You are on page 1of 3

MS Project Management from Bahria University 2020 (PMP Certified)

Civil Engineering from NED 2010

(10th Year in Exploration & Production Projects & Construction Industry.)

Professional Experience:

 Worked in “HSAB” as a Project Manager (Jan-2019 to May-2020)


 Worked in “Berkeley Associates” as a QA/QC Engineer (Oct- 2016 to Dec-2018)
 Worked in “S.G.S” as a QA Auditor. (Mar- 2016 to Sep-2016)
 Worked in “S.G.S” as a QA/QC Engineer. (Jan- 2015 to Feb-2016)
 Worked in “PARAGON” as a Cost Engineer. (June-2014 to Jan-2015)
Aamir Ehsan,  Worked in “BANU MUKHTAR” as a Site Engineer. (July-2013 to May-2014)
 Worked in “AMCORP” as a Site Engineer. (Feb-2011 to May-2013)
D.O.B:

14/08/1987
Rehabilitation & Renovation of Karachi Fish Harbour External Services (Part – 1)
Father Name: Package “A” Civil Work (Project Manager)

Ehsan Ullah  Responsible for managing day-to-day operational aspects of multiple works.
 Attending client and design team meetings.
Address: R-403 Chapal  Preparing presentations.
Garden Abul Hassan  Managing key projects from start to finish in line with project specifications.
Isphani Road,Gulshan  Conducting site inspections.
Iqbal Karachi.  Administering Construction Contracts.
 Preparing technical and progress reports.
Passport#:-  Ensure risk management strategies are followed and reviewed within guidelines.
 Program/project management methodology, tools and templates (includes
CN1117231
program/project planning, schedule development, scope management and cost
management).
Cell:  Direct and control all work performed within the framework of the Work Structure.
 Responsible for making method statements, PMP and QIP.
0341 - 2166465  Prepared project proposals and resolved any client issues.
 Ensured that all proposals and contracts were signed and approved.
0302 - 2428179  Managed all aspects of each assigned civil project.
 Developed and implemented civil engineering principles and concepts.
Email:  Managed Civil/Site development projects from planning to construction.
 Estimate preparation and cost control on project and during proposal.
engraamircheema@
Construction of 2 x 330 Coal Fired Power Plant at Thar Block II (QA/QC Engineer)
gmail.com
 Inspection of Stack, Stacker, Boiler House, Main Block, Turbine Foundation, ESP,
CNIC: 42501-2392723-5
CCR, Maintenance Building, Warehouse, Fire Garage, Oil Tank, Cooling Tower, Coal
Yard, etc.
Computer Tools: -  Inspection of boundary wall (2.6 KM).
 Inspection of Rain water pipe line and manholes.
Primavera P6  Inspection of materials & equipment.
 Inspection of pilling foundations & equipment foundations.
MS Office  Inspection of plant and access road, sewer & drainage system, catch basin, ditches,
asphalt and concrete paving.
MS Project  Inspection of security towers & guardrooms.
 Inspect & control the quality of construction.
AutoCAD  To carry out inspection & certify all necessary inspections during various stages of site
activities as per approved inspection and test plan.
 Verifying execution of works as per IFC Drawings & specifications.
 Making Inspection & Test Plan for the works involved in construction of plant.
Areas of Work: -  Ensuring implementation of Checklist/protocols by the contractors for all the major
activities carried out at site.
Construction of Power  Issuing Quality Notices in case of any violation of Quality parameter and ensuring its
Plant corrective action as per standard engineering practices.
 Verifying Contractor’s Invoices/Project Bills.
Maintenance works  Issuing Revised IFC Drawings to contractors.
 Verifying Release Notes of work Sites from various contractors.
Pilling  Keeping a follow-up of Project deadlines & schedule for civil works.
 Ensuring Health & Safety protocols to be implemented at site.
Construction of Gas  Daily progress reporting of the works carried out at site.
Processing Facilities.  Making Project Dossier for all the Equipment Foundations.

