August 2015 To August 2017

Employer Complete Construction Company

Designation Junior Engineer-Civil

Tenure 10th August 2015 to 09th August 2017

Position held QA cum QC Engineer

Name of the Project Construction of Low Rise Building

Salient Feature Construction of 25 No’s 2,3&4 BHK Low Rise Apartment

Project Cost Approx INR 10 Cr.

PMC Cost Nil

Client
Complete Construction Company
 Drafting AutoCAD Drawing.
Activities  Quantity Calculation & Estimation.
 Sub contractor Measurement Billing.
August 2017 To September 2019

Employer BEGREEN INFRACON I LIMITED

Designation Junior Engineer-Civil

Tenure 21st August 2017 to 28th September 2019

Position held QS cum Drafting Engineer

Name of the Project Construction of ROW Houses & Villas

Salient Feature Construction of 10 No’s 3&4 BHK ROW Houses & Villas.

Project Cost Approx INR 5 Cr.

PMC Cost Nil

Client
Complete Construction Company
 Drafting AutoCAD Drawing.
 Quantity Calculation & Estimation.
Activities
 Supervision of Construction work.
 Sub contractor Measurement Billing.
October 2019 to Till Date

Employer RITES Limited

Designation Technical Assistant-Civil

Tenure 14th October 2019 to 10th Sep 2021

Position held FE cum QC Engineer

Name of the Project a) Preparation of Concept Plan and Feasibility study Report
(FSR), Bid Document, Proof checking of Contractor's design
b) Project Management Consultancy (PMC) for Re-
development of Kalighat Temple Complex- Construction of
Skywalk for wide circulation of Pilgrims
Salient Feature Construction of 02 No’s ROB
 60 No’s 1.20mm dia pile foundation
 OWG for ROB portion
Project Cost Approx INR 120 Cr.

PMC Cost Approx INR 08 Cr.

Client West Bengal Highway Development Corporation Limited


(WBHDCL)
Activities  Supervision of 1.2m dia pile foundation & Substructure for
ROB.
 Supervision of RMC.
 Supervision of Field & Laboratory Test.
Employer RITES Limited

Designation Technical Assistant -Civil

Tenure 11th September 2021 to Till Date

Position held QA cum QC Engineer

Name of the Project a) Preparation of Concept Plan and Feasibility study Report
(FSR), Bid Document, Proof checking of Contractor's design
b) Project Management Consultancy (PMC) for Re-
development of Kalighat Temple Complex- Construction of
Skywalk for wide circulation of Pilgrims
:
Salient Feature Construction of approx 500m length Skywalk for wide
circulation of Pilgrims
 400 No’s 750mm dia pile foundation for Sky walk
 64 No’s 500mm dia pile foundation for G+4 Hawkers
Building
 Composite Superstructure
Project Cost Approx INR 98 Cr.

PMC Cost Approx INR 05 Cr

Client Kolkata Municipal Corporation (KMC)

Activities  Supervision of .750m & 0.500m dia pile foundation


 Supervision of Field & Laboratory Test.