucushion (PTy) Ltd, P O Box 912-717 Silverton
0127 South Africa. m2 20

D White P.V.C. coated straining wire at 383 mm centres tensioned


between and fixed to eaves and apex purlins with hoop iron and
riverts all in strict accordance with the manufacturer's
instructions (ditto). m2 20

5-9-
Carried Forward to Summary of Section No. 5 $
Section No. 5
BUILDER'S WORK
Bill No. 4
ROOF COVERINGS
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining

Item Unit Quantity Rate Amount


No.
BILL NO.5: CARPENTRY

Engineer designed roof truss system designed and supplied


by approved manufacturer, truss members to be
merchantable grade sized to matching thickness and jointed
only at node points, design is to include total roof system and
is to be based on group three stresses on nett section with
matching depth of rafters to projections. The manufacturer
will be deemed to have inspected all relevant drawings before
tendering and shall verify the design with the Architect
before manufacturer (calculations to be submitted if
required)

A
Roof truss system designed to carry 0.58 mm chromadeck IBR
profile roof sheets at 10 degrees pitch on 76 x 50 mm purlins at 1
200 mm centres with plastered plasterboard ceiling on
brandering to sofffits of trusses with trusses at maximum 1 200
mm centres including any neccessary ceiling joists and all
necessary bracing (wall plate, brandering, fascias etc. elsewhere
measured) all as shown on drawings. Item 1.00

ROOF TIMBERS

Sawn softwood

B 38 x 114 mm wall plate m 6

EAVES AND VERGES

C Wrot surfaces of purlins. m2 8

5-10-
D Wrot surfaces of rafter feet. m2 1

E 38 x 228 mm Wrot softwood fascia to ends of trusses. m 18

Carried Forward to Summary of Section No. 5 $


Section No. 5
BUILDER'S WORK
Bill No. 5
CARPENTRY
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining

Item Unit Quantity Rate Amount


No.
BILL NO.6: JOINERY AND IRONMONGERY

CEILINGS AND CORNICES

A 6.4 mm "Rhinoboard " ceiling on 38 x 38 mm brandering at 400


mm centres one way, to underside of trusses at maximum 750
mm centres with joints scrimmed to receive plaster (elsewhere
measured). m2 9

B Extra for trimming for and forming trap door size 600 x 600 mm
in clear with 50 x 76 mm wrot rebated softwood frame and 19
mm wrot softwood quadrant all round. No 1

C 75 mm Stock "rhino" cornice planted on. m 18

DOORS

Solid core external quality flush doors with veneer suitable


for painting both sides

D 44 mm Door. Size 813 x 2 032 mm. No 2

IRONMONGERY

To wood

Supply and fix the following

E Union 3 lever lockset. No 2

5-11-
F CZ6822452 Union 3 lever lockset handle (pair). No 2

G Union AL5066 06AS E10 Male/Female toilet sign. No 1

H Union CZ8731SC Door stop. No 2

Sundries

J "Stunning bathrooms"stainless steel Slimline range code 265


towel rail with pair of end brackets plugged and screwed to tiled
wall, 600 mm long. No 1

Carried Forward to Summary of Section No. 5 $


Section No. 5
BUILDER'S WORK
Bill No. 6
JOINERY AND IRONMONGERY
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining

Item Unit Quantity Rate Amount


No.
BILL NO.7: METAL WORK

METAL DOOR FRAMES

Heavy duty pressed steel door frames with and including


lock box, 3no. Pair 100 mm heavy duty steel butt hinges
welded to frame, and chromium plated striking plates where
appropriate (building in elsewhere measured)

To suit one brick wall (P.B.S) for

A 44 mm Door size 813 x 2 048 mm. No 2

METAL WINDOWS AND FRAMES

Purpose made industrial steel windows and frames with and


inmcluding opening stays, handles and flat mild steel burglar
bars (building in elsewhere measured)

