Professional Documents
Culture Documents
No.
BILL NO.1: FOUNDATIONS (PROVISIONAL)
SITE CLEARANCE
EXCAVATION
Pumping
B Allow for keeping the excavations free from storm, surface water
and mud by pumbing and baling. Item 1.00
Disposal
J Redig from spoil heap, return, fill and well compact selected
excavated material around foundations. m3 6
K Redig from spoil heap and cart away to a tip to be found by the
contractor. m3 8
Formation
Carried to Collection $
Section No. 5
BUILDER'S WORK
Bill No. 1
FOUNDATIONS
5-1-
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining
Sundries
TERMITES
S Footings. m3 3
Sundries
U Strike off and cure top of concrete and finish with a power float
including any additional cement. m2 9
REINFORCEMENT
Carried to Collection $
Section No. 5
BUILDER'S WORK
5-2-
Bill No. 1
FOUNDATIONS
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining
EXPANSION JOINTS
BRICKWORK
AD Extra over one brickwall or skin for fair finishing and pointing in
stretcher bond. m2 3
Carried to Collection $
5-3-
Section No. 5
BUILDER'S WORK
Bill No. 1
FOUNDATIONS
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining
Section No. 5
BUILDER'S WORK
Bill No. 1
FOUNDATIONS
COLLECTION
Page Amount
No
Total Brought Forward from Page No. 1
5-4-
Carried Forward to Summary of Section No. 5 $
Section No. 5
BUILDER'S WORK
Bill No. 1
FOUNDATIONS
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining
CONCRETE
A Ring beam. m3 1
FORMWORK
REINFORCEMENT
PRECAST CONCRETE
F
Rainwater dripstone 450 mm wide x 150 mm thick x 760 mm
long with segmental channel formed in top with one stopped
finished smooth on all exposed faces and place in position. No 4
5-5-
Carried Forward to Summary of Section No. 5 $
Section No. 5
BUILDER'S WORK
Bill No. 2
CONCRETE, FORMWORK AND REINFORCEMENT
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining
BRICKWORK
Sundries
G On walls. m2 3
VENTILATION (PROVISIONAL)
REINFOCEMENT
5-6-
Brickforce lapped at joints and junctions and building in as
the work proceeds (measured nett)
Carried to Collection $
Section No. 5
BUILDER'S WORK
Bill No. 3
BRICKWORK
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining
FACINGS
N Extra over one brick wall or skin for facing and pointing in
stretcher bond. m2 46
BUILDING IN
CILLS
R
75 x 230 x 50 mm Brick on-edge external cill cropped at back,
set sloping and pointing on top, front edge and projecting soffit. m 5
5-7-
Carried to Collection $
Section No. 5
BUILDER'S WORK
Bill No. 3
BRICKWORK
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining
Section No. 5
BUILDER'S WORK
Bill No. 3
BRICKWORK
COLLECTION
Page Amount
No
Total Brought Forward from Page No. 6
5-8-
Carried Forward to Summary of Section No. 5 $
Section No. 5
BUILDER'S WORK
Bill No. 3
BRICKWORK
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining
A
Roof covering in single length sheet to mild steel purlins at
maximum 1 400 mm centres with minimum 300 mm end laps
with and including sealing to side and end laps using pliastic or
other equal and approved sealant and seam bolting at 1 000 mm
centres. m2 20
INSULATION
C
4mm Alucushion bubble fold single sided aluminium foil faced
insulation material in 1 250 mm widths with white polyethene
coating on other side lapped 100 mm at all joints stretched tight
over straining wires (elsewhere measured) on top of timber
purlins all in strict accordance with the manufacturer's
instructions (Alucushion (PTy) Ltd, P O Box 912-717 Silverton
0127 South Africa. m2 20
5-9-
Carried Forward to Summary of Section No. 5 $
Section No. 5
BUILDER'S WORK
Bill No. 4
ROOF COVERINGS
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining
A
Roof truss system designed to carry 0.58 mm chromadeck IBR
profile roof sheets at 10 degrees pitch on 76 x 50 mm purlins at 1
200 mm centres with plastered plasterboard ceiling on
brandering to sofffits of trusses with trusses at maximum 1 200
mm centres including any neccessary ceiling joists and all
necessary bracing (wall plate, brandering, fascias etc. elsewhere
measured) all as shown on drawings. Item 1.00
ROOF TIMBERS
Sawn softwood
5-10-
D Wrot surfaces of rafter feet. m2 1
B Extra for trimming for and forming trap door size 600 x 600 mm
in clear with 50 x 76 mm wrot rebated softwood frame and 19
