1). Name of the Work :: Providing BT Road from Pandithapuram road to Govindaral via
Raigudem from Km 0/0 to 2/600 in Kamepally (M)
Khammam(Dist.)
2). Refrence to Adm. Sanction :: GO Rt.No. 300, Dt.16.08.2018 of TW (STSDF) Department
12). Name of the agency :: Sri G. Murali Mohan, Contractor, H.No.5-1-52, N.K.Nagar,
Kothagudem, Bhadradri Kothagudem Dist.,
Date wise
Slno Description of Item
Amount of increase in
items
1 POL Charges -9917.23
2 B.T 60/70 Grade -85206.25
3 Emulsion ( SS -1) 18370.09
4 Emulsion ( RS -1) -7216.65
5 Cement -14.89
6 Steel 0.00
Round :: -83,985.00
Providing BT Road from Pandithapuram road to Govindaral via Raigudem from Km 0/0 to 2/600 in Kamepally (M)
Khammam(Dist.)
Average whole set
sale price of Percentage Percentage
Percentage of
HSD @ BPC of increase of POL
Date of of increase Name Meas
S. consumer pumps or decrese Accept/ Total Value of component Cost of work done
Estt rate measuremen or decrese in of the urem
No. at Hyd @ days in cost of Reject Work as per M.B. of the work (Vf) Increse/decreased
t of the Bill prior to the last cost of POL ( POL ( rate (Pf) item ent
day of rate Base) Constant Sl.
Base) -5%
measurement (Fi) No.
1 2 3 4 5 6 7 8 9 10 11 12
POL_D
Average whole set
sale price of Percentage Percentage
Percentage of
HSD @ BPC of increase of POL
Date of of increase Name Meas
S. consumer pumps or decrese Accept/ Total Value of component Cost of work done
Estt rate measuremen or decrese in of the urem
No. at Hyd @ days in cost of Reject Work as per M.B. of the work (Vf) Increse/decreased
t of the Bill prior to the last cost of POL ( POL ( rate (Pf) item ent
day of rate Base) Constant Sl.
Base) -5%
measurement (Fi) No.
POL_D
PRICE ADJUSTMENT FOR CEMENT
Providing BT Road from Pandithapuram road to Govindaral via Raigudem from Km 0/0 to 2/600 in Kamepally (M) Khammam(Dist.)
Percenta
Percentage of Cement
Average whole sale ge of
increase or qty in MT's Cost of work set of
Date of price of cement on increase Accept > 5 Cement
decrese in cost = Qty of done CC CC Item Measur
S. No. Estt measurement the days prior to or % Reject Content
of cement (Ci- item*cem Increse/decre Item in Cu.m ement
of the Bill last date of decrese <5% per Cu.m
Co )/Co*100 ( ent qty ased (Vc) Slno
measurement (Ci) in cost of
Rate Base) per cum
cement
1 2 3 4 5 6 7 8 9 10 11 12 13
1 4750.00 15-Dec-2018 4400.00 -7.368 -2.37 Accepted 4.53 -509.36 M 10 20.58 220.00 3
2 4750.00 23-Dec-2018 4400.00 -7.368 -2.37 Accepted 22.74 -2557.91 M 15 82.68 275.00 4
3 4750.00 8-Jan-2019 4300.00 -9.474 -4.47 Accepted 26.00 -5524.68 M 15 94.54 275.00 8
4 4750.00 23-Jan-2019 4300.00 -9.474 -4.47 Accepted 5.78 -1227.19 M 10 26.25 220.00 10
5 4750.00 27-Jan-2019 4300.00 -9.474 -4.47 Accepted 10.83 -2300.68 M 15 39.37 275.00 11
CC
6 4750.00 4-Mar-2019 5200.00 9.474 4.47 Accepted 32.55 6916.88 ROAD 105.00 310.00 14
7 4750.00 19-Apr-2019 5300.00 11.579 6.58 Accepted 5.78 1804.69 M 10 26.25 220.00 16
8 4750.00 25-Apr-2019 5300.00 11.579 6.58 Accepted 10.83 3383.36 M 15 39.37 275.00 17
119.02 -14.89
Cem_D
PRICE ADJUSTMENT FOR BITUMEN EMULTION - ( S.S-1 FOR PRIME COAT )
Providing BT Road from Pandithapuram road to Govindaral via Raigudem from Km 0/0 to 2/600 in Kamepally (M) Khammam(Dist.)
Percentage of
Average whole Cost of
Percentage of increase or
Date of sale price of Accept > 5 Qty of Qty of work done set of
S. increase or decrese decrese in Qty of work
Estt Rate measurement Emultion date of % Reject < Emultion Emultion in Increse/dec Item Measureme
No. in cost of Emultion ( cost of as per M.B
of the Bill measurement 5% per Sqm Tonnes reased nt Slno
rate Base) Emultion ( rate
(Bei) (Vbe)
Base) -5%
1 2 3 4 5 6 7 8 9 10 11 12 13
1 36687.00 6-May-2019 41470.00 13.037 8.04 Accepted 7331.62 0.85 6.23 18370.09 PRIME COAT 18
6.23
18370.09
Emul_SS_D
PRICE ADJUSTMENT FOR BITUMEN EMULTION - ( R.S-1 FOR TACK COAT )
Providing BT Road from Pandithapuram road to Govindaral via Raigudem from Km 0/0 to 2/600 in Kamepally (M) Khammam(Dist.)
1 2 3 4 5 6 7 8 9 10 11 12 13
1 29908.00 6-May-2019 24840.00 -16.945 -11.95 Accepted 7331.62 0.275 2.02 -7216.65 TACK COAT 18
2.02
-7216.65
Emul_RS_D
PRICE ADJUSTMENT FOR BITUMEN 60/70 Grade FOR OGPC & SEAL COAT
Providing BT Road from Pandithapuram road to Govindaral via Raigudem from Km 0/0 to 2/600 in Kamepally (M) Khammam(Dist.)
1 37111.00 6-May-2019 30490.00 -17.841 -12.84 Accepted 7331.62 1.46 10.70 -50990.32 OGPC 18
SEAL COAT
2 37111.00 6-May-2019 30490.00 -17.841 -12.84 Accepted 7331.62 0.98 7.18 -34215.93 (A) 18
17.88
-85206.25
BT_D