B Window type W01. Size 1 810 x 1 210 mm high. No 1

C Window type W02 Size 2 500 x 1 210 mm high. No 1

D Window type W03 Size 545 x 900 mm high. No 1

5-12-
Carried Forward to Summary of Section No. 5 $
Section No. 5
BUILDER'S WORK
Bill No. 7
METALWORK
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining

Item Unit Quantity Rate Amount


No.
BILL NO. 8: PLASTERING AND WALL LININGS

PLASTERING

INTERNALLY

Render one coat cement plaster and set in Rhinoset plaster


including all labors with a steel trowel finish on

A Walls. m2 24

B Walls, reveals, etc. in narrow widths. m2 1

Render one coat cement plaster including all labours with a


steel float finish on

C Walls. m2 9

D Walls, reveals, etc. in narrow widths. m2 0.1

Render in Rhinobond and set in Rhinoset plaster including


all labors with a steel trowel finish on

E Rhinoboard ceilings. m2 9

5-13-
WALL TILING

Approved ceramic wall tiles, with 3 mm continuous


horizontal and vertical joints bedded in tylon grout on and
including cement and sand (1:4) screed and point in white
cement, on completion clean down to approval, on

F Walls. m2 15

G Walls, reveals, etc. in narrow widths. m2 0.3

SUNDRIES

H Aluminium tile edge trims. m2 2

J "Softex: stainless steel 5 roll toilet roll dispenser/holder and


fixing to tiled wall. No 1

Carried Forward to Summary of Section No. 5 $


Section No. 5
BUILDER'S WORK
Bill No. 8
PLASTERING AND WALL LININGS
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining

Item Unit Quantity Rate Amount


No.
BILL NO.9: PAVINGS AND FLOOR COVERINGS

GRANOLITHIC

40 mm Untinted granolithic as described including all


labours

A 100 mm High skirting with cove at junction with floor and


square top edge, including mitres, etc. m 10

5-14-
Carried Forward to Summary of Section No. 5 $
Section No. 5
BUILDER'S WORK
Bill No. 9
PAVINGS AND FLOOR COVERINGS
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining

Item Unit Quantity Rate Amount


No.
BILL NO.10: RAINWATER DISPOSAL AND PLUMBING

0.58 mm Buffalo Brown color coated one side galvanised


chromadeck sheet

A 100 x 100 mm Rectangular section eaves gutter fixed to fascia. m 9

B Extra for outlet nozzle for and joint to 100 x 100 mm rainwater
pipe. No 4

C Ditto for stop end. No 4

D 100 x 100 mm Rainwater pipe fixed 38 mm clear of wall with


holder bats. m 18

E Extra for offset. No 4

F Ditto shoe. No 4

SANITARY FITTINGS

5-15-
NOTE : No sanitary fittings are to be ordered until approved
by the Architect

"Vaal" sanitaryware Hibiscus vitreous china lavatory basin white


color (Code: 702303) overall size 510 x 405 mm with and
including classsic floor mounted pedestal (Code: 715000) ,one
taphole including intergrated overflow, chainstay hole and
"Cobra" code 302-32 slotted basin Aquawaste (click-clack
waste) bolted to wall with and including 2No. 10 mm bolts
(Code: 8448Z0) , Sealed with silicone sealant where basin meets
wall and connect to outlets and pipes. No 1

"Vall' sanitaryware Hibiscus Elite vitreous china closed coupled


W.C. suite front flush color white (Code: 772401) with Hibiscus
Jazz thermoset seat (Code: 8531Z0) comprising 90 degrees
outlet open rim pan (Code: 772600) with matching 9 litre front
single flush cistern (Code: 710533) with and including lid and
fitments, fit pan to floor and connect up. No 1 0.00

SANITARY PLUMBING

Carried to Collection $
Section No. 5
BUILDER'S WORK
Bill No. 10
RAINWATER DISPOSAL AND PLUMBING
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining

Promat or equal rigid P.V.C piping with solvent cement


joints and fittings as described

J 50 mm Diameter pipe fixed to walls. m 2

K 50 mm Ditto to walls in and including chase. m 1

L 50 mm Ditto laid in screed. m 1

M 110 mm Diameter pipe fixed to walls. m 5

Extra on P.V.C. piping for

N 50 mm Bend. No 2

P 50 mm Inspection bend. No 1

Q 50 mm Inspection junction. No 1

R 50 mm Junction. No 1

5-16-
S 50 mm End cap. No 1

T 110 mm Bend. No 2

U 110 mm Inspection bend. No 1

V 110 mm Junction. No 1

W 110 mm Inspection junction. No 1

X 110 mm Straight pan connector and joint to W.C. pan. No 1

Y 110 mm vent cowl

Z 110 mm Blank end access cap. No 1

AA 110 mm Two way vent valve. No 1

Traps

AB 40 - 40 Flexitrap and joint to outlet of fitting and P.V.C. pipe No 1

WATER INSTALLATION

Carried to Collection $
Section No. 5
BUILDER'S WORK
Bill No. 10
RAINWATER DISPOSAL AND PLUMBING
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining

Copper tubing as described

AC 15 mm Diameter pipe fixed to walls. m 6

AD 15 mm Ditto in chase including chase m 3

AE 15 mm Ditto in screed. m 2

AF 22 mm Diameter pipe fixed to walls. m 3

AG 22 mm Ditto in chase including chase. m 2

AH 22 mm Ditto in roof/ceiling space. m 4

Extra on copper tubing for

AJ 22 mm Elbow. No 4

5-17-
AK 22 mm Tee. No 3

AL 22 - 15 mm Reducer. No 2

AM 22 - 15 Reducing equal tee. No 2

AN 28 mm Socket union. No 1

Brasswork

AP Cobra 008/5C metaflex tubing and joints to copper pipe. No 2

AQ Cobra 282-10 angle valve and joints to copper pipe. No 2

AR "Cobra " Ledimo LO-214-15 square pillar tap with cold indices
and 1/2" BSP male inlet, fixed to basin and connect to water
pipes. No 1

AS 15 mm Diameter brass high pressure screw down stop cock and


joints to copper pipe. No 2

AT 20 mm Diameter brass high pressure screw down stop cock and


joints to copper pipe. No 1

AU 25 mm Diameter brass high pressure screw down wheelhead gate


valve and joints to copper pipe. No 1

Carried to Collection $
Section No. 5
BUILDER'S WORK
Bill No. 10
RAINWATER DISPOSAL AND PLUMBING
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining

FIRE APPLIANCES

AV "Chubb" 9kg dry powder fire extinguisher. No 1

AW "Chubb" 9 litre water fire extinguisher. No 1

BUILDER'S WORKS

AX Hole half brick wall for small pipe No 2

AY Hole one brick wall for small pipe. No 2

AZ Ditto for large pipe. No 1

TESTING

5-18-
BA Allow for testing and commissioning all plumbing works
included in this Bill, make good all defects and retest until
approved. Item 1.00

Carried to Collection $
Section No. 5
BUILDER'S WORK
Bill No. 10
RAINWATER DISPOSAL AND PLUMBING
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining

Section No. 5

BUILDER'S WORK

Bill No. 10

RAINWATER DISPOSAL AND PLUMBING

COLLECTION
Page Amount
No
Total Brought Forward from Page No. 15

16

5-19-
17

18

Carried Forward to Summary of Section No. 5 $


Section No. 5
BUILDER'S WORK
Bill No. 10
RAINWATER DISPOSAL AND PLUMBING
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining

Item Unit Quantity Rate Amount


No.
BILL NO.11:GLAZING

Glazing to metal with putty

A 6 mm Clear float glass. m2 5

B 4 mm Obscure glass. m2 1

Mirrors

5-20-
C
4 mm "City Mirror" clear float quality glass silvered and sealed
mirror with polished edges sprayed on back with clear lacquer
before fixing, four times drilled for and plugged and screwed to
walls with and including chromium plated capped mirror screws
and rubber washers. Size 500 x 600 mm. No 1

