28 May 2018 218 Newmarket Road, Postnet Suite 153 Private Bag X3, ARM-E3X-MM04
Validity: -30 days North Riding, South Africa North Riding 2162
Tel +27 11 704 7656 SA Reg 2007/005106/07
www.aptprocessing.com E-mail: info@aptprocessing.com

Quotation – Mutsa Mining


COUNTRY: PNG

Hard rock Plant / 1 to 1.5 t/hr (ore dependant)


ITEM PRICES
CRUSHERS: •JC25 Jaw Crusher / 7.5kW motor •RD15 Fines crusher / 18.5 kW

GOLDKACHA x 2: •GoldKacha Concentrator MK4 - • Feed funnel with integral 3mm wire mesh screen
•Polyurethane bowl •220V/ 50Hz electric drive with gearbox • V-belt power transmission
• Water control valve and hose • Gold Fountain concentrate upgrader (gravity fed) • Starter
•Gold Masta sluice and frame • Slide frame

CONVEYOR: •Feed Conveyor with grizzly and feed hopper •Jaw Crusher Product Conveyor

PIPING: •Plant piping including water reticulation and slurry piping.

ST TABLE: •ST120 Bullion Upgrade Table • ST Vibrating Screen Feeder •Base frame and tray •5Kg Goldfix

SMELTING KIT: •P42 Bench top electric smelter (220 V) •2 x A12 Graphite Crucible •Tongs and Crucible Tray •1 Kg
Slag Mould •25 kg Borax
WATER & PUMPS: •1 x 75m³ water storage pond •RD water supply pedrollo pump

SLURRY PUMP: •3/2 tailings pump with sump (5.5 kW)

ELECTRICS: •Full electrical reticulation including wiring, stop/starts, emergency stops. •Motor control centre.
•Plugable cabling •Soft Start for crusher

PACKING: •Packing only: 2 x 40 ft containers


Plant Cost $ 132,728
GENERATOR: •Generator 80 kVA Generator
$ 25,900
SPARES: •JCRD15 Crusher Consumables & Spares initial kit detailed and given on page 2 REF: ARM-CRS-SPS02 $ 21,213

*Estimate for onsite installation supervision and commissioning $ 12,317

TOTAL PLANT COST, PACKED, EX Works Johannesburg, South Africa $ 192,158

Terms of Sale

 Site Preparation must be effected by the customer according to our  Delivery : - Manufacturing lead time 10 weeks ex receipt of order & deposit
instructions and the site manual.  Conditions : - APT Terms & Conditions apply
 Payment : - 70 % deposit, 30 % 2 weeks prior to shipping including the  ROE: - Plant origin South Africa, any changes to the rate of exchange may be
shipping and freight in the exclusions below applied at APT's discretion.
 Exclusions from this quote
1. Pre-inspection, duties, brokerage & taxes, demurrage, site preparation,
raw water supply, onward training on plant, test-work
2. Freight and shipping costs – if shipping and freight is to be effected into
a non South African tax jurisdiction, APT requires the customer to agree to
appoint APT as being responsible for arranging the shipping and freight to
the customer site, which then results in no VAT being payable on the invoice
amounts payable to APT. APT will separately invoice the customer for
shipping and freight charges prior to date of shipping. Only upon receipt of
all payments due will APT effect shipping of the plant to the customer.
1 of 3
28 May 2018 ARM-1ML20-MM03
Validity: -3 weeks 218 Newmarket Road, Postnet Suite 153 Private Bag X3,
North Riding, South Africa North Riding 2162
Tel +27 11 704 7656 SA Reg 2007/005106/07
www.aptprocessing.com E-mail: info@aptprocessing.com

Quotation – Mutsa Mining


COUNTRY : Zimbabwe

1-1.5tph Mill and Leach Plant

ITEM 1- 1.5tph Milling Circuit PRICES (USD)

