A Pervisional Sum
Relocation of services and repairing for existing,infrastructures(houses,
1 water supply pipes,temples), protection of houses with structures as PS 1 2000000 2000000
instructed by engineer
Environmental and social compliance safeguard measures as instructed
2 PS 1 3000000 3000000
by the Engineers(SS/SP-100)
B General Iteam 5000000 5000000 0.011
Insurance for the loss of damage to works, plant,material,equipment
1 property and personnel injury or death, including third party insurance as LS 1 1000000 1000000
described on Condition of Contract
Providing and installation of project signboards with size of 1.8 x 1.2 m
2 No 2 20000 40000
as per specification and instruction of engineer.r (SS/SP-110)
Establishing Engineers site office including four rooms, bathroom, toilet,
3 and kitchen facilities, furnitures and well furnished as well as Internet Month 24 10000 240000
facilities as per details provided in special provision .
100....
1 Pervisional Sum 1.061 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048 0.048
2 General Items 0.466 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 90....
3 Earth work 6.316 0.316 0.316 0.316 0.316 0.316 0.316 0.632 0.632 0.316 0.316 0.632 0.632 0.632 0.632
80....
4 Filling Works 0.872 0.073 0.073 0.073 0.073 0.073 0.073 0.073 0.073 0.073 0.073 0.073 0.073
70....
Stone Masonry Work for
5 3.144 0.157 0.157 0.157 0.157 0.157 0.157 0.314 0.314 0.314 0.157 0.157 0.157 0.157 0.157 0.157 0.157 0.157
Structures
60....
6 Gabion Work for Structure 31.409 1.570 1.570 1.570 1.570 1.570 1.570 1.570 1.570 1.570 1.570 3.141 3.141 3.141 1.570 1.570 1.570 1.570
7 Form Work 4.777 0.398 0.398 0.398 0.398 0.398 0.398 0.398 0.398 0.398 0.398 0.398 0.398 Actual Accomplishment 50....
Updated program
8 Concrete Work 28.337 1.417 1.417 1.417 1.417 1.417 1.417 1.417 1.417 1.417 1.417 1.417 1.417 2.834 2.834 2.834 2.834
Origiinal Program 40....
9 Reinforcement Works 0.476 0.079 0.079 0.079 0.079 0.079 0.079
30....
10 Sub Base 1.969 0.984 0.984
Total 100.00 0.068 0.068 2.582 3.999 4.078 4.078 4.078 4.078 4.551 4.551 4.156 3.999 5.885 5.885 5.414 5.261 4.673 4.673 5.657 5.502 5.582 5.740 4.594 0.851 -
0.068 0.068 2.582 3.999 4.078 4.078 4.078 4.078 4.551 4.551 4.156 3.999 5.885 5.885 5.414 5.261 4.673 4.673 5.657 5.502 5.582 5.740 4.594 0.851
Monthly
1.000 0.500 0.500 0.500 0.500 0.800 2.100 3.100 8.000 9.000 12.500 2.000 2.000 6.000 12.500 1.000 1.000 2.000 4.000 6.000 3.000 20.000 2.000
Legend
0.068 0.135 2.717 6.716 10.794 14.872 18.950 23.028 27.579 32.130 36.286 40.285 46.170 52.054 57.469 62.729 67.402 72.075 77.732 83.234 88.815 94.555 99.149 100.000
Cumulative - - - - - - - - - - - - - - - - - - - - - - -
1.000 1.500 2.000 2.500 3.000 3.800 5.900 9.000 17.000 26.000 38.500 40.500 42.500 48.500 61.000 62.000 63.000 65.000 69.000 75.000 78.000 98.000 100.000 100.000
Slippage(%) 1.000 1.500 2.000 2.500 3.000 3.800 5.900 9.000 17.000 26.000 38.500 40.500 42.500 48.500 61.000 62.000 63.000 69.000 75.000 78.000 98.000 100.000
3,000,000.00
100,000.00
Purposed
Amount
1,146,353.00
64,756,715.63
69,574.00
336,091.99
406,180.00
120,256.01
Purposed
Amount
264,060.01
-
6,555,176.56
89,048,642.58
101,468,288.28
-
21,907,926.25
19,720,723.44
166,613,396.49
1,153,255.00
-
569,220.01
2,070,000.00
1,568,609.99
6,145,080.32
10,159,686.25
169,200.00
-
256,694.41
13,230,000.00
99,504.00
-
310,500.00
Purposed
Amount
272,154.00
-
1,572,740.04
2,041,298.05
-
4,379,359.87
977,399.98
4,395,400.09
1,821,600.04
1,965,600.04
-
125,363.50
225,167.21
2,507,269.92
-
481,250.00
5,200,000.00
Purposed
Amount
252,000.00
355,000.00
144,000.00
81,000.00
40,000.00
642,000.00
14,305,027.35
553,028,764.28
135,303,925.90
10,824,314.07
33,825,981.48
87,947,551.84
(52,768,531.10)
768,162,006.46