You are on page 1of 10

ARJUN KANNAMBATH

Contact No: 00 91 85477 69130


arjun.kannambath@gmail.com
---------------------------------------------------------------------------------------------------------------------------------

Dear Sirs,

Sub: Application for the Post of Electrical Engineer

It gives me pleasure to introduce myself as a Professional engineer from one of


the leading colleges in Chennai , having worked for 16 years as an Electrical
engineer.

With this technical backdrop I would love to work in a leading organisation like yours.
I am sure our meeting would enable you know how valuable I could be to your
organization. Kindly find my CV attached for your perusal.

I assure you that upon appointment in your organization I shall do my very best
to satisfy my superiors and management.

Thanking you & looking forward to our meeting soon,

Yours faithfully,
Sd/-

Contd. On Page 2
CURRICULUM VITAE
Address for communication : 7A,Bridgetown Apartments,Kannur road,
Calicut,Kerala-673011
Phone No: 91-8547769130

Qualification : Bachelor of Engineering (Electrical & Electronics Engg).


S.R.M.Engineering College, Chennai.
(Affliated to University of Madras)
Year of Completion – 2001

Age & Date of Birth : 39 Yrs, 02.04.1980

Percentage Secured : 63 % (2001 passout)

Passport Details : L7261401.A valid passport valid till 19 TH Feb,2024

Driving License : A Valid Saudi Arabian License valid till 2019 &

A Valid Qatari License valid till 2015

Work Experience:

1) Company: Saudi Bin Ladin-PBAD


Period : From January 2016 to January 2018
Designation :Cost Engineer(MEP).
Project : King Faisal Speciality Hospital,Jeddah
Client : King Faisal Speciality Hospital Foundation,Jeddah
Consultant :Saudi Diyar Consultants.
Main Contractor : Saudi Bin Ladin-PBAD

Main Duties include

Developed, updated, and monitored individual project WBS, schedules and budgets in conjunction with
program team members and consultants

 Ensure project and program compliance with t Authority regulations

 Mechanical and Electrical drawing incorporation into program allocation matrixes

 Identified and reported cost overruns/under-spends so that project management can take
appropriate actions

 Change order maintenance, cash flow trending, report composition and basic heavy construction
cost estimating

 Perform Construction drawing reviews in order to perform detailed cost allocations among various
projects as work was performed under one project for another
 Develop a new project cost report to show actual costs, total commitments and budget for each
project. Reducing the time to update all project files from one week to a couple hours.

 Provide accurate project costs and forecasts based on budget.

 Hold monthly project reviews with project managers to review cost and schedule for every project.
 Prepared and conducted weekly meetings to review projects with Design Engineers, Team
Leaders, and Managers.
 Successfully provide multiple detailed proposal/estimates that became viable and profitable
projects.
 Estimated, priced, and submitted owner contract change orders, vendor backcharges, and rework

2) Company: International Electric Co.


Period : From June 2013 to June 2015
Designation : Electrical Engineer.
Project :
Husn Al Shumookh 14A,B & Villa Complex at Al Khoud Project
Nizwa,
Oman.

Client : Royal Court Affairs.


Consultants :Royal Court Affairs .
Main Contactors : Al Bahja Contracting Co.

Main Duties include

 Guide & oversee Design issues – customer interaction, customer brief, development of the design
brief, design pre requisites, govt regulations conceptual design, design development, construction
design, development of shop drawings, drawing submittals, site work coordination for the entire
duration of the project.

 Pro actively value the design to ensure cost-effectiveness

 To support Project Manager in smooth progress and successful completion of projects.