Milling Circuit
MATERIAL •Feed Bin •APT Belt Feeder/ 4.0 kW •1 x transfer conveyor / 2.2 kW
HANDLING:
BALL MILL: • Ball Mill 1.2 x 2.4 m (37 kW) •Gearboxes •Trunnion Bearings •Liners •Initial ball charge
NB: Mill foundations and site preparation not included - Client responsibility
MILL ANCILLIARIES: •Skid frame for mill •Mill electrics and lubrication system •Piping and feed chute
SLURRY PUMPS: •Feed & Discharge Mill discharge pumps with sump (45 kW) $ 167,896
WATER & PUMPS: •1 x 75m³ water storage pond •1x Water supply pump MN 50 – 160A
PIPING: •Plant piping including water reticulation and slurry piping.
ELECTRICS: •Full electrical reticulation including wiring, stop/starts, emergency stops. • Mill circuit motor
control centre • All cabling •Soft Start for mill
PACKING: • Purchase and packing 2 x 40ft containers

CLASSIFICATION: •Screw Classifier $ 33,675


Tritank 1 x TT20 CIL Plant (1.5tph at 8 hr residence time*)

Tritank CIL Module : TT20


TRITANK: •TT20 Cyanidation Tank • Slurry Volume 20 m3
•Steel Tank •Support Frame
ACCESS: •Grid Flooring •Access Ladders •Safety Railings
EXTRAS: •6 x Impellers & Agitators (Total power 13.2kW) •Inter-stage carbon screens •Airlift Pumps and
Compressor • 2 x carbon transfer boxes with carbon screen.
Tritank Additional Equipment $ 74,050

WATER SUPPLY: • 1 x Polyurethane 2500 litre water tank • Pedrollo CPm130 water pump
SLURRY PUMPS: • 2 x 2/1.5 Slurry Pumps with Sumps (4kW) (Tank Feed and Tailings)

PIPING: •All tank piping including water and slurry piping.


ELECTRICS: •Full electrical reticulation including wiring, stop/starts, emergency stops. • Plugable cabling, pre-
wired and tested
PACKING: •Purchase and packing 2 x 40ft containers

TOTAL COST, PACKED, Ex WORKS Johannesburg, South Africa. $ 275,621


*Estimate for onsite installation supervision and commissioning (approx. min15 %) $ 44,710
Terms of Sale