mm wrot softwood quadrant all round. No 1
DOORS
IRONMONGERY
To wood
5-11-
F CZ6822452 Union 3 lever lockset handle (pair). No 2
Sundries
5-12-
Carried Forward to Summary of Section No. 5 $
Section No. 5
BUILDER'S WORK
Bill No. 7
METALWORK
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining
PLASTERING
INTERNALLY
A Walls. m2 24
C Walls. m2 9
E Rhinoboard ceilings. m2 9
5-13-
WALL TILING
F Walls. m2 15
SUNDRIES
GRANOLITHIC
5-14-
Carried Forward to Summary of Section No. 5 $
Section No. 5
BUILDER'S WORK
Bill No. 9
PAVINGS AND FLOOR COVERINGS
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining
B Extra for outlet nozzle for and joint to 100 x 100 mm rainwater
pipe. No 4
F Ditto shoe. No 4
SANITARY FITTINGS
5-15-
NOTE : No sanitary fittings are to be ordered until approved
by the Architect
SANITARY PLUMBING
Carried to Collection $
Section No. 5
BUILDER'S WORK
Bill No. 10
RAINWATER DISPOSAL AND PLUMBING
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining
N 50 mm Bend. No 2
P 50 mm Inspection bend. No 1
Q 50 mm Inspection junction. No 1
R 50 mm Junction. No 1
5-16-
S 50 mm End cap. No 1
T 110 mm Bend. No 2
V 110 mm Junction. No 1
Traps
WATER INSTALLATION
Carried to Collection $
Section No. 5
BUILDER'S WORK
Bill No. 10
RAINWATER DISPOSAL AND PLUMBING
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining
AE 15 mm Ditto in screed. m 2
AJ 22 mm Elbow. No 4
5-17-
AK 22 mm Tee. No 3
AL 22 - 15 mm Reducer. No 2
AN 28 mm Socket union. No 1
Brasswork
AR "Cobra " Ledimo LO-214-15 square pillar tap with cold indices
and 1/2" BSP male inlet, fixed to basin and connect to water
pipes. No 1
Carried to Collection $
Section No. 5
BUILDER'S WORK
Bill No. 10
RAINWATER DISPOSAL AND PLUMBING
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining
FIRE APPLIANCES
BUILDER'S WORKS
TESTING
5-18-
BA Allow for testing and commissioning all plumbing works
included in this Bill, make good all defects and retest until
approved. Item 1.00
Carried to Collection $
Section No. 5
BUILDER'S WORK
Bill No. 10
RAINWATER DISPOSAL AND PLUMBING
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining
Section No. 5
BUILDER'S WORK
Bill No. 10
COLLECTION
Page Amount
No
Total Brought Forward from Page No. 15
16
5-19-
17
18
B 4 mm Obscure glass. m2 1
Mirrors
5-20-
C
4 mm "City Mirror" clear float quality glass silvered and sealed
mirror with polished edges sprayed on back with clear lacquer
before fixing, four times drilled for and plugged and screwed to
walls with and including chromium plated capped mirror screws
and rubber washers. Size 500 x 600 mm. No 1
ON PLASTER, ETC
5-21-
Prepare and apply three coats internal quality high gloss
enamel paint internally on
ON METAL
ON WOOD, ETC.
F
Carbolineum saturate sawn softwood wall plate before fixing. m2 2
Knot, prime, stop and apply one undercoat and two finishing
coats Eggshell enamel paint on
Carried to Collection $
Section No. 5
BUILDER'S WORK
Bill No. 12
PAINTING
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining
LEAVE CLEAN
K
Allow for touching all work through out, clean off all paint, oil,
cement or other stains onwalls, floors ,ceilings, glass etc. and
leave all surfaces in full and proper working order. Item 1.00
5-22-
Carried to Collection $
Section No. 5
BUILDER'S WORK
Bill No. 12
PAINTING
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining
Section No. 5
BUILDER'S WORK
Bill No. 12
5-23-
PAINTING
COLLECTION
Page Amount
No
Total Brought Forward from Page No. 21
22
5-24-
NOTE: The contractor is referred to the preceeding Bills for full
descriptions of labor and material which apply generally to this
bill
WATER RETICULATION
Generally
Excavation
B
Excavation in pickable material commencing at natural ground
level for surface trenches not exceeding 2 metres deep. m3 16
Disposal
F Redig from spoil heap, return, fill and well compact selected
excavated material in trenches. m3 15
G Redig from spoil heap and cart away to a tip to be found by the
contractor. m3 1
H
25 mm Diameter pipe laid in ground including excavating trench
not exceeding 1 metre deep , fill in, ram and spread surplus
excavated material on site not exceeding 100 metres. m 11
Carried to Collection $
Section No. 5
BUILDER'S WORK
Bill No. 13
EXTERNAL WORKS
