Package - II Part - Civil Works Construction of Service Bay Complex, Substation Transformer Yard SL.

QUANTITY DESCRIPTION OF ITEM UNIT NO. I.2 SERVICE BAY COMPLEX, SUB STATION & TRANSFORMER YARD EARTH WORK 1 1040 Clearing Jungle including uprooting of rank Sq.M vegetation, grass, brush wood, trees and sapplings of girth upto 30 cm measured at a height of 1m above ground level and removal of rubbish upto a distance of 50m outside the periphery of the area cleared. (Note: If however, only grass is met with, the area will be measured and paid for, under as a separate item.) 2 Felling trees of the following girth (measured at a height of 1M above ground level) including cutting of trunks and branches removing the roots, filling the pit and depression, stacking of the serviceable materials and disposal of unserviceable material etc., as directed for: a) 2 Felling Trees-beyond 30 cm upto including 60cm No girth RATE (in Figures & in words) Amount

b)

2 Felling Trees-beyond 60 cm upto including 120cm No girth

c)

2 Felling Trees-beyond 120 cm upto including No 240cm girth

679 Providing and injecting Chemical emulsion for PRE- Sq.M CONSTRUCTIONAL Anti-termite treatment and creating a chemical barrier on top surface of plinth filling, junction of inside wall and floor, on top of damp proof course (DPC) or on masonry at the level of plinth filling as per IS 6313 (Part-II) - 1981 using chemicals like chloropyripos emulsifiable (IS: 8944-1978) 20EC, mixed with water in 1:19 ratio (i.e. 1 litre of chemical to 19 litres of water). The emulsion is spread at 5 lit/sqm on top surface of plinth filling, top of Damp proof course and at 1 lit / linear meter along the junction of wall and floor, all as per specifications and directions. (Plinth area of the building at ground floor only shall be measured). Earthwork in excavation for FOUNDATION TRENCHES in ALL KINDS OF SOILS including dressing of sides, ramming of bottom and disposing the surplus excavated materials within a distance of 50m and lift upto 1.50m complete as per specifications. (Disposed soil to be leveled by breaking clods if any and neatly dressed).

Page 1 of 22

Package - II Part - Civil Works Construction of Service Bay Complex, Substation Transformer Yard SL. QUANTITY DESCRIPTION OF ITEM NO. a) 413 Depth upto 1.5m UNIT Cu.M RATE (in Figures & in words) Amount

b)

91 Depth below 1.5m and upto 3.0m

Cu.M

118 Earthwork in excavation for FOUNDATION TRENCHES in ROCKS, OTHER THAN HARD ROCKS (ORDINARY ROCKS) either by manual labour or by muffled blasting upto a depth not exceeding 1.5m including stacking or disposing the excavated materials, lead upto 50m and lift upto 1.50m etc., complete all as per specifications and directions of Engineer-in-Charge.

Cu.M

30 Earthwork in excavation for FOUNDATION Cu.M TRENCHES in HARD ROCK by muffled blasting upto an initial depth not exceeding 1.5m including stacking or disposing the excavated materials, lead upto 50m and lift upto 1.50m etc., complete all as per specifications and directions of Engineerin-Charge. 30 Earthwork in excavation for FOUNDATION Cu.M TRENCHES in HARD ROCK by chiselling upto a depth not exceeding 1.5m including stacking or disposing the excavated materials, lead upto 50m and lift upto 1.50m etc., complete all as per specifications and directions of Engineer-inCharge. Earthwork in excavation OVER AREAS (exceeding 30cms in depth, 1.50mtr width as well as 10 sqm on plan) in ALL KINDS OF SOIL including disposal of excavated earth, lead upto 50m and lift upto 1.50m etc., complete all as per specifications. (Disposed earth to be levelled by breaking clods if any and neatly dressed). a) 129 Depth upto 1.5m Cu.M

b)

43 Depth below 1.5m and upto 3.0m

Cu.M

Page 2 of 22

Package - II Part - Civil Works Construction of Service Bay Complex, Substation Transformer Yard SL. NO. 9 QUANTITY DESCRIPTION OF ITEM UNIT RATE (in Figures & in words) Amount

a)

Earthwork in excavation over AREAS in ORDINARY ROCKS either by manual labour or by muffled blasting upto a depth not exceeding 1.5m including stacking or disposing the excavated materials, lead upto 50m and lift upto 1.50m etc., complete all as per specifications and directions of Engineer-in-Charge. 37 Depth upto 1.5m

Cu.M

b)

12 Depth below 1.5m and upto 3.0m

Cu.M

10

Earthwork in excavation over AREAS in HARD ROCK by MUFFLED BLASTING upto a depth not exceeding 1.5m including depositing and stacking useful materials for measurementsand disposing the waste materials, lead upto 50m and lift upto 1.50m etc., complete all as per specifications and directions of Engineer-in-Charge. a) 9 Depth upto 1.5m Cu.M

b)