 Site Preparation must be effected by the customer according to our instructions and the  Delivery : - Manufacturing lead time 16 weeks ex receipt of
site manual. order & deposit
 Payment : - 70 % deposit, 30 % 2 weeks prior to shipping including the shipping and freight  Conditions : - APT Terms & Conditions apply
in the exclusions below  ROE: - Plant origin South Africa, any changes to the rate of
 Exclusions from this quote exchange may be applied at APT's discretion.
1. Pre-inspection, duties, brokerage & taxes, demurrage, site preparation, raw water
supply, onward training on plant, test-work, VAT15%
2. Freight and shipping costs – if shipping and freight is to be effected into a non South
African tax jurisdiction, APT requires the customer to agree to appoint APT as being
responsible for arranging the shipping and freight to the customer site, which then results
in no VAT being payable on the invoice amounts payable to APT. APT will separately invoice
the customer for shipping and freight charges prior to date of shipping. Only upon receipt of
all payments due will APT effect shipping of the plant to the customer.
TERMS AND CONDITIONS OF SALE
8. SHIPMENT
1. DEFINITIONS
“Shipment” means delivery to the initial carrier in accordance with the delivery
In this agreement, “APT” means Appropriate Process Technologies (Pty) Ltd terms of this order. The shipping date is based on conditions at the factory on the
including subsidiary or subcontractor companies (TecWin Investments (Pvt) Ltd) date of the placement of order by Purchaser, and APT may change date based on
by which the goods are sold. “Purchaser” means the body corporate, firm or the conditions on date of Purchaser’s acceptance. APT may make partial
person by which the goods are purchased. The “goods” are the goods and shipments. APT shall select method of transportation and route unless terms are
services described in APT/TecWin’s quotation or pro-forma invoice. Ex Works. If Purchaser specifies the method and route of transportation,
Purchaser shall pay all freight costs in addition to the sale price.
2. GENERAL PROVISION
Pre-packing inspection (Certificate of Conformance) is required by some countries
These Terms and Conditions and the terms and conditions set out in the
before freight can be booked. The client must inform APT of any pre-inspections
Quotation or Pro-forma Invoice or Fiscal invoice constitute the entire contract on
requirements at date of initial order. Pre-inspections are the responsibility of the
the subject matter, which may be modified only in writing signed by both parties.
client and must be booked by the client. Unless otherwise stated Pre-inspections
Any notice required under this contract shall be in writing and shall be effective
are excluded from freight cost
when personally delivered or sent electronically. Purchaser may not assign any
rights hereunder without APT’s prior written consent. Any weights specified to the Purchaser or written in the proposal are estimations
and are subject to variations. Any variations to changes to the indicative weights
Failure by APT to enforce any provision hereof shall not be a waiver of the right
shall not alter the contract price, nor give rise to claims again APT.
thereafter to enforce such provision. No waiver or course of dealing between APT
and Purchaser shall affect the right of APT to require performance by Purchaser 9. RISK
strictly in accordance with this contract.
Risk pertaining to the goods shall be passed to the Purchaser upon delivery at the
3. PAYMENT TERMS port of destination or collection according to the INCOTERMS specified in the
contract and the Purchaser will have sole responsibility for all damages as a result
Payment for all goods is due in advance and shall be paid in full prior to shipment,
of theft, accident, natural causes and alike from thereon after. This risk
unless otherwise specified by APT in the Sales Order Acknowledgement. Any
responsibility is irrespective of whether ownership of the goods has been passed
amount not paid to APT within 30 days after the invoice date will bear interest at
to the Purchaser or not.
2% per month (24% annum). APT may at any time in its sole discretion revoke
credit, or require payment in advance of manufacture or delivery of goods. 10. PURCHASER DATA
Upon confirmation of an order, APT will raise and issue a pro-forma invoice to APT will endeavor to meet Purchaser’s schedule, however timely performance by
enable payment of the required deposit. APT is contingent upon Purchaser supplying to APT when needed all required
technical information, including drawing approval, final purchase order and all
Upon completion of the order the Purchaser will be notified and final payment plus
required commercial documentation.
freight costs, if APT is responsible for same, must be effected prior to packing of
the goods for shipping (“final payment”). 11. FORCE MAJEURE
