BLDCST 60 RCM facia 5cm thick in CM (1:3) for drop walls, fins with

N-8-11 rabbit wire mesh & nominal reinforcement as directed by


Page.44 Engineer-in-charge with dubara sponge finishing, including
cost & conveyance of all materials to site, seigniorage
charges, sales & other taxes on all materials, operational &
incidental, cost and conveyance of cement, wire mesh, water
to work site, centering, scaffolding and form work, lift charges
etc., complete for finished items of work but excluding cost of
steel & its fabrication charges, for finished item of work.
(APSS No.403&903)

Sub analysis
Plastering with CM two (2) coats 12mm thick, base coat in
CM (1:4)8mm thick, and top coat in CM (1:2) 4mm thick with
sponze finishing.
a. Material
Base Coat in CM (1:4) 8mm thick
Cement Kg 39.60
Fine sand (screened) Cum 0.11
Top Coat in CM (1:2) 4mm thick
Cement Kg 28.80
Fine sand (screened) Cum 0.04

b. Labour
Mason 1st class day 0.63
Mason 2nd class day 1.47
Mazdoor (Un skilled) day 3.90
Add Agency Allowance 25% 2480.85

Rate per 10 Sqm


Rate per Sqm
MAIN DATA
Unit : 10Sqm
a.Materials
Sqm 13.30
Rabbit wire mesh (1.0 M panna for 0.6 M drop) TBSC-E.I-12
Cement Mortar (1:3) for 25 mm thick cum 0.25
Dry Cement for making Lumps Kg 50.00
12 mm Plastering 2 coats in 1:4 & 1:2 cm both sides Sqm 21.80

b.Labour
Mason 1st Class Day 8.000
Miller operator Day 1.000
Mazdoor (Unskilled) Day 10.000
Add Agency Allowance 25% 8185.00

c. Machinery
Machine Mixing Mortar with Miller - Hire charges 300/200 Hrs 2.000
(diesel)

c. Allowance on Crew Charges of Machinery


Machine Mixing Mortar with Miller - Hire charges 300/200 25% 2.000
(diesel)
Basic Rate per 10 Sqm
Description of Item GF
a Basic rate per 10 Sqm 20437.87
b Hire charges for scaffolding material 10.30
c Labour charges for scaffolding 75.70
d Allowance on labour charges for centring material 25% 18.93
e Lift charges - Add 10% labour charges on G.F Rate, 20% on 0.00
GF, 30% on GF Rate only
Sub-Total :: 20542.80
g 2796.90
Add 13.615% Overhead & Contractors profit on sub - total
h Seigniorage charge (i) Sand - 0.60 x 40 = 24 24.00
Rate per 10 Sqm 23363.70
Say 23363.70
Unit :
10Sqm

4828.15 Kg 191.19
1451.14 Cum 159.63

4828.15 Kg 139.05
1451.14 Cum 58.05
547.92

470.00 day 296.10


425.00 day 624.75
400.00 day 1560.00
620.21
3101.06
3648.98
364.90

17.00 Sqm 226.10

3741.71 cum 935.43


4828.15 MT 241.41
364.90 Sqm 7954.78
9357.72

470.00 Day 3760.00


425.00 Day 425.00
400.00 Day 4000.00
2046.25
10231.25

366.60 Hrs 733.20

733.20

231.40 Hr 115.70
115.70
20437.87
FF SF TF
20437.87 20437.87 20437.87
10.30 10.30 10.30
108.40 141.00 173.70
27.10 35.25 43.43
1366.90 2733.79 4100.69

21950.57 23358.21 24765.98


2988.57 3180.22 3371.89

24.00 24.00 24.00


24963.13 26562.43 28161.87
24963.15 26562.45 28161.90