REGD.OFFICE : 153 MOUNT ROAD,CHENNAI-600 002
PH: 28460283,28460374,28460422
FAX:044-28460581
CIN No.:U29191TN1978PTC007444
e-mail:neptune@md2.vsnl.net.in
www.neptunerefrigeration.com
9887/NR June 17, 2017
BASIS OF DESIGN
Capacity 30 tons/day
Size of can 100 lbs
Brine temperature To be maintained at –10 deg C
Harvesting Cans to be regularly harvested once a day
Insulation material Expanded polystyrene
Insulation thickness 115mm thick for sides and bottom of tank
Refrigerant Ammonia
MATERIAL SPECIFICATIONS
01. ONE KIRLOSKAR make model KCX-6 compressor with suction and discharge
stop valves, flywheel, etc and having the required capacity at the operating
conditions
02. ONE Set high, low and oil pressure gauges and cutouts
04. ONE Fully automatic state delta starter for the above
06. ONE NEPTUNE make ammonia oil separator of suitable size complete with
standard fittings
09. ONE NEPTUNE make ammonia liquid receiver of suitable size with required
connections.
10. ONE Freezing tank of welded construction made from 6mm MS sheet
complete with required raceway and partition. Ice tank to hold 720 nos.
of 100 lbs. ice cans.
11. LOT Expanded polystyrene insulation 115 mm thick for sides and bottom of
tank
12. ONE NEPTUNE make Trunk type evaporator coil of 1800 lft fabricated out of
1-1/4” MS class C pipes complete with required headers and
accumulator.
17. 720 NEPTUNE make 100 lbs. Ice cans fabricated from 16 SWG GI sheet of
size 8” x 16” x 36”
23. LOT GI class B pipes, valves and fittings for the condenser water circuit
24. LOT Refrigerant pipes (MS class C),valves and fittings for interconnecting
various equipment
26. ONE Cubical type steel free standing, floor mounting compartmentalized MCC
board equipped with main switch fuse with selector switch for ammeter
and voltmeter, indicating lamps, current transformer and control fuses and
the required outgoing feeders
27. LOT Electrical wiring materials such as cables, conduits, CU earthing wire for
complete power wiring of the equipments
Please note that you will have to arrange for the following :-
EXCLUSIONS
1. All civil masonry works incidental to the plant including foundations for machinery
2. Main power supply together with main double earthing and main switch terminating
on suitable main switch fuse unit to be located on our switchboard in the plant room
3. Power and make up water drain connections
4. Water piping except those included in our offer
5. Any rack, lighting inside the storage
6. Any other item not specifically included in our offer to be arranged by you
Thanking you,
Yours sincerely,
For Neptune Refrigeration Co. P. Ltd.,
Nikhil Raj
Managing Director