Non-payment of the final payment on due date will result in APT notifying the If APT suffers delay in performance due to any cause beyond its control, including
Purchaser of its payment default and requesting the Purchaser to rectify same but not limited to act of God, war, act or failure of government, act or omission of
within 14 calendar days. Purchaser, fire, flood, strike, labor trouble, sabotage or delay in obtaining from
others suitable services, materials, components, equipment or transportation, the
Failure to rectify will result in cancellation of the order. Cancelled orders will result
time for performance by APT shall be extended equal to the period of the delay
in a 20% penalty (calculated at 20% x of the final payment excluding freight costs)
and its consequences. APT will give Purchaser notice in writing within reasonable
being effected against the deposit payment, and the remaining net deposit
time after APT becomes aware of such delay.
amount (without interest) will be credited against the cost of any new goods
ordered in future by the Purchaser. . 12. STORAGE
If the Purchaser does not collect the goods (for whatsoever reason) at the port of APT may store, at Purchaser's expense and risk, any item for which manufacture
destination, resulting in demurrage and other charges for the account of APT and or shipment is delayed by causes within Purchaser’s control, or which affect
should APT be required to settle same, the Purchaser will be deemed to have Purchaser’s ability to receive the item, and Purchaser shall pay reasonable
given up all right and title to the goods and APT may elect have the goods storage charges as part of purchase price for the goods. This is allocated at US$5
shipped back to APT’s premises. In such event APT will sell the goods to defray per day per square metre of floor space taken.
any and all damages suffered, including but not limited to the shipping costs
incurred in returning the goods to APT’s premises, demurrage and other charges 13. SITE PREPARATION
incurred by APT and will keep 20% of the goods’ original value as a penalty
payment. The balance of moneys left over, if there are any, will be credited The commissioning team will not be dispatched until APT has received
against the cost of any new goods ordered in future by the Purchaser. photographic proof of completed preparations as per APT instructions, being
foundations and water supply.
4. TAXES
14. COMMISSIONING
Purchaser shall pay every existing, new or increased tax, public charge, VAT,
tariff, duty, or reassessment of any of the foregoing, levied or imposed upon If commissioning is included in this contract, the commissioning process will be
goods for this transaction. carried out as per instructions given by APT and is done at the customers risk.
APT shall not be responsible for any resulting loss or damage. All commissioning
5. INSURANCE services carried out by APT will only be performed upon approval by a director of
APT. Any commissioning services carried out as a result of an agreement without
Purchaser shall pay all costs of insuring goods from point of origin, EXW approval of a director of APT shall be void. APT will employ its own installation
Johannesburg RSA. Purchaser assigns to APT Purchaser’s right to any proceeds crews.
of insurance, to the extent of any amount owed by Purchaser to APT.
14.1. Preconditions for commissioning
6. TITLE
APT will supply the client with an estimated timeframe for the commissioning
No ownership in the goods shall pass to Purchaser except in accordance with the process. Due to the uncertainty of the commissioning process, there is no
"Incoterm" specified in the Quotation. After title passes to Purchaser, APT shall warranty as to the estimated time period for the commissioning program.
have a security interest in the goods and a right to exercise a lien over the goods
until Purchaser pays APT in full for the goods and/or pays any and all demurrage 14.2. Stages of commissioning
and other charges incurred by APT
The commissioning process is split into three stages; Installation, Cold
7. POINT OF ORIGIN Commissioning and Hot Commissioning as described below. The commissioning
process should prove the structural, mechanical and electrical integrity of the
All sales are EXW Johannesburg unless otherwise stated. If the goods are goods in terms of good engineering practice.
supplied EXW, the seller is under no circumstances responsible for the transport
of the goods from their place of manufacture to any intended destination required
a) Installation
by the purchaser. The transportation of the goods is the sole responsibility of the
purchaser who undertakes to do all things necessary to arrange for the removal of The Installation process will have been completed upon the physical placement
the goods from its place of manufacture within 1 (one) calendar month after and erection of all machinery and ancillary items.
manufacturing of the goods has been completed.
b) Cold Commissioning