Civil & Earth Works Maintenance works for MKK & KK Zone (QA Auditor)
Projects.
 Inspection of materials, equipment & pilling foundations.
Construction of Well Site  Inspect & control the quality of construction.
Projects.  Inspection of various earth work activities including rig locations & main camp pad,
Access road, extension of existing facilities.
Building Projects:  Conduct HSE Audits and value added progress related GCM’s/trainings with
Contractors.
Hospital, Apartments,  Issuing Quality Notices in case of any violation of Quality parameter and ensuring its
Villas & Shell Structure corrective action as per standard engineering practices.
 Identify quality problems, initiates documented action and verify implementation of
solutions.
Costing & Estimation
 Issuing Minutes of meeting held with Contractors.
 Verifying execution of works as per IFC Drawings & specifications.
Tendering
 Ensuring implementation of Checklist/protocols by the contractors for all the major
activities carried out at site.
 Ensuring Health & Safety protocols to be implemented at site.

Construction of 160mmcfd Naimat Basal Phase IV Gas Processing Plant (QA/QC


Professional Skills: - Engineer)
Project Management
 Construction of Amine Tank, Fire Water Tank, Demin Tank & Raw Water tank.
 Construction of Civil foundation for various mechanical equipment like Vessel,
Quality management
Skids, pipe support, pipe racks, E-House, Vents etc.
System  Piling & Construction of Road, Evaporation Pond, etc.
 Verifying execution of works as per IFC Drawings & C.P.E specifications.
Lab Testing  Making Inspection & Test Plan for the works involved in construction of plant.
 Ensuring implementation of Checklist/protocols by the contractors for all the major
Soil Testing activities carried out at site.
 Verifying Contractor’s Invoices/Project Bills.
 Issuing Revised IFC Drawings to contractors.
Equipment Management  Verifying Release Notes of work Sites from various contractors.
 Keeping a follow-up of Project deadlines & schedule for civil works.
Bar Bending Schedule &  Ensuring Health & Safety protocols to be implemented at site.
BOQs.  Daily progress reporting of the works carried out at site.
 Making Project Dossier for all the Equipment Foundations.
Material & Manpower
Management. Construction of Apartments at Bahria Town Karachi (Costing Engineer)

Quality Assurance/  Making Bar Bending Schedule & its implementation on site.
Quality Control  Verification of quantities & sub contractor’s bills.
 Resolving issues & problems regarding steel drawings.
 Supervise & control the quality of Structures.
 Control the wastage of material at site.
 Making Quantity & Rates comparative for different project items.
 Making of reconciliation statement for steel.
Construction of RCC Shell Structure & Boundary Wall “Artistic Milliners” (Site Engineer)
Personnel Skills: -
 Supervision, monitoring & execution of all construction site activities.
Ability to understand &  Making Bar Bending Schedule & its implementation on site.
present others points of  Inspection & checking reinforcement steel for all concrete works.
view.  Verification of quantities & sub contractor’s bills.
 Conducting on site testing (Concrete Cylinders, FDT, and Sieve Analysis).
Good communication  Making test reports conducted on site.
skills.  Making of submittals and maintaining their log.
 Site execution as per specification, approved drawings & safety.
A Hard working &  Making of request for inspection & request for information.
devoted person.  Filling of Pour Card.
 Supervision of Temperature and slump tests of Concrete on site.
Can handle stress  Making Daily Progress Reports.

Always Proactive Construction of Rig Location & Access Road “Bhit & Bhadara ” (Site Engineer)

Safety conscious  Supervision of all construction works.


 Completing the project with timely & safely.
Doer & Conformist  Co-ordination and management of labor, material, equipment, schedule, quality
assurance and control, contract & safety requirements.
Creative and innovative  Forecasting and planning the resources needed to execute the project.
 Planning and co-ordination of activities designated to ensure that goals and objects are
accomplished within prescribed period, budget parameters and adherence to company
Ability to work standards.
independently and in team  Costing & estimation.
 Supervise & control the quality of construction.
 Supervision and managing of resource pool (man, machine and material).
 Reporting overall status to project manager.
 To execute the construction work like formwork & rebar according to drawing &
specification.

Projects:

 K-27 Well Site & Access Road (Kadanwari Gas Field)


 Bhit-13 Well Site & Access Road (Sehwan Sharif)
 Badhra North-1 Well Site & Access Road (Sehwan Sharif)
 Bhit-15 Well Site & Access Road (Sehwan Sharif)
 Repairing of K-1 Well Site & Cutting Pits (Kadanwari Gas Field)

You might also like