3 Depth below 1.5m and upto 3.0m

Cu.M

11

Earthwork in excavation over AREAS in HARD ROCK with CHISELLING upto a depth not exceeding 1.5m including depositing and stacking useful materials for measurements and disposing the waste materials, lead upto 50m and lift upto 1.50m etc., complete all as per specifications and directions of Engineer-in-Charge. a) 9 Depth upto 1.5m Cu.M

b)

3 Depth below 1.5m and upto 3.0m

Cu.M

Page 3 of 22

Package - II Part - Civil Works Construction of Service Bay Complex, Substation Transformer Yard SL. NO. 12 QUANTITY DESCRIPTION OF ITEM UNIT Cu.M RATE (in Figures & in words) Amount

596 Filling available excavated approved earth (excluding rock) in trenches, sides of foundations, plinth, etc, in layers not exceeding 15cms depth breaking clods, consolidating each deposited layer by ramming, watering and dressing, etc., complete for lead upto 50m and all lifts etc., complete as per specifications. Providing and constructing COURSE RUBBLE GRANITE STONE MASONRY using hard granite stones obtained from approved quarry with edges of stones hammer dressed in courses not less than 20 cms with bond stones at 2m apart in each course including curing, raking out joints and simultaneously flush pointing with the same mortar etc; complete all as per specifications IN FOUNDATION AND PLINTH. (The mix ratio specified is for cement : coarse sand) 15 In cement mortar 1:6

MASONRY 13

Cu.M

14

Providing and constructing Solid Cement Concrete Block masonry in cement mortar 1:6 (1 Cement : 6 oc aso y ce e t o ta 6 ( Ce e t Coarse sand) using factory made, load bearing, approved quality Cement Concrete blocks of specified size, Grade D (4.0), Density of blocks not less than 1800 kg/cum. Minimum average Compressive strength of units - 4.0 N/sqmm and Minimum strength of individual units 3.2 N/sqmm, setting in position, curing, raking out joints wherever required etc., complete with all leads and all as per specifications and directions of the Engineer-in-charge. IN FOUNDATION AND PLINTH 91 For 200mm thick walls using (400 x 200 x 200) mm size blocks.

Cu.M

Page 4 of 22

Package - II Part - Civil Works Construction of Service Bay Complex, Substation Transformer Yard SL. NO. 15 QUANTITY DESCRIPTION OF ITEM Providing and constructing Solid Cement Concrete Block masonry in cement mortar 1:6 (1 Cement : 6 Coarse sand) using factory made, load bearing, approved quality, Grade D (4.0), Density of blocks not less than 1800 kg/cum. Minimum average Compressive strength of units - 4.0 N/sqmm and Minimum strength of individual units 3.2 N/sqmm, set to level plumb including setting in position, providing scaffolding, curing, raking out joints wherever required etc., complete with all leads and all as per specifications and directions of the Engineer-in-charge. IN SUPER STRUCTURE UPTO ALL HEIGHTS. 225 For 200mm thick walls using (400 x 200 x 200) mm size blocks. Cu.M UNIT RATE (in Figures & in words) Amount

PLAIN CEMENT CONCRETE 16 Providing and laying cement concrete using 40mm nominal size graded hard granite stone aggregate obtained from approved quarry including compaction, finishing top surface to level, curing but excluding cost of formwork, etc., complete as per specifications. Mix ratio specified is for (cement: coarse sand: graded stone aggregate). ( t d d d t t ) a) 39 In foundations with PCC 1:5:10 Cu.M

b)

85 In sub-base to floors & Hardstand with PCC 1:5:10

Cu.M

c)

14 In top base to hardstand with PCC 1:3:6

Cu.M

17

Providing and laying cement concrete using 20mm nominal size graded hard granite stone aggregate obtained from approved quarry including compaction, finishing top surface to level, curing but excluding cost of formwork, etc., complete as per specifications. Mix ratio specified is for (cement: coarse sand: graded stone aggregate). 29 In foundations with PCC 1:3:6 Cu.M

Page 5 of 22

Package - II Part - Civil Works Construction of Service Bay Complex, Substation Transformer Yard SL. NO. 18 QUANTITY DESCRIPTION OF ITEM Providing and laying cement concrete using graded hard granite stone aggregate of 20mm nominal size obtained from approved quarry including formwork, compaction, finishing, curing, etc., IN BED BLOCKS, SILL BLOCKS COPING upto all heights complete all as per specifications. Mix ratio specified is for (cement: coarse sand: graded stone aggregate). The work includes providing throating/ drip mould wherever required as per standard engineering practice of size not be less than 40mm x 15mm. The rate is inclusive for making drip mould and no extra cost shall be paid for. 3 In coping with P.C.C (1:3:6) Cu.M UNIT RATE (in Figures & in words) Amount

a)

b)