In order to successfully complete the Cold Commissioning Process, the goods


must be run safely and successfully under no external load for a predetermined
minimum number of consecutive hours, without interruption. Should interruption
occur due to failure of APT equipment, the Cold Commissioning process must be
restarted.

CLIENT INITIAL: APT INITIAL: WITNESS:


(Required for approval before order)
TERMS AND CONDITIONS OF SALE
This warranty shall be void if:
c) Hot Commissioning
a) Purchaser fails to inform APT of a warranty claim within 30 days of
In order to successfully complete the Hot Commissioning Process, the goods
receipt of goods; or
must be run safely and successfully under the load conditions specified in the
b) Purchaser has opened or attempted to repair the item in question
Proposal for a predetermined minimum number of consecutive hours, without
without APT’s express written authority; or
interruption. This predetermined minimum number of hours must be agreed upon
c) Purchaser fails to make any payment when due to APT; or
by APT and the Purchaser before the Hot Commissioning process is due to begin.
d) Any APT logo, decal, warning sign, serial number identification plate,
Should interruption occur for due to failure of APT equipment, the Hot
or other similar item is removed from goods; or
Commissioning process must be restarted.
e) Goods are improperly stored or handled, or are not operated and
Hot Commissioning relies on input from the client to complete successfully. This maintained in accordance with any manuals or training provided and
includes but is not limited to provision of water, power, fuel, trained operators, good industry practice.
loading and haulage equipment and tailings disposal arrangements. APT will
Purchaser may not assign this warranty.
provide the client with a full set of requirements prior to installation. Any
interruptions to the Hot Commissioning arising from Purchasers fault or failure to APT gives no warranty, express or implied, except as expressly set out herein.
supply will result in APT withdrawing the commissioning team and re-mobilising at
a later date, at the client’s expense. Any delays to commissioning (including Purchaser may not make any claim after one year from the date on which the right
weather, strike action etc) do not affect the total running hours agreed on for to do so arose.
acceptance.
19. CONFIDENTIAL NATURE OF DOCUMENTS SUPPLIED BY APT
d) Acceptance Certificate All drawings, specifications, manuals, intellectual property and other such
information supplied by APT to the Purchaser shall remain the exclusive property
Upon successful completion of all three phases of commissioning, namely
of APT and shall not be published or disclosed to any third party or made use of
Installation, Cold Commissioning and Hot Commissioning, an acceptance
by the supplier except for the intended purpose of executing the proposal.
certificate in respect of the goods supplied by APT must be signed by the
Purchaser and will signify his acceptance of APT’s fulfilment of the requirements 20. SPECIFICATIONS
within the proposal and the hand-over of the goods from APT to the Purchaser.
All specifications pertaining to design parameters such as, but not limited to,
15. PERFORMANCE GUARANTEE dimensions, capacity, flowrates, power or performance, stated in any
documentation drafted by APT, are given in good faith and must be taken to be
No process or metallurgical guarantees are provided or implied by APT. APT shall
approximate unless specifically stated to be a warranty or contractual obligation.
not be held responsible for any performance indicators that are different from
APT will not be held responsible for any undesired repercussions resulting from
those predicted. These performance indicators shall have no influence on the
the inaccuracy of any given specification.
measure of success of the commissioning process or the signing off of the
acceptance certificate. 21. MODIFICATIONS
16. INDEMNITY Equipment supplied by APT is manufactured based on standard design. Should
any modifications to this design arise as a result of a request from the Purchaser,
Purchaser shall indemnify and save harmless APT from and against any and all
the cost of such modifications shall be owed by the Purchaser and risk of
claims, actions, demands, losses, costs (including all legal fees and
implementing said modification shall be the sole responsibility of the Purchaser.
disbursements as between an attorney and his own client), damages, expenses
Unless otherwise specified, APT offers no guarantee and will not be held liable for
and liabilities arising in whole or in part out of any use or handling of goods by
the failure of goods modified at the Purchaser’s request.
Purchaser or any other person after shipment of same, or any act or omission of
the Purchaser or its agent, employee or contractor. Should the Purchaser request a modification after the proposal containing the
goods in question has been accepted, APT reserves the right to extend any
17. LIMITATION OF LIABILITY
quoted delivery period that may be effected as a result.
Notwithstanding any other provision hereof, APT’s liability to Purchaser arising
22. LAW
from the manufacture, sale, delivery, use or resale of the goods, whether based
on warranty, contract, negligence or otherwise, shall not exceed the lesser of the This contract shall be governed by the laws of South Africa. All disputes relating
cost to APT of correcting defects in the goods as herein provided or the price paid hereto shall be within the exclusive jurisdiction of the Courts of South Africa,
by Purchaser for the particular item which gives rise to the liability. Upon the provided APT may at its option take action in any other jurisdiction to collect
expiration of twelve months from the date of shipment of goods to Purchaser, all amounts owed by Purchaser.
such liability shall terminate.
23. DISPUTE RESOLUTION
Without limiting the generality of any other provision hereof:
Where a dispute arises in terms of the contract, between APT and the purchaser,
a) APT shall not be responsible for any loss, damage, or expense arising and the dispute in question in not related to a claim in payment of the contract
from any work, equipment, parts or repairs by others not properly price by APT against the purchaser, APT is entitled to institute such action as
within APT’s scope of works appropriate in any court which has jurisdiction or by means of arbitration, which
b) APT shall not be liable to Purchaser or any user for loss of anticipated decision shall be at APT’s sole discretion. The arbitration will be conducted in
profit, loss from plant shut-down, non-operation or increased expense terms of the Rules for the Conduct of Arbitrations as published by the Association
of operation of other equipment, consequential loss, or other loss or of Arbitrators (South Africa).
damage of any nature arising from any cause whatsoever.

18. LIMITED WARRANTY (Where Applicable)

For goods manufactured by or on behalf of APT, APT warrants that if within 6


months from the date of commissioning of such goods to Purchaser (or 12 months
from shipping – whichever is sooner), the Purchaser finds that such goods are
defective in workmanship or materials, then the Purchaser’s sole and exclusive
remedy for breach of warranty, provided the Purchaser gives prompt written
notice of same to APT within the warranty period, APT will repair or replace such
goods. PROVIDED THAT:

a) Such goods must be delivered to APT at Purchaser's expense, or


Purchaser must pay cost of APT’s personnel attending Purchaser's
premises to examine and repair or replace goods, in order for APT to
validate or reject the warranty claim. Should the warranty claim be
justified, APT will reimburse the costs of the personnel attending the
site.
b) APT does not warrant any item that is not manufactured by APT or
elected subcontractor, whether sold separately or as part of APT’s
goods. APT assigns to Purchaser the benefit of any warranty of any
third-party manufacturer, without recourse against APT.
c) All products manufactured by others and sold by APT, whether
separately or as components of other units, are sold solely upon and
subject to the terms warranted by their respective manufacturers.
d) The warranty does not apply to goods subjected to wear and tear by
chemical or abrasive attack, or by abuse or incorrect operation.

CLIENT INITIAL: APT INITIAL: WITNESS:


(Required for approval before order)