 Process control as per documented procedures

 Establish and maintain work environment needed to achieve service conformity maintaining
inspection & test status of at all stages

 Over all in charge of projects/ services responsibility as assigned

 Administration and management of all project related staff

 Identify sub-contractors and evaluate them for pre-qualification

 To identify all the requirements to complete the project including manpower/ materials/ equipment,
tools etc

 Monitor that all materials used, work performed are as per the defined scope and specifications

 Handle planning, design review, engineering, coordination etc. of the projects

 To report to the Project Manager regarding the progress of the work and also if deviation occurred
 Responsible for handling customer supplied products

 Responsible for achieving the objectives in their area (Time, Cost & Quality)

 Cooperate with Quantity Surveyor for effective valuation of the projects

 Responsible for submitting daily, weekly and monthly report to Project Manager

 To implement safety plans and ensure safe working at Project Site

 For all site purchases he should initiate a material requisition note

 Preparation of procurement planning

 Identification of Non conformance

 Implementing Quality Management System in their area

 Responsible for achieving the objectives in their area

 Maintaining Records

 Maintain log of design impacts receive with date & do impact analysis.

 Prepared Material Submittals for approval of client or consultant.

 Prepare Manpower requirements for different construction projects.

 Prepare Method Statements for all the electrical Installation works.

 Schedule of material deliveries at site and manpower requirements for each work discipline.

 Enforce Health, Safety and Environmental policies of the company in construction projects.

 Attended site meetings between contractor, consultant and client.

 Compile all documents related to project construction.

 To supervise the execution of the following electrical works in construction project sites:

1. Conduiting using PVC and EMT for power, light, air-conditioning, security, fire alarms, CCTV,
satellite, data and telephone.

2. Cabling and termination using XLPE/PVC cables for panel boards and distribution boards .

3. Wiring and termination of lighting and power circuits using insulated wires.

4. Grounding installation using bare soft drawn copper cables, earth rods, ground plates, ground
test pits .

5. Lightning protection system installation with air rods, flat copper plates, soft drawn bare copper
conductors, and other accessories to complete the job.
6. Installation & testing of motor and control circuits for electric water distribution pumps, booster
pumps, fire pumps, sump pumps

7. Installation of power supply for elevators.

8. Installation, testing and commisioning of Main distribution,Sub main distribution panelboards.

9. Cabling and termination of devices and panelboards for fire alarm systems including smoke
detectors, heat detectors, fire alarm bells / sirens.

10.Installation of raceways for LV & low current systems.

11. Responsible for conduction surveys and generating reports that helps the sales Team.
   
12.   Responsible for planning the cabling & Installation of Access Control Systems including
Proximity Card, Magnetic Swap Cards, Bio-metric with time and Attendance system,CCTV System,
public address systems, voice evacuation and intruder alarm systems and SMATV system as per
the requirement of the customer .

13..Commissioning and testing of above system

14. Start-up and commissioning of all electrical equipment in a modern building.

3) Company: Mechel Engineering W.L.L...


Period : From October 2010 to March 2013
Designation : Electrical Engineer.
Project :
Barwa City Project- Phase 1,
Amenities Zone,
Doha, Qatar.

Client : Barwa .
Design Consultants : MZ & Partners .
Main Contactors :Shapoorji Pallonji W.L.L..

Main Duties include

 Guide & oversee Design issues – customer interaction, customer brief, development of the design
brief, design pre requisites, govt regulations conceptual design, design development, construction
design, development of shop drawings, drawing submittals, site work coordination for the entire
duration of the project.

 Pro actively value the design to ensure cost-effectiveness

 To support Project Manager in smooth progress and successful completion of projects.

 Process control as per documented procedures

 Establish and maintain work environment needed to achieve service conformity maintaining
inspection & test status of at all stages

 Over all in charge of projects/ services responsibility as assigned

 Administration and management of all project related staff


 Identify sub-contractors and evaluate them for pre-qualification

 To identify all the requirements to complete the project including manpower/ materials/ equipment,
tools etc

 Monitor that all materials used, work performed are as per the defined scope and specifications

 Handle planning, design review, engineering, coordination etc. of the projects

 To report to the Project Manager regarding the progress of the work and also if deviation occurred

 Responsible for handling customer supplied products

 Responsible for achieving the objectives in their area (Time, Cost & Quality)

 Cooperate with Quantity Surveyor for effective valuation of the projects

 Responsible for submitting daily, weekly and monthly report to Project Manager

 To implement safety plans and ensure safe working at Project Site

 For all site purchases he should initiate a material requisition note

 Preparation of procurement planning

 Identification of Non conformance

 Implementing Quality Management System in their area

 Responsible for achieving the objectives in their area

 Maintaining Records

 Maintain log of design inpacts receive with date & do impact analysis.

