This manual is a part of Baccara 90/20 & 90/25 HV remote controlled tables.
Table of Contents
1 Introduction........................................................................................ 5
2.3 Positioning of the Components in the Room and Fixing of the Base..... 14
3.1 Mounting of the Spot Film Device Carriage and the Column............... 17
6.6 Wiring the Interface between Generator and Baccara Cabinets .......... 54
1 Introduction
The purpose of this manual is to install a Baccara X-Ray room beforehand having
followed the instructions given in the Pre-Installation Manual:
This manual is dedicated to Baccara X-Ray room version non-elevating (HF 90/20) and
version elevating (HV 90/25) with a standard generator.
- 25 hours.
Fastening of the table: Warning, necessary tools will depend on the quality of the
concrete of the ground (the thickness must be 10 cm at least); see the specifications
described in the Pre-Installation Manual, chapter 3.2.1. for the load of each fastening
point.
Threaded rod with chemical sealing: M10 or M12 / Length > 100mm,
Adjustable spanner,
Drill for concrete: depend on the type of dowels or threaded rods used,
Thread locker: « Loctite » 243 or equivalent (to use in case of a dismantling of the
structure (models 90/25 and 90/90, of a dismantling of the « Rollon » of the patient
support)
2.1.1 On Place
Built:
SFD :
Column:
Collimator:
X-ray tube cover: 1 x Chc M8x50 + 2 disc LL8 + 2 nuts M10 + 1 Nylstop nuts
M8
2.1.2 On Factory
Base:
Built:
SFD:
Column:
Bottom Xray tube arm cover: 4 x Chc M5x20 + 8 disc M5 + 4 nylstop nuts M5
Compression:
Rhc M5x10 + nylon washer M5
Rhc M5x60 + nylon washer M5 Rhc M5x20 + nylon washer M5
Rhc M5x10 + nylon washer M5
Rhc M5x40 + nylon washer M5
Rhc M5x10 + nylon washer M5
B A C C A R A
The purpose of these pictures is to check that all main components necessary to install
the room are present.
Generator (With
Spot film device –left cover-column
keyboard without
cover
pedestal)
Please refer to the layout diagram made according to the manual of pre-installation,
take to care to keep count of the length of the cables between the various elements
3. Move the base, or drill holes through the base plate to use as a guide and refer to
the paragraph « necessary tools ».
4. Reposition the base and fix at least the three fixing screws on the head side (left
side on the picture) in order to tilt the table at 60° without risking that it falls on the right
side
5. Pre-position Baccara and Generator cabinets in the room on the patient side, and
both consoles (Baccara and Generator) and the pedestal on the user side.
1. Remove the following parts to install the Spot Film Device (see picture 1):
2. Remove the following parts to install the column (see picture 2):
1. The back chain covers of the column fixed with 3 RHC screws,
Picture 1
3
2
Picture 2
3. Slide the spot film device carriage along both rails present on the picture 3, by
lowering with the hand the fixing item of the carriage so that the bearings can go on
(item on the left on picture 1) and do not fix the spot film device carriage for the
moment.
4. Slide the column along the Nadella guide present on picture 4 and fix the column
with both CHC screws provided for this purpose at the foot of the column.
Picture 3
Picture 4
1. Fix the column cable chain on the base of the column with the 2 CHC screws
(picture 5)
2. Fix on side of the focal cable chain on the top part of the upper section of the
column with two bolts, and the other side of this chain with 4 CHC screws on the top of
the focal (picture 6)
Picture 5
Picture 6
Picture 7
3. Connect PR47 and PR75 sockets located on the base of the column
(picture 7), PR70, PR71 and PR72 sockets located at the top of the
focal and PR71C sockets for the handle buttons for brake.
NOTE: For the moment, do not bridle the cables and wait to mount the X-
ray tube in order to set the length of cables.
1. Remove the rear cover of the column fixed with 6 CHC screws.
2. Loose the four screws which fix the lateral sides of the column cover (Picture 8)
3. Loose the two screws which fix the lower cover brackets (Picture 9)
4. Install the column front cover taking great care to not open it widely to avoid any
risk of failure.
