Professional Documents
Culture Documents
B.E. Mechanical
P r o f i l e s ummar y
C ar eer T i mel i n e
MOBILE NUMBER
Job Profile
+971523079980
+91-9008184030 Responsible for the complete MEP works for the project.
Reviewing the project planning, Monthly progressive Bills, Material submittal logs,
Permanent Address Drawing logs, Long lead items logs, method statement logs and authority logs.
Door No. 192, 4th Cross ‘C’ Evaluating and certifying sub-contractor’s invoices of work done st site as per the
Layout, Bannimantap, released work order.
Mysore-570015
Reviewing the submitted shop drawings, material submittals method statements as per
Karnataka, India 691506
the tender documents and architectural requirements.
Supervising the MEP works at site as per the approved method statement, approved
E-Mail shop/co-ordination drawings and detail design drawing, and ensure the work
executions are as per the authority requirement.
ksyedu86@gmail.com Supervising MEP activities to ensure that engineering procurement phase shall meet
the project requirements.
Coordinating with architect and contractors team to resolve the site coordination issues.
Languages Known
Coordinating with sub-contractors and specialist suppliers/contractors for reviewing
English, Hindi, Kannada, their technical submittals (Specialist contractors such as Firefighting, LPG and Fire
Kiswahili and Arabic protection and fire sealant)
Lead the MEP site progress meetings, monitoring the site progress with respect to the
approved execution plan and supervise the tam to meet the targets.
Advising the client team on value engineering for MEP services.
Evaluating the additional client requirements with the contract documents for the
variation.
Preparing the equipment power load summary for the MEP equipment’s as required by
the electrical team.
Supervising the 3rd party Testing and commissioning works as per the approved
method statement.
CORE COMPETENCIES
Review the MEP As-built drawings as per the site condition.
Coordination with Purchase department for timely delivery of the materials.
Strong team management Ensured project completion within budget and on schedule.
Skills
2) M/s. Nu ran Developers Pvt. Ltd – Dar Es Salaam, Tanzania.
Project Management M/s. Pro leed Engineering Consultan ts.
Project Planning Sr. Mechanical Engineer and Ins pector (19-06-2015 to 26-04-2019)
Material Handling
Major Projects Involved in Tanzania
Design and Drafting
HVAC Project Handling Pro posed B+G+6+Penthouse +G YM, Residential Apartm ent Building, Masaki ,
Dar E s Sal aam , T anzani a.
Fire Fighting Project Pro posed B+G+8 Orchi d Ho tel Projec t, Masaki , D ar E s Salaam, T anzania.
Handling AGA KHAN Conventional Hall, Upanga, Dar Es Salaam , T anzani a.
H.H. Sheikh Ammar Bin Hummaid, Residential Private Palace, Ajman UAE
(Chilled water system- Carrier Air Cooled Chiller)
B+G+35+HP, Residential Building, Sports city, Dubai, UAE. (DX Ducted Split
units)
B+G+10 Residential Building, Umm Al Quwain, UAE (DX Ducted Split units)
B+G+6P+20TYP, Al Sawaan Tower, Ajman, UAE
(Chilled water system- Carrier Air Cooled Chillers).
SKILLS G+1 Typical Villa- 35No’s, UAE Housing Program, Umm Al Quwain, UAE.
Al Turkish Restaurant, Chilled Water System, Business Bay, Dubai, UAE.
Strong decision making
skills and the ability to Job Profile
prioritize and plan Raise MR and follow up to get LPO and later materials at site as per the
effectively. project requirements, specifications and as per the material delivery
Strong problem solving schedule.
methodology and Reviewing and submitting the material submittals as per the project
specifications and scope of work BOQ and taking consultants approval.
implementation
Estimate quantities from approved shop dra wings as per approved material
capabilities and BOQ.
A Good Team Leader To execute the site works related to HVAC, Water supply and Drainage and
Optimistic character assure work is carried out as per approved shop drawings and coordinating
with other services.
Tenacity and Focus Preparation of Tag lists for G.I and P.I ducting as per the approved shop
Adaptability to Change drawings.
Raising the work inspection request (WIR) to the consultants and getting
approval for the same.
Monitoring daily allocation and daily progress report and weekly report as per
the budget and budgeted productivity of manpo wer.
Coordinating with the civil team and other subcontractors to execute the
works at site without any hurdles.
Interact and communicate effectively with sub-contractors, architects and
consultants.
Fresh air and extract air calculation and balancing of p ositive and negative
pressure based on the requirements.
Selection of AHU, FCU, Chillers, Extract fans, DX units.
Preparation of monthly progress bills and follow up for certification.
To ensure the health and safety measures are adopted and followed to fu ll
extend.
Key Skills
Have good interpersonal skills, with an eagerness to learn and perseverance towards
attaining goals. Able to take project from conceptualization to implementation.
Educational Qualification
Packages:
At ease with common applications of MS Office Work Suite:
MS Office
MS PROJECT BASICS
AUTOCAD
Declaration
I hereby declare the above information is true and correct to the best of knowledge.