From November 2011 : To: Till to date
Employer : Max Infrastructure Ltd. (MAX GROUP)
Position held : General Manager (construction), Head of Bridges &
culverts/ Head of QA/QC/Resident Engineer, ALDLP
Authorized Representative-ECRRP-BWDB-W-18, and
KMG (Meghna Bridge), RHD (OSJI-JV)
Page 1 of 18
Md. Nazrul Islam Khan
Page 2 of 18
Md. Nazrul Islam Khan
11. Detailed Tasks Assigned 11. Work Undertaken that Best Illustrates the Capability to
Handle the Tasks Assigned
Name of Assignment or project:
1.Construction of new BG track between Kashiani to
Gopalgonj
2. Construction of new Dual Gauge and upgradation of
existing Mg track to dual gauge between Akhaura to
Laksam
3. Additional Rehabilitation works of Polders 41/6B, 41/7B,
39/2A, & 52/53B under Barguna and Paruakhali districts,
BWDB
Page 3 of 18
Md. Nazrul Islam Khan
Page 4 of 18
Md. Nazrul Islam Khan
As Head of QA/QC:
Preparation review and checking of QA plan, establishment
of Quality Management System(QMS) through
incorporation of Process based QMS, Quality assurance
documents, Activity Procedure and Matrix, Inspection Test
Plan, Inspection Weekly Schedule, Control of non-
conformities, CAR, RFI, Compliance of Hold points,
Witness points, Control of documents, Control of records,
Identification and Traceability.
Quality control formats development and application under
relevant codes & specifications. Field quality control etc.
Review, checking of shop drawing, as built drawing with
completion report, survey setting out etc.
Quality assurance and quality control of 53 nos.
bridges/culverts construction along with service pile/test
pile workmanship, load test, integrity test, girder erection
method, rail joint weld: FBW, Alumino-thermic weld, quality
test of dye penetration test, dimension check, slow bend
test, hardness test, ultrasonic test, railway track
installation with ballast profile and track geometry etc.
Mix-design of concrete classes C-35, C-30, C-25, and C-15
Quality assurance and Quality control of construction of
railway embankment, bridges/culverts, stations/buildings,
ballast, rail welding, and concrete sleeper, compliances of
rail fastenings, air content test and drying shrinkage test of
concrete. Materials quality compliances and issuances of
non-conformances, corrective action, Punch list etc
Page 5 of 18
Md. Nazrul Islam Khan
Activities performed:
Monitored, in-depth the project in terms of improvement works of
Page 6 of 18
Md. Nazrul Islam Khan
Page 7 of 18
Md. Nazrul Islam Khan
Page 8 of 18
Md. Nazrul Islam Khan
Page 9 of 18
Md. Nazrul Islam Khan
Page 10 of 18
Md. Nazrul Islam Khan
Page 11 of 18
Md. Nazrul Islam Khan
embedded in 100mm sand under the force main, cover the dia.
and at the top of pipe 150mm by sand at a depth of 1.25 m
width 0.5 m. trench, drain, road, canal, ditch, river and bridge
crossing are being done with M.S./G.I. casing pipe covering the
PVC force main by filling the annular space with dry non sticky
materials, thrust block at bend of 22 ½ o or more being
constructed.
Page 12 of 18
Md. Nazrul Islam Khan
Page 13 of 18
Md. Nazrul Islam Khan
Carried out test boring to examine the soil / sub soil details,
determination of total yield of aquifers water as per design from
BUET/DPHE and to collect sample of ground water for testing to
find out the limit of organic /inorganic chemical, radiological
agents, arsenic and turbidity limit, bacteriological contamination,
iron, chloride etc. for testing in DPHE laboratory before installing
deep tube well of capacity 20000 gallon/ hr. PVC delivery line
150mm to 100mm to of 38 mm G.I. pipe for distribution of
potable drinking water to the key point installations of upazilla
H/Q
Page 14 of 18
Md. Nazrul Islam Khan
Page 15 of 18
Md. Nazrul Islam Khan
Page 16 of 18
Md. Nazrul Islam Khan
Page 17 of 18
Md. Nazrul Islam Khan
13. Certification:
I, the undersigned, certify that to best of my knowledge and belief, this CV correctly describes myself,
my qualifications, and my experience. I understand that any willful misstatement described herein may
lead to my disqualification or dismissal, if engaged.