5. Fix the cover with the 6 screws previously disassembled, taking great care to tight
firmly the lateral screws (Picture 8) because they fix the bearing guides.
Picture 8
Picture 9
Picture 10
2. Unscrew the 4 screws allowing to fix the upper tube of the compression present
on the X-ray tube support cylinder (picture 11).
3. Position vertically the compression Assy on the structure and fix the upper tube of
the compression with the PIN screws.
Note: Take care to centre the compression tube compared with the X-ray
tube support cylinder.
4. Then tight the two grub screws firmly to lock the PIN screws.
5. Loose, but not completely, the two grub screws allowing to fix the lower
tube of the axis of the compression on the half moon of the spot film device
carriage, and let one of the two screws rising above in order to easily position
the axis. (Picture 12).
6. Fix the tube of the compression on the half moon with the grub screws
using the spot film device carriage mobility.
Note: Take care to centre the compression tube in comparison with the
cylinder support of the X-ray tube.
Picture 11
Picture 12
Picture 13
8. Connect the two sockets of the compression named PR60T and PR61T at the rear
of the column base (picture 13), look at the picture 1, parts number 2.
9. When the compression is fixed, fix the spot film device carriage with the 3 CHC
screws.
1. Fix the SFD cable chain with 4 CHC screws on the lower right side of the carriage
(picture 14).
2. Get the following cables through the front face of the SFD (picture 15):
-E8000119 (Table control panel will be connected on the SFD front cover).
-E8000247 (SFD power supply and data will be connected later on the E8000545
board).
-E8000248 (70Vdc power supply for cassette tray and shutters will be connected
later on the E8000545 board).
Warning: Connect this socket in the right direction in order not to damage
several boards.
-E1T00002 (AEC cable, to get over the SFD carriage and to connect on the
preamplifier box of the AEC chamber. (Pictures 16 and 18).
Connect all cables previously named except cables E8000247 and E8000248
cables that will be connected later.
Warning: Bridle that cables so that the fluttering grid motor do not hurt
when fluttering grid. To stimulate the motion of the grid, manually turn
the appropriate cams for the fluttering of grid (picture17).
Route all that cables carefully by using tie wraps, especially in the area of the grid
motor belt to avoid any damage when the belt is moving.
Note: Keep unused cables in output of the SFD cable support chain,
wrapped and fixed on the carriage to not damage them with the
movements of the table. These cables will be used later for the image
intensifier.
Picture 14
Picture 15
Picture 16
Picture 17
Picture 18
Note: For reasons of convenience, the X-ray tube, the Image Intensifier, and the
collimator will be assembled once it will be possible to tilt the table.
The objective now is to connect the main power supply to tilt the table, and finish with
the wiring and mechanical mounting.
Connect Baccara console to Baccara cabinet using the E8000234 cable on J12 connector
of E8000548 board present on the door of the cabinet. (Picture 19 next page).
(Console cable connection not
Picture 19 present)
The table is connected to Baccara cabinet with 4 connecting cables marked CT1 to
CT4 on the table side and CA1 to CA4 on the cabinet side; connect them by taking care
not to twist them. (Picture 20)
Picture 20
Connect in accordance with the pre-installation manual, the power supply cables
inside the electric cabinet (made of 3 wires, 1 phase, 1 neutral and 1 ground) between
the circuit breaker dedicated to Baccara cabinet and FT1 filter located in the cabinet.
Measure voltages present in the input of the electric cabinet on FT1 filter and check
that they are in conformity with the tolerances described in the pre-installation manual.
Make a strap on PR6 socket corresponding to the emergency switch located on the
front cover of the spot film device.
Check that the light indicator of the Baccara console near the On/Off button is
lighted.
Check that the red LED located on the E8000012 On/Off board is lighted on the
door of the cabinet.
5.2 Power Up
Measure the voltage on J11 connector: +70VDC (white wire: positive, brown wire:
GND). J11 is located on the front of SFD carriage.