1 In window cills with P.C.C (1:3:6)

Cu.M

c)

3 In blocks for fencing posts with P.C.C (1:2:4)

Cu.M

REINFORCED CEMENT CONCRETE 19 Providing & laying in position machine batched, machine mixed and machine vibrated design mix cement concrete of specified grade for reinforced cement concrete structural elements, using graded hard granite stone aggregates of maximum 20mm nominal (down graded) size obtained from approved quarry including fine aggregates conforming to latest IS 383 and cement all as per approved design mix proportions conforming to latest IS 10262 with minimum cement content for durability including supplying and providing concrete cover blocks etc., which shall be followed as per latest IS 456-2000 including mixing, transporting, placing vibrating, compaction, finishing to required levels, curing etc., complete all as per specifications but excluding cost of formwork and steel reinforcement.

Page 6 of 22

Package - II Part - Civil Works Construction of Service Bay Complex, Substation Transformer Yard SL. NO. QUANTITY DESCRIPTION OF ITEM Rate to include labour for keeping embedments if any wherever required while casting. Rate also to include lift charges and scaffolding for heights, depths and levels from FFL/GL. (The design mix proportions shall clearly indicate cement: fine aggregate: coarse aggregate: water cement ratio and approval shall be obtained from Engineer-incharge for initial and subsequent mixes as and when there will be change in quarry/materials for M-25 grade reinforced cement concrete, etc., all work upto plinth level. a) 220 Footings Cu.M UNIT RATE (in Figures & in words) Amount

b)

26 Pedestals

Cu.M

c)

17 Columns

Cu.M

d)

70 Plinth beams

Cu.M

20

Providing & laying in position machine batched, machine mixed and machine vibrated design mix cement concrete of specified grade for reinforced cement concrete structural elements, using graded hard granite stone aggregates of maximum 20mm nominal (down graded) size obtained from approved quarry including fine aggregates conforming to latest IS 383 and cement all as per approved design mix proportions conforming to latest IS 10262 with minimum cement content for durability including supplying and providing concrete cover blocks etc., which shall be followed as per latest IS 456-2000 including mixing, transportation, placing, vibrating, compaction, finishing to required levels, curing etc., complete all as per specifications but excluding cost of formwork and steel reinforcement.

Page 7 of 22

Package - II Part - Civil Works Construction of Service Bay Complex, Substation Transformer Yard SL. NO. QUANTITY DESCRIPTION OF ITEM Rate to include labour for keeping embedments if any wherever required while casting. Rate also to include lift charges and scaffolding for heights, depths and levels from FFL/GL. (The design mix proportions shall clearly indicate cement: fine aggregate: coarse aggregate: water cement ration and approval shall be obtained from Engineer-incharge for initial and subsequent mixes as and when there will be change in quarry/materials for M-25 grade reinforced cement concrete, etc., all work above plinth level upto all heights. a) 59 Walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts, etc., 212 Beams, suspended floors, roofs having slope upto 18 degree, landings, balconies, shelves, chajja, lintels, bands, plain windows sills, staircases and spiral staircases etc., Cu.M UNIT RATE (in Figures & in words) Amount

b)

Cu.M

FORM WORK 21

a)

Providing rigid and water tight centering and shuttering using best quality wood/ plywood /steel forms and centering with steel props, acro tubes etc., including strutting, propping, bracing, staging etc., complete for all RCC items fixed in position as required including labour for careful removal of form work etc., complete all as per specifications at all heights. In Horizatal / Vertical / slanting surfaces. 294 Foundations, footings, bases of columns, mass concreting, floorings, etc

Sq.M

b)

1031 Lintels, beams, plinth beams, girders, bressumers and cantilevers

Sq.M

c)

783 Suspended floors, roofs, landings, shelves and their supports, balconies and chajjas.

Sq.M

d)

503 Columns, pillars, abutments, posts and struts.

Sq.M

Page 8 of 22

Package - II Part - Civil Works Construction of Service Bay Complex, Substation Transformer Yard SL. NO. 22 QUANTITY DESCRIPTION OF ITEM Extra for additional height in centering, shuttering wherever required with adequate bracing, propping with steel props, acrotubes etc., including cost of deshuttering and decentering at all levels, for suspended floors, roofs, landings, beams and balconies, etc., for NOTE: (1) Plan area to be measured (2) Floor height to be taken from finished floor level (3) This item is applicable only for roof/high bay slabs & beams and not applicable to other items such as columns, walls, etc. 703 For all RCC items at 6.4m level over initial height of 3.5Mtr Sq.M UNIT RATE (in Figures & in words) Amount

STEEL WORK 23

Steel reinforcement for all RCC items including decoiling, cutting, hooking, bending, cranking, fabricating to required shape, placing in position and tying the system with soft drawn annealed binding wire of diameter not less than 1.00mm with 2 strands etc., complete all as per specifications at all heights (binding wire will not be measured for 62 With TMT 415 bars.