 Prepared Material Submittals for approval of client or consultant.

 Prepare Manpower requirements for different construction projects.

 Prepare Method Statements for all the electrical Installation works.

 Schedule of material deliveries at site and manpower requirements for each work discipline.

 Enforce Health, Safety and Environmental policies of the company in construction projects.

 Attended site meetings between contractor, consultant and client.

 Compile all documents related to project construction.

 To supervise the execution of the following electrical works in construction project sites:

1. Conduiting using PVC and EMT for power, light, air-conditioning, security, fire alarms, CCTV,
satellite, data and telephone.

2. Cabling and termination using XLPE/PVC cables for panel boards and distribution boards .
3. Wiring and termination of lighting and power circuits using insulated wires.

4. Grounding installation using bare soft drawn copper cables, earth rods, ground plates, ground
test pits .

5. Lightning protection system installation with air rods, flat copper plates, soft drawn bare copper
conductors, and other accessories to complete the job.

6. Installation & testing of motor and control circuits for electric water distribution pumps, booster
pumps, fire pumps, sump pumps

7. Installation of power supply for elevators.

8. Installation, testing and commisioning of Main distribution,Sub main distribution panelboards.

9. Cabling and termination of devices and panelboards for fire alarm systems including smoke
detectors, heat detectors, fire alarm bells / sirens.

10.Installation of raceways for LV & low current systems.

11. Responsible for conduction surveys and generating reports that helps the sales Team.
   
12.   Responsible for planning the cabling & Installation of Access Control Systems including
Proximity Card, Magnetic Swap Cards, Bio-metric with time and Attendance system,CCTV System,
public address systems, voice evacuation and intruder alarm systems and SMATV system as per
the requirement of the customer .

13..Commissioning and testing of above system

14. Start-up and commissioning of all electrical equipment in a modern building.

4 ) Company: M/s.Ali Zaid Al Quraishi Electrical Services


Period : From March 2009 till August 2010.
Designation : Electrical Engineer for CUTLER HAMMER.

Required to visit and co-ordinate with partners and customers. Follow-up projects until project
award.

 Responsible for Inspection, pre-commissioning and commissioning of Switchboards, motor and


associated protection devices. Initial energisation, function testing and proving of equipment to
Client during hand over stage.

 Completion of project test and hand over document.

 Authorised Electrical Person for electrical isolations on service equipment, initial energisation of
site equipment and energisations of panels to allow electrical function testing and tests on
equipment.

 Generate One Line Diagram, Layouts, Schedules, Routings, Distribution Schemes, Motor Control
Schemes, Inter-connection Diagrams for Power, Lighting and Grounding system.

 Prepare Method Statements for the Installation of all electrical panels.


 To support project offer compilation, timely bid co-ordination and relevant client
coordination,technical enquiry evaluation through preparation of preliminary offer data
sheets and technical deviations to specifications.

 Assisting project execution of awarded projects.

5) Company: Euro Emirates L.L.C..


Period : From April 2008 to October 2008.
Designation : Electrical Engineer.
Project :
F1 Race Track,
YAS Island,
Abu Dhabi, U.A.E.

Client : PKE Gulf W.L.L.


Consultants :Tilke Gmbh. Co.
Main Contactors :Cebarco-WCT W.L.L. Co.
Job Profile : Electrical Engineer for PKE Gulf W.L.L.

Main Duties include

 Installation, Testing & Commissioning of L.V Switch gear.

 Hi Pot testing and injection of switchboard and field equipment protection devices.

 Responsible for Inspection, pre-commissioning and commissioning of Switchboards, motor and


associated protection devices. Initial energisation, function testing and proving of equipment to
Client during hand over stage.