Carried Forward to Summary of Section No. 5 $


Section No. 5
BUILDER'S WORK
Bill No. 11
GLAZING
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining

Item Unit Quantity Rate Amount


No.
BILL NO.12: PAINTING

ON PLASTER, ETC

Prepare and apply two coats ceiling white P.V.A. Emulsion


paint on

A Steel trowel plastered ceilings. m2 9

5-21-
Prepare and apply three coats internal quality high gloss
enamel paint internally on

B Steel trowel plastered walls. m2 9

Prepare and apply three coats internal quality P.V.A.


emulsion paint internally on

C Steel trowel plastered walls. m2 26

ON METAL

Clean down, touch up priming coat and apply one undercoat


and two finishing coats Eggshell enamel paint on

D Pressed steel door frames. m2 4

E Pressed steel windows and frames (both sides measured flat


overall). m2 11

ON WOOD, ETC.

F
Carbolineum saturate sawn softwood wall plate before fixing. m2 2

Knot, prime, stop and apply one undercoat and two finishing
coats Eggshell enamel paint on

G General surfaces of doors. m2 9

H General surfaces of truss members in narrow widths. m2 9

J General surfaces of fascias and bargeboards. m2 10

Carried to Collection $
Section No. 5
BUILDER'S WORK
Bill No. 12
PAINTING
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining

LEAVE CLEAN

K
Allow for touching all work through out, clean off all paint, oil,
cement or other stains onwalls, floors ,ceilings, glass etc. and
leave all surfaces in full and proper working order. Item 1.00

5-22-
Carried to Collection $
Section No. 5
BUILDER'S WORK
Bill No. 12
PAINTING
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining

Section No. 5

BUILDER'S WORK

Bill No. 12

5-23-
PAINTING

COLLECTION
Page Amount
No
Total Brought Forward from Page No. 21

22

Carried Forward to Summary of Section No. 5 $


Section No. 5
BUILDER'S WORK
Bill No. 12
PAINTING
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining

Item Unit Quantity Rate Amount


No.
BILL NO.13: EXTERNAL WORKS

5-24-
NOTE: The contractor is referred to the preceeding Bills for full
descriptions of labor and material which apply generally to this
bill

WATER RETICULATION

Generally

A Allow for keeping excavations free from storm, surface water by


pumping and bailing. Item 1.00

Excavation

B
Excavation in pickable material commencing at natural ground
level for surface trenches not exceeding 2 metres deep. m3 16

C Extra over excavation in pickable material for excavation in hard


pickable material. m3 2

D Ditto for excavation in rock. m3 1

Planking and strutting

E Allow for maintaining and supporting sides of all excavations


and making good all slips. m2 54

Disposal

F Redig from spoil heap, return, fill and well compact selected
excavated material in trenches. m3 15

G Redig from spoil heap and cart away to a tip to be found by the
contractor. m3 1

High density black polyethylene pressure pipe (HDPE)


CLASS 10

H
25 mm Diameter pipe laid in ground including excavating trench
not exceeding 1 metre deep , fill in, ram and spread surplus
excavated material on site not exceeding 100 metres. m 11

Carried to Collection $
Section No. 5
BUILDER'S WORK
Bill No. 13
EXTERNAL WORKS
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining

5-25-
J 63 mm Diameter pipe laid in ground including excavating trench
not exceeding 1 metre deep , fill in, ram and spread surplus
excavated material on site not exceeding 100 metres. m 16

Extra over HDPE piping for

K 25 mm Elbow. No 6

L 25 mm Tee. No 4

M 25 - 22 mm Socket union. No 2

N 63 mm Elbow. No 4

P 63 mm Tee. No 4

Q 63 - 25 mm Reducer. No 2

R 63 - 54 mm Socket union. No 2

SOIL DRAINAGE

Generally

S Allow for keeping excavations free from storm, surface water by


pumping and bailing. Item 1.00

Excavation

T Excavation in pickable material commencing at natural ground


level for surface trenches not exceeding 2 metres deep. m3 19

U Extra over excavation in pickable material for excavation in hard


pickable material. m3 2

V Ditto for excavation in rock. m3 1

Planking and strutting

W Allow for maintaining and supporting sides of all excavations


and making good all slips. m2 64

Disposal

X Redig from spoil heap, return, fill and well compact selected
excavated material in trenches. m3 17