M.T

24

Supplying, fabricating, assembling, hoisting / erecting and fixing in position at all heights and with all leads, structural steel works of welded builtup sections, all as per structural drawings and as per detailed specifications (for materials and workmanship) in the situations described hereinafter including a) Cutting of components to required lengths/ widths and shapes/ profiles b) Smooth machining of edges/ faces c) Welding (electric arc welding) at joints of builtup sections/ single sections for required weld lengths and sizes and d) Painting all over with two coats of synthetic enamel paint of approved quality, make and colour / shade over one coat of red oxide zinc chromate primer with surfaces duly pressed to receive painting etc., complete all as directed by the Engineer-in-Charge. NOTE: The Contractor shall submit fabrication shop drawings for work involved based on construction drawings (that may be issued during construction period) for approval by Engineer-incharge.

Page 9 of 22

Package - II Part - Civil Works Construction of Service Bay Complex, Substation Transformer Yard SL. NO. QUANTITY DESCRIPTION OF ITEM The fabrication work shall start only after approval to the fabrication drawings. Any change required in the fabrication drawings shall be carried out at no extra cost over the quoted rates. Fabrication shall be in a perfectly workmanship like manner and as provided in Section V and VI of IS 800 and IS 7215. Welding shall be carried out by qualified ld Electrodes for welding, the procedure, selection, test and inspection shall conform to provisions in IS 816. IS 818, IS 822 and IS 833. Erection / hoisting shall commence only after passing of fabricated parts by the Engineer-in-charge. a) 2.50 Structural steel works in welded built up sections M.T with MS channels for fencing posts UNIT RATE (in Figures & in words) Amount

b)

2.00 Structural steel works of supports for CABLE M.T TRENCH COVERS/ DRAIN COVERS fabricated with single sections of MS Angles, tees and other sections. 12.50 Structural steel works of CABLE TRENCH M.T COVERS/ DRAIN COVERS with Chequered MS Plates and welded connection/ joints joints.

c)

24.1

Providing and fixing hand rail by welding etc., to steel ladder railing, balcony railing and staircase railing including applying a priming coat of approved (zinc chromate) steel primer etc., and as per specification above item 270 M.S. Tubes (medium) : 40mm nominal bore Kgs

Page 10 of 22

Package - II Part - Civil Works Construction of Service Bay Complex, Substation Transformer Yard SL. QUANTITY DESCRIPTION OF ITEM NO. FLOORINGS 25 Providing and laying cement concrete in pavements and ramps in panels not exceeding 10 sqm per panel and plinth protection in panels not exceeding 3 sqm per panel using graded hard granite stone aggregate including providing necessary formwork, making 10mm wide grooves in panels for depth of 1/3rd of thickness of pavement or 40mm whichever is more and filling the grooves with approved hot poured sealing compound confirming to grade A or B of IS-1834, consolidation, curing and treatment for the top with broom finish, etc., complete all as per specifications, Mix ration specified is for (cement: coarse sand: graded stone aggregate). a) 13 Using 20mm nominal size aggregate In CC 1:3:6 for Plinth protection UNIT RATE (in Figures & in words) Amount

Cu.M

b)

7 Using 20mm nominal size aggregate In CC 1:3:6 for Ramps

Cu.M

26

Providing l i P idi plain cement mortar skirting 20 t t ki ti 20mm thi k thick in a mix of 1:3 including a base layer and finished smooth to required level and plumb at corners and at face in cement slurry mixed at the rate of 10Kgs per 10 Sqm inclusive of hand rubbing, curing, etc., complete all as per specifications. ( Rate to include cost of chasing of walls wherever required). 157 In skirting 100mm high.

Mtr.

27

Providing and laying Indian patent stone flooring with cement concrete 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) using graded granite stone aggregate obtained from approved quarry laid to level or slope in bays not exceeding 3sqm per panel including providing 3mm thick aluminium dividing strips to the full depth of the flooring and finished smooth, curing, etc., complete all as per specifications. 641 40mm thick (Using 20mm nominal size stone aggregate)