Connect E8000247 and E8000248 cables (see paragraph 3.5.2.) by taking care not
to plug E8000248 cable into the wrong direction.
Display « waiting for communication with the processor » with all the LEDS of the
Console flashing during about 20 seconds,
Message « Welcome ».
While the initialization is in progress, the cassette tray will move backward (parking
position).
The shutters of the spot film device will move wide open.
After several seconds, and if the scattered grid was in parking position, it will move
to its centre position (under the X-ray beam).
Then, at the end of the initialization, the cassette tray will move forward EXIT
position. Ready to load a cassette.
Note: The cassette tray may stay in parking position at the end of the
initialization, if the console is in Service mode. You will see GROUP 0 on the
display.
It is necessary to enter the default parameters in the table before capturing the
dimensions of all surrounding components that may cause a risk of collision.
Warning: Take into account all components of the ceiling that may cause a
risk of collision between the table and the ceiling (air vent, beam etc.…)
Record all parameters in the Technical manual from Group 0 to Group 7 to get a
hard copy of the customer configuration.
Check and tight strongly all fixing screws of the table base.
Fasten the image intensifier crown with 8 Chc M6x16 screws, (picture 21)
Connect the two plugs on the image intensifier (picture 22) by taking care to
position the ferrite on the video cable (black) and to bridle it with a collar.
Warning: bridle the cables of the image intensifier taking into account the
correction of mechanical parallax. Therefore, the image intensifier will move on
head side and on feet side around about 10 cm.
Mount the two half covers of the image intensifier on the bottom of the SFD carriage
(picture 23)
Picture 21
Picture 22
Picture 23
Separate the trunion ring from the X-ray tube housing. (Picture 24),
Fix the trunion ring on the X-Ray tube bracket of the table with the four CHC screws
M6x30. (picture 25),
Warning: Don’t forget to insert the upper X-Ray tube cover bracket
between the trunion ring and the bracket.
Warning: Check that the fastening screws of the trunion ring on the
bracket are not too long and that the X-ray tube rotation in its trunion ring is
easy.
Picture 24
Picture 25
Insert the Anode and Cathode cables into the X-Ray tube housing taking care not to
reverse them, and checking that they are well lubricated and tightened.(Pictures 26 and
27),
Connect the stator made of three cables by respecting the anode impedance:
- A ground cable,
- A cable of thermal switch (2 wires),
- A stator cable (3 wires): Common, main, shift
Picture 26
Picture 27
The collimator is fastened by 4 holding brackets that allow in a first time to fasten
the collimator and in a second time to set the shutters of the collimator in comparison
with the cassette.
Install the lower X-ray tube cover bracket and the collimator mounting flange , put
the collimator on its flange by taking care that primary shutters are not damaged and fix
it with the 4 screws in order to centre the collimator on its flange, turn each screw with
the same number of turns (around 6/7 turns).
Connect the PR81 plug at the rear of the collimator powering the collimator light.
Remove the collimator board from the X-ray tube cover and position it in front of
the collimator.
Picture 28
Picture 29
Baccara cabinet:
Connect the marked plugs (Picture 30) on the processor box fastened in the
cabinet, by first routing the cables through the designated opening under the cabinet.
Connect the black cable « KV ref » to the intended 2 points connector and the
other to the end of J8 plug of PWB Interface board of the generator (Picture 31).
Warning: There are two connectors with two identical points available in
Baccara cabinet. They are marked « +24vdc » and « KV ref », so it is strongly
advised to not invert these two connexions.
Only one cable is connected between Baccara cabinet and Magnum generator
cabinets for the interfacing.
Note that it is a non detailed description because all details are included in the
Technical Documentation of the Magnum generator.
First, Connect the generator power supply cable at the place indicated in the
picture 32,
Connect both HT cables by taking care to not invert the Anode side (+) and
Cathode side (-) and by checking the presence of oil in the intended places on the thank
to connect these cables (Picture 33)
Picture 32
Picture 33
Picture 34
Picture 35
Once this instruction is finished, consult « Baccara X-Ray room Integration » instruction.