Carried to Collection $
Section No. 5
BUILDER'S WORK
Bill No. 13
EXTERNAL WORKS

5-26-
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining

Y Re-dig from spoil heap and cart away surplus material to a tip
to be found by the contractor. m3 2

"Promat" or equal rigid P.V.C. piping with solvent cement joints


and fitting as described

Z 110 mm Diameter in ramps. m 5

AA 110 mm Ditto laid in ground not exceeding 1 metres deep. m 18

AB 110 mm Ditto laid in ground not exceeding 1 and not exceeding


2 metres deep. m 10

Extra on P.V.C. piping for

AC 110 mm Bend. No 2

AD 110 mm Y-junction. No 3

Sundries

AE
Encasement 100 mm thick all round 110 mm diameter pipe in ramp in
concrete (Grade 10-20 mm stone) including all necessary formwork. m 5

AF
75 mm Concrete (Grade 10-20 mm stone) bed and hauching up on both
sides to 110 nm diameter pipe including necessary additional
excavation and spread and level surplus excavated material on site not
exceeding 100 mm. m 27

AG
Cast iron A.B.C pattern cleaning eye cover and frame and joint to 110
mm diameter P.V.C. pipe including encasing all round in concrete
(Grade 10-20 mm stone)and finish smooth on all exposed surfaces. No 2

AH
110 mm Diameter P.V.C. gulley trap with hopper head cast iron
grating and joint to 110 mm P.V.C. pipe including encasing in
concrete (Grade 10-20 mm stone) carried up as kerb 75 mm
high above ground level and dished to grating including
necessary formwork and finish smooth on all exposed faces. No 1

Septic tank (1 No.Provisional)

AJ Excavate in pickable material not exceeding 2 metres deep. m3 8

AK Extra over excavation for hard pickable material. m3 1

AL Ditto for rock. m3 0.4

Carried to Collection $
Section No. 5

5-27-
BUILDER'S WORK
Bill No. 13
EXTERNAL WORKS
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining

AM Allow for maintaning and supportingsides of excavation and


make good all slips. m2 16

AN Redig from temporary spoil heap, return fill and ram excavated
material around walls. m3 3

AP Redig from temporary spoil hip and cartaway to a site to be


located by the contractor. m3 6

AQ Scarify ground to a depth of 150 mm and compact to 93%


H.C.E. density. m2 5

AR Reinforced concrete (Grade 25-20 mm ) in base slab. m3 1

AS Reinforced concrete (Grade 25-20 mm ) in cover slab. m3 0.3

AT Strike off and cure top of concrete. m2 9

AU Sawn formwork as described to soffit of slab in confined


position. m2 3

AV Extra over formwork to soffit of slab for blocking in to form


rebated opening for 610 x 460 mm manhole cover and frame. No 2

AW Mild steel round bars not exceeding 8 mm diameter. kg 44

AX High tensile deformed bars exceeding 8 and not exceeding 12


mm diameter. kg 66

AY Fabric reinforcement Ref.S193 (mass of 1,93 kg/square metre) in


reinforcement to cover slab. m2 3

AZ One brickwall in extra hard burnt common bricks in cement


mortar as described. m2 10

BA Ref. C2 in one brickwall. m 39

BB Hole one brickwall for 110 mm diameter pipe. No 2

BC 610 x 460 mm Medium duty manhole cover and frame, bed


frame in cement mortar and cover in grease. No 2

BD Render one coat cement plaster including all labors with a steel
trowel finish on walls. m2 9

BE 20 mm Untinted granolithic finish as described to top of cover


slab. m2 3

5-28-
Carried to Collection $
Section No. 5
BUILDER'S WORK
Bill No. 13
EXTERNAL WORKS
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining

BF 20 mm Ditto to edge in narrow widths. m2 1

BG 110 mm Diameter P.V.C. pipe to walls. m 2

BH Extra for 110 mm inspection tee junction. No 2

Soakaway

BJ
Excavate for soakaway 8 400 mm long x 1 520 mm wide and 1
830 mm deep, lay 100 mm diameter approved burnt clay or
porous concrete drain pipe laid with 15 mm open joints in 40
mm stone filling including packing stone around the pipe as
construction goes on and lay asbestos sheeting on top after
finishing stone filling. No 1

TESTING

BK
Allow for testing and commissioning all water, fire, refuse and
soil drains included in this bill, make good all defects and retest
until approved, no trenches are to be filled until approved. Item 1.00

5-29-
Carried to Collection $
Section No. 5
BUILDER'S WORK
Bill No. 13
EXTERNAL WORKS
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining

Section No. 5

BUILDER'S WORK

Bill No. 13

EXTERNAL WORKS

COLLECTION
Page Amount
No
Total Brought Forward from Page No. 24

25

26

27

28

5-30-
Carried Forward to Summary of Section No. 5 $
Section No. 5
BUILDER'S WORK
Bill No. 13
EXTERNAL WORKS
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining

Item Unit Quantity Rate Amount


No.
BILL NO.14: PROVISIONAL SUMS

PROVISIONAL SUMS

Test cubes

A Provide the Provisional sum of $800.00 (Eight hundred dollars


only) for test cubes executed complete Item 1.00

B Add profit Item 1.00

C Add attendance Item 1.00

Materials and compaction tests

D
Provide the Provisional sum of $400.00 (Four hundred dollars
only) for materials and compaction tests executed complete. Item 1.00

E Add profit. Item 1.00

F Add attendance. Item 1.00

Electrical installation

G Provide the Provisional sum of $1,500.00 (One thousand five


hundred dollars only) for electrical installation executed
complete. Item 1.00

H Add profit. Item 1.00

J Add attendance. Item 1.00

Work tops

K Provide the Provisional sum of $1,600.00 (One thousand six


hundred dollars only) for work tops executed complete. Item 1.00

5-31-
L Add profit. Item 1.00

M Add attendance. Item 1.00

OTHER SUMS

Carried to Collection $
Section No. 5
BUILDER'S WORK
Bill No. 14
PROVISIONAL SUMS
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining

Builder's work

N Provide the sum of $600.00 (Six hundred dollars only) for


builder's work in connection with specialist services to be
measured at Bill rates or prorata thereto as directed and deducted
in whole or in part if not required. Item 1.00

5-32-
Carried to Collection $
Section No. 5
BUILDER'S WORK
Bill No. 14
PROVISIONAL SUMS
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining

Section No. 5

BUILDER'S WORK

Bill No. 14

PROVISIONAL SUMS

COLLECTION
Page Amount
No
Total Brought Forward from Page No. 30

31

5-33-
Carried Forward to Summary of Section No. 5 $
Section No. 5
BUILDER'S WORK
Bill No. 14
PROVISIONAL SUMS
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining

Section No. 5

BUILDER'S WORK

SECTION SUMMARY - BUILDER'S WORK


Bill Page Amount
No No

1 FOUNDATIONS 4

2 CONCRETE, FORMWORK AND REINFORCEMENT 5

3 BRICKWORK 8

4 ROOF COVERINGS 9

5 CARPENTRY 10

6 JOINERY AND IRONMONGERY 11

7 METAL WORK 12

8 PLASTERING AND WALL LININGS 13

9 PAVINGS AND FLOOR COVERINGS 14

10 RAINWATER DISPOSAL AND PLUMBING 189

11 GLAZING 20

12 PAINTING 23

13 EXTERNAL WORKS 29

5-34-
14 PROVISIONAL SUMS 32

Carried to Final Summary $


Section No. 5
BUILDER'S WORK
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining

5-35-