Sq.M

Page 11 of 22

Package - II Part - Civil Works Construction of Service Bay Complex, Substation Transformer Yard SL. NO. 28 QUANTITY DESCRIPTION OF ITEM Providing and laying Ceramic tile flooring / dadoing of approve quality, size, colour and thickness according to the dimensions of tiles and having scratch hardness and other parameter conforming to IS 13630 ( Bell or Navin or spartek or Jhonson or kajaria or somany or equivalent make) laid over a bed/backing as specified below, with cement slurry at 3.30 kg/sqm, close jointed and pointed with matching white cement slurry mixed with approved pigment and finishing to required level, curing etc., complete all as per specification and as directed by EIC at all floors. 8 In flooring with approved colour Matt finish / AntiSkid premium floor tiles of size 300mm x 300mm as per IS 13755-1993 over bed/backing of 20mm thick in CM 1:4. 17 In dado with approved colour wall tiles (Regular / plain or dark colour / glossy or mat series ) size 300mm x 200mm as per IS 13753-1993 over a bed/backing of 12mm thick in CM 1:3. Providing and laying 18 to 30mm thick polished Kota stone slab flooring / skirting / dadoing / riser / tread using slabs, machine cut to required size, laid over a bed of 20mm thick cement mortar 1:4 1:4, and cement slurry at the rate of 4.4 kg/sqm for bedding and 2 kg/sqm for joints, close jointed and pointed with grey cement slurry mixed with pigments to match the shade of the slabs, finishing to required level and slope, curing, rubbing, cleaning with oxalic acid and wax polishing etc; complete all as per specifications. 6 For treads and risers Sq.M Sq.M UNIT RATE (in Figures & in words) Amount

a)

b)

Sq.M

29

Page 12 of 22

Package - II Part - Civil Works Construction of Service Bay Complex, Substation Transformer Yard SL. QUANTITY DESCRIPTION OF ITEM NO. WOOD WORK & JOINERY 30 Supplying and fixing standard steel rolling shutter made out mild steel stips slats or laths of deep convex corrugations made from from tested steel sheets confirming to IS-277 specifications for galvanised steel sheets 63mm to 75mm wide, 1.25mm thick, machined rolled and straightened with an effective bridge depth not less than 15mm including interlocking the laths through out the length, mounting on specially designed pipe shaft including all accessories such as top cover of required size, side guides of size 63.5mm x 25.4mm (2.5" x 1" ) made out of 10g thick plate and "L" reinforced angle iron fixed out side brackets, suspension shafts, top rolling springs made out of strong and best tested continental spring, hood covers made out of mild steel sheets not less than 0.9mm thick, bottom rails, locking arrangements, painting with one coat of factory finish red oxide zinc chromate primer of approved make, etc., complete all as per specifications in all floors. 41 Gear opearated type (Mechanical type) with ball bearings, operated by a bevel gear box and crank handle upto a clear area of 25sqm. UNIT RATE (in Figures & in words) Amount

Sq.M

31

Providing and fixing steel door system made out of standard rolled steel sections. The door frame, shutter frame and diagonal stiffeners for the shutters, styles and rails and for shutters shall be MS angles / Tees. The shutter frame shall be covered with MS sheet (single / double skin) electrically welded. The door frame shall have base tie made out of 12mm square MS rod embedded in flooring and 3nos. of 15mm x 3.15mm lugs of 100mm long on each side embedded in cement concrete blocks of size 150 x 100 x 100mm of 1:3:6 mix (1 cement : 3 coarse sand : 6 hard granite stone aggregate 20mm nominal size) or with anchor fasteners or with fixing clips with bolts and nuts as required.

Page 13 of 22

Package - II Part - Civil Works Construction of Service Bay Complex, Substation Transformer Yard SL. NO. QUANTITY DESCRIPTION OF ITEM UNIT RATE (in Figures & in words) Amount

The work includes providing approved pivots as required and iron oxidized butt hinges 125mm long, 3nos. for each shutter conforming to IS 13411970 etc., including cutting the steel sections to required lengths, joints mitred and electrically welded, ground and cleaning the surface thoroughly free from rust scales and painted with two coats of synthetic enamel over a coat of red oxide zinc chromate primer, after pre treatment of the surface by pickling and phosphating etc., conforming to IS specifications including providing and fixing MS aldrops, MS tower bolts and MS handles etc., complete all as per specifications, drawings and instructions of Engineer in charge at all heights. 950 a) Fully openable (single / double) shutter and Kgs Using MS sheet covered on single or both sides

32

Providing and fixing at all heights/ in all floors with all leads coloured anodized aluminium doors/ windows/ partitions manufactured from best extruded Aluminium sections confirming to ISI, cut to length, joints mitred and corners grinded with joints water proof the outer frame and shutter frame stiffened with corner angle strips or provided for in the frame for fixing the frame to RCC columns/ masonry on sides, RCC lintels on top and PCC cills or floor at bottom, the frame work fixed with standard approved fastenings all generally as per details shown in drawings and specifications with all the sections pretreated for removal of any rust and prevention of further rust formation and coated with greasy materials for non-adherence of mortar or any other sticky materials and this coat to be removed after installations of the subdividing frames by tennoned and rivetted into frames all aluminium surface be thoroughly cleaned free or rust scale or dirt and mill scale by pickling surface finished with anodized dull matt finishing 15 MICRON thick including cost of pull and push plates and