 Completion of project testing and hand over document.

 Authorised Electrical Person for electrical isolations on service equipment, initial energisation of site
equipment and energisations of panels to allow electrical function testing and tests on equipment.

 Responsible for completion of Commissioning documentation and procedures.

 Testing of Cables ,CT's & relays.

 Review electromechanical system designs, specifications & implementation plan.

 Review of design to ensure conformance to the local(ADWEA guidelines) and the international
guidelines(British Standards) as specified in the contract.

 Generate One Line Diagram, Layouts, Schedules, Routings, Distribution Schemes, Motor Control
Schemes, Inter-connection Diagrams for Power, Lighting and Grounding system.

 Prepare Method Statements for the Installation of all electrical panels.

6) Company: Euro Emirates L.L.C..


Period : From April 2006 to January 2008.
Designation : Electrical Engineer.
Project :
Baggage Handling System for Emirates Head Quarters, Dubai
Client: Emirates Airlines
Consultants: ADPi, Archon, Ian Banham & Associates
Main Contactors: ACC, Alstef Automation SA, DDStudio

Job Profile: Electrical Engineer for Alstef Automation SA

Main Duties include

  HiPot
Ins testing and injection of switchboard and field equipment protection devices.
tallation &

Commissio Responsible for Inspection, pre~commissioning and commissioning of Switchboards, Motor
Control Centres and associated protection devices. Initial energisation, function testing and
ning of L.V
Switch proving of equipment to Client during hand over stage.
gears, Heat
 Erection and Commissioning of the LV Panels, Motors, & VFD panels.
run testing
and

commission Commissioning of 1.5 KW Danfoss make AC drives for conveyor application.
ing of
Motors,
 and
Testing of CT's,cables & relays.
Control
panels.
 Functional testing of electrical systems up to low voltage .

 Routine Testing and Maintenance of the Protective relays.

  Maintenance of the Battery Chargers and Battery Bank.

 Maintenance and supervising of control circuits and starters of motors in conveyors.

 Completion of project test and hand over document.

 Authorised Electrical Person for electrical isolations on service equipment, initial energisation of site
equipment and energisations of panels to allow electrical function testing and tests on moving
equipment.

 Responsible for completion of commissioning documentation and procedures.

 Prepare Method Statements for the Installation of all electrical panels.

 Design of this BHS system according to the client requirement as well as the availability of
equipments according to the standards of Alstef .

7) Company: IGenT Middle East, Dubai.

Period : From December 2005 to April 2006 .

Designation : Techno-Commercial Engineer.

M/s.IGenT Middle East are the authorised distributors of GE brand of UPS Systems in U.A.E.

Job Profile:

Required to visit and co-ordinate with local partners and customers. Follow-up projects until project
award.

 To assist in collecting information of projects for the sales to grow in local market.
 To support the our team in developing local project business, to be proactive in searching
new clients .

 To support project offer compilation, timely bid co-ordination and relevant client
coordination,technical enquiry evaluation through preparation of preliminary offer data
sheets, battery calculations and technical deviations to specifications.

 Assisting project execution of awarded projects.

 Assist in developing and sustaining the business for GE UPS .

 To head a group of Sales engineers and manage their performance as well.

8) Company: M/s. Pioneer Electricals.


Period : From April 2001 to November 2005.
Designation : Electrical Engineer.

Project :Jetty Substation


BPCL, Mahoul(Mumbai)

Job Profile: Electrical Engineer

Main Duties include

 Plan, schedule and provide the work direction to the subcontractors.

 Preparing the drawings, material submittal and documents for submittal to the consultant.

 Checking other contractor’s (e.g. CIVIL etc) documents and drawings for interferences
and preparing comments for them.

 Checking sub contractor’s documents and drawings and interact with them.

 Check the progress of the work on site.

 Supervise of all the electrical works in the Jetty area .

 Inspecting the site for co ordination and interferences.

You might also like