Years As role of Quantity surveyor, I have more than seven-year
experience in quantity estimation and drawings. In these year I
worked on various project with top leading companies in Saudi
Riyadh, Saudi Arabia Arabia.
Worked more than two years with an engineering firm in India with
+966 535256463
technical work profile to facilitate project estimation and technical
Md Saquib | LinkedIn drawings. During this period, good experience was gained in the
related field.
Saquibsaudi1992@gmail.com
EXPERTISE
1. Quantity Estimation.
Job Responsibilities:
• Prepare quantity take-off as design drawing to procure
material.
• Prepare RFQ package for suppliers to get quotation.
• Compare supplier’s quotation to get lowest price for
procure materials.
• Review technical specification and comply with supplier.
• Submitting MAR to consultant for sample approval.
• Follow up suppliers for delivery.
• Raise RFI to correct discrepancy between project
specification and design drawings.
PIF Tower, KAFD • Preparing materials attic stock list as per specification and
project contract.
• Review subcontractor progress payment.
Job Responsibilities:
• Preparation & Submission take-off quantity of each BOQ
item for approval to the client base on shop drawing during
Annex-B KFSH&RC execution.
• Preparing and submission monthly interim payment
certificate as per contract to Clint/consultant.
• Preparation & submission cost estimation of provisional
sum items as client request using element method unit rate
method.
• Prepare and submit Variation order and technical quires.
• Responsible for subcontractor payment against work
progress.
• Revise final BOQ measurement and review, claims,
drawings, site clarification request, and their submissions
with all relevant and supporting documents Consultant.
PROFESSIONAL EXPERIENCE
Job Responsibilities:
• Revising BOQ with reference of project specification, design
drawings and other technical documents.
• Review all project documents and prepare list to analyze
missing document.
• Prepare drawing and pre-approved document list to
proceed planning schedule.
• Re-estimate quantity as per approved shop drawings.
• Preparing Time of extension.
• Preparing document for WIR.
Job Responsibilities:
• Quantity take-off based on Method of Measurement, studying
specification, BOQ, drawings, and other Technical documents,
co-ordinate with other team-mates.
• Prepare & submit monthly interim payment certificate to
consultant/client.
• Preparation of monthly payment certificates of the
Subcontractors after inspection of their works, checking their
measurements.
• Submitting and follow-up shop drawing to consultant.
Herfy Head • Coordinate with technical team to take shop drawing
approval.
Quarter
PROFESSIONAL EXPERIENCE
Job Responsibilities:
• Preparing take-off quantity to revise BOQ.
• Review subcontractor invoices.
• Assist Senior QS.
• Coordinate with architectural team to submit shop
drawings.
• Prepare and submit technical quires.
• Prepare and submit design change concept for client
approval.
Cayan MEIFC Tower • Coordinate with finishing manager and site manager for
drawing issue due to change order.
• Report to finishing manager.
Project: Various.
Location: Al Bawani Head office Takhasusi, Riyadh
Job Responsibilities:
• Preparing shop drawings and tracking list.
• Coordinate with MEP Department.
• Prepare take-off quantity for QS department of related
project to update project BOQ.
PROFESSIONAL EXPERIENCE
-India
Office In-charge Nov.2013 - Aug.2015
at Seapac Engineers.
Experience: 10
Project: Various
Years
Location: Office-India
EDUCATION
https://mmhapu.ac.in/