Page 14 of 22

Package - II Part - Civil Works Construction of Service Bay Complex, Substation Transformer Yard SL. NO. QUANTITY DESCRIPTION OF ITEM UNIT RATE (in Figures & in words) Amount

a)

fixtures for hinged openings (arrangement with steel bearings wherever necessary), cost of labour for fixing of mortice lever locks, aluminium handles, door fittings like tower bolts etc., supplied free for fixing including screws/ bolts (or theses materials measured separately elsewhere) where shutters are involved etc., complete, cost of providing and fixing of glass of selected glazing quality of thickness and type of glass specified hereinafter or panel boards including nylon or PVC or rubber lining of approved quality wooden grounds, rubber gasketc, aluminium glazing clips, mastic etc., and fixing with aluminium glazing clips and also snap-on type with holes as per drawing and specifications provided for separately in the sub items following the main items of frame work for partition and door shutters as below: NOTE: All fitting works shall be carried out as per IS specifications including necessary rivets, screws, lugs, scaffolding, etc., complete all generally as per drawings. The sizes of the components should confirm as per details in drawings. 170 Providing and fixing of coloured Anodised aluminium (Matt finish) frame work (Horizontal and Verticals) for partitions Doors/ Windows with required sections of JINDAL/INDAL make or equivalent including all items and contingencies described above complete (Aluminium beadings and glazing clips measured under this item only) 112 Providing and fixing of frame work (Styles and rails) for Doors shutters/ window shutters with required sections of JINDAL/INDAL make or equivalent including providing all items and hinged/ pivotes arrangements for operation of shutters and labour cost for fixing of door fittings and locks (Which shall be free issues for fixing or paid separately) etc., complete. (Aluminium beadings and glazing clips measured under this item only). 10 Providing and fixing Glass panes of selected glazing quality and thickness as specified below including providing and fixing Nylon/ rubber/ PVC lining of approved quality and fixing with aluminium glazing clips/ Aluminium beadings (Supply cost of aluminium clips/ Aluminium beadings are measured in items above for DOORS/ WINDOWS/ PARTITIONS etc., Using 4mm thick plain glass

Kgs

b)

Kgs

c)

Sq.M

Page 15 of 22

Package - II Part - Civil Works Construction of Service Bay Complex, Substation Transformer Yard SL. QUANTITY DESCRIPTION OF ITEM NO. d) 27 Providing and fixing Glass panes of selected glazing quality and thickness as specified below including providing and fixing Nylon/ rubber/ PVC lining of approved quality and fixing with aluminium glazing clips/ Aluminium beadings (Supply cost of aluminium clips/ Aluminium beadings are measured in items above for DOORS/ WINDOWS/ PARTITIONS etc., Using 5mm thick plain glass 33 Supplying of factory made composite door shutter with frame and single shutter manufactured by M/s. Fimen Fibre Products Pvt. Ltd. Or equivalent with door frame of size 70x50mm. The door shutter shall be of rigid G.R.P. sandwich composte structure of 26mm thick (minimum) laminated on all sides with G.R.P. skin fabricated using U.V. stabilized Isopthalic gel coat and one layer of 450 GSM E glass chopped strand mat (CSM) impregnated with polyster resin. The thickness of skins shall not be less than 1.5mm 2.1 Expanded polysterene structural foam panel of Sq.M density 20kg/cum shall be used as core material for the whole areas of door except the wooden frame structure. The wooden reinforcements made of seasoned salwood block of minimum cross section of 70x26 for lock side 40x26 all round forming the framework for shutter and minimum of 75mm wide intermediate strip for the width of the door for fixing locks and fixture and shall conform to IS-4020-1998. The finish of the shutter be without grains and of approved colour etc., complete all as per manufacturers specifications at all heights. 34 Providing and fixing MS grills of required pattern in wooden / steel frames of windows, ventilators, clerestory windows, etc; with M. S flats, square orround bars with round headed bolts and nuts or by screws, etc; complete all as per drawings and directions of Engineer-in-charge. 445 Plain grill ( With vertical, horizontal members or a Kgs combination of both) UNIT Sq.M RATE (in Figures & in words) Amount

Page 16 of 22

Package - II Part - Civil Works Construction of Service Bay Complex, Substation Transformer Yard SL. NO. 35 QUANTITY DESCRIPTION OF ITEM UNIT Sq.M RATE (in Figures & in words) Amount

37 Providing and fixing SS mosquito proof and fly proof mesh to aluminium frame work including cost of mesh, and labour for fixing builders harware and locking arrangements etc., complete all as per specifications but excluding cost of builders hardware and locking arrangement issued by the Department free of cost. (Aluminium frame work shall be measured under the relevant item)