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining
5-25-
J 63 mm Diameter pipe laid in ground including excavating trench
not exceeding 1 metre deep , fill in, ram and spread surplus
excavated material on site not exceeding 100 metres. m 16
K 25 mm Elbow. No 6
L 25 mm Tee. No 4
M 25 - 22 mm Socket union. No 2
N 63 mm Elbow. No 4
P 63 mm Tee. No 4
Q 63 - 25 mm Reducer. No 2
R 63 - 54 mm Socket union. No 2
SOIL DRAINAGE
Generally
Excavation
Disposal
X Redig from spoil heap, return, fill and well compact selected
excavated material in trenches. m3 17
Carried to Collection $
Section No. 5
BUILDER'S WORK
Bill No. 13
EXTERNAL WORKS
5-26-
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining
Y Re-dig from spoil heap and cart away surplus material to a tip
to be found by the contractor. m3 2
AC 110 mm Bend. No 2
AD 110 mm Y-junction. No 3
Sundries
AE
Encasement 100 mm thick all round 110 mm diameter pipe in ramp in
concrete (Grade 10-20 mm stone) including all necessary formwork. m 5
AF
75 mm Concrete (Grade 10-20 mm stone) bed and hauching up on both
sides to 110 nm diameter pipe including necessary additional
excavation and spread and level surplus excavated material on site not
exceeding 100 mm. m 27
AG
Cast iron A.B.C pattern cleaning eye cover and frame and joint to 110
mm diameter P.V.C. pipe including encasing all round in concrete
(Grade 10-20 mm stone)and finish smooth on all exposed surfaces. No 2
AH
110 mm Diameter P.V.C. gulley trap with hopper head cast iron
grating and joint to 110 mm P.V.C. pipe including encasing in
concrete (Grade 10-20 mm stone) carried up as kerb 75 mm
high above ground level and dished to grating including
necessary formwork and finish smooth on all exposed faces. No 1
Carried to Collection $
Section No. 5
5-27-
BUILDER'S WORK
Bill No. 13
EXTERNAL WORKS
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining
AN Redig from temporary spoil heap, return fill and ram excavated
material around walls. m3 3
BD Render one coat cement plaster including all labors with a steel
trowel finish on walls. m2 9
5-28-
Carried to Collection $
Section No. 5
BUILDER'S WORK
Bill No. 13
EXTERNAL WORKS
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining
Soakaway
BJ
Excavate for soakaway 8 400 mm long x 1 520 mm wide and 1
830 mm deep, lay 100 mm diameter approved burnt clay or
porous concrete drain pipe laid with 15 mm open joints in 40
mm stone filling including packing stone around the pipe as
construction goes on and lay asbestos sheeting on top after
finishing stone filling. No 1
TESTING
BK
Allow for testing and commissioning all water, fire, refuse and
soil drains included in this bill, make good all defects and retest
until approved, no trenches are to be filled until approved. Item 1.00
5-29-
Carried to Collection $
Section No. 5
BUILDER'S WORK
Bill No. 13
EXTERNAL WORKS
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining
Section No. 5
BUILDER'S WORK
Bill No. 13
EXTERNAL WORKS
COLLECTION
Page Amount
No
Total Brought Forward from Page No. 24
25
26
27
28
5-30-
Carried Forward to Summary of Section No. 5 $
Section No. 5
BUILDER'S WORK
Bill No. 13
EXTERNAL WORKS
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining
PROVISIONAL SUMS
Test cubes
D
Provide the Provisional sum of $400.00 (Four hundred dollars
only) for materials and compaction tests executed complete. Item 1.00
Electrical installation
Work tops
5-31-
L Add profit. Item 1.00
OTHER SUMS
Carried to Collection $
Section No. 5
BUILDER'S WORK
Bill No. 14
PROVISIONAL SUMS
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining
Builder's work
5-32-
Carried to Collection $
Section No. 5
BUILDER'S WORK
Bill No. 14
PROVISIONAL SUMS
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining
Section No. 5
BUILDER'S WORK
Bill No. 14
PROVISIONAL SUMS
COLLECTION
Page Amount
No
Total Brought Forward from Page No. 30
31
5-33-
Carried Forward to Summary of Section No. 5 $
Section No. 5
BUILDER'S WORK
Bill No. 14
PROVISIONAL SUMS
Proposed Guard House in Guruve
For ILO Zimbabwe - Women in Mining
Section No. 5
BUILDER'S WORK
1 FOUNDATIONS 4
3 BRICKWORK 8
4 ROOF COVERINGS 9
5 CARPENTRY 10
7 METAL WORK 12
11 GLAZING 20
12 PAINTING 23
13 EXTERNAL WORKS 29
5-34-
14 PROVISIONAL SUMS 32
5-35-