ROOFING 36

Providing and laying water proofing treatment over RCC roof in 3 courses, as specified below, after thoroughly cleaning surface of the roof slab with wire brush, cleaning of dust and foreign matters, raking and cleaning of construction joints if any etc., complete to make the surface suitable for receiving water proofing treatment. I Course: The existing covering on slab to be removed and the surface of the RCC slab exposed. Construction joints if any are to be raked and cleaned. A coat of cement slurry at the rate of 4.4kg/sqm mixed with acrylic water proofing compound (as per manufacturers specification) is spread uniformly over the RCC roof area and ensuring that the slurry penetrates in to the RCC slab below and fills all micron cracks and all other porous areas. Over this a layer of 15mm thick cement mortar 1:5, mixed with acrylic water proofing compound as per manufacturers specifications shall be laid to place the II course. II Course: A single layer of brick on edge with 15mm wide gaps filled with CM 1:5 mixed with acrylic water compound is laid (i.e. bricks placed vertically on its 75x115mm side or 75x230mm side as the case may be, to suit the required thickness of courses), when the bottom layer (I course) is still green and laid to slope of 1 in 60 as per roof drainage scheme using approved well burnt bricks (wear absorption not more than 20%) with minimum thickness of 65mm at outer edge including the top and bottom plastering (I&III course) to get required gradient, laying the bricks with not less than 15mm gap alround, which shall be properly filled completely and compacted with CM 1:5 mixed with acrylic water proofing compound as per manufacturers specification using full bricks or bricks cut to required size to lay the course with single layer with gradient said above for adequate drainage.

Page 17 of 22

Package - II Part - Civil Works Construction of Service Bay Complex, Substation Transformer Yard SL. NO. QUANTITY DESCRIPTION OF ITEM III Course: 20mm thick cement mortar 1:4 mixed with acrylic water proofing compound with a layer of Chicken mesh 12mmx26G and marked with 300mmx300mm false squares including curing etc., for not less than 7 days, complete all as per specifications and directions of Engineer-incharge. The 20mm thick layer shall be carried out in two layers of 10mm thick with an inter layer of chicken mesh of 12mmx26G laid in between the two layers of cement mortar. NOTE: The acrylic water proofing compound to be used shall be; a). CHEMSEAL - Manufactured by M/s. Overseas Water Proofing Corporation, Mumbai. The proportion of CHEMSEAL shall be 2% by weight of cement. OR CONPLAST X 421 IC - integral water proofing compound manufactured by M/s. FOSROC Chemicals (India) Ltd., Bangalore. The proportion of CONPLAST x 421 IC shall be 130ml per 50 kgs of manufactured by M/s. ROFFE Construction Chemicals Pvt. Ltd., liquid integral water proofing compound at 140ml per 50kg of cement or Equivalent. b)The second course of the treatment shall be laid in single course using full bricks/cut bricks as may be required for laying the course in 1 in 60 slope. c) The rate to include all labour, material and contingent coats for execution of work in a workman like manner including curing, etc., complete for respective courses. d) The plane horizontal measurements of roof slab only shall be measured for payment. e) The theoretical cement consumption required for the above work will be worked out based on coefficient for each layer of work as per specification. f) The work shall be got executed through specilised water proofing agency. 717 g) The contractor should finish a guarantee bond in the prescribed format for satisfactory water proofing performance for 10 years. UNIT RATE (in Figures & in words) Amount

Sq.M

Page 18 of 22

Package - II Part - Civil Works Construction of Service Bay Complex, Substation Transformer Yard SL. NO. 37 QUANTITY DESCRIPTION OF ITEM UNIT RATE (in Figures & in words) Amount

Providing and fixing rigid PVC SWR (soil, waste and rain water) drainage/ rain water pipe conforming to type-A of IS 13592-1992, including accessories like bends and fixing with pipe clips, adhesive at joints all as per manufacturer's specifications to required length etc., complete all as per specifications and directions of Engineer-incharge. 86 110mm OD pipes with minimum wall thickness of Mtr 2.20mm.

38

Providing and making khurras of size specified below with 12mm thick CM 1:3 plaster finish over PCC 1:2:4 using 10mm nominal size stone aggregate (1 cement: 2 coarse sand: 4 stone aggregate) of 600mmx600mm of varying thickness of 40mm at WPC side to 30mm at pipe end, laid to slope, compacted over PVC sheet of 1000x1000mm x 400 micron laid over top of slab after cleaning the surface of concrete slab. The top surface of CM 1:3 plaster shall be finished smooth with cement punning, rounding of edges etc., complete all as per specifications and directions of Engineer-in-charge Engineer in charge. [Note: The RWP shall be fixed during construction of parapet to ensure filling the joints and around pipe properly]. 12 600mmx600mm size Each

39

2 Providing and fixing 75mm dia (O.D) Unplasticised Mtr PVC pipe water spouts conforming to IS 49851988 inclusive of specials (Tee) conforming to IS 7834 (part IV) 1987 of working pressure 6kg/sqcm. The outlet end shall be provided with PVC Tee and the inlet end shall be flush with inner face of facias/ parapets, fixing in cement mortar 1:3 etc; complete all as per specifications. 118 Providing and laying angular fillet 7.5 x 7.5cm Mtr cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) 20mm nominal size, including compaction, finishing, curing, etc; complete all as per specifications.

40

Page 19 of 22

Package - II Part - Civil Works Construction of Service Bay Complex, Substation Transformer Yard SL. QUANTITY DESCRIPTION OF ITEM NO. FINISHING 41 Plastering 12mm thick with cement mortar specified below, finished rough including scaffolding, curing, etc. complete for EXTERNAL SURFACES inclusive of sills, jambs, soffits, ceilings, etc., complete all as per specifications for IN ALL FLOORS AND AT ALL HEIGHTS. Mix specified is for cement : coarse sand. NOTE : i) CM 1 : 3 OR CM 1:4 is generally applicable for ceilings and RCC surfaces unless otherwise specified. With CM (1:5) to brick walls 1689 Upto 10 m Level UNIT RATE (in Figures & in words) Amount

a)

Sq.M

b)

With CM (1:4) to RCC surfaces 141 Upto 10 m Level

Sq.M

42

a)

Plastering 12mm thick with cement mortar specified below, finished smooth with lime neeru including scaffolding, curing, etc., complete f i l di ff ldi i t l t for INTERNAL SURFACES of walls, beam, ribs, sills, jambs, ceiling, etc., complete all as per specifications at ALL HEIGHTS. Mix specified is for cement: fine sand. 775 With CM 1:5 to masonry walls

Sq.M

b)

146 With CM 1:4 to RCC surfaces

Sq.M

c)

936 With CM 1:4 to ceiling

Sq.M

Page 20 of 22

Package - II Part - Civil Works Construction of Service Bay Complex, Substation Transformer Yard SL. NO. 43 QUANTITY DESCRIPTION OF ITEM Water proof cement plastering of thickness as specified below in cement mortar 1:3 (1 cement: 3 coarse sand) mixed with approved water proofing compound such as CICO or ACCOPROOF or equivalent as per manufacturers specifications including scaffolding, curing, etc., complete for EXTERNAL SURFACES all as per specifications UPTO ALL FLOORS AND AT ALL HEIGHTS. UNIT RATE (in Figures & in words) Amount

606 12mm thick

Sq.M

44

45

74 Providing and fixing GI hexagonal chicken wire mesh of size 12mm x 22g at the junction of disimilar surfaces of brick masonry wall and RCC column by beams and the like including necessary nails for fixing etc, complete all as per specification and direction of Engineer - in - charge for all floors at all heights. 160 Painting steel work with TWO or more coats of SYNTHETIC ENAMEL PAINT of Ist quality and approved colour to give an even shade over a coat of red oxide zinc chromate primer including cleaning the surfaces, applying a coat of approved putty on whole surface and rubbing the surface to achive desired smooth surface, scaffolding, etc., complete all as per specifications. (Rate to include cost of zinc chromate primer, putty also). 1830 Painting external plastered surfaces with two or more coats of 100% acrylic exterior emulsion paint of approved make and colour (weather coat of Berger or apcolite apex of Asian or equivalent) having protection against fungal, growth, flaking, fading, alkali and UV degradation and to give an even shade with required finish including cleaning the surfaces, filling the crevices with approved filler, scaffolding, curing, etc., complete all as per specifications at all heights.

Sq.M

Sq.M

46

Sq.M

Page 21 of 22

Package - II Part - Civil Works Construction of Service Bay Complex, Substation Transformer Yard SL. NO. 47 QUANTITY DESCRIPTION OF ITEM UNIT Sq.M RATE (in Figures & in words) Amount

1838 Painting plastered surfaces with TWO or more coats of ACRYLIC WASHABLE DISTEMPER of I quality and approved colour to give an even shade over a coat of water thinnable cement primer/ oil based cement primer including cleaning the surfaces, filling the crevices with approved filler, applying a coat of approved putty on whole surface and rubbing the surface to achieve desired smooth surface, scaffolding, etc., complete all as per specifications. (Rate to include cost of primer, putty also).

FENCING 48

19 Supplying and laying 40mm HBG metal of 100mm Cu.M thick and levelling the existing ground surface in transformer yard including cost of metal, spreading and levelling the metal surface etc., complete all as directed by Engineer - in - Charge. 40 Providing and fixing Chain Link fencing with 50 x Rm 50 x 4.5 MS sq.pipe supports at an interval of 2 Mtrs. Centre to Centre upto a height of 2.4Mtr from the Ground Level including 0.6 Mtrs in to the Ground fixed in PCC 1:2:4 , including fixing of 50 x 50 x 3mm PVC Chain Link Fence with 25 x 5mm MS flat and bolts & nuts including painting of MS members with 2 coats of synthetic enamel paint over a coat of primer etc.,complete all as directed by Engineer-in-Charge. Providing and laying light duty Non-pressure NP-2 class RCC hume pipes with collars jointed with stiff mixture of CM 1:2 (1 cement: 2 fine sand) inlcuding joints etc., complete. 6 300mm dia Rm

49

50

TOTAL